Truong Phu Steel Buildings

102
PRE- ENGINEERED STEEL BUILDINGS Head Office: No. 115 Street 100, Binh Thoi, Ward 15, District 11, HCM City. Tel: +84.8 397 44677 -+848 397 4931- Fax: +848 3974 7018 Web: truongphusteel.vn – Email: [email protected]

Transcript of Truong Phu Steel Buildings

Page 1: Truong Phu Steel Buildings

PRE- ENGINEERED STEEL BUILDINGS

Head Office: No. 115 Street 100, Binh Thoi, Ward 15, District 11, HCM City.

Tel: +84.8 397 44677 -+848 397 4931- Fax: +848 3974 7018

Web: truongphusteel.vn – Email: [email protected]

Page 2: Truong Phu Steel Buildings

CONTENT

1. INTRODUCTION ABOUT TRUONG PHU STEEL BUILDINGS

2. MANUFACTURING FACILITIES

4. CLIENTS

3. SOME TYPICAL PROJECTS

3.1 MULTI-STORY STEEL BUILDINGS

3.2 JAPANESE INVESTOR STEEL BUILDINGS

Page 3: Truong Phu Steel Buildings

PART I

INTRODUCTION

TRUONG PHU

ALWAYS IMPROVE THE QUALITY

TRUONG PHUPRE-ENGINEERED STEEL BUILDINGS

Page 4: Truong Phu Steel Buildings

TRUONG PHU PRE- ENGINEERED STEEL BUILDINGS

Truong Phu Construction & Steel Structure J.S.C. is a growing organization established in the year 2002.Over the years we have achieved a strong foothold over the market by designing, manufacturing and implementation of pre-fabricated steel structures or range of products with includes 10-180 meters in wide offering free consultant, design and technical support.

Established in 2002,

Offer Free Consultant, Design, Technical Support and Site Supervision

OUR VALUE

Truong Phu has developed rapidly, creating a solid share market, while receiving an evergrowing trust from its clients.Our products had appeared in almost industrial zones in Ho Chi Minh City, Bình Dương,Đồng Nai, Bà Rịa Vũng Tàu and other provinces in the west and central of Vietnam.Moreover, our customers have come from a list of multi –national backgrounds: Vietnam,China, Taiwan, Korea, Japan, Malaysia, Singapore, US, Swiss, French, Canada, andDenmark.

Page 5: Truong Phu Steel Buildings

TRUONG PHU PRE- ENGINEERED STEEL BUILDINGS

l OUR PEOPLEOur qualified staff engineers, designers, civil engineers, the architects apply hightechnology using main frame structure and specialized software of design andcalculation to provide you solution for your project, including quotation, proposaldrawings to help customer save cost.

Established in 2002,

Offer Free Consultant, Design, Technical Support and Site Supervision

drawings to help customer save cost.

In addition to our in –house team, we have developed relationships with a number ofexperienced sub- contractors who can be deployed as required.

Truong Phu is constantly improving its professional skills;our products become high quality, quality assurance efficient and satisfy all strictlyrequirements, and receive great appreciation and high praise from investors

Page 6: Truong Phu Steel Buildings

TRUONG PHU PRE- ENGINEERED STEEL BUILDINGS

WHO WE ARE ?

We are an ISO 9001:2008 certified professionally managed units engaged inmanufacturing many products in pre-fabricated segments.Every Truong Phu contract taken by us handle by a team of projects managers of parEvery Truong Phu contract taken by us handle by a team of projects managers of parexcellence and we have many team for a diverse industry segments.We have designed and constructed many types of pre - engineered steel structuressuch as warehouses, workshops, showroom, supermarkets, technical towers, andsteel structure office buildings in catering domestic and oversea clients.

Page 7: Truong Phu Steel Buildings

TRUONG PHU PRE- ENGINEERED STEEL BUILDINGS

OUR COMMITMENTSTruong Phu Steel is committed to be the most experiences enterprise in designing,manufacturing and implementation of pre-fabricated steel buildings. Being an ISO 9001:2008We make sure that we all try to provide high level satisfaction to our clients.

3. Entrepreneurship

5. Integrity

2. Teamwork

4. Passion for Quality

1. Empowerment

Page 8: Truong Phu Steel Buildings

Teamwork and careful

Page 9: Truong Phu Steel Buildings

Passion for Quality

Page 10: Truong Phu Steel Buildings

Quality Commitment

Page 11: Truong Phu Steel Buildings

Integrity

Page 12: Truong Phu Steel Buildings

TRUONG PHU PRE- ENGINEERED STEEL BUILDINGS

WHAT WE DO?

l Design and Build Pre-engineered Steel Buildings.l Industrial and Civil Construction.l Import and export Steel Material.

Page 13: Truong Phu Steel Buildings

TRUONG PHU PRE- ENGINEERED STEEL BUILDINGS

PRODUCTS OF:Industrial – manufacturing warehouses and Cold storagesCommercial – office/shop complexes, automotive dealerships, Fuel Station Canopy and Large Retail Outlet

Page 14: Truong Phu Steel Buildings

TRUONG PHU PRE- ENGINEERED STEEL BUILDINGSOUR STRENGES

Strongest of Truong Phu are:Ø Clear spans up to 100 meters without internal columnsØ Flexibility in building dimensionØ ISO 9001 quality accreditationØ Fixed deadlines and costsFixed deadlines and costsØ Weather- tight roof and wall coverings with accessories for long maintenance

free exteriors.

Page 15: Truong Phu Steel Buildings

TRUONG PHU PRE- ENGINEERED STEEL BUILDINGS

Advantages of Truong Phu are:

Ø Single source responsibilityØ Low initial costØ Engineering flexibility

Excellence in Customer Services

Ø Engineering flexibilityØ Faster overall project completionØ Fast modular expandabilityØ Low maintenance

Truong Phu Customer Care Team was set up to always meet every requestfrom customers and settle quickly to solve all problems arising to ensurecustomers are always satisfied with Truong Phu Steel. Customer feels secureas choosing Truong Phu

Page 16: Truong Phu Steel Buildings

Our TeamProject Management

Mr. Trần Văn Đoàn Tụ, EngineerFounder, Managing DirectorEmail: [email protected]

Tran Van Doan Tu graduated from HCMC University of Polytechnics in 1993. Throughout14 years working, with devotion and infinite love for his job, Mr. Tụ has opportunity to usehis designing and management talent in his projects including Industrial – manufacturingwarehouses and Cold storages, Commercial – office/shop complexes, automotivedealerships, Fuel Station Canopy and Large Retail Outlet such as Petec WarehouseLogistics, Megastar Media, Hoang Lai Cold Warehouse, PV Engineering's, C.T Group KingPost Projects, Posco Vietnam, Seah Pipe Steel Factory, SMC Steel Factory, and manyother prestigious Vietnamese companies like Baconco Production Factory, Hoang GiaCeramics.Projects undertaken by Mr. Tụ won completed satisfaction from the customers thanks to amodern style, efficient space utilization, reasonable costs and professional implementation.Mr. Tụ is a member of the Vietnamese Association of Engineer,

Page 17: Truong Phu Steel Buildings

Our TeamProject Management

Mr. Trần Văn Hoàng, EngineerFounder, General DirectorEmail: [email protected]

Tran Van Hoang graduated from HCMC University of Polytechnics in 1997, and completedhis master degree in 2003. During 10 years working experiences, Hoang has accumulatedmuch experience through various projects which is appointed as Chief Engineer andFactory Production Manager in charge of production, executive producer of components,items of steel works, direct the construction of steel works, industrial building, structure orapartment, prepare tender documents, making payment records steel works; Namely heresome projects undertaken by him: design of the cross rhythm K60m and K50m aperture,the plug 3 is also phase 1 and phase 2 in Phu My Industrial Park, SMC Steel Factory in BaRia Vung Tau, Posco- VHPC, Seah; U&I warehouses, Megastar Seating Flat form Systemand dozens of other high profile, prestigious projects.

Page 18: Truong Phu Steel Buildings

Our TeamProject Management

Mr. Hồ Tùng Lâm, EngineerProject DirectorEmail: [email protected]

More than 15 years workings experiences with tireless effort and high responsibility, Mr.Lâm has been trustingly assigned to be the site construction manager and project managerof many big projects including Thanh Cong Cold Warehouse -Binh Chanh District, HCMC;Cement Ha Tien Factory, Kien Luong, Kien Giang; Ha Tien 2 Cement Factory, Kien Luong,Kien Giang; Truong Thanh Furniture Company, Binh Duong; Company WEC Saigon, CuChi, Ho Chi Minh City; Markets Hoc Mon, Ho Chi Minh City; FULLIN company, Dong AnIndustrial Park; Refinery reclaimed rubber, Ben Cat District, Binh Duong Province; May XKLong An, Tan An, Long An.;Long An Import Export, LAFUCO.

.Lam graduated Civil Construction & Industrial from Ho Chi Minh University of Architecture .Beside, he also holds another two degree about Supervision on construction quality andSafety management in construction. Currently, he is Project Director of Truong PhuConstruction & Steel Structure Joint Stock Company.

Page 19: Truong Phu Steel Buildings

Our TeamProject Management

Mr. Lê Minh Nghĩa, EngineerFounder, Project DirectorEmail: [email protected]

Graduated from Ho Chi Minh Polytechnic University, Major : Civil Construction & Industrialin 1993, Nghia has accumulated a lot of experiences during his working life with manycompanies as different jobs. He used to be Supervisor Engineer of Defico Company, ViceDirector of Mai Linh Real Estate Corporation. Since 2004, Mr. Nghia joined Truong PhuPre-engineered Steel Building and appointed as Vice Director. Nghia had taken part indesigning and supervising the construction of dozens of prestigious projects such as FreeTrend 1-9 workshops at Linh Trung Industrial Zone, Columbia Hospital, Workshops IDCNew Port, White feather’s Mỹ Phước Industrial Zone, Bình Dương, Ánh Bình Minh Factoryproduction at Tam Phước Industrial Zone, Đồng Nai. He also holds another two degreeabout Fulbright Economics Teaching programs, Co-designing practice certificate.Training Selling Skills Faculty Certificate.Currently, he is Project Director of Truong Phu Construction & Steel Structure Joint StockCompany.

Page 20: Truong Phu Steel Buildings

Our TeamProject Management

Mr. Trần Vĩnh Phú, EngineerManufactory DirectorEmail: [email protected]

Phu completed his bachelor degree in 2006 respectively in Ho Chi Minh City University ofPolytechnic. During 6 working years experience, Phu was appointed to hold important roleas Factory Director of Truong Phu Construction & Steel Structure Joint Stock Company.Phu was set up the factory in scientific way and gain a lot of valuable experience inproduction, executive producer of components, items of steel works. Direct the constructionof steel works, industrial building, prepare tender documents, making records steel work,contact, counseling, keep relationships with customers

Page 21: Truong Phu Steel Buildings

Our TeamProject Management

Mr. Vũ Hữu Trí, EngineerProject DirectorEmail: [email protected]

Starting his career by joining BlueScope Building, an Australian group specialized inconstruction and materials, Tri was able to gather a lot of valuable experiences on projectsmanagement and modern design techniques as a factory manager/ site owner. Hemanaged and be responsible for production, maintenance warehouse, stock quality andsafety, security of site owner. After working here for more than 9 years, Tri had taken partin project management of Truong Phu pre-engineered steel buildings. Mr. Tri has beentrustingly assigned to be site construction manager and project Director of many bigprojects including in oversea market such as Laos, Myanmar, Cambodia and India.Tri finished bachelor of Civil Engineering from Polytechnics University of Ho Chi Minh City,Bachelors of Economics Diploma, Quality Management for construction projects andprofessional selling Skills and other international training programmed.

Page 22: Truong Phu Steel Buildings

Our TeamProject Management

Mr. Le Tung Quan, ArchitectureSenior Project ExecutiveEmail: [email protected]

Graduating from Ho Chi Minh University of Architecture, after 6 year working withBluescope Steel Buildings , he has participated in Truong Phu Steel Bulidngs and havedone for many various big projects such as Factory of Kim Khí Sài Gòn Thép (Việt ThànhSteel), Factory of Thong Nhat Flat Steel; Factory of SMC Steel, Restaurant Steel Buildingat 526 Điện Biên Phủ, Bình Thạnh District; HCM City, Workshop of Đức Toàn Company;ICD New Port ;SeAH Steel; Hoàng Gia Ceramics; Ethanol Bình Phước; Kỳ Nam Steel, ĐạiNam Factory.With enthusiasm and whole hearted, Quan always tried to improve his technical skill.Besides, his civil engineering degree, he has another two graduated degree from Universityof Economics major in Business Management and Construction quality supervision.

Page 23: Truong Phu Steel Buildings

Our TeamProject Management

Ms. Trương Thu Huyên, BachelorChief AccountantOperation ManagerEmail: [email protected]

Truong Thu Huyen was hold two degree from Economics University, and Law Universityof Ho Chi Minh. After 10 year working experiences, Huyen has done great of excellence jobin corporate financial management, accounting and compliance with laws and relevantbusiness requirements of the company, implementation, effective asset managementcapital of the company. She is the key person whom coordinate and support departmentsto complete assigned tasks.On behalf of Director, she independence works with tax authorities, banks andcustomers.Beside these activities, she also handle in management activities of theaccounting department.

Page 24: Truong Phu Steel Buildings

Our TeamProject Management

Ms. Trần Thị Thanh Bình, BachelorPurchasing and Procurement ManagerEmail: [email protected]

Graduating in Ho Chi Minh, University of Economics, Finance Department. Bình hasparticipating in estimating, providing all main kind materials including steel structures,Panel insulation for almost projects of Truong Phu pre-engineered Steel Buildings.With enthusiasm and whole hearted, Binh always tried to improve her abilities and skills toprovide best materials and company services to customer. Beside, she also in charge ofadvising the board of directors in corporate financial management, periodical reportsfinancial situation, accurate to the board of directors, Contact the bank is the procedure ofdisbursement, payment, recovery of debt, plan to pay debts to customers, plan to purchasematerials, Materials for each project, coordinate and support departments to completeassigned tasks, managing all the financial activities of the company.

Page 25: Truong Phu Steel Buildings

Our TeamProject Management

Ms. Nguyễn Thị Kim Linh, BachelorMarketing and Business Development ManagerEmail: [email protected]

Linh has over 07 years experience working in foreign-related businesses in HCMC and isgraduated from University of Economics. Her experience specializes in marketing,business administration with a background with Ministry of Education and Training ofHCMC. Since becoming Marketing and Business Development Manager, Linh has focus onusing her experiences to raise the marketing campaigns and constantly improve thecustomer services to bring the professional services to investors. She understand the valueof product and brand activation to clients through creative solutions.

.

Page 26: Truong Phu Steel Buildings

Our TeamProject Management

Truong Phu Steel Truong Phu Steel Workers

Page 27: Truong Phu Steel Buildings

PART II

TRUONG PHU FACTORYTRUONG PHU FACTORY

Page 28: Truong Phu Steel Buildings

OUR FACTORY

All our machines and accessories are fabricated at our highly sophisticatedmanufacturing unit that is equipped with manufacturing machines, base on latesttechnology.

Production : Zone 7, Uyen Hung Town, Tan Uyen Dist., Binh Duong Provinces, Vietnam

Tel: +84 650 247 5575 - +846502475576 - Fax: +84 650 364 2232

Page 29: Truong Phu Steel Buildings

OUR FACTORY

We follow strict quality measures that confirm to all quality parameters of ISOstandard. Machinery system for manufacturing pre-fabricated steel structures suchas Hydraulic Cutting, CNC Cutting Machine, Automatic Welding System, Auto beamstraightening machine, Blasting Machines which is capable to produce more than20,000 tons per year.

Production : Zone 7, Uyen Hung Town, Tan Uyen Dist., Binh Duong Pro.

Page 30: Truong Phu Steel Buildings

OUR FACTORY

Blasting Machines which is capable to produce more than 20,000 tons per year.

Production : Zone 7, Uyen Hung Town, Tan Uyen Dist., Binh Duong Pro.

Page 31: Truong Phu Steel Buildings

OUR FACTORY – PRODUCTION PROCESSFactory productiveness per month: 1,200 tonsFactory productiveness per month: 1,200 tons..

Raw materials must be tested by Tensile test before put in to production

Raw materialsTensile Test Machine

Page 32: Truong Phu Steel Buildings

OUR FACTORY Land area: 20,000 m2, plants (indoor): 13.000m2.Land area: 20,000 m2, plants (indoor): 13.000m2.

Hydraulic Cutting: 16lyx6.2m, 01 machine Screw Cutting: 16lyx3.2m, 01 machine

Stage 1: Initial Cutting

The first phase of produces plate steel, known as initial cutting. This stage, technician will check the thickness of the steel plates and the quality controller will conduct the final inspection. Use the automatic Hydraulic cutting machine - cutting machine

Page 33: Truong Phu Steel Buildings

OUR FACTORY Factory productiveness per month: 1,200 tonsFactory productiveness per month: 1,200 tons..

Combine Beam H HG-1500III automatic machine

Stage 2: Mounting IThe combination of abdominal wing can be done by hand or by machine.Ensure proper structural shape, deviation, flatness, angle of the structures ...components.Combination by beam mounting automatic machine, also known as mounting machine I

Combine beams by vertical

Page 34: Truong Phu Steel Buildings

OUR FACTORY Number of units: 07 units; wide per unit: 2000 square meter Built in February 2007 and have been using since October of 2007.

Stage 3: Weld StructuralComponents are welded by both turtle-welds and welded gates. The quality of welding is in accordance with design.Before welding, the preparation of welds should be matched to the welding process, scrub cleaned, and sanitary weld at both sides. The method of visual inspection and measuring equipment must be inspected during welding by the engineering department.Technical controller: 02 engineers follow up and check Workers clean the slot before welding

Automatic Welding System

Page 35: Truong Phu Steel Buildings

OUR FACTORY Number of units: 07 units; wide per unit: 2000 square meter Built in February 2007 and have been using since October of 2007.

Stage 4: Beam Straighten ITo avoid the phenomenon of curving due to thermal distortion,the process of fitting I and transportation between the space components, structures were put into bending by automatically beambending machine to ensure technical accuracy, after installation, matching in tolerance processing.Technical controller: 02 engineers follow up and check

Auto beam straightened machine

Page 36: Truong Phu Steel Buildings

OUR FACTORY Number of units: 07 units; wide per unit: 2000 square meter Built in February 2007 and have been using since October of 2007.

Stage 5: Mounting Details. § This phase, components is classified into the bit cut adjustment, eight links, ribs reinforcement and other extra details

Page 37: Truong Phu Steel Buildings

OUR FACTORY Number of units: 07 units; wide per unit: 2000 square meter Built in February 2007 and have been using since October of 2007.

Stage 7: Hole DrillingWe drill the hole with eight links associated and the other details side by drill hole machine, ensuring the geometric dimensions of the hole does not affect the mechanical properties of steel. The drill holes are made parallel with the production of components.Technical controller: 01 engineer follow up and examination

Page 38: Truong Phu Steel Buildings

OUR FACTORY Number of units: 07 units; wide per unit: 2000 square meter Built in February 2007 and have been using since October of 2007.

Stage 8: BlastingClean the components with automatic ball sprayer (eight jets) with small steel balls, and big power sprayer to cleanthe surface of structural steel components.Technical controller: 01 engineer Expert Installation: Technical expert at factory

Automatic Blasting machine (08 blasting)

Page 39: Truong Phu Steel Buildings

OUR FACTORY Number of units: 07 units; wide per unit: 2000 square meter Built in February 2007 and have been using since October of 2007.

Stage 9: Paint Completing.Modern American painting machine, make sure the paint thickness is 35-38 μm / 01 paint. Before painting, the surface components are cleaned by wire brush or grinderProcess of painting as follow:Paint 01 layer stainless.Paint 02 layer completing.

Page 40: Truong Phu Steel Buildings

Test surface and the thickness of the paint have the technical personnel in charge toensure the product meets the high aesthetic.

Page 41: Truong Phu Steel Buildings

PART III

SOME TYPICAL PROJECTS SOME TYPICAL PROJECTS

Page 42: Truong Phu Steel Buildings

JAPANESE INVESTOR STEEL BUILDINGS

1. VIJA GAS FACTORY_ STAGE22. TAZMO VIETNAM FACTORY3. OHNOSEIKO VIETNAM FACTORY4. NANKAI KINZOKU FACTORY5. SOLTEC INDUSTRIAL JSC (JAPAN)

Page 43: Truong Phu Steel Buildings

Our Customer Projects

Project Name: VIJA GAS Factory_ Stage2 (Japan) Investor: Japan Vietnam Co., Ltd.Location: Phú Mỹ I, Tân Thành, Bà Rịa - Vũng Tàu

Page 44: Truong Phu Steel Buildings

Our Customer Projects

Project Name: TAZMO VIETNAM Factory (Japan) Investor: TAZMO VIETNAM CO., LTD.Location: Lot H.09, Road 01, Long Hau I.P., Long Hau, Can Giuoc, Long An

Page 45: Truong Phu Steel Buildings

Project Name: TAZMO VIETNAM Factory (Japan) Investor: TAZMO VIETNAM CO., LTD.Location: Lot H.09, Road 01, Long Hau I.P., Long Hau, Can Giuoc, Long An

Page 46: Truong Phu Steel Buildings

Our Customer Projects

Project Name: OHNOSEIKO VIETNAM Factory (Japan) Investor: OHNOSEIKO VIETNAM CO., LTD.Location: Lot S-2, Road 7, Long Hau I.P., Long Hau, Can Giuoc, Long An

Page 47: Truong Phu Steel Buildings

Project Name: OHNO SEIKO VIETNAM Factory (Japan) Investor: OHNOSEIKO VIETNAM CO., LTD.Location: Lot S-2, Road 7, Long Hau I.P., Long Hau, Can Giuoc, Long An

Page 48: Truong Phu Steel Buildings

Our Customer Projects

Project Name: NANKAI KINZOKU Factory (Japan)Investor: NANKAI KINZOKU Corporation.Location: Nhon Trach III I.P., Road 25B., Hiep Phuoc Ward, Nhon Trach – Dong Nai Province

Page 49: Truong Phu Steel Buildings

Our Customer Projects

Project Name: NANKAI KINZOKU Factory (Japan)Investor: NANKAI KINZOKU Corporation.Location: Nhon Trach III I.P., Road 25B., Hiep Phuoc Ward, Nhon Trach – Dong Nai Province

Page 50: Truong Phu Steel Buildings

Our Customer Projects

Project Name: NANKAI KINZOKU Factory (Japan)Investor: NANKAI KINZOKU Corporation.Location: Nhon Trach III I.P., Road 25B., Hiep Phuoc Ward, Nhon Trach – Dong Nai Province

Page 51: Truong Phu Steel Buildings

Project Name: NANKAI KINZOKU Factory (Japan)Investor: NANKAI KINZOKU Corporation.Location: Nhon Trach III I.P., Road 25B., Hiep Phuoc Ward, Nhon Trach – Dong Nai Province

Page 52: Truong Phu Steel Buildings

Our Customer Projects

Project Name: Soltec Industrial JSC (Japan)Investor: Soltec factory - PhaseArea: 20,800 m2Location: II located at Nhon Trach II Industrial Zone, Dong Nai province

Page 53: Truong Phu Steel Buildings

Project Name: Soltec Industrial JSC (Japan)Investor: Soltec factory - PhaseArea: 20,800 m2Location: II located at Nhon Trach II Industrial Zone, Dong Nai province

Page 54: Truong Phu Steel Buildings

Project Name: Soltec Industrial JSC (Japan)Investor: Soltec factory - PhaseArea: 20,800 m2Location: II located at Nhon Trach II Industrial Zone, Dong Nai province

Page 55: Truong Phu Steel Buildings

Installation

Project Name: Soltec Industrial JSC (Japan)Investor: Soltec factory - PhaseArea: 20,800 m2Location: II located at Nhon Trach II Industrial Zone, Dong Nai province

Page 56: Truong Phu Steel Buildings

Project Name: Nanshin Seiki Vietnam(Japan)Investor: Nanshin Seiki Viet Nam Company Limited.Area: 11,950 m2Location: Lot B_1E_CN Road NE4A, My Phuoc 3 Industrial Park, Binh Duong Province

Page 57: Truong Phu Steel Buildings

Project Name: Temco Vietnam Factory(Japan)Investor: Temco Viet Nam Company Limited.Location: Lot B-6D10-CN Road NE4A, My Phuoc 3 Industrial Park, Binh Duong Province

Page 58: Truong Phu Steel Buildings

INDUSTRIALS STEEL BUILDINGS PROJECTS

1. Ánh Bình Minh Metal Packaging Factory2. SMC Steel Mechanic Factory3. IBS Granite Long An Factory - Workshop 1, 2, 34. Tien Nga Factory5. Yue De Việt Nam Shoes Production Factory6. Etanol Binh Phuoc Production Factory7. Baconco Bonded Warehouse7. Baconco Bonded Warehouse8. Thanh Binh Paint Brush Production Factory9. Carian Wooden Factory10.Far Eastern Factory 11.Megastar Cineplex at Pandora Building12.Vina Australia Factory13.Shyange Paint Factory14.Petec Logistics 15.Posco – VHPC Factory16.Dai Nam Steel Factory17.Seah Factory18.Saigon Metal Workshop19.Thong Nhat Cold-rolled Steel Factory.20.ICD Long Binh Warehouse.

Page 59: Truong Phu Steel Buildings

Our Customer Projects

Project Name: Ánh Bình Minh Metal Packaging Factory Investor: Anh Binh Minh Corporation Area: 18 084 m2 “ K36x134m; K102x130 Location: Tam Phuoc Industrial Zone, Dong Nai

Page 60: Truong Phu Steel Buildings

Our Customer Projects

Project Name: SMC Steel Mechanic Factory Investor: SMC Trading Investment Joint Stock CompanyArea: 9.600 m2Location: KCN Phú Mỹ I I.Z, Tân Thành, Bà Rịa - Vũng Tàu

Page 61: Truong Phu Steel Buildings

Our Customer Projects

Project Name: IBS Granite Long An Factory - Workshop 1, 2, 3Investor: IBS CorporationArea: 4.320 m2, 5.664 m2 , 4.886 m2 Location: Nhựt Chánh I.Z, Long An

Page 62: Truong Phu Steel Buildings

Our Customer Projects

Project Name: Tien Nga Factory Investor: Tien Nga Trading and Manufacturing Co. Ltd.Area: 23.400 m2Location: Long Bình, Biên Hòa, Đồng Nai

Page 63: Truong Phu Steel Buildings

Our Customer Projects

Project Name: Yue De Việt Nam Shoes Production Factory Investor: Pou Yuen Việt Nam Co. Ltd.,Area: 4.560 m2Location: Tân Hương I.P, Tiền Giang

Page 64: Truong Phu Steel Buildings

Our Customer Projects

Project Name: Etanol Binh Phuoc Production Factory Investor: Oriental Biofuels Co. Ltd.,Area: 12.850 m2"Location: Dong Xoai, Binh Phuoc

Page 65: Truong Phu Steel Buildings

Our Customer Projects

Project Name: Baconco Bonded Warehouse Investor: Baconco Co. Ltd.,Area: 8.640 m2Location: Phú Mỹ I I.P., Tân Thành, Bà Rịa - Vũng Tàu

Page 66: Truong Phu Steel Buildings

Our Customer Projects

Project Name: Thanh Binh Paint Brush Production Factory Investor: Thanh Binh Paint Brush Pte.Area: 2.779 m2Location: Long HậuI. I. P., Cần Giuộc, Long An

Page 67: Truong Phu Steel Buildings

Our Customer Projects

Project Name: Carian Wooden FactoryInvestor: Carian Wooden Co. Ltd.,Area: 20,800 m2Location: VSIP 2, Bình Dương

Page 68: Truong Phu Steel Buildings

Our Customer Projects

Project Name: Far Eastern Factory Investor: Apparel Far Eastern Vietnam Co. Ltd.Area: 7.573,5 m2Location: VSIP 1 I.P, Bình Dương

Page 69: Truong Phu Steel Buildings

Our Customer Projects

Project Name: Megastar Cineplex at Pandora BuildingInvestor: Megastar Media CompanyArea: 8 cinemasLocation: Tan Phu District, HCM City

Page 70: Truong Phu Steel Buildings

Our Customer Projects

Project Name: Vina Australia Factory Investor: Vina Australia Package Co. Ltd.Area: - 6.336 m2 -"K52x88+K20x88m"Location: Tam Phuoc Industrial Zone, Dong Nai

Page 71: Truong Phu Steel Buildings

Our Customer Projects

Project Name: AVA Food Factory Investor: AVA Food Industry Co. Ltd.Area: - 18.600 m2- "K60x200m+K40x165m "Location: Tam Phuoc Industrial Zone, Dong Nai

Project Name: Shyange Paint FactoryInvestor: Shyange Paint Co., Ltd.Area: - 7308 m2 - K66x78m K30x72m Location: Tam Phuoc Industrial Zone, Dong Nai

Page 72: Truong Phu Steel Buildings

Our Customer Projects

Project name: Petec Logistics Investor: Petec Logistics Joint Stock Co.Area: 23,328 m2- K162x144m Address: Tan Uyen I.P., Binh Duong

Page 73: Truong Phu Steel Buildings

Our Customer Projects

Project Name: Posco – VHPC FactoryInvestor: Posco – VHPC Co., LtdArea: 12,600 m2 - K75x168mLocation: Nhon Trach I.Z, Dong Nai

Page 74: Truong Phu Steel Buildings

Our Customer Projects

Project Name: Dai Nam Steel FactoryInvestor: Dai Nam Steel CorporationArea: 3960 m2 – K48x82.5 mLocation: Tan Tao I.Z., Binh Tan

Project Name: Mainetti FactoryInvestor: Mainetti Vietnam Co., Ltd.Area: 14,500 m2 – K90x100m+K50x110m Location: Long Thanh I.Z., Dong Nai

Page 75: Truong Phu Steel Buildings

Our Customer Projects

Project Name: Seah FactoryInvestor: Seah Vietnam Steel Co. Ltd.Area: 8,757 m2– K62.5x125+BK15x18+K18x37.5m Location: Bien Hoa I.Z., Dong Nai

Page 76: Truong Phu Steel Buildings

Our Customer Projects

Project Name: Saigon Metal WorkshopInvestor: Saigon Metal Corporation.Area: 7,272 m2 Location: Ben Luc, Long An

Page 77: Truong Phu Steel Buildings

Our Customer Projects

Project Name: Thong Nhat Cold-rolled Steel Factory.Investor: Thong Nhat Flat Steel CorporationArea: 12.636 m2Location: Phu My I Industrial Zone, Tan Thanh, Ba Ria - Vung Tau

Page 78: Truong Phu Steel Buildings

Our Customer Projects

Project Name: Processing and storage of agricultural export products Factory Investor: Long Hai- Binh Phuoc CorporationArea: 12.744 m2Location: Đồng Tiến, Đồng Phú, Bình Phước

Page 79: Truong Phu Steel Buildings

Our Customer Projects

Project Name: ICD Long Binh Warehouse.Investor: ICD New Port – Long Binh Corporation.Area: 18.000 m2Location: Long Bình, Biên Hòa, Đồng Nai

Page 80: Truong Phu Steel Buildings

Our Customer Projects

Project Name: Seafood Processing Factory.Investor: Hung Vuong Corporation.Area: 10.303 m2Location: My Tho I.P, Tien Giang

Page 81: Truong Phu Steel Buildings

Our Customer Projects

Project Name: Soltec Industrial JSC (Japan)Investor: Soltec factory - PhaseArea: 20,800 m2Location: II located at Nhon Trach II Industrial Zone, Dong Nai province

Project Name: Southern C.T- Nguyen Dinh ChieuInvestor: Southern CT - Member of C.T Group Items: Kingpost Location: 117, Nguyen Dinh Chieu St., District 3, Ho Chi Minh City

Page 82: Truong Phu Steel Buildings

Project Name: Southern C.T- Nguyen Dinh ChieuInvestor: Southern CT - Member of C.T Group Items: Kingpost Location: 117, Nguyen Dinh Chieu St., District 3, Ho Chi Minh City

Page 83: Truong Phu Steel Buildings
Page 84: Truong Phu Steel Buildings

Project Name: Viet Thang Fiber Factory

Project Name: Viet Thang Fiber FactoryInvestor: Viet Thang CorporationArea: 13,000 m2

Location: 127 Lê Văn Chí, P. Linh Trung, Q. Thủ Đức, TP. HCM

Page 85: Truong Phu Steel Buildings

Project Name: CHING LUH Shoes FactoryInvestor: Ching Luh Shoes Co.,LtdArea: 11.000 m2Location: Thuan Dao, Ben Luc, Long An

Page 86: Truong Phu Steel Buildings

Project Name: Thai Tuan Textile FactoryInvestor: Thái Tuấn Group CorporationLocation: 1/148 Nguyễn Văn Quá, P.Đông Hưng Thuận, Quận 12, Tp.Hồ CHí Minh

Page 87: Truong Phu Steel Buildings

Project Name: Sai Gon Beer WarehouseInvestor: Sabeco CorporationArea: 33.656m2Location: Ward Trung Mỹ Tây – District 12- Hồ Chí Minh City.

Page 88: Truong Phu Steel Buildings
Page 89: Truong Phu Steel Buildings

DÖÏ AÙN TIEÂU BIEÅU

Project Name: Factory NTPM Việt NamInvestor: Cty TNHH NTPMItems: Factory Sản XuấtLocation: VSIP II A, Tỉnh Bình Dương

Page 90: Truong Phu Steel Buildings

Project Name: Vina Kraft PaperInvestor: Kraft Vinna Paper CompanyItems: Factory ProductionLocation: Mỹ Phước 3 Industrial Zone, Bến Cát Bình Dương

Page 91: Truong Phu Steel Buildings

Project name: NTPM Việt Nam FactoryInvestor: NTPM Viet Nam Company LimitedItems: Factory ProductionLocation: VSIP II A, Tỉnh Bình Dương

Page 92: Truong Phu Steel Buildings

Project Name: Factory NTPM Việt NamInvestor: Cty TNHH NTPMItems: Factory Sản XuấtLocation: VSIP II A, Tỉnh Bình Dương

Page 93: Truong Phu Steel Buildings

Customer Testimonial

Page 94: Truong Phu Steel Buildings
Page 95: Truong Phu Steel Buildings
Page 96: Truong Phu Steel Buildings
Page 97: Truong Phu Steel Buildings

ISO 9001:2008 CERTIFICATE

TRUONG PHU STEEL has been awarded the ISO 9001:2008 certificate by TÜV SUD ASIA PACIFIC

TUV SUD GROUP.

To be able to acquire this certificate we have been working very hard in managing our daily been working very hard in managing our daily operations by focusing on quality control and

continual improvement in all aspects of our business.

Page 98: Truong Phu Steel Buildings

Trusted Quality Supplier 2013 Nhà cung cấp Chất lượng 2013

Page 99: Truong Phu Steel Buildings

OUR CLIENTS

Page 100: Truong Phu Steel Buildings

OUR CLIENTS

Page 101: Truong Phu Steel Buildings

TRUONG PHU PRE-ENGINEERED STEEL BUILDINGS

Page 102: Truong Phu Steel Buildings

HCM Head Office

Truong Phu Construction and Steel Building JSC.

115 Street 100 Binh Thoi, Ward 15, District 11, HCMC, Vietnam

Tel: (84) 8 397 44 677Fax: (84) 8 397 47 018Emails: [email protected]

Dong Nai ‘s Office Branch

Truong Phu Construction and Steel Building JSC.

No. 14 Nguyễn Thị Hiền, Thanh BìnhWard, Biên Hòa City, Đồng Nai Province

Tel: (84) 8 397 44 677Fax: (84) 8 397 47 018Emails: [email protected]

Factory

Truong Phu Construction and Steel Building JSC.

Zone 7, Uyen Hung, Tan Uyen BinhDuong , Vietnam

Tel: (065) 02 47 55 75Fax: (065) 03 64 22 32

Email:[email protected]