TSA Comparative Analysis Reports on Bridge and Tunnel Security
Gregory M. JizbaU.S. Army Corps of Engineers, Omaha District Protective Design Center
US Army Corps of EngineersBUILDING STRONG®1
AASHTO SCOBST-01 Committee Meeting
June 27, 2016
-
BUILDING STRONG®
The Implementing Recommendations of the 9/11 Commission Act of 2007: Risk Assessments on critical infrastructure and
key resources of the United States must be conducted.
In addition, a report shall also be prepared on the comprehensive assessments evaluating threat, vulnerability, and consequence.
9/11 Act Recommendations
-
BUILDING STRONG®
Project Delivery Team Department of Homeland Security (DHS)
Transportation Security Administration (TSA)Office of Security Policy and Industry EngagementSurface Division (formerly the Highway and Motor Carrier Branch)
USACE Omaha District Protective Design Center Black & Veatch Federal Services Division
-
BUILDING STRONG®4
Focus on Antiterrorism Vulnerability Assessment Risk Analysis Feasible Mitigation Measures (with cost)
TSA provides interface with bridge owner: scheduling and coordination
Three steps in process: 1 – Site survey 2 – Risk Assessment 3 – Report to TSA
Bridge and Tunnel Assessment Program for TSA
-
Step One: Site Survey Assessment
Data Collection Review of available
drawings and information
Completion of questionnaires
Conduct information gathering discussions
On-site survey
5
-
Step Two: Risk Assessment Vulnerability Analysis
Identify Threats Identify Vulnerable
Components Prioritize using
Component Risk Analysis (Phase Ia)
Develop Threat Scenarios
Risk Reduction Develop Protective
Measures Develop Mitigation
Measures Mitigated Component
Risk Analysis Mitigation Measures
Cost Estimates
6
-
BUILDING STRONG®7
Step Three: Report to TSA – Surface Division Individual Site Report
Phase I: Draft Report, USACE Internal Review Phase II: Draft Final Report, TSA / FHWA /
Stakeholder Review Final Report shared with Cleared Owner Personnel Enhanced Executive Summary Sent to Stakeholders
Unclassified SSI document. Redacted version of sections 1-4 of the classified report.
-
BUILDING STRONG®8
Rij = Oij x Vij x IjBridges: Risk-Based Prioritization of Terrorist Threat
Mitigation Measures on Bridges, ASCE Journal of Bridge Engineering, James C. Ray, P.E. – ERDC WES March/April 2007
Tunnels: Leveraged Best Practices and recommendations from past work. Developed risk assessment method similar to bridge risk process (look and feel)
Risk Analysis Methodology
-
BUILDING STRONG®9
Bridge: One Risk Assessment Structure Risk Analysis Evaluate individual bridge components
since loss of life is prevented by protecting the structure (stability)Threats are VBIED, HEIED, NECD, VI, Fire
Tunnel: Two Risk Assessments Operational Risk Analysis (Closure) Evaluate tunnel components
and systems for “catastrophic damage” (Shut-Down of Operations)Threats are VBIED, HEIED, NECD, VI, Fire
Casualty Risk Analysis (Injury) Evaluate magnitude of casualties caused by attack
Threats are VBIED, Fire, Chemical
Bridge versus Tunnel Risk Assessment
-
BUILDING STRONG®10
TSA Program Status - Bridges Inter Agency Agreement Signed 24 Jan 2010
1st Bridge Site Visit conducted: 8 Feb 2010
39 Reports Complete 11 Suspension ● 3 Cable Stay 8 Through Truss ● 2 Deck Truss 3 Through Arch ● 3 Deck Arch 4 Box Girder ● 7 I-Girder (Concrete and Steel) 1 Lift Span
23 States and International Length from 105 ft to more than 2000 ft 2 lanes to 15 lanes Opened 1906 to 2005 Comparative Report Complete
-
BUILDING STRONG®11
TSA Program Status - Tunnels 1st Tunnel Site Visit conducted: 15 Nov 2011
14 Reports Complete Rock, Soft Earth, Cut & Cover, Immersed Tube,
Shield Driven, Air Rights Structure
5 States Length from 825’ to more than 2 miles 1 lanes to 9 lanes (total in all bores) Comparative Report Complete
-
BUILDING STRONG®12
Identify Highest Risk Components/Threat Combinations
Look at : Vulnerabilities by type of structure Existing Security Measures Operational Procedures Mitigation strategies by structure type Effectiveness of proposed mitigation Compare cost of mitigation Summary of questionnaires Research Recommendations
Comparative Analysis Reportfor Bridges and Tunnels
-
BUILDING STRONG®13
Two Part Report, SSI with Classified Appendices
-
Copies of the Bridge and Tunnel Comparative Report are being distributed to:
All State Homeland Security Agencies SSI Report, Classified Appendices
All State DOT’s SSI Report
Participating Bridge and Tunnel Stakeholders SSI Report
14
-
For additional information contact: Raymond D. Cotton Surface Division Office of Security Policy and Industry Engagement Transportation Security Administration 601 South 12th Street, Arlington, Virginia 20598-6028 571-227-4237 (Office) 202-360-3666 (cell) 571-227-2935 (fax) [email protected]
15
Slide Number 1��Project Delivery TeamBridge and Tunnel Assessment Program for TSAStep One: Site Survey AssessmentStep Two: Risk AssessmentStep Three: Report to TSA – Surface DivisionRisk Analysis MethodologyBridge versus Tunnel Risk AssessmentTSA Program Status - BridgesTSA Program Status - TunnelsComparative Analysis Report�for Bridges and TunnelsTwo Part Report, SSI with Classified AppendicesCopies of the Bridge and Tunnel Comparative Report are being distributed to:For additional information contact: