U.C. Pianificazione Territoriale e P.T.R.C.

12
1 U.C. Pianificazione Territoriale e P.T.R.C. ALPCITY” ALPCITY” VENETO CASE-PROJECTS VENETO CASE-PROJECTS Renovation and optimum use of Renovation and optimum use of abandoned rural and productive abandoned rural and productive buildings buildings 2 0 0 5 Interreg IIIB “Alpine Space” – ALPCITY PROJECT Giunta Regionale Assessorato alle politiche per il territorio GRAINAU MEETING 9-10 MAY 2005 GRAINAU MEETING 9-10 MAY 2005 Arch. Tiziana Quaglia Arch. Tiziana Quaglia

description

2 0 0 5. Giunta Regionale Assessorato alle politiche per il territorio. “ALPCITY” VENETO CASE-PROJECTS Renovation and optimum use of abandoned rural and productive buildings. U.C. Pianificazione Territoriale e P.T.R.C. GRAINAU MEETING 9-10 MAY 2005 Arch. Tiziana Quaglia. - PowerPoint PPT Presentation

Transcript of U.C. Pianificazione Territoriale e P.T.R.C.

Page 1: U.C. Pianificazione  Territoriale e P.T.R.C.

1

U

.C.

Pia

nif

icaz

ion

e T

erri

tori

ale

e P

.T.R

.C. ““ALPCITY”ALPCITY”

VENETO CASE-PROJECTSVENETO CASE-PROJECTS

Renovation and optimum use of abandoned Renovation and optimum use of abandoned rural and productive buildingsrural and productive buildings

2 0

0 5

Interreg IIIB “Alpine Space” – ALPCITY PROJECT

Giunta Regionale

Assessorato alle politiche per il territorio

GRAINAU MEETING 9-10 MAY 2005GRAINAU MEETING 9-10 MAY 2005Arch. Tiziana QuagliaArch. Tiziana Quaglia

Page 2: U.C. Pianificazione  Territoriale e P.T.R.C.

2

Mountain Community “Comelico Sappada”

THE TWO CASE-PROJECTS OF VENETO REGION ARE SITUATED IN BELLUNO PROVINCE

Mountain Community “Agordina”

Page 3: U.C. Pianificazione  Territoriale e P.T.R.C.

3

SOME RURAL BUILDINGS OF THE TERRITORY CONCERNED

Mountain Community “Agordina”

Mountain Community “Comelico Sappada”

Page 4: U.C. Pianificazione  Territoriale e P.T.R.C.

4

VENETO CASE-PROJECTS

The activities carried out starting from the 1The activities carried out starting from the 1stst of April 2005 of April 2005 are:are:

• Drafting of a detailed Drafting of a detailed work planwork plan on the implementation of on the implementation of the two case-projectsthe two case-projects

• a coordination meetinga coordination meeting with the two Mountain with the two Mountain Communities involved (“Agordina” and “Comelico Communities involved (“Agordina” and “Comelico Sappada”)Sappada”)

• Collection of documentsCollection of documents necessary to start up with the necessary to start up with the cases’ implementationcases’ implementation

““RENOVATION AND OPTIMUM USE OF ABANDONED RURAL RENOVATION AND OPTIMUM USE OF ABANDONED RURAL AND PRODUCTIVE BUILDINGSAND PRODUCTIVE BUILDINGS””

will be implemented by a group of external experts

Page 5: U.C. Pianificazione  Territoriale e P.T.R.C.

5

CASE-PROJECTS IMPLEMENTATION

PHASE 1:PHASE 1: preliminary analysis

PHASE 2:PHASE 2: local community involvement

PHASE 3:PHASE 3: collection and assessment of local needs

PHASE 4:PHASE 4: data collection and identification of rural

buildings

PHASE 5:PHASE 5: definition of renovation and valorization

criteria of abandoned buildings

PHASE 6:PHASE 6: feasibility projects

PHASE 7:PHASE 7: information and publicity

Page 6: U.C. Pianificazione  Territoriale e P.T.R.C.

6

PHASE 1: preliminary analysis

The Analysis will concern historical and cultural heritages of the small alpine towns and underline architectural and urban characteristics of rural buildings.

• historical and cultural heritageshistorical and cultural heritages of the territory concerned;of the territory concerned;

• social-economic resources social-economic resources of the two Mountain of the two Mountain

Communities;Communities;

• traditional jobstraditional jobs related to rural buildings related to rural buildings used for production used for production

purposes;purposes;

• local development potentialitieslocal development potentialities related to the renovation related to the renovation

and use of rural buildings;and use of rural buildings;

• legislation issueslegislation issues concerning the renovation of rural buildingsconcerning the renovation of rural buildings

The topics considered in the analysis:The topics considered in the analysis:

Page 7: U.C. Pianificazione  Territoriale e P.T.R.C.

7

PHASE 2: local community involvement

PHASE 3: collection and assessment of local requests

the local communities are invited to workshops for express the local communities are invited to workshops for express their needs and indicate the buildings to be restoretheir needs and indicate the buildings to be restore

a set of questions are prepared to collect the local requests a set of questions are prepared to collect the local requests and needs concerning the restoration of rural buildingsand needs concerning the restoration of rural buildings

the relevant requests and needs are considered in the the relevant requests and needs are considered in the implementation of the case-projectsimplementation of the case-projects

Activities of the PhasesActivities of the Phases::

2 initial workshops2 initial workshops

2 mid-term workshops 2 mid-term workshops

1 final regional conference1 final regional conference

The implementation of the two case-projects will be based on a bottom-up approachbottom-up approach:

Page 8: U.C. Pianificazione  Territoriale e P.T.R.C.

8

PHASE 4: data collection and identification of rural buildings

In this phase the experts will provide to collect data concerned the main characteristic of the rural buildings and to identify those that have an evident historical value.

• Identification of historical rural buildingsIdentification of historical rural buildings registered by local registered by local

municipalities in cataloguesmunicipalities in catalogues

• Implementation of a databaseImplementation of a database and data storage and data storage

• Identification of the architectural featuresIdentification of the architectural features of the buildings of the buildings

registeredregistered

The topics of this phase are:The topics of this phase are:

Page 9: U.C. Pianificazione  Territoriale e P.T.R.C.

9

PHASE 5: definition of renovation and valorization criteria of abandoned buildings

The aim of this phase is to identify new possible uses of the rural buildings and problems linked to their re-use.

• Analysis of legislation Analysis of legislation

• Identification of re-use criteria and techniques Identification of re-use criteria and techniques

• Working proposals to preserve peculiar features of alpine Working proposals to preserve peculiar features of alpine

landscapeslandscapes

Outputs:Outputs:

““Guidelines for renovation and optimum use of rural abandoned buildings”Guidelines for renovation and optimum use of rural abandoned buildings”

““Handbook of new building uses, working tools and best practices”Handbook of new building uses, working tools and best practices”

The topics of this phase are:The topics of this phase are:

Page 10: U.C. Pianificazione  Territoriale e P.T.R.C.

10

PHASE 6: feasibility projects

The criteria defined in the previous phases will be applied to specific buildings as explanatory examples.

Structure of the projects:Structure of the projects:

• technical reportstechnical reports

• planimetries and mapsplanimetries and maps

• preliminary estimation preliminary estimation

cost and financial plancost and financial plan

• specificationsspecifications

Page 11: U.C. Pianificazione  Territoriale e P.T.R.C.

11

PHASE 7: information and publicity

•Invitation leafletsInvitation leaflets

•Meeting and conference minutes Meeting and conference minutes

•Photos and cartographies of buildingsPhotos and cartographies of buildings

•Brochures Brochures

The aim of this phase is to disseminate the results of Veneto case-projects. The experts will draw up the “communication plan” which will provide the following outputs:

Some of these outputs will be handed out during the workshops and Some of these outputs will be handed out during the workshops and the final conference, some others will be published on the project web the final conference, some others will be published on the project web sitesite

Page 12: U.C. Pianificazione  Territoriale e P.T.R.C.

12

CASE-PROJECTS GANNT

Month 1 2 3 4 5 6 7 8 9 10 11 12

Activity                        

Preliminary analysis                        

Local community involvement                        

Collection and assessment of local requests                        

Data collection and identification of rural buildings                        

Definition of renovation and valorization criteria                        

Feasibility projects                        

Information and publicity                        

The implementation of the foreseen activities have begun on the 1st of April 2005 and will probably last until the 31st of March 2006, as described in the following chart: