TURNER INNOVATION SERIES

74
TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013 Building in Quality Building in Quality Building in Quality Building in Quality Chris Edwards BIM Specialist Turner International Korea [email protected] TURNER INNOVATION SERIES October 2013

Transcript of TURNER INNOVATION SERIES

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Building in QualityBuilding in QualityBuilding in QualityBuilding in Quality

Chris Edwards

BIM Specialist

Turner International Korea

[email protected]

TURNER INNOVATION

SERIES

October 2013

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Building in QualityBuilding in QualityBuilding in QualityBuilding in Quality

� Logistics & Safety Planning

� Procurement (Visualize Scope)

� Laser Scanning

� 3D Coordination (workflow of…)

� Model Based Layout and Installation

� Prefab

� Visual Production Control

� Metrics

TURNER INNOVATION

SERIES

October 2013

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

What we are trying to avoid…What we are trying to avoid…What we are trying to avoid…What we are trying to avoid…

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Why BIM? Try to visualize this sectionWhy BIM? Try to visualize this sectionWhy BIM? Try to visualize this sectionWhy BIM? Try to visualize this section

Pike Place Market – Seattle,

Washington

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Why BIM? Does this make more sense?Why BIM? Does this make more sense?Why BIM? Does this make more sense?Why BIM? Does this make more sense?

Pike Place Market – Seattle,

Washington

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

BIM for Logistics PlanningBIM for Logistics PlanningBIM for Logistics PlanningBIM for Logistics Planning

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Current Uses: Logistics PlansCurrent Uses: Logistics PlansCurrent Uses: Logistics PlansCurrent Uses: Logistics Plans

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Site Logistics & Traffic Safety

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Brickell CitiCentre

Remove 4’ Sand

Install

Temporary

Sheet Piles

Conceptual Model of Tunnel Connection

Congested Area For Utilities-S Miami Ave & 7th Ave St

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Brickell CitiCentre

Concrete

Conceptual Model of Tunnel Connection

Congested Area For Utilities-S Miami Ave & 7th Ave St

Dig until utilities are exposed

Water Level

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Brickell CitiCentre

Place steel support for Utilities

Place Hangers to support Utilities

Drain Water

Conceptual Model of Tunnel Connection

Congested Area For Utilities-S Miami Ave & 7th Ave St

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Brickell CitiCentre

Conceptual Model of Tunnel Connection

Congested Area For Utilities-S Miami Ave & 7th Ave St

Concrete

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Excavation Planning

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

BIM for Safety = Better Communication

Accidents Happen Due to:

• Poor Work Planning

• Poor Communication of the Work Plan

• Poor Supervision that the Work Plan is

being followed

BIM Helps to:

• Demonstrate the Construction Work Flow

• Identify hazard potentials

• Discuss safety issues virtually before work

starts

• Finalize safety plans with a more complete

understanding of the planned work

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

SolibriSolibriSolibriSolibri for Model Checkingfor Model Checkingfor Model Checkingfor Model Checking

Imported ModelModel Checking

Rule InformationDetailed Results &

Reports

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Model Checking Model Checking Model Checking Model Checking ---- Fire Extinguisher Fire Extinguisher Fire Extinguisher Fire Extinguisher

Warning: Fire

Extinguishers are

>75’ apart!

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Model Checking Model Checking Model Checking Model Checking ---- Fire ExtinguisherFire ExtinguisherFire ExtinguisherFire Extinguisher

Warning: There is no

fire extinguisher close

to the hoist on any

floors!

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Warning: These slab

openings require edge

protection!

Model Checking Model Checking Model Checking Model Checking –––– Fall ProtectionFall ProtectionFall ProtectionFall Protection

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Viewing in the FieldViewing in the FieldViewing in the FieldViewing in the Field

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

BIM for Safety

New York University

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

New York Police Academy

Procurement Visual Bid Packages

CM• Tender Documents

GC• Subcontractor Buy-Out

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Procurement // Bid DocumentsProcurement // Bid DocumentsProcurement // Bid DocumentsProcurement // Bid Documents

Items distributed to MEP Subcontractors:

� Design .nwd Navisworks Model

� QA/QC Design Review Document

� MEP Snapshots Booklet

� Instruction Manual for Navisworks Model

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Procurement // Bid DocumentsProcurement // Bid DocumentsProcurement // Bid DocumentsProcurement // Bid Documents

Items distributed to MEP Subcontractors:

� Design .nwd Navisworks Model

� QA/QC Design Review Document

� MEP Snapshots Booklet

� Instruction Manual for Navisworks Model

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Procurement // Bid DocumentsProcurement // Bid DocumentsProcurement // Bid DocumentsProcurement // Bid Documents

Items distributed to MEP Subcontractors:

� Design .nwd Navisworks Model

� QA/QC Design Review Document

� MEP Snapshots Booklet

� Instruction Manual for Navisworks Model

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Procurement // Bid DocumentsProcurement // Bid DocumentsProcurement // Bid DocumentsProcurement // Bid Documents

Items distributed to MEP Subcontractors:

� Design .nwd Navisworks Model

� QA/QC Design Review Document

� MEP Snapshots Booklet

� Instruction Manual for Navisworks Model

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Procurement // Bid DocumentsProcurement // Bid DocumentsProcurement // Bid DocumentsProcurement // Bid Documents

Items distributed to MEP Subcontractors:

� Design .nwd Navisworks Model

� QA/QC Design Review Document

� MEP Snapshots Booklet

� Instruction Manual for Navisworks Model

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Procurement // HVAC Bid PackagesProcurement // HVAC Bid PackagesProcurement // HVAC Bid PackagesProcurement // HVAC Bid Packages

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Procurement // HVAC Bid PackagesProcurement // HVAC Bid PackagesProcurement // HVAC Bid PackagesProcurement // HVAC Bid Packages

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

New York Police Academy

Procurement

Scope Models

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Procurement // Roofing Bid PackageProcurement // Roofing Bid PackageProcurement // Roofing Bid PackageProcurement // Roofing Bid Package

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Procurement // Roofing Bid PackageProcurement // Roofing Bid PackageProcurement // Roofing Bid PackageProcurement // Roofing Bid Package

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Scope & Workflow VisualizationScope & Workflow VisualizationScope & Workflow VisualizationScope & Workflow Visualization

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

3d Laser Scanning3d Laser Scanning3d Laser Scanning3d Laser Scanning

Digital imaging and scanning captured

by onsite computer

LEICA Laser Scanner

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 201334

Example Example Example Example –––– Digital AsDigital AsDigital AsDigital As----Built ImageryBuilt ImageryBuilt ImageryBuilt Imagery

� Laser Scan Point Cloud (Each point is an as-built laser measurement)

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Example Example Example Example –––– Digital AsDigital AsDigital AsDigital As----Built ImageryBuilt ImageryBuilt ImageryBuilt Imagery

35

� 3D CAD Model – Built to match point cloud model

(CAD models are easier for designers to work with)

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Example Example Example Example –––– Digital AsDigital AsDigital AsDigital As----Built ImageryBuilt ImageryBuilt ImageryBuilt Imagery

36

� Consolidated 3D CAD Model: As-built = Grey, Planned = Colored

� 3D CAD Model – Built to match point cloud model

(CAD models are easier for designers to work with)

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Example Example Example Example –––– Digital AsDigital AsDigital AsDigital As----Built ImageryBuilt ImageryBuilt ImageryBuilt Imagery

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Example Example Example Example –––– Digital AsDigital AsDigital AsDigital As----Built ImageryBuilt ImageryBuilt ImageryBuilt Imagery

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

3D Coordination Clash Detection

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

3D Coordination (Clash Detection)

� Scheduling Coordination

� How long will it take to coordinate the project ?

� When do you need to start by ?

� Can you start earlier ?

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

3D Coordination (Clash Detection)

� Develop a Standard Workflow for the Project

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Subcontractor Coordination (Clash Detection)

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

3D Coordination (Clash Detection)

� BIM Execution Plan

� Develop before BIM starts

� Everyone MUST follow the plan

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

IPD [L IPD [L IPD [L IPD [L iiii t e]t e]t e]t e]

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Modeling Software Consolidation Platform• AutoCAD

• Revit

• Sketch-Up

• Solidworks

• ArchiCAD

• FormZ

NavisWorks

•Clash Detection

•4D Modeling

•Rendering

Multiple Models

Consolidated Model

Getting to “One Building”Getting to “One Building”Getting to “One Building”Getting to “One Building”

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Subcontractor Coordination (Clash Detection)

� Tracking

� Track the coordination

process

� Who is doing well ?

� Who needs help ?

� Is the project improving ?

� Are you staying on

schedule ?

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Installation Drawings

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Model Based Layout

Using the BIM model

to layout work

accurately

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Constructing from Plans

Plans

Drawings

Construction

Model

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Extracting Points from Drawings and Models

Use the Model

To Gather Layout Points

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Layout by the Points

Art Plumbing

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Benefits

� Digital Layout Tools allow the mechanical, electrical and

plumbing contractors to take 3D positional data to the field digitally,

increasing productivity and accuracy by improving layout processes.

� One Person Layout is faster and more accurate than two

people using traditional methods. This efficiency results in both a

reduction in labor costs and elimination of mistakes that can result in

costly re-work.

� Reporting and Updating As-built point data is

collected as points are laid out in the field and can be imported back

into office CAD/MEP software applications for progress reports or to

communicate design updates and as-builts.

� Faster and Better Communication Wireless

capability in the controller enables transfer of design data and daily

progress updates between the office and field

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013Pathway to Lean BUILT 58

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

PrefabricationPrefabricationPrefabricationPrefabrication

Full MEP systems ready for

installation and hook-up

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Prefabrication Prefabrication Prefabrication Prefabrication

Mercy Hospital

Typical Construction = 60

days

Prefab = 9 days

Install = 5 days

Total = 14 days

Allowed 46 days for alternate

work to start early

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Installation Verification

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Steel Curtain Wall

Production TrackingProduction TrackingProduction TrackingProduction Tracking

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Steel Piece Production TrackingSteel Piece Production TrackingSteel Piece Production TrackingSteel Piece Production Tracking

01-30-12 Steel

Piece Tracking

Matrix

Submission Dates and Packages Returned Status Used for Pivot Table - Do not edit Fabrication Status

CS

C P

iece

#

Se

qu

en

ce

CS

C Q

ua

ntity

Bu

ildin

g

Co

lum

n o

r B

ea

m

Dra

win

g

Re

vis

ion

Se

nt

Civ

es T

ran

sm

itta

l

T/S

TV

Su

b P

acka

ge

Re

turn

ed

Sta

tus

Co

rre

cte

d S

tatu

s

Ap

pro

ve

d

NO

T A

pp

rove

d

bla

nk

Fa

b D

ate

Fa

b Q

ua

ntity

Ra

w/

Fa

bb

ed

Ma

t'l

We

igh

t

To

tal W

eig

ht

1000C1(?) 103 1Academic Yes 1000 0 6/9/2011 22-33_05 12 00.00_E.0 7/7/2011 NE NE 1 0 10/2/2011 1 1984.06 1984.06

1001C1(?) 103 1Academic Yes 1001 0 6/9/2011 22-33_05 12 00.00_E.0 7/7/2011 NE NE 1 0 10/2/2011 1 1653.38 1653.38

1002C1(?) 101 1Academic Yes 1002 0 6/9/2011 22-33_05 12 00.00_E.0 7/7/2011 NE NE 1 0 10/2/2011 1 2011.29 2011.29

1002C2(?) 108 1Academic Yes 1002 0 6/9/2011 22-33_05 12 00.00_E.0 7/7/2011 NE NE 1 0 10/2/2011 1 1676.07 1676.07

1003C1(?) 111 1Academic Yes 1003 0 7/13/2011 87710 22-59_05 12 00.00_E.0 8/4/2011 EAN EAN 1 0 12/2/2011 1 3885 3885

1004C1(?) 111 1Academic Yes 1004 0 7/13/2011 87710 22-59_05 12 00.00_E.0 8/4/2011 EAN EAN 1 0 12/2/2011 1 1683 1683

1005C1(?) 111 1Academic Yes 1005 0 7/13/2011 87710 22-59_05 12 00.00_E.0 8/4/2011 EAN EAN 1 0 12/2/2011 1 2335 2335

1006C1(?) 101 1Academic Yes 1006 0 7/7/2011 87705 22-58_05 12 00.00_E.0 7/28/2011 NE NE 1 0 10/2/2011 1 2187.94 2187.94

1007C1(?) 103 1Academic Yes 1007 0 7/7/2011 87705 22-58_05 12 00.00_E.0 7/28/2011 NE NE 1 0 10/9/2011 1 641.42 641.42

1007C2(?) 101 1Academic Yes 1007 0 7/7/2011 87705 22-58_05 12 00.00_E.0 7/28/2011 NE NE 1 0 10/9/2011 1 587.82 587.82

14th February 2012

13th December 2011

17th April 2012 2nd May 2012

20th March 2012

10th January 2012

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Curtain Wall TrackingCurtain Wall TrackingCurtain Wall TrackingCurtain Wall Tracking

� Curtain Wall Contractor

� Gamma International

East Campus Curtain Wall

� Fabrication activity – Miami

Start - 3/22/2012

Finish - 10/1/2012

� Wall types : 14

� Installation:

� 32 Panels/Day

� 16 Panels/crew

Start – 6/18/2012

Finish - 2/5/2013`

~7 Months

~7 Months

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Curtain Wall Production TrackingCurtain Wall Production TrackingCurtain Wall Production TrackingCurtain Wall Production Tracking

Activities Tracked -

� Fabrication

� Delivery

� Installation

� Damaged Panels

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

Generic models with limited parameters Generic models with limited parameters Generic models with limited parameters Generic models with limited parameters

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

DatabaseDatabaseDatabaseDatabase

Panel # Crate #Wall

TypeBuilding Façade Floor

Reference

Gridlines

Fabrication

Date

Delivery

Date

Installation

DateFabricated?

Delivered

?

Installed

?

UA801-01 T12-F02-01 A RAB Southeast 2 AA-AB 3/22/12 6/13/12 6/19/12 1 1 1

UA803-01 T12-F02-01 A RAB Southeast 2 AA-AB 3/23/12 6/13/12 6/19/12 1 1 1

UA805-01 T12-F02-02 A RAB Southeast 2 AA-AB 3/23/12 6/13/12 6/19/12 1 1 1

UA801-01 T12-F02-02 A RAB Southeast 2 AA-AB 3/22/12 6/13/12 6/19/12 1 1 1

UA803-01 T12-F02-03 A RAB Southeast 2 AA-AB 3/23/12 6/13/12 6/19/12 1 1 1

UA805-01 T12-F02-03 A RAB Southeast 2 AB-AC 3/23/12 6/13/12 6/19/12 1 1 1

UA801-01 T12-F02-04 A RAB Southeast 2 AB-AC 3/22/12 6/13/12 6/19/12 1 1 1

UA803-01 T12-F02-04 A RAB Southeast 2 AB-AC 3/23/12 6/13/12 6/19/12 1 1 1

UA805-01 T12-F02-05 A RAB Southeast 2 AB-AC 3/24/12 6/13/12 6/19/12 1 1 1

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

ModelModelModelModel

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

WorkflowWorkflowWorkflowWorkflow

Fabrication Dates from Gamma

Delivery and Installation dates from Turner/STV

field staff

Excel database

Six Shared Parameters: Panel # , Wall Type, Building, Façade, Floor, Reference Gridlines

Fabrication Date

Delivery Date

Installation Date

NAVISWORKS iConstruct Plugin

Excel Database + Revit Model from Gamma

Weekly Production Tracking Report

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

MetricsMetricsMetricsMetrics

e

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

MetricsMetricsMetricsMetrics

s

TURNER INNOVATION SERIES | BIM CONFERENCE | MIDDLE EAST | OCTOBER 2013

The Finish LineThe Finish LineThe Finish LineThe Finish Line

• Precon BIM

• Visual Planning & Communication

• Added Detail

• Full Collaboration with Project Team

• Installation & Verification

• Hand over to Facilities Management