Pianificazione Progetti 4
description
Transcript of Pianificazione Progetti 4
PIANIFICAZIONE PROGETTIPROJECT PLANNING
Claudio G. Casati
PROJECT PLANNING
Parte 4 di 4
Logica di progetto, Diagramma di Gantt, Project Baseline
Gennaio 2011
Metodologie
� PMI PMBOK - Project Management Body of Knowledge
� Internationally recognised standard
� Application of knowledge, skills, tools & techniques, processes
� IPMA Competence Baseline – ICB� IPMA Competence Baseline – ICB
� the world’s leading certification program
� a major role in the promotion and progress of project management
� PRINCE 2 - PRoject IN a Controlled
Environment 2nd edition (UK Gov.)• International best practice in project management
• Process based project management methodology
2
Contenuti
� Network - Logica di progetto
� Diagramma di Gantt
� Project Baseline� Project Baseline
Metodologia di riferimento PMI PMBOK Guide
3
The Essence of PMBOK® Guide
5 Project Management Process Groups
Initiating Process Group
Planning Process Group
ClosingProcess Group
Monitoring and Controlling
Process Group
Executing Process Group
4
Project IntegrationManagement
Project ScopeManagement
Project QualityManagement
Project CostManagement
Project TimeManagement
9 Knowledge Areas Processes
Project ProcurementManagement
Project Human Resource
Management
Project Communications
Management
Project RiskManagement
Citazione
Vengono utilizzati materiali tratti dai corsi:
MIT OpenCourseWare | Sloan School of Management |
ESD.36J/1.432J System & Project Management, Fall 2003 |
1.040/1.401J/ESD.018J Project Management, Spring 2004 |
Prof. Prof. Olivier de Weck, Prof. Steven Eppinger, Prof. James Lyneis, Prof. Prof. Olivier de Weck, Prof. Steven Eppinger, Prof. James Lyneis,
course materials for ESD.36J/1.432J System & Project Management,
Fall 2003, MIT OpenCourseWare (http://ocw.mit.edu), Massachusetts
Institute of Technology. Downloaded on 29 October 2005.
Dr. Nathaniel Osgood, course materials for 1.040/1.401J/ESD.018J
Project Management, Spring 2004, MIT OpenCourseWare
(http://ocw.mit.edu), Massachusetts Institute of Technology.
Downloaded on 29 October 2005.
5
Network – Logica di progetto
Pianificazione Progetto
6
Pianificazione Progetto
1.1.1 1.1.2 1.1.3
1.1
1.2.1 1.2.2 1.2.3 1.2.4
1.2
1.3.1 1.3.2
1.3
1
4 : Network – Logica di progetto
1 : WBS - Cosa si deve fare ?
Inviti Scelta sala Scelta menù Personale
Organizzazione
Cibi Bevande Vettovaglie Fiori
Acquisti
Sala Cucina Cottura Servizio
Preparazione
WBS - Cena di gala
SegreteriaSig.a Salvi
Ufficio P.R.D.ssa Paoli
Squadra Cucina1° Chef
Resp. ProgettoDott. Galante
2 : OBS Struttura di Progetto
3 : RAM – Assegnazione responsabilità
77
6 : Piano delle risorse
BASELINE
7 : Piano dei costi
Attività 1
Attività 2
Attività 3
Attività 4
Attività 5
5 : Diagramma di Gantt
Impresa di Trasporto
Squadra Camerieri
Ufficio ServiziSig. Ulivi
Project Network
� A project network is a graph (flow chart) depicting
the sequence in which a project's terminal elements
are to be completed by showing terminal elements
and their Product Breakdown Structure show the
"part-whole" relations. In contrast, the Project"part-whole" relations. In contrast, the Project
Network shows the "before-after" relations.
� The most popular form of project network is activity
on node, the other one is activity on arrow.
� The condition for a valid project network is that it
doesn't contain any circular references.
8
Predecessor Table & DSM
� The activity network diagram technique emerged as the Program Evaluation Research Technique (PERT) and as the Critical Path Method (CPM) in the 1950s. There are several ways to represent the output of the PERT/CPM process.
� Project dependencies can also be depicted by a � Project dependencies can also be depicted by a Predecessor Table.
� An alternative way of showing and analyzing the sequence of project work is DSM * (Design StructureMatrix).
* MIT OCW: ESD.36J / 1.432J System and Project Management
9
Logic network and Planning
� The logic network, also refereed to as precedencediagraming, is the basic management tool forcontrolling, monitoring, and distributing all resourcesthat are directly related to time.
� The logic network at the planning stage is a pure dependency diagram. All activities are drawn in the order in which they must be accomplished withoutorder in which they must be accomplished withoutregard to particular construction preference.
� One of the major uses of the logic network duringthe planning stage is to indicate all activities that mustbe accomplished to complete a particular project.
� As a general rule, an activity should be created for any function that consumes or uses direct labor resources.
10
Costruzione Box:
Network Diagram
Scelta modello (1g)
Acquisto Costruzione Controllo
11
Acquisto Materiali (1g)
Costruzione Base (3g)
Controllo Gettata (2g)
CollaudoBox (1g)
Preparazione Legno (2g)
Assemblaggio(3g)
Costruzione Box:
Predecessor Table
# AttivitàDurata
in giorniPredecessore
1 Inizio Progetto Box 0
2 Scelta modello Box 1 1
12
3 Acquisto Materiali 1 2
4 Costruzione Base 3 3
5 Controllo Gettata 2 4
6 Preparazione Legno 2 3
7 Assemblaggio 3 5, 6
8 Collaudo Box 1 7
9 Fine Progetto Box 0 8
Diagramma di Gantt
Pianificazione Progetto
13
Pianificazione Progetto
1.1.1 1.1.2 1.1.3
1.1
1.2.1 1.2.2 1.2.3 1.2.4
1.2
1.3.1 1.3.2
1.3
1
4 : Network – Logica di progetto
1 : WBS - Cosa si deve fare ?
Inviti Scelta sala Scelta menù Personale
Organizzazione
Cibi Bevande Vettovaglie Fiori
Acquisti
Sala Cucina Cottura Servizio
Preparazione
WBS - Cena di gala
SegreteriaSig.a Salvi
Ufficio P.R.D.ssa Paoli
Squadra Cucina1° Chef
Resp. ProgettoDott. Galante
2 : OBS Struttura di Progetto
3 : RAM – Assegnazione responsabilità
1414
6 : Piano delle risorse
BASELINE
7 : Piano dei costi
Attività 1
Attività 2
Attività 3
Attività 4
Attività 5
5 : Diagramma di Gantt
Impresa di Trasporto
Squadra Camerieri
Ufficio ServiziSig. Ulivi
Diagramma di Gantt
Attività Gen Feb Mar Apr Mag Giu Lug AgoInizio Progetto Attività 1
Periodo Attuale
15
Attività 1Attività 2Attività 3Attività 4P&C ProgettoFine Progetto
Diagramma di Gantt
16
Diagramma di GanttA popular bar chart that aims to show the timing of tasks or
activities as they occur across time. Although the Gantt chart didnot initially show the relation-ships between activities, thishas become more common in current use as both timing and interdependencies betweentasks can be identified.
17
tasks can be identified.
Pianificazione Pietre Miliari
InizioProgetto
Pietre miliari
Milestone
A key event during the
18
ObiettivoProgetto
A key event during the
life of a project, usually
completing project
deliverables or other
noteworthy achievement.
Milestones Chart
19
Relazione tra attività
Per avere la massima rispondenza con la modellazione dei processi le relazioni di interdipendenza temporali sono:
20
Le relazioni sono ulteriormente modificabili con l’introduzione di ritardi, o anticipi, rispetto al predecessore.
Costruzione Box:
WBS
Costruzione Box
PM
Scelta Modello
Acquisto Materiali
PreparazBase
PreparazLegno
Assem-blaggio
Collaudo
21
CostruzBase
Controllo Gettata
Costruzione Box: Grafo di
Progetto - Network Diagram
Scelta modello (1g)
Acquisto Costruzione Controllo
22
Acquisto Materiali (1g)
Costruzione Base (3g)
Controllo Gettata (2g)
CollaudoBox (1g)
Preparazione Legno (2g)
Assemblaggio(3g)
Percorso critico/
Critical Path
� The critical path is the sequence of activities that must be
completed on time for the entire project to be completed
on schedule.
� It is the longest duration path through the workplan. � It is the longest duration path through the workplan.
� If an activity on the critical path is delayed by one day, the
entire project will be delayed by one day unless another
activity on the critical path can be finished a day earlier
than planned.
23
Costruzione Box:
Cammino Critico
Scelta modello (1g)
Acquisto Costruzione Controllo
24
Acquisto Materiali (1g)
Costruzione Base (3g)
Controllo Gettata (2g)
CollaudoBox (1g)
Preparazione Legno (2g)
Assemblaggio(3g)
Costruzione Box: Gantt Chart
25
Project Baseline
Pianificazione Progetto
26
Fonte: bespokesg.com
Project Baseline
� A baseline is an approved configuration item, for
example a project plan that has been signed off for
execution.
� The baseline records the schedule, the planned
resources, the planned costs, and technical requirementsresources, the planned costs, and technical requirements
against which a project is measured. Data including:
� Tasks: Duration, Start and Finish dates, work,
timephased work, cost and timephased cost.
� Resources: Work, timephased work, cost, timephased
cost, budget work, timephased budget work, budget
cost and timephased budget cost.
27
28
29
30
Buon Progetto!