Transport, Environment and Leisure Services
Service Delivery Plan 2009 to 2012
SERVICE DELIVERY PLAN 2009/12
2
TranSporT, EnvironmEnT and LEiSurE SErvicE
SERVICE DELIVERY PLAN 2009/12
3
TranSporT, EnvironmEnT and LEiSurE SErvicE
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
4
TranSporT, EnvironmEnT and LEiSurE SErvicES
contents Foreword by the Executive Director .............................................. 5
Vision, aims and priorities ............................................................. 6
What we do ................................................................................ 16
Strategic relationships ................................................................ 24
Continuous improvement ............................................................ 32
Current and future challenges and issues ................................... 42
Workforce development .............................................................. 52
Achievements during 2008/09 .................................................... 56
Finance ...................................................................................... 62
Work plans 2009/10 to 2011/12 .................................................. 72
Annex A Lead officers ................................................................. 96
Appendix B Forward plan of procurement ................................... 98
Appendix C Risk register ............................................................106
Appendix D Performance indicators ...........................................110
Appendix E Audit plan 2009/2010 .............................................114
Appendix F Revenue budget tables ...........................................116
Appendix G Capital summary ....................................................122
Appendix H Value for money ......................................................126
Appendix I Business continuity ..................................................132
Appendix J Abbreviations and acronyms ...................................136
Appendix K Relevant strategies .................................................140
SERVICE DELIVERY PLAN 2009/12
5
TranSporT, EnvironmEnT and LEiSurE SErvicES
Foreword In TELS we make a big difference to the quality of life of the people who live, work or play a part in the borough.
This shines through in our priorities. We are passionate about improving our open spaces, our streets, our parks and leisure facilities. We want people to enjoy what the borough has to offer and we want them to feel some personal ownership as well. We want people to take part; to be creative, to get fit and healthy, and to enjoy being a part of their community.
We set out our ideas about how we can achieve these goals in this year’s service delivery plan. We look well beyond the next year, reflecting the significant and ambitious nature of the challenge. This is true, for example, of the events and cultural activity associated with the 2012 Olympic Games, the streetscape improvement projects such as Exhibition Road, our continued parks improvement plan, and our rapidly developing work on mitigating the impacts of climate change.
We will not be doing this alone. We must work with others and be prepared for change if we are to succeed. By now you’ll know about the Council’s Smartest Council initiative that started in 2008. We will embrace this with enthusiasm – staying focussed on the needs and aspirations of our residents, extracting the most value we can from our resources, by being green – and by being fair to our staff.
I know that you’ll find this genuinely exciting. Our service delivery plan puts the detail around how we’ll bring all this together in a tight, businesslike way. As ever, please take time out to read and discuss it. I’ll be genuinely delighted to receive your feedback.
Thank you, and have a good year.
Tot BrillExecutive DirectorTransport, Environment and Leisure Services (TELS)
SERVICE DELIVERY PLAN 2009/12
6
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
our vision To provide excellence and value for money in everything the business group does. This means delivering efficient and effective services which improve the environment, to ensure that everyone has the opportunity to enjoy the streetscape, parks, and cultural and leisure facilities in the borough.
This will be underpinned by everyone in TELS adopting the Council’s values: being collaborative, positive, innovative and appreciative, and keeping public service ethos at the heart of everything we do.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
7
TranSporT, EnvironmEnT and LEiSurE SErvicES
Our aims: 2009 to 2012The Council has three aims that are outlined in its Cabinet Business Plan. The following aims underpin the overarching vision for ‘A Better City Life’:
• Responding to residents - Listening to - and leading - our diverse population, and using public money wisely.
• Really good services - Setting high standards for ourselves and others.
• Renewing the legacy - Investing in the public buildings and places that make the Royal Borough special.
The Transport, Environment and Leisure Services (TELS) Business Group has taken these three aims (the three ‘R’s) as the framework for its own aims.
Key business group aims
Responding to residents • Toprovideeffectiveandappropriateenforcementwhich encourages individuals and businesses to respect the environment and the rights of others in their safe enjoyment of it.
Really good services• Toprovideleisureandartsfacilitiesandservicesthatpromote good physical and mental health and a sense of well-being.
• Toensurethatpeoplecanmoveabouttheboroughsafelyand efficiently,withminimalimpactontheenvironment.
• Toprovideservicesthathelpourresidentscopewiththeimpact of a changing climate, and endeavour to reduce the adverse effects our work may have on climate change.
SERVICE DELIVERY PLAN 2009/12
8
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Renewing the legacy• Toimproveandmaintainouropenspacesandstreetscapefor thebenefitofcurrentandfuturegenerations.
• Totacklethecausesofclimatechangethatarisefromthe activities of those living and working in the borough, and take action to adapt to the unavoidable effects of a changing climate.
Our aims are strongly linked to the priorities and ambitions of the other business groups in the Council and those of our partners. For example, the aim to promoting good physical and mental health closely accords with the aims of the Housing, Health and Adult Social Care (HHASC) and those of the Primary Care Trust (PCT).
Key business group priorities for 2009 to 2012To achieve the above aims, priority tasks have been developed that will contribute to the achievement of ‘A Better City Life’. Our work, which includes these priorities, is detailed in the section on work plans (see page 38).
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
9
TranSporT, EnvironmEnT and LEiSurE SErvicES
Responding to residentsTELS aim: To provide effective and appropriate enforcement to encourage individuals and businesses to respect the environment and the rights of others in their safe enjoyment of it.
Priorities:
• Improving street cleanliness: Further improve street cleanliness by targeting sites where substantial improvements in this area can be made.
• Reducing waste: Reduce the amount of residual waste produced in the Royal Borough through a combination of less overall waste and more reuse, recycling and composting.
• Efficiency: Regularly review priorities, working methods and useofresourcestobecomemoreefficient.
Priorities:
• Addressing the challenges posed by climate change: Implementing the Climate Strategy, make changes to the operation of the Council’s estate, deliver services in a more energyefficientwayandstimulatechangeamongstresidents, businesses and other organisations.
Really good servicesTELS aim: To provide leisure and arts facilities and services that promote good physical and mental health and a sense of well-being.
SERVICE DELIVERY PLAN 2009/12
10
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Priorities:
• Developingartisticpractice:Developexcellenceinartistic practice, including professional development for artists and cultural organisations, which will contribute to the reputation of the Royal Borough and attract new businesses and new residents.Thiswillenrichthe‘socialmix’andfuelthelocal economy.
• Encouragingparticipationinthearts:Encouragepeopletotake part in more cultural activity and enhance their artistic skills to create a stronger sense of community.
• LeavinganOlympiclegacy:Capitaliseonthe2012Olympics and Paralympics to promote recognition of the Royal Borough as a place for creativity and innovation, and increase participation in sport and community activity.
TELS aim: To ensure that people can move about the borough safely and efficiently, with minimal impact on the environment.
Priorities:
• Fair parking: Doing all we can to make it easy for motorists to comply with parking rules and regulations, and to take a sensible approach to enforcement.
• First class roads and pavements: Continuing to lead the way in delivering high-quality and well-maintained streets for all to enjoy.
• Promoting better transport choices: Making it easier for residents to choose not to use a private car.
TELS aim: To provide services that help our residents cope with the impact of a changing climate, and endeavour to reduce the adverse effects our work may have on climate change.
• Addressing the challenges posed by climate change: Implementing the Climate Strategy, making changes to the operation of the Council’s estate, delivering services in a more energyefficientwayandstimulatingchangeamongst residents, businesses and other organisations.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
11
TranSporT, EnvironmEnT and LEiSurE SErvicES
Renewing the legacyTELS aim: To improve and maintain our open spaces and streetscape for the benefit of current and future generations.
Priorities:
• Improving parks: Ensure the Council’s parks remain a valuable resource for all residents by improving them as outlined in the Council’s ten year Parks Strategy, and winning ‘Green Flag’ status for all of the Royal Borough’s parks over the nextdecade.
• Transforming Exhibition Road: Deliver ambitious enhancementstoExhibitionRoadthatwillcreateamore welcoming environment in which to live, work and visit.
TELS aim: To tackle the causes of climate change that arise from the activities of those living and working in the borough, and take action to adapt to the unavoidable effects of a changing climate.
Priorities:
• Protectingandenhancingtheenvironment:Deliverlasting improvements to the environment and reduce the adverse impact of the Council’s and its partners’ operations on the environment by implementing the action plans that will deliver the Council’s Environment Strategy.
SERVICE DELIVERY PLAN 2009/12
12
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Community Strategy linksThe Community Strategy describes what it feels like to live in, work in, or visit the Royal Borough. Our contribution to the strategy is significant, particularly in achieving the following goals:
• Aboroughwithanenvironmentandamenitieswhichenhance the quality of life of the whole community, and which is aware of, prepared for and able to meet the challenges presented by climate change.
• Aboroughwhereeveryonehastheopportunitytoenjoyits public parks, open spaces and a wide variety of high quality cultural, artistic and leisure activities.
And in taking the lead in the goal to:
• Minimisetheimpactonclimatechangebythoselivingand working in the borough.
TELS also has a part to play in cross-cutting issues that affect the borough, such as safer communities and improving health and well-being. We recognise that the borough has a diverse population and consideration for issues of inclusivity and equality are paramount in the work we carry out.
Smartest CouncilThe Smartest Council initiative wants to build on our reputation as one of the best councils in England. It recognises changing circumstances and the need for us remain excellent.
This is particularly true in the current economic climate and will be considered in all future business planning and decision making processes within TELS.
We have a key role to play in the main Smartest Council programmes, such as ‘Here to Help’, ‘Space’ and ‘Mobile Working’. Work will also take place on embracing the Council’s ‘Values’ in the workplace.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
13
TranSporT, EnvironmEnT and LEiSurE SErvicES
How are we led and scrutinised politically?The business group’s responsibilities are diverse and far-reaching, and our work broadly falls within the remit of the Cabinet portfolio for Transportation, Environment and Leisure. It covers leisure, arts and cultural services (including museums and sport centres), parks and open spaces, licensing, waste management and environmental policy. It also includes transportation and parking policy, traffic management issues, highways and transport planning.
In relation to community safety work undertaken by our Waste Management and Street Enforcement Service, officers also report to the holder of the Cabinet portfolio for Community Safety.
Overseeing the key decisions made by Cabinet Members are a number of Overview and Scrutiny Committees (OSCs). The Public Realm OSC has a primary scrutiny role over TELS. There are also a number of committees and strategic working groups that ensure the business group is delivering what it is meant to be. These include the Community Safety Board and the Regulation Enforcement and Review Committee.
SERVICE DELIVERY PLAN 2009/12
14
TranSporT, EnvironmEnT and LEiSurE SErvicES
How are staff involved in the development of the SDP?Senior managers have a responsibility to ensure the TELS SDP reflects the key priorities emanating from the Cabinet and Management Board; they should provide the ‘big picture’ context.
Service managers are tasked with providing the annual work plan for each of their services in consultation with their staff. This can be through team meetings and one-to-ones. Not only are managers asked to discuss service delivery planning with their teams, TELS staff are also invited to raise relevant issues directly with the SDP author. Each staff member should be able to recognise an element of the SDP that reflects their work and targets.
The Strategy and Service Development division is responsible for publishing the SDP each year and, while the bulk of the work is done in the quarter before the new financial year, information gathering takes place throughout the year.
Drafting is an iterative process involving consultation, consolidation and checking. Once finalised, the SDP is made available on the TELS intranet site and in hardcopy (on request), and all TELS staff, unions and working partners are invited to provide feedback and suggestions for improvement throughout the year.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
15
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
16
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
What we doWaste Management and
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
17
TranSporT, EnvironmEnT and LEiSurE SErvicES
Leisure DepartmentThe Waste Management and Street Enforcement Service manages several operations related to street-based activity. It is responsible for the borough’s waste collection and recycling service, and keeping the streets clean and in good order. The Contracts Team manages the contract with SITA, the waste collection and street cleansing service provider, and works in partnership to deliver high standards of service. The Service has a Commercial Waste Team that seeks out new business and manages existing commercial waste collection accounts. Recycling is a very high priority and the amount of waste diverted from landfill steadily increases every year.
Quick fact: In the first six months of 2008 to 2009, we collected around 1,200 tonnes less waste for landfill than in the same period of 2007 to 2008.
The Markets Team issues street trading licences and manages the Council’s two markets at Portobello Road and Golborne Road. The Enforcement Teams take action to prevent and enforce against street clutter and fly tipping. The Safer Neighbourhoods Team works closely with the police to solve complex social and environmental problems, including vandalism and street drinking. The service also manages several other community safety functions including the Parks Police, the contract for dog wardens, and CCTV.
The Waste Management and Street Enforcement Service have resources dedicated to improving public health and safety at special events - in particular, the Notting Hill Carnival. Officers work closely with the Metropolitan Police, Westminster City Council and London Notting Hill Carnival Ltd (LNHC) to ensure a safe event and minimise the adverse impacts of the annual event on residents.
The Arts and Leisure Service brings together a number of leisure
SERVICE DELIVERY PLAN 2009/12
18
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
and cultural services. It is responsible for developing the Royal Borough’s Arts and Cultural Strategy which outlines how arts and culture are being progressed in the borough. This forms an important part of the Royal Borough’s overall Community Strategy. The Museums team runs the Council’s two museums (Leighton House and Linley Sambourne House), and its art galleries (the Ice House and The Orangery). These prestigious visitors’ attractions are also hired out as venues for special occasions, such as weddings and private exhibitions.
Quick fact: The In Transit festival attendance and participation figures increased from around 10,000 people in 2007, to 30,068 in 2008.
Unlike other civic services provided by the Council, Opera Holland Park (OHP) is unique to the Royal Borough. The performance season takes place over nine weeks between June and August and consists of an average of 47 performances. The team is responsible for the artistic requirements, marketing, gaining sponsorship and recruitment.
A significant part of Art and Leisure’s work is in procuring and managing the contract of the Council’s two sports centres (Kensington Sports Centre and Chelsea Sports Centre). The current contract is with Nuffield Health and the Sports Development (Adult) Team works closely with the Youth Sports Development Team (based in Family and Children’s Services) to develop opportunities for all sectors of the community to participate in sporting and physical activity. The team is also focused on delivering the new Sports and Physical Activity Strategy for the Royal Borough.
Quick fact: There were over 500 resident responses to the leisure satisfaction surveys in autumn 2008.
The service also manages the contract for grounds maintenance (including cemeteries and sports facilities in the parks) that is held by Quadron Services Ltd. The Parks Team continues to implement the Royal Borough’s ten year Parks Strategy Action Plan, for improving all the parks in the borough.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
19
TranSporT, EnvironmEnT and LEiSurE SErvicES
The Ecology Centre, based in Holland Park, provides an environmental education service for schools and is responsible for developing the Royal Borough’s Local Biodiversity Action Plan. This plan sets out the Council’s and partner organisations’ commitments towards protecting and enhancing the local natural environment.
Transportation and Highways DepartmentHighways and Construction manage the physical improvements, maintenance and repair of the borough’s roads, streets and bridges - including Albert Bridge and Chelsea Bridge over the River Thames. Such maintenance and repair work includes street lighting, resurfacing, paving, road signs and other street furniture such as bollards and seats.
It plays an integral part in reducing street clutter and introducing Yorkstone and other high quality materials into the streetscape. It also oversees the issuing and enforcement of highways permits for a variety of street-related activity, such as erecting scaffolding, or carrying out work on the street.
Working closely with other services in TELS and Planning Services, officers play a key role in the implementation of streetscape improvement projects and road safety schemes. The service also has a highways network management role to carry out the Council’s responsibilities under the Traffic Management Act 2004, ensuring that works on roads are better managed and coordinated.
Quick fact: There are over 10,000 utility company excavations in the highway each year.
Parking Services covers all aspects of the Council’s parking management and enforcement responsibilities, including the procurement and management of the Council’s parking enforcement contractor (currently NCP). As well as issuing and dealing with compliance issues of penalty charge notices, resident parking permits and parking suspensions, it also manages the Town Hall car park.
SERVICE DELIVERY PLAN 2009/12
20
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
The department oversees the operations of some 800 pay and display machines located in the borough and has a dedicated contact centre, Parkingline, that motorists can contact.
Quick fact: In the financial year ending in March 2008, Parking Services processed approximately 262,000 Penalty Charge Notices and removed around 8,200 vehicles that were found parked in contravention. They also processed 140,305 telephone calls during this period.
Traffic and Transportation Policy is the strategic development function of the department, leading on all areas of transportation policy as well as the streetscape work for which the Council has received national and international recognition.
This work incorporates, among other things, road safety and traffic management elements. Its innovative partnership with Project Centre Ltd, an engineering consultancy, assists in the implementation. Officers work with schools and businesses on travel plans to reduce the number of car journeys in Kensington and Chelsea, and have also facilitated the expansion of car clubs across the borough.
The group deals with Transport for London (TfL) on a wide range of issues, including congestion charging and public transport. It also works closely with Council’s Planning and Borough Development officers to ensure that new development does not add to traffic growth and parking pressure, and has championed the use of ‘permit-free’ agreements for new housing.
Quick fact: There are now 97 on-street and 30 off-street car club bays in the borough, and nearly 4,000 members of car clubs. See www.rbkc.gov.uk/TransportandStreets/general/carclub.asp for details.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
21
TranSporT, EnvironmEnT and LEiSurE SErvicES
Licensing and Business ImprovementCustomer Services generally provide the first response to members of the public who call or email the Council for a variety of services and information. The team handles the calls and emails fielded by three Council contact centres - namely Environmental Healthline, Arts and Leisureline, and Streetline - as well as the out of hours call handling service.
Last year, the three centres and the out of hours service dealt with a total of 150,000 calls. The contact centres also deal with a range of administrative duties including pest control bookings, payment processing for a range of services and food hygiene course bookings. The team also manages the ‘Too big for the bin’ service.
Quick fact: Streetline and Environmental Healthline had a combined average of over 95 per cent of calls answered within 15 seconds, in the period January 2008 to September 2008. This is higher than the Council’s target of 90 per cent.
Strategy and Service Development (SSD) provide strategic and policy development support for the entire business group. It is responsible for developing the Council’s Climate Change Strategy and Environment Strategy, and leads on corporate requirements such as service delivery planning, the annual review of charges, and business improvement initiatives.
It is responsible for formulating and implementing the business group’s Information Systems (IS) Strategy, including the procurement and deployment of systems, and integration with the corporate IS Strategy. It also provides expertise in analysis and consultation, including coordinating the TELS performance monitoring reporting and overseeing any consultation work carried out within TELS. Responsibility for coordinating health and safety, equalities, risk management and business continuity planning work also rests with the team.
SERVICE DELIVERY PLAN 2009/12
22
TranSporT, EnvironmEnT and LEiSurE SErvicES
Quick fact: A community launch event for Sunbeam Gardens is to be arranged for spring 2009.
The Licensing Team issues and enforces permits for a variety of premises and activities, including licences to sell alcohol and provide public entertainment, particularly enforcing legislation stemming from the Licensing Act 2003.
Officers support Councillors on the Licensing Committee, who review and accept or reject various licensing applications. The team is responsible for processing applications and overseeing licences for casinos, betting shops and other types of gambling premises in accordance with the Gambling Act 2005.
Quick fact: In its successful pilot year, 37 licensed premises were awarded membership of the Best Bar None scheme. All of these premises underwent a rigorous application process and had to demonstrate good, if not excellent, standards of management. The scheme will be extended to the whole borough in 2009, targeting a total of 150 premises.
Group FinanceGroup Finance manages a full range of accountancy and financial management services for the business group. It provides financial input and support to decision making processes at all levels, ensures corporate standards are maintained, and enables sound financial and operational controls and service improvements to be implemented.
Quick fact: The 2008 to 2009 revenue budget for the business group is £21m, which is made up of expenditure of £75m offset by an income of £54m.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
23
TranSporT, EnvironmEnT and LEiSurE SErvicE
SERVICE DELIVERY PLAN 2009/12
24
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Strategic relationshipsTransport, Environment and Leisure Services (TELS) has an extensive history of working in partnership with other business groups, local authorities, external organisations and agencies. The key strategic relationships are described below, but this list is by no means exhaustive.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
25
TranSporT, EnvironmEnT and LEiSurE SErvicES
Arts and Leisure The Arts Service works with a number of partners to deliver its regular activity programme. For example, Western Wedge is a partnership between the Arts Council and eight West London boroughs which is working towards delivering Momentum – a project enhancing the capacity for dance in the area.
TheSeer.info Partnership Board, a network of 16 councils, has developed a website that includes a directory of cultural events around London. The Festivals Forum is a network of local festival and carnival organisations working together to promote local festivals and identify shared opportunities for professional development.
As well as working within these cross-borough networks, we also work closely with local organisations delivering events in the borough.
The Arts Service also works with a number of contractors who help with the delivery of services. This includes Quadron (grounds maintenance and sports facilities in the parks) and Nuffield Health (leisure facilities).
SERVICE DELIVERY PLAN 2009/12
26
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Environment The North Kensington Environment Project (NKEP) brings together people from a wide spectrum of community and voluntary organisations. It includes working with the Urban Eye Project (a community arts charity), the Westway Development Trust and the Muslim Heritage Centre, to improve the physical environment around the Westway using art, horticulture and local participation.
We also work with organisations such as Sixty Plus, Full of Life, Equal People, Scope, the Tenant Management Organisation (TMO) and local Residents Associations to bring environmental improvements to the area.
Work also continues with longstanding partners, such as the Kensington and Chelsea Environment Round Table and the London Environmental Coordinators Forum (LECF). The ‘Green Partners’ group brings together representatives from local businesses, voluntary organisations, academic institutions and other public bodies, to share information and experiences in relation to sustainable development issues.
We hope to develop joint working initiatives with these sectors to address the environmental challenges faced by the whole community.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
27
TranSporT, EnvironmEnT and LEiSurE SErvicES
TransportTransport for London (TfL) delivers London’s public transport services and manages some of the major roads in the city. We work with TfL on areas such as improvements to local bus services. We also hold regular meetings of the Public Transport Advisory Group so that Members can raise local issues of concern with representatives of London Underground, TfL Buses and local bus operators.
The Council has pioneered an award winning, innovative approach to partnership working with our transport engineering consultancy Project Centre Ltd. Seven consultants are employed on a permanent basis to work within Traffic and Transportation Policy, with a further two working in Highways and Construction. Additional services are being made available as and when required. Other contractors include J Murphy and Sons (footway works), Ringway (carriageway surfacing) and NCP (parking enforcement).
Case studyResidents of Kensington and Chelsea rely largely on TfL to deliver reliable public transport services. In 2008 to 2009, TfL allocated some £2.8m to the Royal Borough to deliver transport-related schemes, including road safety education programmes.
TfL also fund and work closely with the Council to develop public spaces such as Exhibition Road. Major decisions on transport investment are taken at a London-wide level, increasing the importance of attempts by the Partnership to express local priorities and influence regional bodies through lobbying.
SERVICE DELIVERY PLAN 2009/12
28
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Waste Management The Western Riverside Waste Authority (WRWA) is an autonomous statutory local government body, responsible for the disposal of waste collected by the Council. WRWA has responsibility for waste disposal on behalf of the Royal Borough and the London boroughs of Lambeth, Hammersmith and Fulham, and Wandsworth. It is managed by a committee comprising of two elected councillors from each of the four councils. SITA acts as a key contractor, providing waste management and street cleansing services.
Other key partnerships
Metropolitan Police Service (MPS)The MPS is a major partner in the ‘Safer Surer’ campaign to reduce crime in targeted areas of the borough. As part of the campaign, Safer Neighbourhood Teams (SNTs) provide a policing presence in local neighbourhoods to tackle ‘quality of life’ crimes such as graffiti, abandoned cars, noisy neighbours and vandalism.
TELS officers attend the Partnership Tasking Group, which brings together a wide range of Council, MPS and community representatives all working towards reducing crime and improving community safety in the borough.
In addition, the Licensing Team is starting to work closely with the MPS on specific projects to reduce crime and disorder around licensed premises.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
29
TranSporT, EnvironmEnT and LEiSurE SErvicES
Other business groupsA vast amount of TELS work links in with the other business groups in the Council, whether on a day-to-day basis or in relation to discrete projects. Examples include working with Corporate Services to promote sustainable procurement, and our long-standing collaboration with Planning and Borough Development on streetscape and transportation planning. We also continue to provide customer service provision for Environmental Health, and out of hours call handling for a variety of services such as the Homeless Persons Unit and the Emergency Duty Team.
Our services work proactively across all business groups. Indicative of this is the Arts Ambassadors network (which encourages the use of arts and culture in service delivery across the council) and the Green Champions present in the business groups.
Kensington and Chelsea Partnership (KCP)The Kensington and Chelsea Partnership, led by the Council, brings together local public organisations including the Metropolitan Police, the Kensington and Chelsea Chamber of Commerce, and the Primary Care Trust, to work alongside the voluntary sector and community groups. It aims to join up services within the borough, plan locally for the long term, and improve quality of life in the borough - especially in more deprived neighbourhoods.
London Borough of Hammersmith and FulhamThere was a major development for the business group and the Council during 2006, with the creation of a joint directorship between the Royal Borough and the London Borough of Hammersmith and Fulham which covers transportation, highways and parking. This has not only brought about efficiency savings, but has also paved the way for developing joint initiatives with our neighbouring borough.
SERVICE DELIVERY PLAN 2009/12
30
TranSporT, EnvironmEnT and LEiSurE SErvicES
As a result of the successes during the two years of this unique arrangement, both councils have committed to continuing the joint directorship for a further three years. We have also made a joint submission to the National Transport Awards in the ‘Partnership of the Year’ category this year.
Portobello and Golborne Management Committee (PGMC)This voluntary organisation represents the area’s market traders and shopkeepers, and protects and promotes the markets in the Portobello and Golborne area. The Council consults the Committee on an ongoing basis with regard to the borough’s two markets and the related services run by the Council.
Primary Care Trust (PCT)The joint publication of the Royal Borough’s Public Health and Well-being Strategy Choosing good health – together in 2007 was an important step in underpinning our work with the PCT. TELS has an important part to play in realising the strategy’s vision, particularly in the realm of managing parks, open spaces, leisure centres and in the arts. Working with the PCT, we aim to develop initiatives that have a positive impact on health and well-being.
Westway Development Trust (WDT)The WDT manage 23 acres of land under and around the Westway flyover in North Kensington. It impacts greatly on the quality of the local environment, local employment and sports provision. Given the clear areas of common interest, we wish to look at the scope for greater joint working and dovetailing of services.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/10
31
TranSporT, EnvironmEnT and LEiSurE SErvicE
Best Bar None - Working in partnershipThis scheme has a variety of different partners from the Council, MPS, TfL and the British Institute of Innkeeping. The wide range of partners on the steering committee, each with extensive experience in their own fields, has proved to be invaluable in setting up an effective BBN scheme for licensees, neighbours and visitors to the borough.
The scheme aims to help licensees to adopt a completely holistic approach to managing licensed premises, maintaining and continually raising standards.
SERVICE DELIVERY PLAN 2009/12
32
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
continuous improvement Continuous service improvement is a well-established concept within the business group. We deliver some essential services for residents, businesses and visitors to the borough and are committed to providing value for money and delivering our services to the best standards we can with the resources we have. There are three elements of continuous improvement: consultation, performance monitoring, and value for money and efficiency.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
33
TranSporT, EnvironmEnT and LEiSurE SErvicES
ConsultationConsultation with our residents and stakeholders is one of the most important things we do. It enables us to establish what they think of services, what they want from them, and what they think of our plans for the future. We then use this information to help us make decisions about services and policies.
We do this in a number of ways - from consulting on drafts of documents and meeting with groups of residents to discuss services, to building long-term relationships with groups and individuals and sharing decision making responsibilities with them. All areas of the business group try to create opportunities for people to be involved in decisions about their services.
There has been good progress in involving a wider range of people during 2008 and 2009, and this has included encouraging more joined-up working within TELS and other business groups. In particular, there has been work with Family and Children’s Services to encourage children’s participation in parks’ consultation projects.
Whilst departments lead on their own consultation projects, all work in this area reflects corporate guidelines on consultation and market research, and is reported to senior management and councillors. The Vital Messages system captures information about past, current and future consultation exercises and is a way of tracking what has changed as a result of work carried out.
SERVICE DELIVERY PLAN 2009/12
34
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Some examples of consultation projects from 2008 to 2009 are:
Leisure centre customer satisfaction surveysThe Leadership Factor is a market research consultancy firm which has developed its own methodology for measuring customer satisfaction, the ‘drivers’ for satisfaction, and the relevance of each driver to satisfaction as a whole.
The methodology has been adapted in-house and was run for the second time this year. It showed that changes made in response to last year’s survey had had a noticeable impact on customers’ overall satisfaction, and highlighted further areas for potential improvement. In particular, cleanliness, though improved, was still an issue for many customers, along with the attitude of leisure centre staff.
The Council’s partners, Nuffield Health, are keen to make use of the results and develop staff training initiatives to achieve further improvement for next year.
Little Wormwood Scrubs consultationExtensive consultation has been undertaken since May 2008, when Little Wormwood Scrubs came under the Royal Borough’s management. The aim was to find out the views of residents and park users on the future of park.
A two-stage process took in the views of park users, including the Friends group, as well as local children and their parents, to find out what they thought of the park and what they felt the Council’s priorities should be for improving it.
These views were presented as a range of ideas, and park users were given a second opportunity to comment on them, via a questionnaire and face-to-face sessions in the park and at local venues.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
35
TranSporT, EnvironmEnT and LEiSurE SErvicES
Future consultation and engagement work up to 2012With the new Government duty (Duty to Involve) being introduced in April 2009, there is continued emphasis on good communication and consultation with residents and partners as part of service delivery.
Within TELS, this will mean being more systematic in the way we gather and use feedback on services, and more adventurous in the way we involve people in making decisions about services.
Some examples of how we might do this are set out below.
Customer satisfaction - monitoring of parksOver the past few years, there have been comprehensive consultations about some of the major parks in the borough which have led to a good understanding of the issues that matter to park users. In addition, during 2008 to 2009 the Residents’ Panel was asked about parks using the Leadership Factor methodology to ascertain drivers of satisfaction. In the next three years we will look to build a programme of individual customer satisfaction surveys for all the borough’s main parks.
Delivering the Climate Change StrategyThe Council’s role as community leader is identified in the Climate Change Strategy as one of the three main roles it plays in reducing the borough’s carbon footprint.
To achieve this, TELS is committed to working with local groups and organisations in effectively communicating the message. Ideas include working with the Environment Round Table to produce a lay persons summary of the strategy and develop a partnership with a local primary school. This should, in turn, assist with an implementation strategy in schools and boost communication with other children.
SERVICE DELIVERY PLAN 2009/12
36
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Other consultation work Other consultation expected to take place over the next three years includes:
• Customersatisfactionmonitoringofhighwayscustomers
• LondonSustainabilityWeeks–feedbackfromattendeesof Council events
• ConsultationwithlocalpeopleonnewplayequipmentforLittle Wormwood Scrubs
• ConsultationwithlocalpeopleonthefutureofAvondalePark
• Continuedconsultationwithstaffabouttheirtravelchoices
• Consultationwithresidentsabouttheirparticipationinthe doorstep recycling service.
Performance monitoring
External assessmentAll councils are assessed by the Government on how well they deliver services, how well they are run, and the degree to which they are improving. Up to 2007 to 2008, the framework used to make this assessment was the Comprehensive Performance Assessment (CPA). Within the CPA system, TELS was responsible for managing the Environment block. For 2007 to 2008, the Council was awarded four stars and is “still improving strongly”.
The CPA system has now been replaced by Comprehensive Area Assessment (CAA), which will look at how well local services are working together to improve the quality of life for local people. There are various elements of the CAA process including the National Indicator Set, Local Area Agreements and the Community Strategy. The first CAA score is expected to be announced in November 2009.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
37
TranSporT, EnvironmEnT and LEiSurE SErvicES
The CAA will form part of the new assessment framework, as well as other relevant performance assessment frameworks. It will be carried out yearly at:
• county,singletieranddistrictcouncils
• fireandrescueauthorities
• policeauthorities
• PrimaryCareTrusts(PCTs)
• aspartoftheexternalauditbyappointedauditors.
This CAA assessment will have both an area and organisation component. It assesses use of resources in a broader way than previously, embracing the use of natural, physical and human resources. It places new emphasis on commissioning services for local people and achieving value for money.
Performance indicatorsPerformance indicators are measures of specific areas of the Royal Borough’s work. These are useful as they enable the Council to look back at how performance compares to previous years, and to look forward in setting targets that encourage improvement.
There are two types of performance indicators: national, which are set by the Government; and local, which measure performance against the Council’s local priorities.
TELS has the responsibility for 23 of the 200 or so national indicators (as outlined in Appendix D). 2008 to 2009 was the first year that the national indicators were reported; therefore, 2008 to 2009 serves as the base year for many indicators. Now that the base year is confirmed, TELS will start to set three year targets for all the national indicators.
While local authorities are obliged to collect national indicators, most also choose to collect local indicators that measure performance on issues that matter locally. TELS have selected 14 local indicators (as outlined in Appendix D) to monitor performance for 2009 to 2010.
SERVICE DELIVERY PLAN 2009/12
38
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Community Strategy and the Local Area AgreementThe Community Strategy is a plan that provides a long-term vision and coordinates the actions of the public agencies, and private and community organisations to meet the needs and priorities of local communities.
The aim of the Community Strategy is to look forward 10 to 15 years and make plans to enhance the quality of life for local communities. A monitoring plan, which accompanies the Community Strategy, presents a suite of performance indicators to monitor progress against the aims (see Appendix D for a full list of indicators related to TELS). The Council and its partners are committed to delivering the aims of the Community Strategy through the Local Area Agreement.
The Local Area Agreement (LAA) sets performance targets to deliver improvements across a range of outcomes that are a priority for Kensington and Chelsea. In summer 2008 all councils were required to select national indicators for the new LAA, these are known as designated national indicators. At the same time, the Community Strategy was also being refreshed.
The strategy has been published and the LAA will be updated again in March 2009 to take account of the new Community Strategy and the aims within it. There are two designated indicators that are related to TELS; in addition, there is also one indicator that is carried over from the previous year.
The diagram (right) explains the relationship between performance data and the various external assessments and frameworks.
Comprehensive Area Assessment
Full Local Area Agreement (delivering for our community)
National Indicator Set
Designated Local AreaAgreement
Community Strategy(consists of national and local indicators)
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
39
TranSporT, EnvironmEnT and LEiSurE SErvicES
Internal monitoring frameworksIn addition to the above, the Council has its own internal processes to monitor performance. These include:
Vital Signs - a bi-annual report to Cabinet on key indicators of performance. The aim is to use a small number of ‘vital’ indicators to inform Cabinet Members about the achievements of the targets it has set itself, and whether performance is set to improve. See Appendix D for the list of TELS Vital Indicators.
Vital Programmes and Projects - the Royal Borough’s Improvement Programme (previously known as the Vital Improvements programme) was originally drawn up in 2002 to address specific recommendations of the CPA Corporate Assessment. It has since been maintained and expanded in response to broader performance framework developments at both a local and national level. It is hoped that this will ensure that strong performance is sustained.
Data qualityThe Council takes the issue of data quality seriously and has formalised a Data Quality Action Plan since 2008. In line with the corporate Data Quality Action Plan, TELS has developed their own plan that is unique to the business group.
The Data Quality Action Plan is essential to improve our data quality arrangements to ensure a consistent, best practice approach across the business group. The action plan involves working with colleagues from all levels, as well as external contractors.
The action plan addresses weaknesses identified through audits and internal reviews, and meets external assessment requirements. The action plan is reviewed annually and is available from SSD.
SERVICE DELIVERY PLAN 2009/12
40
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
ValueformoneyandefficiencyThe challenge of improving services is prompted and driven by a number of factors. We are committed to responding to residents through consultation, and strive to attain the performance set out in the indicators; however, the Council’s own transformational ‘Smartest Council’ initiative, coupled with the external financial pressures on both income generation and grant settlement, also play a key role.
These pressures have prompted an increased focus within the Council on both value for money and efficiency as a way of improving services. In 2008 to 2009, a value for money appendix was added to the SDP in recognition of the importance of efficiency measures. Identifying specific actions in this way assists the business group in prioritising work, allocating resources and ensuring that the benefits of any changes are realised.
Some progress has been made with the actions identified in the 2008 to 2009 plan - most notably with the sharing of procurement knowledge with the London Borough of Hammersmith and Fulham in Highways and Construction, and by the progression of the out of hours service moving towards a split service of CCTV monitoring and call handling. There remain a number of projects that have been carried forward to the current action plan.
The types of activity included in the action plan mostly fall in the category of smarter procurement and the improved use of technology. This includes measures around the improvement of the waste management contract and how energy for lighting is procured. The improved use of technology includes:
• hand-heldmobiledevicesforbothHighwaysandConstruction and Waste Management
• makingservicesavailableonthewebforsportsbooking
• ‘Toobigforthebin’
• residentsparkingpermits.
The current areas identified for improvement, which include both business benefits and financial impacts, are described in Appendix H.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
41
TranSporT, EnvironmEnT and LEiSurE SErvicES
Equalities and diversityExcellent progress has been made on the Equalities Action Plan 2008 to2009. Particular success has been achieved in work on improving the accessibility of parks and open spaces for all; new ramps, better seating at Opera Holland Park, and considering of the needs of families with young disabled children in designing and improving play areas have all been achieved.
The full action plan progress report is available at [please create a link to our Mar 09 updated action plan progress report]. All but five of the actions have been completed within the specified timescale. Work will continue on those that have not been completed, with them rolling forward into the 2009 to 2010 action plan.
The Equalities Standard for local government has been replaced by a new Equalities Framework. Until now the Equalities Standard has been used as a performance and improvement structure for the work on equalities within the Council. The new framework is expected to be less prescriptive and resource intensive, with greater emphasis being placed on the framework linking in with other strategic partnerships (such as Local Strategic Partnerships, Local Area Agreements and Comprehensive Area Assessment); however, it is not yet clear how the framework will be used to structure our work on equalities and diversity. The definition of equality set out in the Equalities Review has been used and this emphasises equal life chances for all.
The Council, along with other London councils, has agreed to achieve Level 3 (Excellence), by 2012. It has been assumed that the Council is currently at Level 2 (Achieving), and there is likely to be some significant work to be done to ensure we can meet Level 3.
Work on equalities remains an important aspect of the business group’s work and should permeate all aspects of it. The new framework also places more emphasis on understanding our communities and is more outcomes focused. For TELS, this new focus will require greater impetus to be given to the monitoring of our progress against actions, and greater effort to collect monitoring data on those who use our services. This will be especially important to ensure that the needs of vulnerable and marginalised groups are taken into account. It may also be the case that that we review the mechanisms in place to enable staff to make local service improvements.
SERVICE DELIVERY PLAN 2009/12
42
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
current and future challenges and issues
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
43
TranSporT, EnvironmEnT and LEiSurE SErvicES
Parks StrategyThe Royal Borough has an ambitious ten year Parks Strategy that sets out to improve and invest in its main parks. This includes a rolling programme of consultation followed by improvements to each of the main parks.
Westfield Park and Kensington Memorial Park have been upgraded and detailed plans are in place for St Luke’s Gardens. We aspire to increase the number of public open spaces managed by the Council, including Brompton Cemetery.
The management of Little Wormwood Scrubs was transferred from the London Borough of Hammersmith and Fulham to the Royal Borough in 2008, as a result of realising this aspiration. Once the management of Little Wormwood Scrubs and Brompton Cemetery is transferred to the Royal Borough, we will aim to embark on a major programme of maintenance and improvement.
Arts and Culture StrategyThe Council’s aspiration for excellence in arts is to be delivered through a ten-year Arts and Culture Strategy, which supports a range of projects. We will promote excellence in the arts and increase access and engagement - especially for those groups who face barriers to participation in arts and culture. We will support a stronger and more sustainable creative economy, and build greater links between creative and cultural activity and the reputation and values of the Royal Borough.
We aim to increase visitor footfall, improve the profile and boost the revenue of the museums. A major refurbishment of Leighton House commenced in late 2008 and this will necessitate closure for approximately 12 months. The refurbishment will rejuvenate the museum and ensure that modern access standards are in place.
SERVICE DELIVERY PLAN 2009/12
44
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
The Council is keen for Opera Holland Park (OHP) to operate without Council subsidy. In 2007, OHP benefited from the new canopy that increased the seating capacity by 200 people. The two main priorities are:
• tomaintainahighquality,appealing,culturally mixedprogramme
• toaspiretominimalsubsidysupportfromtheCouncil.
The Royal Borough’s Environment StrategyThe Environment Strategy was launched in 2006 and sets out the Council’s vision for environmental sustainability in both the conduct of its own business and as a community leader. The initiatives set out as part of the strategy are intended to be completed within the five year framework, and progress is reported annually.
Sustainable procurement features in the Environment Strategy and work has progressed in 2008 to 2009 to develop an approach. This includes drafting a strategy and policy for sustainable procurement, and auditing current practices against the Mayor’s Green Procurement Code. Future work will include education of key officers to assist with contract monitoring, and engaging with our suppliers to promote sustainable practices.
We will continue to ensure that the environment and sustainability have a high public profile in the borough - by scheduling a range of events held during London Sustainability Weeks in June, for example.
The detail of replacing Ireton Lodge in Holland Park is still to be finalised. Proposals include using sustainable technology and low carbon building techniques to house a TELS parks employee and, potentially, could demonstrate what sustainable building and design might look like in the Royal Borough for residents and visitors. Any proposal will include the complete rebuilding of Ireton Lodge. This coincides with the need to replace the outdated Ecology Centre that is also situated in Holland Park.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
45
TranSporT, EnvironmEnT and LEiSurE SErvicES
Climate Change StrategyThe Climate Change Strategy was published in December 2008 and sets out the local direction that the Council intends to take in mitigating the causes and adapting to the impacts of climate change. Over the next three years, we will develop and refine a mitigation strategy showing how the Council will contribute to slowing down global warming in line with our Nottingham Declaration obligations.
Between 2008 and 2009, we completed a study of the Council’s carbon footprint in conjunction with the Carbon Trust and this has identified effective local mitigation and adaptation measures amongst residents and businesses. A new target has been set for the Council to reduce its carbon footprint by 40 per cent by 2015 and this has been added to the Council’s list of vital improvements. New national indicators that focus on climate change were introduced in 2008 to 2009, and this will be a further factor driving our efforts to reduce carbon emissions.
Portobello and Golborne Road marketsResidents, local Members, traders and representative organisations are keen to deliver ambitious regeneration programmes in and around the markets. This will include a varied number of projects to improve both the infrastructure and operational arrangements for supporting the markets and surrounding areas. Securing resources for the projects to provide these changes is likely to be challenging, particularly for longer-term improvements.
SERVICE DELIVERY PLAN 2009/12
46
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Towards2012– ‘Cultural Olympics’ The Royal Borough is playing an active role in the four years leading up to the London 2012 Olympic and Paralympic Games with events demonstrating the cultural and artistic diversity of London, particularly around the museum quarter of South Kensington.
The ‘Cultural Olympics’ are a valuable opportunity to build a legacy for the arts sector and ensure that the Royal Borough’s cultural offer matches other London Cultural Olympic events held in 2012. The borough aims to:
• gainincreasedrecognitionfortheborough’screativity and innovation
• ensuremoreresidentsparticipatinginlocalciviclife
• ensuremorechildrenandadultsinthenorthoftheborough take part in regular sport and physical activity.
Maintain and improve the streetscapeMajor improvements to the streetscape are underway for the highly visited areas of Exhibition Road and Hans Crescent. These improvements aim to serve the increasing demands made by visitors to these areas, and to create high quality public spaces. Plans are also in place for street scene improvements for Ladbroke Grove and Notting Hill Gate, where preparatory work is taking place.
Improve customer service and our response to customers
The out of hours call handling service is to be split from the CCTV monitoring operation this year. Improvements for both services will be driven through the alteration of work practices and shift patterns.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
47
TranSporT, EnvironmEnT and LEiSurE SErvicES
The day time call handling service is to be improved through the cross-training of call handlers in Streetline, Arts and Leisureline and Environmental Healthline. These changes will result in a more comprehensive and flexible service being offered to customers.
Municipal Waste ManagementThe building of an ‘energy from waste’ plant has been agreed through partnership with the Western Riverside Waste Authority (WRWA). The plant is due for completion during 2010 to 2011 and will avoid any punitive costs and environmental degradation associated with landfill.
There will continue to be growing resident and national expectations that we will increase recycling and reduce the impact on the environment of domestic and commercial waste.
Parking policyOver the next three years, the increasing pressure on resident parking may result in new policy directions. Conflicting pressures will continue between the London-wide directives to reduce the environmental and social effects of increasing car use, our own ambitions for carbon reduction and reducing particulate emissions, and the needs of our residents, businesses and institutions. This is set against an overall reduction in parking income and the challenges that this poses for future budgeting.
The use of technological advances, such as online application and renewal of residents parking permits, will enable us to make the service more accessible and convenient for our residents. It will also ensure that the service is more cost effective.
Parking Services undertook a major review of its contracted services in 2008 to 2009. A number of improvements have been identified and will be implemented, including work around the Traffic Management Act (TMA) 2004 and developing the partnership with the contractor and the LBHF.
SERVICE DELIVERY PLAN 2009/12
48
TranSporT, EnvironmEnT and LEiSurE SErvicES
EnforcementChanges in legislation - for instance, the Clean Neighbourhoods and Environment Act 2005, the Gambling Act 2005, and the Health Act 2006 - have impacted on the work we do to help create better city life in the borough. Managing the tensions between greater public awareness of personal rights and higher expectations of public behaviour will continue to stretch our staff.
Work continues with the Council’s ‘Eyes and Ears’ initiative that was successfully piloted in 2008 in the Queen’s Gate ward. The initiative fosters joint working, particularly with the community support officers and the parking attendants. The aim is to extend this to adjoining wards and beyond from 2009.
The CCTV service will be re-organised in 2009 to focus resources on key times and to foster greater cooperation with the Metropolitan Police Service. These changes will result in a more proactive and responsive service.
North Kensington Environment Project (NKEP)NKEP has historically focused on neglected sites that are subject of a Local Area Agreement dealing with orphan sites and waste dumping in the four northernmost wards of the borough. Although this work will continue, other environmental improvements such as establishing community gardens and improving Golborne Road Bridge will be added to the programme of works.
These new projects will provide challenges, particularly in ensuring that local community and community groups are engaged, but will also provide creative and innovative environmental improvements. This work also links to the Council’s aim of improving North Kensington.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
49
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
50
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Sports StrategyThe Sports Strategy identifies methods of addressing the significant health inequalities within the borough and will provide projects in the years ahead. Options for dealing with the lack of sport provision in Chelsea include the refurbishment of Chelsea Sports Centre and exploring the possibility of using alternative sites. Either option will require an innovative approach to ensure success.
Smartest CouncilThe ‘Smartest Council’ initiative encompasses a variety of changes that will impact on the business group. This initiative includes a number of work programmes: ‘Here to Help’ aims to improve customer services; ‘Space’ will change the way that accommodation is used; ‘Mobile Working’ will harness new technologies; and the Climate Change Programme will ensure we do all that we can to reduce our carbon emissions. The other element of the initiative is the work on the organisational values and re-alignment of the management structure.
The shared set of organisational values has been developed through consultation with staff to provide a reference point on how they work together, whether at an individual, team or organisational level. The values are being collaborative, positive, innovative, appreciative and keeping the public service ethos at the heart of everything we do. These values are integral to the change process required under the ‘Smartest Council’ initiative and are closely aligned with the REAL behaviour framework.
The challenge for TELS is to embrace and embody the values in everything that we undertake, so that we all understand what it means for us on a day-to-day basis. GMB is committed to embedding the values, although at the time of writing the actions required have not been finalised.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
51
TranSporT, EnvironmEnT and LEiSurE SErvicES
The combined effect of these programmes will have a profound, but as yet still uncertain, impact on the business group. Some specific changes these initiatives have begun to generate include:
• relocatingTrafficandTransportationPolicytoPembrokeRoad
• theintroductionofthecustomerrelationshipmanagement system (CRM)
• furtherimprovementstothecallhandlingservices.
SERVICE DELIVERY PLAN 2009/12
52
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Workforce development
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
53
TranSporT, EnvironmEnT and LEiSurE SErvicES
TELS Workforce Development Plan 2009 to 2012The Workforce Development Plan has been changed to a three year document so that it is consistent with the time period of the SDP. The timescale also reflects the reality that workforce development is an incremental process that tends to occur over more than a single year.
The purpose of the plan is to:
• identifythecurrentandfutureskillsandthenumberof employees needed to deliver new and improved services
• highlightshortages,surplusesandcompetencygapsinthe workforce and outline actions to address these
• lookatthediversityprofileandensureequalopportunitiesare being offered.
Challenges have emerged from the change instigated by the Smartest Council, Council values, and changes in working practice prompted by the Here to Help and Space programmes. The latest plans have developed actions to address these changes and reflect the results of both the statistical analysis of TELS workforce profile and staff survey.
The plan includes an evaluation of the previous year’s actions and has given greater focus to the action planning for the next three years. The findings of the analysis and the priorities identified were:
Workforce characteristicsWhen compared to the Council as a whole, the business group has:
• fewerwomenintheworkforce
• lowerlevelsofstaffwithdisabilities
SERVICE DELIVERY PLAN 2009/12
54
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
• aslightlyolderworkforce
• alessdiverseworkforce,particularlyincertainsections
• generallyalowersicknessandstaffturnoverrate
• aperceptionbystaffthatcommunicationandworkrecognition could be improved.
PrioritiesThe priorities are:
• toimprovestaffcommunicationthroughregularteammeetings (minimum once every two months) and one-to-one meetings (minimum once every three weeks)
• toincreasethediversityofstafftomirrortheCouncilprofile
• toimprovesicknesslevelssothatnomorethanthreepercent of working time is lost to short-term sickness
• ensureallstaffhaveaminimumoftwodaysrelevanttraining per year
• ensureallstaffhaveaPDP
• toimprovestaffperceptionofbothmotivationandsupport,and learning and development in future staff surveys.
TELS Development ProgrammeIn September 2007, TELS launched a pilot Development Programme to strengthen and develop the skills of junior staff. The pilot concluded in December 2008 with seven delegates successfully completing the programme.
There were four elements, namely:
• SpringboardorNavigator–work-baseddevelopmenttraining designed for non-managerial staff.
• TheInstituteofLeadershipandManagement–NVQinFirst Line Management, or the Chartered Institute of Management’s CertificateinTeamLeading.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
55
TranSporT, EnvironmEnT and LEiSurE SErvicES
• MentoringbyseniormanagersfromTELS.
• Projectwork–aimedatdevelopingtheskillsandexperienceof the delegates outside of their normal work area.
The evaluation of the programme identified improvements not only in skills and expertise, but in confidence, assertiveness and motivation. In a number of cases this has led to the delegate taking on either new responsibilities or a more responsible role.
The feedback from the delegates was extremely positive and where areas of improvement were identified, these will be incorporated into the next programme. The programme will continue to actively encourage applications from both female and black and minority ethnic (BME) employees.
Investors in People (IiP)IiP remains a central element of the Council’s commitment to its staff. In December 2007, the Council’s Investors in People accreditation was reassessed. Although strengths were identified, the assessors felt a number of areas required improvement. These areas were consistency of management, and staff empowerment and engagement.
A further reassessment occurred in March 2008, which renewed the Council’s accreditation. In advance of the next assessment, actions will be required to meet the level set by the IiP standard. TELS will continue to support and implement the required actions as they arise and will use the IiP model as a framework for continuous improvement and review.
SERVICE DELIVERY PLAN 2009/12
56
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
achievements during 2008 to 2009
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
57
TranSporT, EnvironmEnT and LEiSurE SErvicES
Example 1Climate Change Strategy The Council’s Climate Change Strategy 2008 to 2015 was finalised and distributed. During its development there was wide consultation, internally and externally, through local businesses and resident panels, before being agreed by the Council’s Cabinet in September.
The main aims of the strategy are to cut local greenhouse gas emissions and adapt to the impacts of climate change. We intend to do this by putting our own house in order as a council (in regard to the delivery of services), and by leading on this in the community.
Example 2North Kensington Environment ProjectThe landscaping works and new play area at Sunbeam Gardens have been completed. The play area now has over 12 new pieces of play equipment and the landscaping improvements include:
• newpathways
• anew,largergrassareawhichwillallowtheparktobeused for community events and activities
• ayouthseatingareawithtwopiecesofoutdoorgym equipment.
A launch event is to be arranged for late April 2009 and a programme of community events to encourage use of the park is being developing in partnership with the local social landlords.
SERVICE DELIVERY PLAN 2009/12
58
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Example 3Across the Street, Around the WorldThe Across the Street, Around the World arts winter festival came to a close in December 2008. Over 2400 people attended and participated in events; more than double the 2007 attendance figures.
Example 4Environment Day eventsThe Council held two Environment Days in the Royal Borough as part of the sixth Love London Festival. The first open day was held in Holland Park on 10 June in glorious sunshine. Over a 1000 people attended the event and feedback suggested the day was enjoyable because of the quality of the activities and the mixture of informative displays. In addition to the ‘Flood Tent’, which provided important details on flood prevention measures, the farm animals, hanging baskets, and the Dr Bike stands were particularly popular.
Example 5 Recycling Our recycling rate remains strong because we are collecting significantly less waste overall than last year. We are on target to achieve an annual household recycling rate of around 29 per cent, which is just ahead of the target agreed in our Local Area Agreement.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
59
TranSporT, EnvironmEnT and LEiSurE SErvicES
Example 6 Little Wormwood ScrubsLittle Wormwood Scrubs has received a £400,000 grant from the Mayor of London’s Priority Parks initiative. The Parks Team, with help from other Council departments, has been campaigning since the programme launched in November 2008.
Example 7London in Bloom and Britain in BloomThe Council attained a Gold and Silver award in this year’s annual competitions. The Mayor of Kensington and Chelsea hosted a reception on 20 January 2009 to celebrate this success and thanked those involved.
Example 8Eyes and EarsFollowing its pilot success, the ‘Eyes and Ears’ project has been extended to take in all wards in Chelsea. The scheme now covers the southern half of the borough and is looking to extend it northwards.
SERVICE DELIVERY PLAN 2009/12
60
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Example 9The Best Bar None Scheme The Best Bar None pilot scheme in the borough has been a success, having received amongst the highest number of applications in the country. There has also been a significant reduction in reports of crime, antisocial behaviour and nuisance within the vicinity of premises that now have Best Bar None membership.
Example 10School Travel PlansIn 2008 we made great strides towards having approved school travel plans at every school in the borough. By the end of 2008 over 40 schools had plans, and we are on target to ensure that all local authority schools in the borough will have a school travel plan by April 2009.
Example 11ExhibitionRoadThe Council secured £13.4m from the Mayor of London towards the cost of the innovative Exhibition Road scheme. This funding meant that the full scheme could go ahead – with work on the 1960s gyratory system outside South Kensington station already underway.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
61
TranSporT, EnvironmEnT and LEiSurE SErvicES
Example 12TheintroductionoftheTrafficManagement Act in 2008 This has provided a framework for a more open approach with residents regarding our parking enforcement practice. A new ‘resident friendly’ policy document is currently being developed and will be available on the internet later in 2009.
Example 13Park Mark Award For the third year running, the British Parking Association’s Park Mark Award has been awarded to the Royal Borough for its Town Hall car park in Hornton Street. This prestigious award is an initiative of the Association of Chief Police Officers. It is aimed at reducing crime and the fear of crime in car parks. The award demonstrates that the Town Hall car park has measures in place that can help deter criminal activity and antisocial behaviour.
Example 14Carbon Management ProgrammeThe Council launched its Carbon Management Programme in June 2008 and has a target of 40 per cent carbon dioxide reduction by March 2014. We have started to monitor our emissions from our buildings, vehicles fleets, street lighting and landfill sites. The baseline figures are already established and the programme board has been working on identifying potential projects that reduce the Council’s carbon footprint.
SERVICE DELIVERY PLAN 2009/12
62
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Finance The implications of the revenue budget, financial plan and capital budget for the business group are summarised below and have been agreed by the Council. Detailed tables covering resource changes and the Capital Programme are available in the main Capital Programme 2009 and 2010, to 2011 and 2012.
The funding position for 2011 to 2012 and beyond is extremely uncertain due to the changing macroeconomic climate and its impact on public finances. Government grant allocations for the next two years were provisionally announced last year, including many specific grants. The Council is at the funding floor and the known increases in grant for the next two years are well below the rate of inflation.
Within the budget, pay and general price increases are budgeted at 2.5 per cent with allowance made for a number of items (e.g. energy) where cost increases are expected to be much higher. Savings have been identified to balance the budget and to fund growth.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
63
TranSporT, EnvironmEnT and LEiSurE SErvicES
Revenue budget 2009 to 2010The 2009 to 2010 revenue budget is £25m, which is made up of expenditure of £78m, offset by an income of £53m. This is a net increase of £4m on the 2008 to 2009 original budget. There has been an inflationary increase of £2.1m, with a Capital Charges decrease of £0.5m, and £0.052m transferred to other services.
Opportunities for saving within the business group amounted to £2.352m, comprising £0.509m to the General Fund and £1.843m to on-street parking. These savings are broken down as follows:
Fund savings £
Additionalincomeoverandaboveinflationaryrises 227,000
Reduction in running costs 282,000
Subtotal 509,000
Reduction in pay and display budgets 182,000
Additionalincomeoverandaboveinflationaryrises 1,330,000
Reduction in running costs 331,000
Subtotal 1,843,000
Total 2,352,000
SERVICE DELIVERY PLAN 2009/12
64
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Growth of £4.83m has been built into the budget; comprising £1.73m additional expenditure to the General Fund and £3.1m in on-street parking. The principal growth items are shown below:
General Fund growth £
Environmental events 30,000
Increased running costs of public conveniences 25,000
Portobello Road and Golborne Road DevelopmentOfficer
72,000
Reduced income from Young Street car park 28,000
2012 Olympics and related cultural events (funded from reserves)
150,000
Running costs at Brompton Cemetery 250,000
Western Riverside Waste Authority 1,175,000
Subtotal 1,730,000
On-street parking growth £
Reduced income from resident permits 100,000
Parking income shortfall 3,000,000
Subtotal 3,100,000
Total growth 4,830,000
On-street parking growth £
National non-domestic rates 32,000
Street trading -75,000
Total increase in expenditure -43,000
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
65
TranSporT, EnvironmEnT and LEiSurE SErvicES
The headline changes to the budget, when compared to 2008 to 2009, are increasing inflation (£2.1m), reduced parking income (£1.798m) and increased waste disposal costs (£1.175m).
The main service contracts, including the cleansing contract, are inflated annually on agreed published indices including labour, Retail Price Index and oil. There is an element of catch-up for underestimating inflation in 2008 to 2009 and predicting inflation for 2009 to 2010 which, until recently, was running at five per cent per annum against a general allowance for inflation of two-and-a-half per cent.
The 2009 to 2010 budget allows for higher than average increases for these and energy costs, particularly for street lighting. Inflation is now reducing, so it is possible that the full extra indexation allowed for, will not be needed. The majority of £39m of parking income is not increased annually for inflation, as charges are set over longer time periods, whilst costs do increase with inflation.
Customers have changed their practice and the Council are now issuing fewer Penalty Charge Notices compared to previous years. Neighbouring boroughs are experiencing similar changes but, as a result, the Council’s income has fallen by £3m. This is partially offset by increased parking suspension income and a proposed ten per cent increase in residents parking permits in April 2009.
Waste disposal charges will increase by £1.175m above inflation. The two main reasons are the £8 per tonne increase in Landfill Tax to £40, and the need for Western Riverside Waste Authority to purchase Landfill Allowance Trading Scheme (LATS), as the tonnage allocation will be insufficient to meet landfill requirements.
The budget includes service savings and locally funded growth items, which recycle business group savings and corporately funded growth. It incorporates savings totalling £2.352m, partially offset by local growth of £0.255m. The corporately funded growth amounts to £4.575m, which includes increased waste disposal and reduced parking income. The residual corporate growth is £400,000. These are all detailed within the budget tables.
SERVICE DELIVERY PLAN 2009/12
66
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Appendix F contains tables showing a summary by service of the 2009 to 2010 revenue budget, a subjective summary and third party payments.
The capital budgetThe capital budget in this SDP sets out commitments and proposals for substantial expenditure on a wide range of transportation, environmental and leisure improvement projects and essential maintenance.
Appendix G shows the capital budgets according to the Cabinet portfolios. Many schemes require a funding release before they can commit expenditure, normally through a key decision. The detailed projects list identifies those schemes in 2009 to 2010 that are already assumed to have authority to spend. Schemes assumed to have spending approval may still require the governance process to be observed, to comply with the Financial and Contract Procedure Rules.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
67
TranSporT, EnvironmEnT and LEiSurE SErvicES
Main proposed capital projects: 2009 to 2012The total cost of the schemes included in this draft programme is £52.575m, of which it is proposed to spend £18.408m in 2009 to 2010 as summarised below.
Total cost and funding of projects
Description 2009/11 2010/11 2011/12 Later years Total cost
£'000 £'000 £'000 £'000 £'000
Expenditure
Arts and museums 1,274 0 0 0 1,274
Community safety 200 200 0 0 400
Highways and street scene 12,617 14,670 7,045 910 35,242
Parks 2,027 1,137 911 71 4,146
Sports centres 1,205 173 145 0 1,523
Waste, cemeteries and markets 1,085 1,955 1,600 5,350 9,990
Total Expenditure 18,408 18,135 9,701 6,331 52,575
Funding
Capital grants and contributions 5,523 7,100 3,010 330 15,963
Capital receipts 0 0 0 0 0
Car parking reserve 6,596 7,820 4,510 580 19,506
Capital reserves/revenue funding 1,656 400 0 0 2,056
Corporate funding * 4,633 2,815 2,181 5,421 15,050
Total funding 18,408 18,135 9,701 6,331 52,575
*Use of borrowing, general capital reserves/receipts
SERVICE DELIVERY PLAN 2009/12
68
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Proposed Capital Programme: 2009 to 2012Changes to schemes in existing programme period (2008 and 2009, to 2010 and 2011)
The main reason for the change to the existing schemes is the updated expected cost to complete Exhibition Road. Stage 1 has been approved and work has commenced; Stage 2 of the Kensington paving works, subject to a cabinet decision, will commence in mid 2009.
There are several other major schemes in the programme, notably Leighton House Phase 2, St Luke’s Gardens, the Parks Strategy and Development Plan, and the Hans Crescent and Hans Road development; however, there are no significant changes from the last capital budget, apart from the phasing of expenditure for slippage.
New schemes added to existing programme period (2008 and 2009, to 2010 and 2011)
A number of schemes have been added to the current programme period. The significant ones are:
• AlbertBridgemajorstructuralrepairs.Structuralproblems wereidentifiedandreportedtoCabinet.TfLhavefundedthe fees to identify the works required and will fund the structural repairsrequired.Thiscurrentlystandsatapproximately£6m, with the Royal Borough meeting the cost (£1.42m) of the repainting and relighting.
• BromptonCemeteryinfrastructure.TheRoyalBoroughis negotiating to take over the management of this site from the RoyalParks.Asumof£8.8mhasbeenidentifiedasthesum required to bring the area to a high standard. It will be phased over a ten year period.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
69
TranSporT, EnvironmEnT and LEiSurE SErvicES
• TheCouncilhastakenoverthemanagementofLittle Wormwood Scrubs from the London Borough of Hammersmith and Fulham. Phase 1 is included as a new scheme (to enable some impact to be made at £600,000), with Phase 2 included as a pipeline bid of £1.4m while proposals are prepared.
• LadbrokeGroveenvironmentalimprovements.Thisisarepaving and streetscape scheme. It has been in the pipeline for some timeandisexpectedtocommencein2010to2011.
• TheCabinethasagreedaCouncilcontributionof£650,000 towards the new station on the West London Line at Imperial Wharf.
Other new schemes are:
• Turningtheone-offinitiativeNorthKensingtonEnvironmental Project into an annual rolling programme of £200,000.
• ResurfacetheKensingtonMemorialParkandHollandPark tennis courts.
• WorkstoBevingtonRoadandTalbotRoadpublic conveniences, and provide new toilet facilities in Hanwell Cemetery.
• ProvideanelectricitysupplytoPortobelloRoadmarkettraders.
• ReplacetheCCTVcameras.
SERVICE DELIVERY PLAN 2009/12
70
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Schemes in the pipelineThere are a number of projects which are likely to appear in capital programmes in future years, but are not sufficiently advanced to be included in the 2009 and 2010, to 2011 and 2012 programme. These ‘pipeline’ schemes are shown in the table below with best estimates of the likely cost:
Pipeline schemes - Appraisal/concept (Stage 1)
Title Start YearTotal £'000
Council funding £'000
Transport, Environment and Leisure Services
Chelsea Sports Centre and Town Hall Site 2009/10 30,000 30,000
Golborne Road Area Improvement 2009/10 1,749 1,599
Holland Park - New Ecology Centre 2010/11 990 990
Hornton Street Public Conveniences 2010/11 180 180
Leighton House Museum Phase 3 2010/11 3,100 2,050
RoyalCrescentTrafficCalming 2010/11 700 700
36,719 35,519
Strategic brief/outline cost (Stage 2)
Title Start YearTotal £'000
Council funding £'000
Transport, Environment and Leisure Services
Ireton Lodge 2010/11 800 800
Little Wormwood Scrubs Development - Phase 2 2010/11 1,400 1,400
Notting Hill Gate Initiative 2010/11 4,800 4,800
7,000 7,000
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
71
TranSporT, EnvironmEnT and LEiSurE SErvicES
• TheChelseaSportsCentreisoneoftheprojectsthatmight involve refurbishment, relocation or a new facility.
• GolborneRoadisamajorstreetscapeproject;asyetnofirm proposals have been agreed.
• AnewEcologyCentrecouldbebuiltbytheplayground, providinganewfacilityandcreatingextraaccommodation.
• HorntonStreetPublicConveniencescouldberefurbishedand incorporate a special needs changing facility.
• LeightonHousePhase3wouldincludetherefurbishmentofthe Perrin Wing.
• Measurescanbeexploredtoseeifatrafficmanagement scheme can make improvements, as there have been two fatalities.
• IretonLodgecanberebuiltandincludefeaturesdemonstrating sustainability.
• TheNottingHillGateinitiativeisamajorstreetscapeproject.
More detail is available on the budgets in the Council’s Revenue Budget and Capital Programme booklets
2009 and 2010, to 2011 and 2012: Work plans for Transport, Environment and Leisure Services
SERVICE DELIVERY PLAN 2009/12
72
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
What’s new in this Sdp?This SDP is the first to achieve our aspiration of increasing the duration from a single year to three years. The objective is to improve the long-term planning process and to increase the focus on strategic issues.
These plans outline some of the work that will be undertaken by the business group in addition to the ongoing and routine service work of the departments. It gives a flavour of what we are doing to improve our service delivery and help meet not only TELS priorities, but the overall objectives of the Council.
Progress is monitored twice a year through exception reporting of any projects that are causing concerns or are slipping the original timescales. This enables senior managers to focus their attention on any problems and allocate resources or remove obstacles where necessary.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
73
TranSporT, EnvironmEnT and LEiSurE SErvicES
Art
s an
d L
eisu
re S
ervi
ces
Year
one
200
9/10
Ref
.ID
A
im*
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
A1
2 and 3
Par
ks S
trat
egy
1.DrawupCapitalProgram
metoreflectchangingpriorities
2. W
ith S
SD
sup
port
, und
erta
ke c
onsu
ltatio
n to
iden
tify
prio
ritie
s fo
r A
vond
ale
Par
k
3. S
ubm
it G
reen
Fla
g ap
plic
atio
ns fo
r H
olla
nd P
ark,
Ken
sing
ton
Mem
oria
l P
ark,
St L
uke’
s G
arde
ns a
nd G
unne
rsbu
ry C
emet
ery
1. P
rogr
amm
e ag
reed
by
Cllr
Pag
et-B
row
n
2. C
onsu
ltatio
n un
dert
aken
an
d pr
iorit
ies
esta
blis
hed
3. G
reen
Fla
g st
atus
achi
eved
for
thes
e sp
aces
1.Q1
2.Q2
3.Q3/4
Pol
icy
Boa
rd
A2
2 and 3
Pro
duce
a R
oyal
Bor
ough
Par
ksca
pe G
uide
, sim
ilar
to th
e S
tree
tsca
pe
Gui
de, w
hich
incl
udes
tech
nica
l gui
danc
e an
d a
desi
gn e
lem
ent.
Doc
umen
t pro
duce
d an
d ad
opte
d by
Cab
inet
Q3
GM
B a
nd
Pol
icy
Boa
rd
A3
2D
evel
op a
nd im
plem
ent t
he C
apita
l Pro
gram
me
for
the
Roy
al B
orou
gh’s
pa
rks
and
open
s sp
aces
1. H
olla
nd P
ark
Nor
th W
all
2. L
ittle
Wor
mw
ood
Scr
ubs
3.
Ken
sing
ton
Mem
oria
l Park–tenniscourts
4.
Bro
mpt
on C
emet
ery
1.Q2
2.Q2
3.Q3
4.Q4
Pol
icy
Boa
rd a
nd
TELS
Cap
ital
Boa
rd
A4
2D
evel
op th
e R
oyal
Bor
ough
’s
Art
Str
ateg
yS
trat
egy
adop
ted
by
Cab
inet
Q1
Cab
inet
*The
aim
refe
rs to
thos
e ai
ms
men
tione
d un
der
the
Cou
ncil’s
Thr
ee ‘R
’s’ l
iste
d on
pag
e 4
We
will
revi
ew th
e co
nten
t of t
he w
ork
plan
s an
nual
ly a
nd u
pdat
e or
am
end
as re
quire
d.
SERVICE DELIVERY PLAN 2009/12
74
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Year
one
200
9/10
Ref
.ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
A5
2
Leig
hto
n H
ous
e
1. D
evel
op a
vis
ion
for
Leig
hton
Hou
se
2. C
ompl
ete
phas
e 2
capi
tal w
orks
to L
eigh
ton
Hou
se
3. S
ubm
it a
capi
tal b
id fo
r ph
ase
3 ba
sed
on th
e ag
reed
Vis
ion
1. C
abin
et a
gree
men
t on
the
‘Vis
ion
for
Leig
hton
H
ouse
’.
2. R
efur
bish
men
t com
plet
e an
d w
ithin
bud
get,
and
Hou
se o
pen
to th
e pu
bic.
3. C
apita
l bid
sub
mitt
ed
1.Q1
2.Q4
3.Q3
Cab
inet
and
P
olic
y B
oard
A6
2
Sp
ort
s D
evel
op
men
t
1. U
nder
take
cus
tom
er s
atis
fact
ion
surv
eys
of th
e C
ounc
il’s tw
o le
isur
e centresandresultingactionplansagreedwithNuffieldHealth.
2. U
nder
take
feas
ibilit
y st
udy
of C
hels
ea S
port
s C
entr
e an
d w
ork
with
th
e D
irect
or o
f Pro
pert
y S
ervi
ces
to a
sses
s im
pact
of t
he s
tudy
.
1. S
urve
y re
sults
and
identifiedactionsrepo
rted
to P
olic
y B
oard
.2.
Stu
dy c
ompl
eted
an
d im
pact
ass
essm
ent
unde
rway
.
1.Q3
2.Q4
Pol
icy
Boa
rd a
nd
TELS
Cus
tom
er
Ser
vice
s B
oard
A7
3 an
d 4
Dev
elop
and
impl
emen
t the
Ser
vice
Impr
ovem
ent P
lan
crea
ted
from
the
self-
asse
ssm
ent o
f Cul
tura
l Ser
vice
s ac
ross
the
busi
ness
gro
up.
1. P
eer
chal
leng
e of
im
prov
emen
t pla
n un
dert
aken
.
2. Im
prov
emen
t pla
n ag
reed
.
3. Y
ear
1 im
prov
emen
ts
impl
emen
ted.
1.Q1
2.Q2
3.Q4
Pol
icy
Boa
rd
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
75
TranSporT, EnvironmEnT and LEiSurE SErvicES
Year
one
200
9/10
Ref
.ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
A8
1
Par
ks P
olic
e
To m
aint
ain
a hi
gh le
vel o
f pol
ice
visi
bilit
y in
our
par
ks a
nd o
pen
sp
aces
at t
imes
whe
n it
will
be m
ost e
ffect
ive.
Rev
iew
met
adat
a to
es
tabl
ish
key
tem
pora
l and
sp
atia
l ind
icat
ors.
Rev
ise
patr
ol p
atte
rns
in
linewithfindingsabo
ve.
Q2
Q3
Reg
ulat
ion
and
Enf
orce
men
t C
omm
ittee
/H
olla
nd P
ark
advi
sory
gro
up
A9
1Toincreasepublicsatisfactionandconfidenceinthesafetyofour
parksandraisetheprofileoftheservice.
Runatleastsixpublic
even
ts p
er a
nnum
to
enga
ge w
ith p
ark
user
s.
Dev
elop
pre
ss li
aiso
n st
rate
gy.
1.Q4
2.
Est
ablis
hed
byQ2and
ongo
ing
Par
ks u
ser
surv
ey
A10
1To
em
bed
a ‘S
afer
Par
ks T
eam
’ met
hod
of o
pera
tion
for
the
serv
ice
an
d de
velo
p cl
oser
link
s w
ith th
e co
mm
unity
saf
ety
team
, M
PS
and
oth
er p
artn
ers.
Trai
n al
l sta
ff in
S
PT
prin
cipl
es.
Expandexternalliaison
cont
acts
and
inte
lligen
ce
loop
.
1.Q2
2.Q3
RE
C
A11
1Toadd
ressspecificconcernsaboutantisocialbehaviourand
inci
dent
s in
eac
h pa
rk u
sing
a p
robl
em s
olvi
ng a
ppro
ach.
Dev
elop
inci
dent
dat
abas
e to
link
with
map
ping
sy
stem
(Atla
s).
Trai
n al
l sta
ff in
pro
blem
so
lvin
g pr
inci
ples
.
1.Q3
2.Q2
RE
C
TELS
GM
B
SERVICE DELIVERY PLAN 2009/12
76
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Year
tw
o 2
010/
11
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
tw
o
Mo
nito
ring
m
echa
nism
s(s)
A1
2D
evel
op a
nd im
plem
ent t
he C
apita
l Pro
gram
me
for
the
R
oyal
Bor
ough
’s p
arks
and
ope
ns s
pace
s.To
be
agre
ed.
tbc
tbc
A2
2 and 3
Par
ks S
trat
egy
Im
prov
emen
t Pro
gram
me.
Sub
mit
annu
al G
reen
Fla
g ap
plic
atio
ns fo
r H
olla
nd P
ark,
Ken
sing
ton
Mem
oria
l Par
k, S
t Luk
e’s
Gar
dens
an
d G
unne
rsbu
ry C
emet
ery.
Gre
en F
lag
stat
us a
chie
ved
for
thes
e sp
aces
. tb
ctb
c
A3
3 and 4
Impl
emen
t the
Ser
vice
Impr
ovem
ent P
lan
crea
ted
from
the
se
lf-as
sess
men
t of C
ultu
ral S
ervi
ces
acro
ss th
e bu
sine
ss g
roup
.Ye
ar 2
impr
ovem
ents
im
plem
ente
d.Q4
Pol
icy
Boa
rd
Year
thr
ee 2
011/
12
Ref
.ID
A
imD
etai
ls o
f w
ork
(pro
ject
s)Ta
rget
(s)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
thr
ee
Mo
nito
ring
M
echa
nism
s(s)
A1
2D
evel
op a
nd im
plem
ent t
he C
apita
l Pro
gram
me
for
the
Roy
al B
orou
gh’s
pa
rks
and
open
s sp
aces
.To
be
agre
ed.
tbc
tbc
A2
2 an
d 3
Par
ks S
trat
egy
Im
prov
emen
t Pro
gram
me.
S
ubm
it an
nual
Gre
en F
lag
appl
icat
ions
for
Hol
land
Par
k, K
ensi
ngto
n M
emor
ial P
ark,
St L
uke’
s G
arde
ns a
nd G
unne
rsbu
ry C
emet
ery.
Gre
en F
lag
stat
us a
chie
ved
for
thes
e sp
aces
. tb
ctb
c
A3
3 and 4
Impl
emen
t the
Ser
vice
Impr
ovem
ent P
lan
crea
ted
from
the
se
lf-as
sess
men
t of C
ultu
ral S
ervi
ces
acro
ss th
e bu
sine
ss g
roup
.Ye
ar 3
impr
ovem
ents
im
plem
ente
d.Q4
Pol
icy
Boa
rd
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
77
TranSporT, EnvironmEnT and LEiSurE SErvicES
Str
ateg
y an
d S
ervi
ce D
evel
op
men
t, C
usto
mer
Ser
vice
s an
d L
icen
sing
Year
one
200
9/10
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
S1
4C
omm
ence
the
Clim
ate
Cha
nge
Pro
gram
me.
1. C
ompl
ete
the
programmedefinition
docu
men
ts.
2.Carryoutthefirst
tran
che
of p
roje
cts.
1.Q1
2.Q4
GM
B, C
limat
e C
hang
e P
rogr
amm
e
S2
1
Cus
tom
er S
ervi
ces
- H
ere
to H
elp
Pro
gra
mm
e
1. Im
prov
e th
e ou
t of h
ours
ser
vice
thro
ugh
the
sepa
ratio
n of
the
call
hand
ling
serv
ice
from
CC
TV m
onito
ring
and
chan
ging
wor
k pa
tter
ns.
2. In
trod
uce
on-li
ne b
ooki
ng fo
r ‘T
oo b
ig fo
r th
e bi
n’, P
est
Con
trol
and
Hea
lth P
rom
otio
n bo
okin
gs.
1. D
isag
greg
ate
CC
TV m
onito
ring
from
the
call
hand
ling.
2. S
ervi
ces
avai
labl
e on
the
web
sub
ject
to
tech
nolo
gy.
1.Q3
2.Q4
OO
H/C
CTV
S
epar
atio
n pr
ojec
t boa
rd
S3
4C
ontin
ue to
impr
ove
and
deve
lop
the
‘Env
ironm
ent D
ay’
conc
ept h
eld
in p
revi
ous
year
s.
Org
anis
e an
d de
liver
a
rang
e of
eve
nts
for
the
Roy
al B
orou
gh’s
E
nviro
nmen
t Day
s.
Q1
GM
B
S4
4P
rom
ote
the
Sus
tain
able
Pro
cure
men
t Pol
icy
and
enco
urag
e th
e
adop
tionofthekeyprinciplesbyprocurem
ento
fficers.
1. H
old
a la
unch
ev
ent s
emin
ar o
r w
orks
hop.
2. D
evis
e an
d im
plem
ent a
sup
plie
r en
gage
men
t pro
gram
me.
Q1
Q4
SERVICE DELIVERY PLAN 2009/12
78
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Year
one
200
9/10
Ref
.ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
S5
1,2,
Con
duct
Hea
lth a
nd S
afet
y A
udits
for
the
TELS
wor
kpla
ces.
Com
plet
e an
aud
it of
hal
f of
the
team
s w
ithin
the
busi
ness
gro
up.
Q4
GM
B, H
ealth
an
d S
afet
y A
nnua
l Rep
ort
S6
3
Nor
th K
ensi
ngto
n E
nviro
nmen
t Pro
ject
(NK
EP
) Im
plem
ent e
nviro
nmen
tal
initi
ativ
es in
Nor
th K
ensi
ngto
n th
roug
h co
mm
unity
eng
agem
ent.
Com
mun
ity K
itche
n G
arde
n P
ilot.
All
Sai
nts
Chu
rch
Ope
n S
pace
Env
ironm
enta
l Im
prov
emen
ts.
3. G
reen
er S
tree
ts.
Est
ablis
h on
e ne
w
com
mun
ity k
itche
n ga
rden
and
gar
den
club
.W
ork
with
par
tner
s to
im
plem
ent e
nviro
nmen
tal
impr
ovem
ents
to A
ll S
aint
s C
hurc
h op
en s
pace
.Im
plem
ent t
hree
en
viro
nmen
tal p
roje
cts
whi
ch e
ngag
e re
side
nts
in
thei
r lo
cal e
nviro
nmen
t.
1.Q3
2.Q4
3.Q4
NK
EP
Ste
erin
g G
roup
, OS
C,
Ann
ual R
epor
t
S7
1ExpandtheBestB
arNoneschemefromthepilotareato
cove
r th
e w
hole
of t
he b
orou
gh.
Ens
ure
a m
inim
um o
f 10
0 pr
emis
es a
pply
fo
r m
embe
rshi
p of
the
sche
me.
Q2
Lice
nsin
g C
omm
ittee
Cab
inet
Mem
ber
for R
egen
erat
ion,
E
nviro
nmen
tal
Man
agem
ent
and
Leis
ure
S8
1P
rovi
de a
nd e
ncou
rage
alte
rnat
ives
to g
lass
con
tain
ers
for
alco
hol i
n on
an
d of
f sal
es re
taile
rs w
ithin
the
Car
niva
l foo
tprin
t for
Car
niva
l 200
9.
Red
uce
the
leve
l of g
lass
di
scar
ded
with
in th
e C
arni
val f
ootp
rint.
Q2
GM
B
S9
1
Liai
se w
ith C
entr
al F
inan
ce (O
new
orld
) and
ISD
to s
et u
p a
syst
em w
here
lic
ence
app
lican
ts c
an a
pply
on-
line
(incl
udin
g pa
ymen
t) th
roug
h th
e C
ounc
il’s w
ebsi
te.
This
is in
acc
orda
nce
with
the
Eur
opea
n U
nion
Ser
vice
s D
irect
ive
and
the
Dep
artm
ent f
or B
usin
ess,
Ent
erpr
ise
and
Reg
ulat
ory
Ref
orm
.
On-
line
appl
icat
ion
syst
em
for
licen
ce a
pplic
ants
in
plac
e by
Dec
embe
r 20
09.
Q3
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
79
TranSporT, EnvironmEnT and LEiSurE SErvicES
Year
tw
o 2
010/
11
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
tw
o
Mo
nito
ring
m
echa
nism
s(s)
S1
4Im
plem
ent t
he C
limat
e C
hang
e P
rogr
amm
e.C
ompl
ete
seco
nd tr
anch
e of
pro
ject
s.Q4
GM
B, C
limat
e C
hang
e P
rogr
amm
e
S2
1
Cus
tom
er S
ervi
ces
- H
ere
to H
elp
Pro
gram
me.
Improvetheefficiencyoftheouto
fhourscallhandling
serv
ice
thro
ugh
anal
ysis
and
impr
ovem
ent o
f the
pr
oces
ses
and
proc
edur
es.
Rev
iew
and
impl
emen
t nec
essa
ry c
hang
es
to a
ll ou
t of h
ours
pro
cedu
res.
Q4
TELS
Cus
tom
er
Ser
vice
s B
oard
S3
4Environm
entS
trategy–evaluatethecurrentstrategy
andincorporatefindingsintoanew
strategyfor
20
11 to
201
6.
1. P
rodu
ce a
n ev
alua
tion
repo
rt o
f th
e cu
rren
t str
ateg
y.
2. P
ublis
h th
e E
nviro
nmen
t Str
ateg
y fo
llow
ing
com
preh
ensi
ve c
onsu
ltatio
n.
1.Q3
2.Q4
GM
B
S4
4C
ontin
ue to
pro
mot
e an
d en
cour
age
su
stai
nabl
e pr
ocur
emen
t.
1. M
onito
r ke
y C
ounc
il co
ntra
cts
on
impa
ct o
f pol
icy.
2. D
evis
e ac
tion
plan
for
im
plem
enta
tion
and
mea
sure
men
t.
Q4
Q4
S5
1,2,
Con
duct
Hea
lth a
nd S
afet
y A
udits
for
th
e TE
LS w
orkp
lace
s.C
ompl
ete
an a
udit
of h
alf o
f the
team
s w
ithin
th
e bu
sine
ss g
roup
. Q4
GM
B, A
nnua
l R
epor
t
S6
3
NorthKensingtonEnvironm
entP
roject(N
KEP)–
impl
emen
t env
ironm
enta
l ini
tiativ
es in
Nor
th
Ken
sing
ton
thro
ugh
com
mun
ity e
ngag
emen
t.
1. G
olbo
rne
Roa
d B
ridge
Impr
ovem
ents
.
2. C
omm
unity
Kitc
hen
Gar
dens
Rol
lout
.
3. G
reen
er S
tree
ts.
1. Im
plem
ent i
mpr
ovem
ents
to b
ridge
incl
udin
g ne
w li
ghtin
g, s
ide
pane
ls a
nd re
pain
ting.
2. W
ork
with
par
tner
s to
dev
elop
thre
e ne
w
com
mun
ity k
itche
n ga
rden
site
s.
3. Im
plem
ent t
hree
env
ironm
enta
l pro
ject
s w
hich
eng
age
resi
dent
s in
thei
r lo
cal
envi
ronm
ent.
1.Q4
2.Q4
3.Q4
NK
EP
Ste
erin
g G
roup
, OS
C,
Ann
ual R
epor
t
SERVICE DELIVERY PLAN 2009/12
80
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Year
tw
o 2
010/
11
S7
1
Con
tinue
the
boro
ugh-
wid
e B
est B
ar
Non
e (B
BN
) sch
eme.
Eva
luat
e th
e B
BN
sch
eme.
Year
on
year
incr
ease
in s
chem
e m
embe
rshi
p an
d re
duct
ion
in c
rime,
dis
orde
r an
d nu
isan
ce
com
plai
nts.
Rep
ort o
n op
tions
and
impl
emen
t re
com
men
datio
ns.
Q4
Q4
Lice
nsin
g C
omm
ittee
Cab
inet
Mem
ber
for R
egen
erat
ion,
E
nviro
nmen
tal
Man
agem
ent
and
Leis
ure
Year
thr
ee 2
010/
11
Ref ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
thr
ee
Mo
nito
ring
m
echa
nism
s(s)
S1
4Im
plem
ent t
he C
limat
e C
hang
e P
rogr
amm
e.C
ompl
ete
third
tran
che
of p
roje
cts.
Q4
GM
B, C
limat
e C
hang
e P
rogr
amm
e
S2
4E
nviro
nmen
t Str
ateg
y 20
11 to
201
6.
Laun
ch a
nd im
plem
ent t
he n
ew s
trat
egy.
1. H
old
a la
unch
eve
nt s
emin
ar o
r w
orks
hop.
2. Im
plem
ent s
trat
egy.
Q1
Q4
GM
B
S3
4S
usta
inab
le p
rocu
rem
ent.
1. Im
plem
ent a
ctio
n pl
an.
2. A
ttai
n G
old
Leve
l for
the
May
or’s
Gre
en
Pro
cure
men
t Cod
e.
1.Q4
2.Q4
GM
B
S4
1 an
d 2
Con
duct
Hea
lth a
nd S
afet
y A
udits
fo
r th
e TE
LS w
orkp
lace
s.C
ompl
ete
an a
udit
of h
alf o
f the
team
s w
ithin
th
e bu
sine
ss g
roup
Q4
GM
B, A
nnua
l R
epor
t
S5
3
Nor
th K
ensi
ngto
n E
nviro
nmen
t Pro
ject
1. H
urst
way
Wal
k En
viron
men
tal I
mpr
ovem
ents
(P
hase
1).
2. G
reen
er S
tree
ts.
3. C
omm
unity
Kitc
hen
Gar
dens
mon
itorin
g an
d ev
alua
tion.
1. W
ork
with
par
tner
s to
impl
emen
t en
viro
nmen
tal i
mpr
ovem
ents
to H
urst
way
Wal
k.
2. Im
plem
ent t
hree
env
ironm
enta
l pro
ject
s w
hich
eng
age
resi
dent
s in
thei
r lo
cal
envi
ronm
ent.
3. R
evie
w, m
onito
r an
d ev
alua
te C
omm
unity
K
itche
n G
arde
n pr
ogra
mm
e.
Q4
Q4
3.Q
2
NK
EP
Ste
erin
g G
roup
, OS
C,
Ann
ual R
epor
t
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
81
TranSporT, EnvironmEnT and LEiSurE SErvicES
Traf
fic
and
Tra
nsp
ort
atio
n P
olic
yYe
ar o
ne 2
009/
10
Ref ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
T12
Opt
imis
ing
tran
spor
t im
pact
s
of th
e O
lym
pics
Wor
k w
ith O
DA
and
TfL
to
min
imis
e im
pact
of O
RN
en
forc
emen
t on
our
resi
dent
s.
Seekbenefitsfortransport
stat
ions
ser
ving
Oly
mpi
c ve
nues
, (E
arl’s
Cou
rt a
nd W
est B
rom
pton
).
Ong
oing
Pol
icy
Boa
rd
T24
Sec
ure
loca
tions
for
Cyc
le
Hire
Sch
eme
dock
ing
stat
ions
Wor
k w
ith T
fL to
sec
ure
all
nece
ssar
y pe
rmis
sion
s
to e
stab
lish
up to
50
cycl
e hi
re
dock
ing
stat
ions
in
the
boro
ugh.
Pro
gram
me
is
depe
nden
t on
whe
ther
pl
anni
ng
perm
issi
on
will
be
soug
ht.
Assum
eQ4.
Pol
icy
Boa
rd
OS
C P
ublic
R
ealm
T34
Impr
ove
the
Rai
l Offe
r in
N
orth
Ken
sing
ton
An
appl
icat
ion
subm
itted
for
a TW
A O
rder
for
a C
ross
rail
stat
ion
at C
anal
Way
. Agr
eem
ent f
rom
TfL
to
sup
port
a n
ew r
ail s
tatio
n at
N
orth
Pol
e R
oad
an
d es
tabl
ish
cost
s.
Tim
ing
for
Cro
ssra
il is
uncertain–
assumeQ4;
N P
ole
Road–Q3.
Pol
icy
Boa
rdC
abin
et
T41
Del
iver
y of
use
r-fri
endl
y
park
ing
polic
ies
App
rove
d ne
w p
olic
ies
and
prog
ram
mes
to
be im
plem
ente
d.Q4
Pol
icy
Boa
rdC
ounc
il
SERVICE DELIVERY PLAN 2009/12
82
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Year
one
200
9/10
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
T51
Com
plet
ion
of a
Roa
d S
afet
y P
lan
to a
ddre
ss c
ollis
ion
targ
ets
beyo
nd 2
010.
An
appr
oved
pol
icy
docu
men
t for
ro
ad s
afet
y.Q3
Pol
icy
Boa
rd
and
OS
C P
ublic
R
ealm
T61
Sub
mis
sion
of t
rave
l pla
ns b
y al
l sc
hool
s in
the
boro
ugh.
An
indi
vidu
alis
ed s
trat
egy
to
impr
ove
all s
choo
l tra
vel i
n th
e bo
roug
h.Q4
Tran
spor
t for
Lo
ndon
, OS
C
Pub
lic R
ealm
T74
Carclub–developanewmod
elforcarclubinthebo
rough,expand
the
num
ber
of b
ays
on-s
tree
t, im
prov
e m
onito
ring.
Dou
ble
num
ber
of c
ar c
lub
bays
.Q3
Pol
icy
boar
d
T83
Takeforwardprop
osalsformajorstreetscapeandtraffic
man
agem
ent i
mpr
ovem
ents
at:
Lad
brok
e G
rove
rout
e st
udy
Not
ting
Hill
Gat
e In
itiat
ive
St M
arks
Roa
d ro
unda
bout
.
Con
sulta
tion
Sum
mer
200
9,
Des
ign
Win
ter
2009
, Con
stru
ctio
n 20
10.
Pla
nnin
g Fr
amew
ork
Spr
ing
2009
, Fe
asib
ility
Sum
mer
200
9, C
onsu
lt W
inte
r 20
09, C
onst
ruct
ion
2010
.P
rogr
amm
e de
pend
ant u
pon
publ
ic m
eetin
g Ja
nuar
y 20
09.
Ong
oing
Pol
icy
Boa
rd
and
OS
C P
ublic
R
ealm
T93
Pro
gres
s th
e C
ounc
il’s s
tree
tsca
pe in
itiat
ives
.
1.Taketheop
portunityto
makesignificantstreetscape
impr
ovem
ents
as
part
of p
rogr
amm
ed w
ork.
Sch
emes
incl
ude:
F
ulha
m R
oad
Kin
g’s
Roa
d
Che
lsea
and
Wes
tmin
ster
Hos
pita
l.
2. P
rogr
ess
the
stre
etsc
ape
revi
ew in
Col
ville
and
Pem
brid
ge w
ards
.
1. C
ontin
ue to
impl
emen
t the
C
ounc
il’s s
tree
tsca
pe p
olic
ies
whe
n un
dert
akin
g en
viro
nmen
tal
impr
ovem
ents
.
2. U
nder
take
a s
yste
mat
ic
prog
ram
me
of S
tree
tsca
pe
Rev
iew
s in
sel
ecte
d w
ards
acr
oss
the
boro
ugh.
Ong
oing
Pol
icy
Boa
rd,
Str
eets
cape
A
dvis
ory
Gro
up
and
OS
C P
ublic
R
ealm
T10
3
Pro
mot
e th
e C
ounc
il’s s
tree
tsca
pe e
thos
by:
1. C
reat
ing
a pe
dest
rian
spac
e in
Han
s C
resc
ent.
2. D
evel
opin
g a
sing
le s
urfa
ce d
esig
n fo
r co
nstr
uctio
n
in 2
010.
Han
s R
oad/
Bas
il S
tree
t.
Impl
emen
t env
ironm
enta
l wor
k at
H
ans
Cre
scen
t.D
esig
n si
ngle
sur
face
layo
ut fo
r H
ans
Roa
d.
1.Q4
2.Q3
Pol
icy
Boa
rdO
SC
Pub
lic
Rea
lm
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
83
TranSporT, EnvironmEnT and LEiSurE SErvicES
Year
one
200
9/10
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
T11
3C
yclin
g is
sues
suc
h as
Pro
ject
619
, Cyc
le
Par
king
on
the
Hig
hway
, and
LC
N+
.
Monitorexperim
entalprojectsandreview
.Implem
ent
bike
hire
sch
eme.
Mon
itor,
revi
ew a
nd re
com
men
d im
prov
emen
ts o
n LC
N+
.
Q3
Ong
oing
Ong
oing
Pol
icy
Boa
rd
Year
tw
o 2
010/
11
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
T13
Pro
duce
dra
ft Lo
cal
Impl
emen
tatio
n P
lan
(LIP
) 2.
The
Cou
ncil’s
sec
ond
Loca
l Im
plem
enta
tion
Pla
n w
ill be
put
out
to p
ublic
con
sulta
tion.
Q3
Cou
ncil
T24
Impr
ove
the
rail
offe
r in
N
orth
Ken
sing
ton.
Suc
cess
ful o
utco
me
of T
WA
Ord
er fo
r a C
ross
rail s
tatio
n.
Fund
ing
stra
tegy
for
a N
orth
Pol
e st
atio
n ag
reed
.
Q4
Q4
Pol
icy
Boa
rd
Cab
inet
T33
Impl
emen
t pro
posa
ls fo
r m
ajor
str
eets
cape
and
trafficmanagem
entimprovem
entsat:
Ladb
roke
Gro
ve ro
ute
stud
yN
ottin
g H
ill G
ate
Initi
ativ
eS
t Mar
ks R
oad
roun
dabo
utR
oyal
Cre
scen
t.
Con
stru
ctio
n 20
10.
Con
stru
ctio
n 20
10.
Pro
gram
me
subj
ect t
o pu
blic
con
sulta
tion
Jan
2009
.D
esig
n an
d co
mm
ence
con
stru
ctio
n.
Thro
ugho
ut
2010
/11.
Thro
ugho
ut
2010
/11.
TBA
.Th
roug
hout
20
10/1
1.
Pol
icy
Boa
rd
and
OS
C P
ublic
R
ealm
SERVICE DELIVERY PLAN 2009/12
84
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Year
tw
o 2
010/
11
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
T43
Pro
gres
s th
e C
ounc
il’s
stre
etsc
ape
initi
ativ
es:
1.Taketheop
portunityto
makesignificant
stre
etsc
ape
impr
ovem
ents
as
part
of
prog
ram
med
wor
k. S
chem
es in
clud
e: G
louc
este
r R
d T
avis
tock
Squ
are
Tal
bot R
oad.
2. F
inal
ise
the
stre
etsc
ape
revi
ew in
C
olvi
lle a
nd P
embr
idge
war
ds.
3.Consultonnextstreetscapereview
area.
1. C
ontin
ue to
impl
emen
t the
Cou
ncil’s
str
eets
cape
po
licie
s w
hen
unde
rtak
ing
envi
ronm
enta
l im
prov
emen
ts.
2. U
nder
take
a s
yste
mat
ic p
rogr
amm
e of
Str
eets
cape
R
evie
ws
in s
elec
ted
war
ds a
cros
s th
e bo
roug
h.
3.Selectnextreviewarea.
1. O
ngoi
ng
2010
/11
2.Q3
3.Q4
Pol
icy
Boa
rd,
Str
eets
cape
A
dvis
ory
Gro
up
Year
thr
ee 2
011/
2012
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
T14
Impr
ove
Rai
l Offe
r in
Nor
th K
ensi
ngto
n.
Cro
ssra
il’s a
gree
men
t to
deliv
er a
new
sta
tion
by 2
017.
Fund
ing
esta
blis
hed
for
a N
orth
Pol
e S
tatio
n.Q1
T23
Impl
emen
t pro
posa
ls fo
r m
ajor
str
eets
cape
and
trafficmanagem
entimprovem
entsat:
Ladb
roke
Gro
ve ro
ute
stud
yN
ottin
g H
ill G
ate
Initi
ativ
e
Fina
lise
cons
truc
tion
of 2
010/
11 p
rogr
amm
e.Q3
Pol
icy
Boa
rd
and
OS
C P
ublic
R
ealm
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
85
TranSporT, EnvironmEnT and LEiSurE SErvicES
Hig
hway
s an
d C
ons
truc
tio
n Ye
ar o
ne 2
009/
10
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
H1
3Im
plem
ent A
lber
t Brid
ge M
ajor
Str
uctu
ral
Rep
air
and
Ref
urbi
shm
ent.
Tend
er a
nd a
war
d th
e co
ntra
ct.
Sta
rt w
ork
on th
e re
furb
ishm
ent.
Q1
Q3
Pol
icy
Boa
rd, G
MB
, M
anag
emen
t Te
am
H2
2 and 4
Dev
elop
upd
ated
ligh
ting
inve
ntor
y.M
ove
stre
et li
ghtin
g en
ergy
pro
cure
men
t fro
m u
n-m
eter
ed
supp
ly to
hal
f-ho
urly
(HH
) met
erin
g th
roug
h in
stal
latio
n of
m
onito
ring
equi
pmen
t. P
ursu
e in
trod
uctio
n of
low
er
ener
gy lu
min
aire
s.
Impr
oved
sys
tem
s to
man
age
ener
gy
usag
e an
d re
duce
cos
ts.
Q2
Man
agem
ent
Team
, Car
bon
Man
agem
ent
Pro
gram
me,
P
olic
y B
oard
H3
3Implem
enthighprofilestreetscapeim
provem
entschem
es.
Impl
emen
t Han
s C
resc
ent.
Q3
Pol
icy
Boa
rd, G
MB
, M
anag
emen
t Te
am
H4
2D
evel
op n
ew te
rm c
ontr
acts
for:
Str
eet l
ight
ing
M
inor
hig
hway
wor
ks A
spha
lt su
rfaci
ng
Brid
ges
term
con
sulta
ncy
Suc
cess
ful a
war
d of
con
trac
t, fo
llow
ing
OJE
U p
rocu
rem
ent p
roce
ss.
Q4
Pol
icy
Boa
rd,
Man
agem
ent
Team
, KD
’s
H5
2
Intr
oduc
e ha
ndhe
ld m
obile
tech
nolo
gy in
to th
is s
ervi
ce, i
nitia
lly
in th
e S
tree
twor
ks T
eam
, to
redu
ce p
aper
wor
k an
d im
prov
e re
spon
sive
ness
. (S
ubje
ct to
ISD
arr
ange
men
ts a
nd fu
ndin
g.)
Sof
twar
e up
date
d an
d ha
ndhe
ld
equi
pmen
t in
use,
follo
win
g tr
aini
ng.
Q3
Man
agem
ent
Team
, Mob
ile
Wor
king
P
rogr
amm
e
H6
3P
repa
re a
dra
ft th
ree
year
pro
gram
me
of h
ighw
ay w
orks
ba
sed
on v
isua
l ins
pect
ions
and
mec
hani
sed
surv
eys.
A lo
ng-t
erm
pro
gram
me
to e
nabl
e gr
eate
r ad
vanc
e pr
ogra
mm
ing
and
coor
dina
tion
with
util
ities
.
Q4
(to
con
tinue
th
roug
h fu
ture
yea
rs)
Man
agem
ent
Team
, Pol
icy
Boa
rd, K
D’s
H7
Coo
rdin
ate
and
insp
ect o
ngoi
ng N
atio
nal G
rid g
as m
ains
re
new
al a
nd T
ham
es W
ater
Vic
toria
n m
ains
repl
acem
ent
acro
ss th
e R
oyal
Bor
ough
.
Wor
ks c
ompl
eted
with
goo
d qu
ality
re
inst
atem
ents
and
min
imum
dis
rupt
ion
to re
side
nts.
Q4
(to
con
tinue
th
roug
h fu
ture
yea
rs)
Man
agem
ent
Team
, Pol
icy
Boa
rd, O
SC
SERVICE DELIVERY PLAN 2009/12
86
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Year
tw
o 2
010/
11
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
H1
2, 4
To in
vest
igat
e op
tions
to re
duce
ene
rgy
cons
umpt
ion
of H
ighw
ay L
ight
ing
e.g.
thro
ugh
nigh
t tim
e di
mm
ing
and
rem
ote
mon
itorin
g.
Rep
ort o
n op
tions
and
impl
emen
t re
com
men
datio
ns.
Q2
Pol
icy
Boa
rd,
Man
agem
ent
Team
, Car
bon
Man
agem
ent
Pro
gram
me
H2
1In
trod
uce
hand
held
mob
ile te
chno
logy
to s
tree
t lig
htin
g an
d hi
ghw
ays
oper
atio
ns to
impr
ove
asse
t managem
entandefficiencyofservice.
To in
stal
l the
sof
twar
e, p
urch
ase
hand
held
eq
uipm
ent a
nd s
et u
p th
e sy
stem
.Q2
Man
agem
ent
Team
, Mob
ile
Wor
king
P
rogr
amm
e
H3
3C
ompl
ete
a su
rvey
of a
ll hi
stor
ic s
tree
t nam
epla
tes,
bo
llard
s, e
tc, a
nd im
plem
ent a
refu
rbis
hmen
t pr
ogra
mm
e.To
mai
ntai
n hi
stor
ic a
sset
s as
a le
gacy
.Q2
Pol
icy
Boa
rd,
Man
agem
ent
Team
Year
Thr
ee 2
011/
12
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
H1
2 an
d
3
LiaisonwithODA.TfLto
ensuretheefficient
man
agem
ent o
f the
net
wor
k
in th
e bu
ild u
p to
the
Oly
mpi
cs.
Ens
ure
nece
ssar
y w
orks
car
ried
out o
n ke
y corridors,andtrafficordersinplace.
Q1
Pol
icy
Boa
rd,
GM
B
H2
1 an
d
4
Con
tinui
ng li
aiso
n w
ith T
ham
es W
ater
to p
rogr
ess
sewerfloodalleviationschemefortheCounter’sCreek
sew
er.
Schem
e,to
preventbasem
entfloodingduring
heav
y st
orm
s, a
ppro
ved
by O
FWAT
to s
tart
in
2012
. Q4
Pol
icy
Boa
rd,
OS
C
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
87
TranSporT, EnvironmEnT and LEiSurE SErvicES
Was
te M
anag
emen
t an
d S
tree
t E
nfo
rcem
ent
Year
one
200
9/10
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
W1
3M
eet t
he ta
rget
in L
ocal
Are
a A
gree
men
t (d
efer
red
outc
ome
11) t
o re
duce
was
te
dum
ping
and
impr
ove
orph
an s
ites.
1.Te
n pe
r ce
nt re
duct
ion
in d
umpi
ng a
gain
st 2
006/
07
base
line
in th
e w
ards
nor
th o
f Not
ting
Hill
Gat
e.
2. T
wo
per
cent
redu
ctio
n ag
ains
t 200
6/07
bas
elin
e in
the
war
ds s
outh
of N
ottin
g H
ill G
ate.
3. E
ight
‘orp
han’
site
s im
prov
ed.
Q4
KC
P
W2
4
Mee
t the
yea
r 2
Loca
l Are
a A
gree
men
t ta
rget
for
hous
ehol
d w
aste
recy
clin
g,
whi
le p
rovi
ding
wel
l-evi
denc
ed
reas
sura
nce
to re
side
nts
that
recy
clin
g is
stil
l wor
thw
hile
, des
pite
the
fall
in
com
mod
ity v
alue
s.
30.7
per
cen
t tar
get f
or h
ouse
hold
was
te re
cycl
ing.
Q4
KC
P, O
SC
W3
3
Sus
tain
an
envi
ronm
enta
lly e
ffect
ive
andfinanciallyviablecommercialwaste
serv
ice
thro
ugh
the
rece
ssio
n, e
nsur
ing
deliveryoftheCouncil’sfinancialtargets
for
the
serv
ice.
Incr
ease
inco
me
by £
20,0
00 a
nd re
duce
dis
posa
l cos
ts b
y £1
00,0
00 -
by
com
paris
on w
ith th
e 20
08/0
9 bu
dget
. Q4
Pol
icy
Boa
rd
W4
3In
vest
in th
e in
frast
ruct
ure
of th
e
mar
ket s
tree
ts a
nd im
prov
e
cond
ition
s fo
r tr
adin
g.
1. R
efur
bish
men
t and
re-o
peni
ng o
f Tal
bot R
oad
pu
blic
con
veni
ence
.
2. P
rovi
sion
of a
n el
ectr
icity
sup
ply
to th
e no
rthe
rn
stre
tch
of P
orto
bello
Roa
d.
Q4
Pol
icy
Boa
rd,
Mar
ket S
tree
ts
Act
ion
Gro
up
SERVICE DELIVERY PLAN 2009/12
88
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Year
one
200
9/10
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
W5
1
Wor
k w
ith L
ondo
n N
ottin
g H
ill C
arni
val
Ltd,
the
polic
e an
d ot
her
publ
ic b
odie
s
toensurethatCarnival2009finishes
earli
er a
nd is
less
noi
sy.
1. C
arni
val t
o be
clo
sed
by d
usk.
2.Peaknoiselevelsnotto
exceed135decibelsmeasured
thre
e m
etre
s fro
m a
ny s
peak
er.
W6
1R
epla
ce h
alf t
he C
ounc
il’s C
CTV
cam
eras
to
ens
ure
the
cont
inue
d vi
abilit
y of
th
e ne
twor
k.30
cam
eras
repl
aced
. Q4
Saf
er S
urer
P
olic
y B
oard
Year
tw
o 2
010/
11
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
W1
4
Mee
t the
yea
r 3
Loca
l Are
a A
gree
men
t ta
rget
for
hous
ehol
d w
aste
recy
clin
g,
whi
le p
rovi
ding
wel
l-evi
denc
ed
reas
sura
nce
to re
side
nts
that
recy
clin
g is
stil
l wor
thw
hile
, des
pite
the
fall
in
com
mod
ity v
alue
s.
33.2
per
cen
t ta
rget
for
hous
ehol
d w
aste
recy
clin
g.Q4
KC
P, O
SC
W2
1C
ompl
ete
the
repl
acem
ent o
f the
C
ounc
il’s C
CTV
cam
eras
to e
nsur
e th
e co
ntin
ued
viab
ility
of th
e ne
twor
k.30
cam
eras
repl
aced
. Q4
Saf
er S
urer
P
olic
y B
oard
W3
3In
vest
in th
e in
frast
ruct
ure
of th
e m
arke
t st
reet
s an
d im
prov
e co
nditi
ons
for
trad
ing.
Ref
urbi
shm
ent o
f Bev
ingt
on R
oad
publ
ic c
onve
nien
ce.
Q4
Pol
icy
Boa
rd,
Mar
ket S
tree
ts
Act
ion
Gro
up
W4
3D
eter
min
e w
heth
er th
e C
ounc
il sh
ould
exercisethebreakclauseinitscontract
with
SIT
A in
201
4.
Mem
bers
and
SIT
A a
gree
term
s fo
r th
e co
ntin
uing
pa
rtne
rshi
p, o
r M
embe
rs a
gree
to la
unch
a p
rocu
rem
ent
exerciseforanewwastemanagem
entcontract.
Q3
Pol
icy
Boa
rd,
Cab
inet
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
89
TranSporT, EnvironmEnT and LEiSurE SErvicES
Year
thr
ee 2
011/
12
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
Tobeconfirm
edQ42009/10
Gro
up F
inan
ceYe
ar o
ne 2
009/
10
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
F12
Pre
pare
the
annu
al c
apita
l and
reve
nue
budg
ets
in a
ccor
danc
e w
ith
corp
orat
e gu
idel
ines
.
Impe
rativ
es a
nd o
ppor
tuni
ties
proc
ess,
cap
ital b
udge
t pr
oces
s an
d th
e A
nnua
l Bud
get r
epor
ts.
Q4
Man
agem
ent
Team
F22
Closethefinalaccountsandprod
uce
outt
urn
repo
rt in
acc
orda
nce
with
the
Cou
ncil’s
tim
etab
le.
TELS
accountsfinalisedaspertheagreedtimetable.
Q2
Man
agem
ent
Team
F32
Suppo
rttransferofexternalauditservice
from
Pric
e W
ater
hous
e to
the
Dis
tric
t A
udit
Ser
vice
.
Providebackgrounddetailswhendealingwithexternal
audi
tors
to e
nhan
ce th
eir
unde
rsta
ndin
g.O
ngoi
ngM
anag
emen
t Te
am
F42
Pre
pare
and
impl
emen
t acr
oss
the
busi
ness
gro
up n
ew d
ebt w
rite
off
proc
edur
es.
Irrec
over
able
deb
ts a
re w
ritte
n of
f pro
perly
from
the
Acc
ount
s R
ecei
vabl
e S
yste
m.
Q3
Man
agem
ent
Team
SERVICE DELIVERY PLAN 2009/12
90
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Year
one
200
9/10
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
F52
Rev
iew
the
stat
us a
nd re
quire
men
t for
Cos
t Con
trol
re
port
s, p
endi
ng th
e su
cces
sful
rollo
ut o
f the
ExecutiveConsole.
Red
uce
the
need
to p
rodu
ce re
port
s th
at c
an
readilybeob
tainedthroughExecutive
C
onso
le re
port
s.Q3
Man
agem
ent
Team
F62
Identifyrevenuebudg
etprofilingsuchthatmonthly
budg
ets
mirr
or, a
s fa
r as
pos
sibl
e, th
e cu
rren
t sp
endi
ng p
atte
rns.
Cou
ncil’s
tim
etab
le.
Impr
oved
bud
get m
onito
ring.
agr
eed
timet
able
.Q3
Man
agem
ent
Team
Year
tw
o 2
010/
11
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
F12
Preparetheannualcapitalandrevenuebudg
etsandfinancialplanin
acco
rdan
ce w
ith c
orpo
rate
gui
delin
es.
Impe
rativ
es a
nd
Opp
ortu
nitie
s R
epor
t an
d th
e A
nnua
l Bud
get
Rep
orts
.
Q2
Man
agem
ent
Team
F22
Closethefinalaccountsandprod
uceoutturnrepo
rtinaccordancewiththe
Cou
ncil’s
tim
etab
le.
TELS
accountsfinalisedas
per
the
agre
ed ti
met
able
.Q3
Man
agem
ent
Team
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
91
TranSporT, EnvironmEnT and LEiSurE SErvicES
Year
one
200
9/10
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
F52
Rev
iew
the
stat
us a
nd re
quire
men
t for
Cos
t Con
trol
re
port
s, p
endi
ng th
e su
cces
sful
rollo
ut o
f the
ExecutiveConsole.
Red
uce
the
need
to p
rodu
ce re
port
s th
at c
an
readilybeob
tainedthroughExecutive
C
onso
le re
port
s.Q3
Man
agem
ent
Team
F62
Identifyrevenuebudg
etprofilingsuchthatmonthly
budg
ets
mirr
or, a
s fa
r as
pos
sibl
e, th
e cu
rren
t sp
endi
ng p
atte
rns.
Cou
ncil’s
tim
etab
le.
Impr
oved
bud
get m
onito
ring.
agr
eed
timet
able
.Q3
Man
agem
ent
Team
Year
tw
o 2
010/
11
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
F12
Preparetheannualcapitalandrevenuebudg
etsandfinancialplanin
acco
rdan
ce w
ith c
orpo
rate
gui
delin
es.
Impe
rativ
es a
nd
Opp
ortu
nitie
s R
epor
t an
d th
e A
nnua
l Bud
get
Rep
orts
.
Q2
Man
agem
ent
Team
F22
Closethefinalaccountsandprod
uceoutturnrepo
rtinaccordancewiththe
Cou
ncil’s
tim
etab
le.
TELS
accountsfinalisedas
per
the
agre
ed ti
met
able
.Q3
Man
agem
ent
Team
Year
tw
o 2
010/
11
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
F32
Sup
port
re-o
rgan
isat
ion
of T
ELS
.
The
busi
ness
gro
up is
like
ly to
reor
gani
se o
n or
by
2011
. Thi
s m
ay m
ean
chan
ging
the
char
t of a
ccou
nts
and
may
impa
ct o
n in
divi
dual
dut
ies
and
how
Gro
up F
inan
ce is
str
uctu
red
The
re-o
rgan
isat
ion
may
cut
acr
oss
Cab
inet
Mem
ber
Por
tfolio
s an
d th
e existingdirectorate.Changesinstructuresusuallyresultinrebuildingthe
financesuppo
rtfunctionandsystem
stodeliverservices.
Re-
orga
nise
d M
anag
emen
t ar
rang
emen
ts.
Q4
Man
agem
ent
Team
F4
2
Sup
port
Impl
emen
tatio
n of
One
Wor
ld S
yste
m c
hang
es.
Oneworldislikelyto
undergoafairlytransformationalchangeoverthenext
few
yea
rs. T
he fr
ont e
nd w
ill be
sim
ple
and
use
smar
t for
ms,
but
the
Gro
up
Financemaintenanceelementw
illbemorecomplex.
Thos
e su
ppor
ting
One
wor
ld w
ill ne
ed tr
aini
ng a
nd d
evel
op n
ew
skills
to m
eet t
he C
ounc
il’s v
isio
n an
d ob
ject
ives
.
One
Wor
ld S
yste
m c
hang
es
impl
emen
ted
acro
ss th
e bu
sine
ss g
roup
.
Cor
pora
te
Pro
ject
Ti
met
able
Man
agem
ent
Team
Year
thr
ee 2
011/
12
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
F12
Preparetheannualcapitalandrevenuebudg
etsandfinancialplanin
acco
rdan
ce w
ith c
orpo
rate
gui
delin
es.
Impe
rativ
es a
nd
Opp
ortu
nitie
s R
epor
t an
d th
e A
nnua
l Bud
get
Rep
orts
.
Q42011
Man
agem
ent
Team
SERVICE DELIVERY PLAN 2009/12
92
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Year
thr
ee 2
011/
12
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
F22
Closethefinalaccountsandprod
uceoutturnrepo
rtin
acco
rdan
ce w
ith th
e C
ounc
il’s ti
met
able
. TE
LSaccountsfinalisedas
per
the
agre
ed ti
met
able
.Q3
Man
agem
ent
Team
F32
Implem
entationofSpaceProgram
me–ItispossiblethatGroupFinance
will
be re
loca
ted
away
from
Pem
brok
e R
oad.
Thi
s m
ay e
ntai
l wor
king
di
ffere
ntly
with
rega
rds
to a
ccom
mod
atio
n, IT
and
rela
tions
hips
. Gro
up
Fina
nce
shou
ld p
repa
re fo
r th
e lik
ely
impa
ct.
Ach
ievi
ng a
ccom
mod
atio
n sp
ace
savi
ngs.
Cor
pora
te
Pro
ject
Ti
met
able
Man
agem
ent
Team
F4
2P
repa
re fo
r th
e ef
fect
of a
gein
g w
orkf
orce
thro
ugh
the
an
nual
per
form
ance
dev
elop
men
t pla
nnin
g pr
oces
s.
Youn
ger
staf
f abl
e to
pr
ogre
ss to
hig
her
leve
l jo
bs.
Ong
oing
Man
agem
ent
Team
Par
king
Ser
vice
sYe
ar o
ne 2
009/
10
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
P1
1 an
d 3
Mob
ile P
hone
Par
king
Wor
king
with
the
‘Par
tner
ship
in P
arki
ng B
oard
’ (P
iP) a
nd L
ondo
n co
unci
ls,
dete
rmin
e th
e im
plic
atio
ns a
nd p
oten
tial w
ay fo
rwar
d fo
r us
ing
the
‘mob
ile
phon
e pa
rkin
g pa
ymen
t fac
ility’
con
trac
t tha
t the
y ha
ve a
cqui
red.
Rep
ort t
o C
abin
et
Mem
bers
. Q1
PD
MT
and
DM
T
P2
4
‘On-
Line
’ Per
mits
and
Sus
pens
ions
Sub
ject
to P
olic
y B
oard
app
rova
l:1
Intr
oduc
e a
syst
em to
ena
ble
on-li
ne p
erm
it re
new
als
for
thos
e re
side
nts
thatfulfilcertaincriteria.
2. U
nder
take
pre
limin
ary
wor
k fo
r in
trod
ucin
g el
ectr
onic
-bas
ed a
pplic
atio
ns
for
susp
ensi
ons.
1. S
yste
m te
sted
and
im
plem
ente
d.2.
Pro
duce
a re
port
on
the
wor
k ne
eded
, its
im
plic
atio
ns (s
yste
m
limita
tions
) and
the
timef
ram
es.
1.Q2
2.Q1
PD
MT
and
DM
T
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
93
TranSporT, EnvironmEnT and LEiSurE SErvicES
Par
king
Ser
vice
sYe
ar o
ne 2
009/
10
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
P3
1 ‘In
tellig
ent’
Par
king
Per
mit
Sys
tem
With
in th
e lim
itatio
ns o
f ava
ilabl
e an
d co
mpa
tible
tech
nolo
gy, p
ursu
e th
e de
velo
pmen
t of a
n ‘in
tellig
ent p
arki
ng p
erm
it sy
stem
’.
Rep
ort f
or C
abin
et
Mem
bers
that
det
ails
the
impl
icat
ions
and
pot
entia
l w
ay fo
rwar
d.
Q1
PD
MT
and
DM
T
P4
1
‘Atla
s’ M
appi
ng a
nd
Pho
togr
aphi
c D
ata
Det
erm
ine
how
the
Cou
ncil’s
‘Atla
s’ s
yste
m c
an b
e us
ed to
mak
e in
itial
impr
ovem
ents
to p
arki
ng o
pera
tions
, but
with
an
ultim
ate
view
to
mak
ing
info
rmat
ion
publ
icly
ava
ilabl
e in
a g
raph
ic fo
rmat
. The
pro
ject
will
inco
rpor
ate
info
rmat
ion
such
as
lines,streetsignsandTraffic
M
anag
emen
t Ord
ers.
A re
port
inco
rpor
atin
g a
briefandspecification,
includingfinancial,
oper
atio
nal a
nd tr
aini
ng
impl
icat
ions
.
Q1
PD
MT
and
DM
T
P5
1
Par
king
Pol
icy
Writ
e a
Roy
al B
orou
gh p
arki
ng p
olic
y do
cum
ent,
whi
ch w
ill be
eas
y to
un
ders
tand
and
ava
ilabl
e on
the
Cou
ncil’s
web
site
. The
doc
umen
t will
explaintheCouncil’sapp
roachtoparkingenforcementtoresidents,
busi
ness
es a
nd v
isito
rs.
Pol
icy
docu
men
t pub
lishe
d.
Q1
PD
MT
and
DM
T
P6
1
Cou
ncil
On-
Str
eet P
arki
ng E
nfor
cem
ent
Rev
iew
the
curr
ent o
n-st
reet
enf
orce
men
t reg
ime
taki
ng in
to
acco
unt r
esid
ent,
busi
ness
and
vis
itor
com
men
ts o
ver
the
last
yea
r. R
evie
w to
incl
ude
area
s su
ch a
s pa
y an
d di
spla
y, u
se o
f car
pou
nd,
perfo
rman
ce m
onito
ring,
dai
ly o
pera
tiona
l pro
cedu
res.
Rev
ised
doc
umen
tatio
n pr
oduc
ed a
nd n
ew re
gim
e op
erat
iona
l. Q2
NC
P R
evie
w
Mee
tings
, the
P
artn
ersh
ip
Boa
rd, D
MT
SERVICE DELIVERY PLAN 2009/12
94
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Year
one
200
9/10
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
P7
1 an
d 3
Env
iro
nmen
tal R
epo
rtin
g
Undertakeareview
ofdefectivelines/signs/graffitirepo
rtingbytheCouncil’s
‘On-
Str
eet E
nfor
cem
ent’
cont
ract
or, t
o id
entif
y ar
eas
for
impr
ovem
ent.
This
m
ay in
clud
e m
akin
g us
e of
the
Cou
ncil’s
‘Atla
s’ s
yste
m, i
ncre
asin
g th
e ra
nge
of re
port
ed it
ems,
and
the
pote
ntia
l for
repo
rtin
g ot
her
co
mm
unity
issu
es th
roug
h pa
rtne
rshi
p w
orki
ng w
ith th
e lo
cal p
olic
e.
Rev
iew
com
plet
e, a
nd
timef
ram
e an
d re
sour
ces
for
diffe
ring
initi
ativ
es
agre
ed.
Q3
(How
ever
, el
emen
ts
will
need
to
link
in w
ith
the
‘Atla
s’
map
ping
pr
ojec
t.)
PD
MT
and
DM
T
Year
tw
o 2
010/
11
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
P1
1 an
d
4
Pub
lic In
form
atio
n
Reviewpublicparkinginform
ationtoensurethatallliteratureandtextisup
to d
ate,
ava
ilabl
e in
the
mos
t app
ropr
iate
form
at a
nd e
asy
to u
nder
stan
d.
Reviewto
includeleaflets,website,G
IS,m
odesofaccessinginform
ation
(e.g
. web
, pho
ne, i
n pe
rson
), an
d us
age.
Cab
inet
Mem
bers
repo
rt
thatdetailsthefindings
from
the
revi
ew a
nd
reco
mm
enda
tions
for
go
ing
forw
ard.
Q1
PD
MT
and
DM
T
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
95
TranSporT, EnvironmEnT and LEiSurE SErvicES
Year
thr
ee 2
011/
12
Ref
. ID
Aim
Det
ails
of
wo
rk (p
roje
cts)
Targ
et(s
)
Est
imat
ed
tim
e o
f d
eliv
ery
for
year
one
Mo
nito
ring
m
echa
nism
s(s)
P1
Procurementprocessfortherenewalofcontractforbackofficeadministration.
Pro
cess
com
plet
ed b
efor
e contractexpiresinJune
2012
.Q12012/13
PD
MT
and
DM
T
SERVICE DELIVERY PLAN 2009/12
96
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
appendix a - Lead officers
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
97
TranSporT, EnvironmEnT and LEiSurE SErvicES
Transport, Environment and Leisure Services Group Management BoardExecutive Director Tot BrillDirector of Waste Management and Leisure Peter RamageDirector of Transportation and Highways Graeme SwinburneHead of Licensing and Business Improvement Neil HerbertGroup Finance Manager Mick Semeta
Heads of Service
Service Officer Email Phone
Licensing and Business Improvement
Neil Herbert [email protected] 020 7341 5157
Arts and Leisure Hamish Pringle [email protected] 020 7471 9823
Waste Management and Street Enforcement
Peter Ramage [email protected] 020 7341 5666
TrafficandTransportationPolicy
Mahmood Siddiqi [email protected] 020 7361 3589
Highways and Construction
Tony Putt [email protected] 020 7341 5235
Parking Services Kevin Hayes [email protected] 020 7361 4201
SERVICE DELIVERY PLAN 2009/12
98
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
appendix B - Forward plan of procurement
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
99
TranSporT, EnvironmEnT and LEiSurE SErvicES
2009/2010
Business group
Div/Dir 1Contract
description 2
Expected method of
procurement 3
Expected length of contract
4
Expected start date
5
Estimated value
6
Contact name and
email 7
TELSArts and
Leisure
Chelsea Sports
Centre major maintenance
and refurbishment works phase
2
Framework (Consultants) and Tender
(Contractors)
Three months
July 2009
c£760,000
Jeff Mays
TELSArts and
Leisure
Kensington Leisure
Centre major maintenance works phase
2
Framework (Consultants) and Tender
(Contractors)
Three months
Jan2010
c£350,000
Jeff Mays
TELSArts and
Leisure
DDA works at leisure sitesparks and cemeteries
phase 1
Framework Agreements
Three months
September2009
c £74,000
Jeff Mays
TELSArts and
Leisure
Lighting and sound contract for Holland Park
Strategy
TenderFive
yearsApril 2009
c £120,000
Mike Harth
TELSArts and
Leisure
Northside Garage
Framework (Surveyors) and Tender
(Contractors)
Three months
September 2009
c£275,000 Jeff Mays
TELSArts and
Leisure
Holland Park North Wall
Tender Three
months
April 2009
c£300,000 Jeff Mays
TELSHighways and Construction
Paving worksEU
RestrictedFive
yearsApril 2009
c£4m p.a (£20m
over life of contract)
Tony Putt/Arif Mahmud
SERVICE DELIVERY PLAN 2009/12
100
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
2009/2010
Business group
Div/Dir 1Contract
description 2
Expected method of
procurement 3
Expected length of contract
4
Expected start date
5
Estimated value
6
Contact name and
email 7
TELSHighways and Construction
Drainage and gully works
EU Restricted
Five years
April 2009
c£350k p.a (£1.75m
over life of contract)
Tony Putt/Arif Mahmud
TELSHighways and Construction
General works and repair
contract for bridges and
highway structures
EU Restricted
Five years
April 2009
c£80,000
p.a (£400k
over life of contract)
Tony Putt/Arif Mahmud
TELSHighways and Construction
Supply and application of road markings
Full Tender
Five years
April 2009
c£170k p.a
(£850k over life of contract)
Tony Putt/Arif Mahmud
TELSHighways and Construction
Highway safety
inspections
EU Restricted
Five years
April 2009(subject to
review)
c£50,000
p.a (£250k
over life of contract)
Tony Putt/Arif Mahmud
TELSParking Services
Town Hall Car Park
Management
EU Restricted (possible extensionofexistingcontract)
Two years +
Two years
1 April 2010
c£240,000
p.a(£960k over all
remaining contract extensionperiods)
Kevin Hayes
TELSParking Services
Bailiff Services TenderThree years
Jan 2010 NilKevin Hayes
TELS
Trafficand
Transportation Policy
Framework Contract for Trafficand
Transportation Professional
Services
EU Open
Four years
1 August 2009
£10m Ian Davies
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
101
TranSporT, EnvironmEnT and LEiSurE SErvicES
2009/2010
Business group
Div/Dir 1Contract
description 2
Expected method of
procurement 3
Expected length of contract
4
Expected start date
5
Estimated value
6
Contact name and
email 7
TELSWaste
Management
Provision of waste and
recycling bags
EU Open
Five years
September 2009
c£2.5m
Jay Amies
TELSWaste
Management
Purchase of electronic FPN machines for enforcement
officers
TenderFive
years2009 £100,000
John Goode
TELSWaste
Management
Purchase of replacement
CCTV cameras,
demountables and mobile equipment
QuotationFive
years2009/10 £70,000
John Goode
TELSWaste
Management
Digitalisation of control
roomQuotation
Three months
2009/10 £10,000John
Goode
TELS
Waste Management
and Street Enforcement
Provision of temporary toilets for
Notting Hill Carnival
EU Restricted
Three years
August 2008
c£225,000
Kenneth Thompson
TELS
Waste Management
and Street Enforcement
Animal Warden Service
Full tender
Three years
April 2010
c£100,000
Kenneth Thompson
SERVICE DELIVERY PLAN 2009/12
102
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Forward Plan of Procurement2010/2011
Business group
Div/Dir 1Contract
description 2
Expected method of
procurement 3
Expected length of contract
4
Expected start date
5
Estimated value
6
Contact name and
email 7
TELSArts and Leisure
Chelsea Sports
Centre major maintenance
and refurbishment works phase
3
Framework (Consultants) and Tender
(Contractors)
Three months
June 2010c
£200,000Jeff Mays
TELSArts and Leisure
Kensington Leisure
Centre major maintenance works phase
3
Framework (Consultants) and Tender
(Contractors)
Three months
January 2011
c£200,000
Jeff Mays
TELSHighways and Construction
Asphalt and bituminous
workEU Restricted
Five years
April 2010
c£2m p.a (£10m
over life of contract)
Tony Putt/Arif Mahmud
TELSArts and Leisure
DDA works at leisure sitesparks and cemeteries
phase 2
Framework Agreements
Three months
September 2010
c£117,000
Jeff Mays
TELSHighways and Construction
Public lighting maintenance
and new works
EU RestrictedFive
yearsApril 2010
c£1.3mk
p.a (£6.5m
over life of contract)
Tony Putt/Arif Mahmud
TELSHighways and Construction
Minor Highway Works
(Including improvement
schemes)
EU RestrictedFive
yearsApril 2010
c£750 p.a (£3.75m
over life of contract)
Tony Putt/Arif Mahmud
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
103
TranSporT, EnvironmEnT and LEiSurE SErvicES
Forward Plan of Procurement2010/2011
Business group
Div/Dir 1Contract
description 2
Expected method of
procurement 3
Expected length of contract
4
Expected start date
5
Estimated value
6
Contact name and
email 7
TELSHighways and Construction
The inspecting
and reporting in respect of Albert
and Chelsea Thames Bridges
and other highway
structures
EU RestrictedFive
yearsApril 2010
c£35k p.a (£1.75m
over life of contract)
Tony Putt/Arif Mahmud
TELSParking Services
Enforcement of on-street
parking regulations
and management
of vehicle compound
EU Restricted.(Possible extensionofexistingcontract)
Three years
July 2010
c£5.8m
per annum
Kevin Hayes
TELSParking Services
Maintenance of Pay and
Display Equipment
EU Restricted(Possible extensionofexistingcontract)
One + one + one +
one years
January 2011
c£400,000
Kevin Hayes
SERVICE DELIVERY PLAN 2009/12
104
TranSporT, EnvironmEnT and LEiSurE SErvicES
Forward Plan of Procurement2011/2012
Business group
Div/Dir 1Contract
description 2
Expected method of
procurement 3
Expected length of contract
4
Expected start date
5
Estimated value
6
Contact name and
email 7
TELSArts and Leisure
DDA works at leisure sitesparks and cemeteries
phase 3
Framework Agreements
Three months
September 2010
c£86,000
Jeff Mays
TELSHighways and Construction
The supply of Yorkstone paving slabs for use on the public highway
EU Restricted
Five years
April2012
c£1.2m p.a (£6m over
life of contract)
Tony Putt/Arif Mahmud
TELSParking Services
‘BackOffice’admin.
Tender(Possible extensionofexistingcontract)
Three years and two years
June2012
c£150,000
Kevin Hayes
KEY1 - Name of division or directorate contract falls under. 2 – The name of the contract as it will be advertised.
3 – Quotations/tender - Open, Restricted, EU Negotiated Procedure or Competitive Dialogue. 4 – Number of years, including extensions e.g. four plus one.
5 – Date when contract comes into force. 6 – Estimated value over the full contract term.
7 – Project Manager (for internal use only).
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/10
105
TranSporT, EnvironmEnT and LEiSurE SErvicE
SERVICE DELIVERY PLAN 2009/12
106
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
appendix c - risk register
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
107
TranSporT, EnvironmEnT and LEiSurE SErvicES
Top level risks highlighted for monitoring. Many other risks are managed on a day to day basis through systems of control and security.
Details Risk Ref.Current status/
likelihood/impactSummary Assigned to
Parking income shortfall
ES0063
Will Occur (6)Significant(3)
= 18
Action:Housekeep
November 2008Two reports have been sent to
Leader's Group and Policy Board outlining key information around the reduction of PCN income.
Normal contract monitoring information immediately
highlighted the falling off of PCN numbers. The contract monitoring also showed that
some of the fall in PCN numbers was due to performance
problems on the part of the parking enforcement contractor,
in particular around staff shortages and management
failures which are being addressed through contractual
obligations.
It is currently anticipated that there will be an income shortfall
of £3m, which is being dealt with through the budget monitoring
and setting process.
Swinburne, Graeme
Inability to recruit and retain sufficientqualified
staff to meet service
demand.
ES0003
Probable (4)Significant(3)
= 12
Action:Housekeep
Thisisanexistingriskwhichhadbeen controlled to a satisfactory
level but, due to changing circumstances in December
2008, the TELS GMB asked for the risk to be reviewed and
re-rated.
A new risk assessment is being carriedouttoreflectthenew
environment, and a new action plan is being prepared.
Brill, Tot
SERVICE DELIVERY PLAN 2009/12
108
TranSporT, EnvironmEnT and LEiSurE SErvicES
Details Risk Ref.Current status/
likelihood/impactSummary Assigned to
Climate change
impact on service delivery
and service demand
ES0062
Probable (4)Significant(3)
= 12
Action:Housekeep
November 2008The draft Climate Change Strategy was approved by Cabinet following a public consultation and it will be
published shortly.
TheexistingEnvironmentStrategy is already putting
mitigation measures in place in terms of the Council’s Carbon
Foot print.
The Council has signed the Nottingham Declaration to indicate the political will to
address climate change and will incorporate it as part of work on
being a Smarter Council.
December 2008GMB requested a review of this risk to clarify nature of the risk and where the impacts fall, to
ensure TELS are only managing therisksspecifictotheirown
business group.
Mcgarvey, Ms Joan
Loss of sponsorship supporting Arts Service
activities
ES0067
Probable (4)Significant(3)
= 12
Action:Housekeep
ThisriskwasidentifiedatDecember 2008 TELS GMB and
a full risk assessment is being prepared as a basis for an
action plan.
Ramage, Mr Peter
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
109
TranSporT, EnvironmEnT and LEiSurE SErvicE
SERVICE DELIVERY PLAN 2009/12
110
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
appendix d - performance indicators
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
111
TranSporT, EnvironmEnT and LEiSurE SErvicES
Indicators NISLocal
Indicator
Designated LAA
Indicator
Community Strategy Indicator
Vital Signs Indicator
Adult participation in sport and active recreation
NI8 X
Visits to museums or galleries NI10 X
Engagement in the Arts NI11 X
People killed or seriously injured inroadtrafficaccidents
NI47 X X
Children killed or seriously injured in roadtrafficaccidents
NI48
Congestion–averagejourneytimeper mile during the morning peak
NI167
Principal roads where maintenance should be considered
NI168
Non-principalclassifiedroadswheremaintenance should be considered
NI169
Access to services and facilities by public transport, walking and cycling
NI175
Working age people with access to employment by public transport (andotherspecifiedmodes)
NI176
Local bus and light rail passenger journeys originating in the
authority areaNI177
Bus services running on time NI178
CO2 reduction from local authority operations
NI185 X X X
Per capita reduction in CO2 emissions in the local authority area
NI186 X
Planning to adapt to climate change NI188 X
Achievement in meeting standards for the control system for
animal healthNI190
Residual household waste per household
NI191
Percentage of municipal waste landfilled
NI193 X
SERVICE DELIVERY PLAN 2009/12
112
TranSporT, EnvironmEnT and LEiSurE SErvicES
Indicators NISLocal
Indicator
Designated LAA
Indicator
Community Strategy Indicator
Vital Signs Indicator
Improved street and environmental cleanliness (levels of litter, detritus,
graffitiandflyposting)NI195 X X
Improved street and environmental cleanliness–flytipping
NI196 X
Improvedlocalbiodiversity–proportion of local sites where
positive conservation management has been or is being implemented
NI197 X
Childrentravellingtoschool– mode of transport usually used
NI198
The average number of days taken to repair a street lighting fault that is under the control of
the local authority
X
Percentage of street lights in residential areas with ’white light’
X
Number of independent schools with a School Travel Plan
X X
Number of state schools with a School Travel Plan
X X
Car Club membership in the borough
X X
Customer satisfaction with Kensington Leisure Centre
X X
Customer satisfaction with Chelsea Sports Centre
X X
Numberjustifiablecomplaints of missed bin collections
X X
Percentage of residents’ vehicles for which CO2 ratings are given,
that are below 121g/CO2X X
Place Survey - Satisfaction with parks and open spaces
X X
Place Survey - Satisfaction with refuse collection
X X
Number of parks with a Management Plan
X X
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
113
TranSporT, EnvironmEnT and LEiSurE SErvicE
SERVICE DELIVERY PLAN 2009/12
114
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
appendix E - audit plan 2009 to 2010
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
115
TranSporT, EnvironmEnT and LEiSurE SErvicES
Parking Services
Audit Scope Quarter Client Manager
Parking Enforcement
High Level ReviewFollow up of previous audit in 2007 to 2008, test key controls and full
review of any changes.
To include review of the current enforcement contract with NCP,
monitoring of performance including ticket issuance rate, and
income projections.
To review recovery of outstanding PCN and escalation to court proceedings.
3/4
Graeme Swinburne(Director of
Transportation and Highways)
Kevin Hayes(Head of Parking
Services)
ParkingResidents Permits
High Level ReviewThis review will be undertaken jointly reporting to TELS and
Corporate Services.
Follow up of previous audit in 2007 to 2008, test key controls and full review of any changes. To include review of
stock control over permits, reconciliation against end of day income reports,
eligibility of applicants who have been issued with resident parking permits,
and any planned system developments such as online renewal of permits.
3
Steven Evans(Head Of Customer
Services and Revenues)
Ray Brown(Customer Services
Manager)
Parking Suspensions
Full ReviewFull review of systems including monitoring income levels, review
chargingpolicy,efficiencyindealingwithsuspension requests and interface with
OneWorld.
2
Graeme Swinburne(Director of
Transportation and Highways)
Kevin Hayes(Head of Parking
Services)
Pay and
Display
High Level ReviewFollow up of previous audit 2008 to
2009, test key controls and full review of any changes.
4
Graeme Swinburne(Director of
Transportation and Highways)
Kevin Hayes(Head of Parking
Services)
Off-Street Parking
Full ReviewFull review of key controls, system for
collection and reconciliation of income.2
Graeme Swinburne(Director of
Transportation and Highways)
Kevin Hayes(Head of Parking
Services)
SERVICE DELIVERY PLAN 2009/12
116
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
appendix F - revenue budget tables
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
117
TranSporT, EnvironmEnT and LEiSurE SErvicES
A summary by service of the 2009/10 revenue budget is shown in the table below.
Service2007/08 Actual 2008/09 Budget 2009/10 Budget
Exp Income Net Exp Income Net Exp Income Net
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Cabinet Member for Regeneration, Environmental Management and Leisure
Waste Management
Operations - Cleansing 12,507 159 12,348 13,125 145 12,980 13,626 140 13,486
Commercial Waste and Revenue Services
2,379 4,360 -1,981 2,552 4,743 -2,191 2,672 4,905 -2,233
Waste Disposal 7,534 230 7,304 8,110 105 8,005 9,387 67 9,320
Recycling 2,286 282 2,004 2,452 0 2,452 2,466 8 2,458
Regulation of Street Trading
870 870 0 900 900 0 803 803 0
Traders Stores and Market Development
65 182 -117 87 174 -87 168 179 -11
Carnival and Other Events
608 150 458 589 120 469 934 146 788
Leisure & Parks
Sports Centres 895 150 745 1,162 148 1,014 1,311 261 1,050
Parks and Open Spaces
4,002 172 3,830 4,577 241 4,336 4,571 226 4,345
Cemeteries 632 694 -62 684 714 -30 951 735 216
Arts and Mauseums
Arts Development and Support
519 88 431 452 0 452 514 0 514
Holland Park Theatre 2,294 1,736 558 2,424 1,998 426 2,763 2,286 477
Museums and Galleries 751 384 367 687 272 415 729 280 449
SERVICE DELIVERY PLAN 2009/12
118
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Service2007/08 Actual 2008/09 Budget 2009/10 Budget
Exp Income Net Exp Income Net Exp Income Net
Executive
Environmental Strategy 293 82 211 251 0 251 309 0 309
Licensing 987 634 353 1,039 622 417 1,052 631 421
Total Cabinet Member for Regeneration, Environmental Management and Leisure
36,622 10,173 26,449 39,091 10,182 28,909 42,256 10,667 31,589
Deputy Leader and Cabinet Member for Planning Policy, Housing Policy and Transportation
Transportation and Highways
Highway Maintenance 10,541 994 9,547 11,139 838 10,301 11,273 892 10,381
Public Lighting 2,208 37 2,171 2,338 25 2,313 2,549 40 2,509
Rechargeable and Other Street Works
741 647 94 449 402 47 608 593 15
TrafficSection 2,480 114 2,366 2,713 57 2,656 2,369 58 2,311
Transportation and Road Safety
728 107 621 819 66 753 957 89 868
Parking
Car Parking Off-Street 1,061 1,912 -851 1,072 1,943 -871 944 1,915 -971
Car Parking On-Street 15,740 39,478 -23,738 16,833 40,191 -23,358 16,675 38,567 -21,892
Total Deputy Leader and Cabinet Member for Planning Policy, Housing Policy and Transportation
33,499 43,289 -9,790 35,363 43,522 -8,159 35,375 42,154 -6,779
Corporate and Democratic Core
292 0 292 262 0 262 273 0 273
Adjustment for Recharged Services Income and Internal Recharges
326 326 0 322 322 0 397 397 0
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
119
TranSporT, EnvironmEnT and LEiSurE SErvicES
Service2007/08 Actual 2008/09 Budget 2009/10 Budget
Exp Income Net Exp Income Net Exp Income Net
TOTAL TRANSPORT, ENVIRONMENT AND LEISURE SERVICES
70,739 53,788 16,951 75,038 54,026 21,012 78,301 53,218 25,083
FULLY RECHARGED SERVICES
ExecutiveGroup 1,470 3 1,467 1,575 3 1,572 1,599 3 1,596
Contact Centres and Business Support
2,923 466 2,457 3,109 496 2,613 3,217 505 2,712
Contracts and Enforcement Support
1,746 112 1,634 2,035 31 2,004 1,946 64 1,882
Transportation and Highways Administration
1,332 60 1,272 1,152 3 1,149 1,236 0 1,236
FULLY RECHARGED 7,471 641 6,830 7,871 533 7,338 7,998 572 7,426
A subjective summary of the 2009/10 revenue budget is shown in the table below.
SERVICE DELIVERY PLAN 2009/12
120
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Item2007/08 2008/09 2009/10
Actual Budget Budget
£'000 £'000 £'000
EXPENDITURE
EmployeeRelatedExpenses 12,684 13,530 13,945
PremisesRelatedExpenses 4,268 4,845 5,515
TransportRelatedExpenses 123 135 135
Supplies & Services 4,742 5,238 5,524
Third Party Payments 40,564 41,983 44,202
Transfer Payments 0 0 0
Central Support
Central Departments 6,240 6,526 6,646
Other Departments 96 88 238
Capital Charges 2,022 2,693 2,096
TOTAL EXPENDITURE 70,739 75,038 78,301
INCOME
Government Grants 373 0 111
Other Grants, Reimbursements 731 370 407
& Contributions
Customer & Client Receipts
Fees & Charges 51,244 52,152 51,205
Rents 936 967 947
Interest 1 1 1
Recharges to Other Revenue A/Cs
Other Departments 503 536 547
TOTAL INCOME 53,788 54,026 53,218
NET EXPENDITURE 16,951 21,012 25,083
Third party payments are shown in more detail below.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
121
TranSporT, EnvironmEnT and LEiSurE SErvicES
Item2009/10Budget
£'000
Cleansing Contract 14,225
WRWA Levy and Commercial Waste Payments 9,385
Parking Contracts including Meter Bays and Posts 7,388
London Councils and Court Registration 458
Footway and Carriageway works, Bridge Maintenance, TrafficSchemesandStreetFurniture
8,632
Surface Water Drainage 369
Public Lighting 1,130
TrafficandTransportationConsultants 602
UrbanTrafficControl 241
Lee Valley Regional Park Levy 308
Notting Hill Carnival 205
Sports Centre Contract 372
Holland Park Theatre 401
Transport 130
Other 356
Total Third Party Payments 44,202
SERVICE DELIVERY PLAN 2009/12
122
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
appendix G - capital summary
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
123
TranSporT, EnvironmEnT and LEiSurE SErvicES
Project Ref. No.
Scheme Exp in
previous years
2008/09 2009/10 2010/11 2011/12 Later years
Total
Deputy Leader and Cabinet Member for Planning
Policy, Housing Policy and Transportation
£000 £000 £000 £000 £000 £000 £000
TBCAlbert Bridge Major Structural
Repairs 1,910 4,675 825 7,410
X5044Albert Bridge Strengthening
Design Fees97 205 302
X5054 Bus Priority - TfL 50 50
X5099 Bus Stop Accessibility - TfL
25
20
20
20 85
X5011 Cycling Initiatives - TfL 100 100 100 100 400
X5124 ExhibitionRoad-Design,PR
and Research1,993 220 180 120 30 2,543
X5094 ExhibitionRoad-Stage1 1,358 2,440 2,790 685 7,273
X5094 ExhibitionRoad-Stage2
Kensington 500 3,570 5,940 3,360 560 13,930
TBC Final Accounts 242 242
X5079 Hans Crescent 215 500 585 1,300
X5082Hans Road / Basil Street
Junction 100 650 300 1,050
TBC Imperial Wharf Station 650 650
TBCLadbroke Grove Environmental
Improvements700 850 350 1,900
X5098 Local Area Accessibility - TfL 100 80 80 80 340
X5007 Local Safety Schemes - TfL 100 200 100 100 500
X5048 Old Brompton Road 55 270 325
X5012 School Travel Plans and
Travel Awareness 80 100 80 80 340
X5073 Stanley Bridge 9 10 77 96
X5071 Street Scene Improvements
ten year programme 300 750 800 800 2,650
SERVICE DELIVERY PLAN 2009/12
124
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
Project Ref. No.
Scheme Exp in
previous years
2008/09 2009/10 2010/11 2011/12 Later years
Total
X5050 Structural Maintenance of
Roads - TfL 92 200 100 100 492
X5006 Transport Action Plans 350 400 400 400 1,550
X5085 Walking - TfL - CLP 50 100 100 100 350
3,672 5,464 12,417 14,470 6,845 910 43,778
Project Ref. No.
Scheme Exp in
previous years
2008/09 2009/10 2010/11 2011/12 Later years
Total
Deputy Leader and Cabinet Member for Planning
Policy, Housing Policy and Transportation
£000 £000 £000 £000 £000 £000 £000
X6398Art Acquisition of Leighton’s
Clytie Painting420 420
TBCBevington Road Public
Conveniences120 120
TBCBrompton Cemetery
Infrastructure1,820 1,600 5,350 8,770
TBCCCTVFixedCamera
Replacement 200 200 400
X6393 Disability Discrimination Act
Works - Leisure Sites 289 74 117 86 71 637
TBCHanwell Cemetery - New
Toilets135 15 150
X6342 Holland House Essential
Repairs 35 178 213
X6337 Holland Park North Wall 14 60 256 330
TBC Holland Park Tennis Courts 220 220
TBCKensington Memorial Park
Tennis Courts185 185
X6395Leighton House Museum
Phase 2 350 1,274 1,624
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
125
TranSporT, EnvironmEnT and LEiSurE SErvicES
Project Ref. No.
Scheme Exp in
previous years
2008/09 2009/10 2010/11 2011/12 Later years
Total
TBC Little Wormwood Scrubs 600 600
X6340North Kensington
Environmental Project 245 200 200 200
845
X6334 Parks Strategy and Development Plan
625 650 675 1,950
X6206 Pembroke Road North Side
Garage 75 200
275
TBCPortobello Road Market
Electricity Supply400 400
X6207 Rebuilding Denyer Street
Depot 122 149 271
X6352 Sports Centre Planned
Maintenance Programme 575 1,205 173 145 2,.098
X6347 St Luke’s Gardens 184 2,020 137
2,341
TBCTalbot Road Public
Convenience Refurbishment350 350
X6332 WM&L Asset Management
Plans 160 150 150 150 610
355 4,521 5,991 3,665 2,856 5,421 22,809
Total Transport
Environment and Leisure 4,027 9,985 18,408 18,135 9,701 6,331 66,587
* Cabinet responsibilities subject to change
highlights indicate “Authority to spend”
SERVICE DELIVERY PLAN 2009/12
126
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
appendix H - value for money
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
127
TranSporT, EnvironmEnT and LEiSurE SErvicES
PurposeThe purpose of this table is to:
• understand the actions that will be undertaken and the outcomes achieved to improve value for money
• 0utline other actions and activities that are part of the Service Delivery Plan and will lead to value for money improvements.
ID/Division
ActionVfM
category
Expected outcomes/
improvements/ benefits
Expected financial impact (if
applicable)
OwnerIs this a new
activity?
Link to
work plan
1.Arts and Leisure
Sports bookings (i.e.
for tennis courts)
available on-line
Use of technology.
Improved efficiencydueto reduction in call volumes
associated with this service. There is also potential for improved customer
satisfaction, as the service can
be offered out of officehours.
Undefinedatthis stage and expectedfordelivery after ‘Too big for
bin’ (see 10).
Head of Arts and Leisure
Yes N/A
2.Highways
and Construction
Reduction in street
lighting energy consumption by transferring
to metered supply,
lower energy luminaires, night time dimming
and remote monitoring.
Smarter procurement/
use of technology.
Reduced energy consumption and carbon emissions
through lower energy lighting.
Financial saving as
charged for actual energy consumption, as opposed to estimated
value in addition to lower
consumption.
Head of Highways
and Construction
YesH2/H8
3.Highways
and Construction
Introduce handheld
mobile technology
to the Street Works, Street Lighting and Highways Operations
teams.
Use of Technology/
business process
improvement.
Reduce paperwork,
improve responsiveness
and increase officerefficiency
as data is entered on-site.
Undefinedat this stage.
Head of Highways
and Construction
YesH5/H9
SERVICE DELIVERY PLAN 2009/12
128
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
ID/Division
ActionVfM
category
Expected outcomes/
improvements/ benefits
Expected financial impact (if
applicable)
OwnerIs this a new
activity?
Link to
work plan
4.Parking
Cashless pay and display payments.
Use of technology.
Increased efficiency(whenthe cash option
is removed), with no cash collections required.
The risk associated with
this project is high, as
failure could significantlyimpact the
reputation of the Council
and the income generated.
Success, however,
would result insignificantgains, as the
costly handling of cash would be removed completely from the process.
In the short term, it would
be more expensiveto provide both cash
and cashless services.
When cash options are withdrawn,
cost savings would be achieved
with machine monitoring,
maintenance/repairs, and the removal of the need
for cash collection on-
street.
There may be additional
general ongoing costs per
transaction, as a result
of third party involvement
in processing payments.
Head of Parking Services
Yes P2
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
129
TranSporT, EnvironmEnT and LEiSurE SErvicES
ID/Division
ActionVfM
category
Expected outcomes/
improvements/ benefits
Expected financial impact (if
applicable)
OwnerIs this a new
activity?
Link to
work plan
5.Parking
Parking permit
renewal and suspensions
available on-line.
Use of technology.
Increased efficiency
through self-service and potential for improved customer
satisfaction, as the service can be offered out ofofficehours.
In the short term, costs would be greater as information
indicates that take-up would be slow and a comprehensive on-line solution
would need to be both
developed and supported.
However, as take-up increased
there would be reductions in
staff costs per parking permit
renewal.
Head of Parking Services
Yes P3
6.Parking
‘Intelligent’ parking
permits and handhelds for
checking.
Use of technology.
Increased efficiencyof parking attendants
through automated checking of
permits.
Undefinedatthis stage. However,
there will be additional costs to
develop the preferred solution.
Head of Parking Services
Yes P4
7.Strategy
and Service Development
Out of hours call handling.
Business process
improvement.
Improved efficiencyofout of hours services with
separation and specialisation
of call handling and CCTV monitoring.
Additional cost will be
incurred with the split of the service.
Potential efficiencysavings could be
achieved with improved
processes.
Head of Licensing
and Business Improvement
No S2
SERVICE DELIVERY PLAN 2009/12
130
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
ID/Division
ActionVfM
category
Expected outcomes/
improvements/ benefits
Expected financial impact (if
applicable)
OwnerIs this a new
activity?
Link to
work plan
8.SSD
Implementation of Climate Change Strategy.
Utilisation of property
assets.
Reduction in energy use and consumption of
resources.
Undefinedatthis stage
Head of Licensing
and Business Improvement
No S1
9.SSD
Sustainable Procurement
Policy.
Smarter procurement.
Requires an assessment of whether purchase is required and the impact
using ‘whole life costing’.
Implementation could increase contract costs,
but achieve Council’s goals for
sustainability.
Head of Licensing
and Business Improvement
No S4
10.Waste
Management
‘Too big for the bin’ collection bookings available on-line,
followed by pest control
bookings and health promotion.
Use of technology.
Improved efficiencydueto a reduction in call volumes associated with
this service.
Potential for improved customer
satisfaction, as the service can be offered out ofofficehours.
Undefinedatthis stage.
Head of Waste
Management and
Enforcement
Yes S2
11.Waste
Management
Revise the waste
management contract
specificationwith SITA.
Smarter procurement.
To identify possible areas forefficiency
and cost savings.
Undefinedatthis stage.
Head of Waste
Management and
Enforcement
No W6
12.Waste
Management
Transferring the issuing of fixedpenaltynotices from
a paper-based
system to electronic devices.
Use of technology.
Streamlining of the procedure.
This could lead to a
reduction in the handling of administration and offers the
potential for on-line payment.
Undefinedatthis stage. Pending an appropriate
solution.
Head of Waste
Management and
Enforcement
Yes N/A
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
131
TranSporT, EnvironmEnT and LEiSurE SErvicES
ID/Division
ActionVfM
category
Expected outcomes/
improvements/ benefits
Expected financial impact (if
applicable)
OwnerIs this a new
activity?
Link to
work plan
13.Waste
Management
Introduction of a new
commercial waste
information system.
Use of technology.
Replacement ofexistingsystem.
Longer-term reduction in system
maintenance costs and
greater streamlining
of procedures with the potential
to increase capacity/efficiency.
Head of Waste
Management and
Enforcement
Yes N/A
14.Waste
Management
Eyes and ears reporting by on-street enforcement.
Utilisation of human resources.
Increased level and speed of fault reporting.
Could facilitate reduction instaffingresources
Head of Waste
Management and
Enforcement
Yes N/A
Measurement of VFM
Actions to improve the measurement of Value for Money. (E.g. comparison between costs and quality / performance;
comparative information with others and over time)
Business process improvement
Business process improvement activities that aim to modernise service and improve productivity.
Use of technology Use of technology to modernise service and improve productivity.
Smarter procurement
Better /smarter procurement /enhanced competition (this is not the forward plan of procurement activity which outlines the schedule to procurement, but what actions are
underway to improve the procurement process undertaken in the business group).
Utilisation of property assets
Actions that will lead to better utilisation of property assets (e.g. changes to accommodation).
Use of human resources
Better use of human resources (if not outlined previously).
SERVICE DELIVERY PLAN 2009/12
132
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
appendix i - Business continuity
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
133
TranSporT, EnvironmEnT and LEiSurE SErvicES
Business Continuity Planning (BCP)Business Continuity Planning (BCP) is the creation of a practiced logistical plan for how an organisation will recover and restore partially or completely interrupted critical functions. In plain language, this means working out how to stay in business in the event of disaster. Incidents include those which are local - such as building fires, regional incidents like earthquakes - and national incidents like pandemic illnesses.
ID Priority Description Business areaResponsible
personLocation of plans
Date of update
1 1
Business must be recovered within zero to 24 hours.
Cemeteries Barrie Maclaurin
TELS intranet page › Plans and
Performance › Plans and Strategies ›
Business Continuity Plans
April2009
2. 1(Parking) Customer
ServicesMarya Lee
As aboveApril2009
3. 1StreetOperations–
ComplianceAndrew Vennard As above
April2009
4. 1 IT Dominic Hurley As aboveApril2009
5. 1(Exec)Customer
ServicesJennie Tucker
TELS intranet page › Plans and
Performance › Plans and Strategies ›
Business Continuity Plans
April2009
6. 1Customer Liaison
ServiceJennie Tucker As above
April2009
7. 1 Parks Police Chris Ellinson As aboveApril2009
8. 2Business must be recovered within 24 to 72 hours.
Commercial Waste Scott Wilson As aboveApril2009
SERVICE DELIVERY PLAN 2009/12
134
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
ID Priority Description Business areaResponsible
personLocation of plans
Date of update
9. 3
Priority 3 Services must be
recovered within three to seven
days.
Contracts Ken Thompson As aboveApril 2009
10. 3Markets and Enforcement
Nicholas Kasic As aboveApril 2009
11. 3 Special Events Adrian Hodgson As aboveApril 2009
12. 3 Museums Daniel Robbins As aboveApril 2009
13. 3 Opera Holland Park Michael Volpe As aboveApril 2009
14. 3 Leisure Services Hamish Pringle As aboveApril 2009
15. 3 Sports Development Jeffery Mays As aboveApril 2009
16 3 TrafficManagement Mark Chetwynd As aboveApril 2009
17 3 Transportation Mark Chetwynd As aboveApril 2009
18 3(Traffic/Transport)Special Projects
Mark Chetwynd As above
19 3Highways
Maintenance Gary Noble As above
April 2009
20 3 Highways Network Gary Noble As aboveApril 2009
21 3Construction/Street
Lighting Gary Noble As above
April 2009
22 3Projects and
Contracts Gary Noble As above
April 2009
23 3 Construction Gary Noble
TELS intranet page › Plans and
Performance › Plans and Strategies ›
Business Continuity Plans
April2009
24 3Parking Services
–suchassuspensions
Sue Taylor As aboveApril 2009
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
135
TranSporT, EnvironmEnT and LEiSurE SErvicES
ID Priority Description Business areaResponsible
personLocation of plans
Date of update
25 4
Priority 4 Services must be
recovered within seven to 14 days.
Enforcement John Goode As aboveApril 2009
26 4 Arts Service As aboveApril 2009
27 4Marketing and
Publicity Cecilia Mahor As above
April 2009
28 5
Priority 5 Services Must be
recovered within 14 days to one
month.
(Finance) Special Projects
Prakash Patel As aboveApril 2009
SERVICE DELIVERY PLAN 2009/12
136
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
appendix J - abbreviations and acronyms
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
137
TranSporT, EnvironmEnT and LEiSurE SErvicES
Abbreviations and acronyms
A&L–ArtsandLeisure LAA–LocalAreaAgreement
AES–AnnualEfficiencyStatementLACMP - Local Authority Carbon Management
Programme
BCP–BusinessContinuityPlan LBAP–LocalBiodiversityActionPlan
BG–Businessgroup LBHF–LondonBoroughofHammersmithandFulham
BME–BlackandMinorityEthnic LDA–LondonDevelopmentAgency
BVPI–BestValueperformanceindicator LDF–LocalDevelopmentFramework
CBP–CabinetBusinessPlan LEC–LatimerEducationCentre
CCTV–Closedcircuittelevision LECF–LondonEnvironmentalCoordinatorsForum
CCZ–Congestionchargezone LIP–LocalImplementationPlan
C-H–ChelseatoHackney[crossrailline] LNHC–LondonNottingHillCarnival
CLG–CommunitiesandLocalGovernment LoBEG–LondonBridgesEngineeringGroup
CLP–CentralLondonPartnership LoTAG–LondonTechnicalAdvisorsGroup
CLS–CustomerLiaisonService LPAM–Leisure,Parks,ArtsandMuseums
CPA–ComprehensivePerformanceAssessment LSE–LondonSustainabilityExchange
CSR–ComprehensiveSpendingReview LSPA–LocalServicePerformanceAgreement
cttee–Committee MB–ManagementBoard
DEFRA–DepartmentforEnvironment,Food and Rural Affairs
MPS–MetropolitanPoliceService
DfT–DepartmentforTransport mtg–Meeting
DMT–DepartmentalManagementTeam MTS–Mayor’sTransportStrategy
ERBIPG–ExecutiveRoyalBoroughImprovementProgramme Group
NHC–NottingHillCarnivalLtd
FPN–FixedPenaltyNotice NIS–NationalIndicatorsSet
GLA–GreaterLondonAuthority NKEP–NorthKensingtonEnvironmentProject
GLA–GreaterLondonAuthority NRF–NeighbourhoodRenewalFund
GMB–GroupManagementBoard OHP–OperaHollandPark
GOL–GovernmentOfficeforLondon OOH–Outofhours
H2H–HeretoHelp OSC–OverviewandScrutinyCommittee
SERVICE DELIVERY PLAN 2009/12
138
TranSporT, EnvironmEnT and LEiSurE SErvicES
Abbreviations and acronyms
HHASC–Housing,HealthandAdultSocialCare[BusinessGroup]
PCN–penaltychargenotice
ICE–ImprovingtheCustomerExperience PCSO–PoliceCommunitySupportOfficer
IDeA–ImprovementandDevelopmentAgency PCT–PrimaryCareTrust
IiP–InvestorsinPeople PiP–PartnershipinParking
IS–InformationSystems PMC–PortobelloManagementCommittee
ISD–InformationSystemsDivisionPPHPT–PlanningPolicy,HousingPolicyand
Transportation
ISPG–InformationSystemsPolicyGroup PR–PublicRealm
KCP–KensingtonandChelseaPartnership PRU–Pupils’ReferralUnit
KD–KeyDecision RBPI–RoyalBoroughperformanceindicator
REAL–Reasoning,Engagement,Achievement,Leadership[PerformanceDevelopmentFramework]
TfL–TransportforLondon
RERC–RegulationandEnforcement Review Committee
TfLN–TransportforLondonNetwork
RSL–RegisteredSocialLandlord TMA–TrafficManagementAct
SDP–ServiceDeliveryPlan TMO–TenantManagementOrganisation
SME–SmalltoMediumEnterprise VfM–ValueforMoney
SNT–SaferNeighbourhoodTeam WDT–WestwayDevelopmentTrust
SSD–StrategyandServiceDevelopment WMSE–WasteManagementandStreetEnforcement
T&H–TransportationandHighways WoW–WalkonceaWeek/WalkonWednesdays
TELS–Transport,EnvironmentandLeisureServices[BusinessGroup]
WRWA–WesternRiversideWasteAuthority
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
139
TranSporT, EnvironmEnT and LEiSurE SErvicE
SERVICE DELIVERY PLAN 2009/12
140
TranSporT, EnvironmEnT and LEiSurE SErvicES TranSporT, EnvironmEnT and LEiSurE SErvicES
appendix K - relevant strategiesThis list is by no means comprehensive, but indicates the key current strategies that are produced by TELS or have an impact upon work within TELS.
TranSporT, EnvironmEnT and LEiSurE SErvicES
SERVICE DELIVERY PLAN 2009/12
141
TranSporT, EnvironmEnT and LEiSurE SErvicES
Title Date published Time period covered
Cabinet Business Plan April 2009 2009/10 to 2011/12
Community Strategy November 2005 2005 to 2015
Climate Change Strategy December 2008 2008 to 2015
Corporate Equalities Policy July 2004
Environment Strategy August 2006 2006 to 2011
Here to Help Strategy July 2006
Local Biodiversity Action Plan January 2007 2007 to 2011
Local Implementation Plan August 2007
Municipal Waste Management Strategyand Action Plan
July 2004 2004 to 2009
Parks Strategy November 2005 2006 to 2015
Public Health and Well-Being Strategy September 2007 2007 to 2012
Streetscape and Transport Policies February 2008 ‘living’ document - ongoing
TELS Information Systems (IS) Plan March 2008 2008 to 2011
Waste Policy Framework April 2008 2008 to 2015
Workforce Development Strategy March 2008 2007 to 2008
Planned documents
Arts and Cultural Strategy: 2008 to 2018
Cemeteries Management Policy Guidance document
Local Development Framework
Sports and Physical Activity Strategy
© April 2009. The Royal Borough of Kensington and Chelsea. PIRS Design 020 7361 4325. 12747njc.