Traffic and Transport Expert Witness Conclave – Joint Summary This joint statement refers to the matters relating to traffic and transport impacts of the MMRP as outlined in Chapter 8 of the EES and the Transport Impact Assessment Report prepared by AJM JV. All Experts that submitted a witness statement related to this topic were invited to attend the conclave on Wednesday the 17 th August, 2016. The following experts attended the conclave: Shaun Smedley, Smedley Technical & Strategic engaged by MMRA (SS) Brett Young, Ratio engaged by Melbourne Grammar School (BY) Chris Coath, GTA engaged by George Weston Foods (CC) Stephen Hunt, Cardno engaged by City of Stonnington (SH) Jason Sellars, GTA engaged by University of Melbourne (JS) Richard Smithers, City of Melbourne (RS) John Kiriakidis, GTA engaged by Citywide Services and The Botanica Owners Corporation (JK) John Tekieli representing Haig Poulson, City of Melbourne As John Tekieli was representing Haig Poulson (on leave during the times the conclave was convened), he was able to raise the issues that Haig had raised in his witness statement but was not in a position to endorse the positions agreed. Contact was not achieved with William McDougall representing Stonnington City Council prior to the conclave. Members of the conclave (apart from those from the City of Melbourne, which were unable to attend) reconvened on Thursday the 18 th August, 2016 to finalise positions. It was agreed that to protect the intent of the conclave, experts would not consult with their clients to seek further instruction between these meetings. Due to the limited time of all experts and the volume of issues it was agreed that the most suitable approach to address the issues raised by the transport experts was to focus on the suitability of the Environmental Performance Requirements to address the issues raised by the experts. Where specific changes were required to address a localised specific issue, only those experts relevant to the issue/change would provide commentary and either agree or disagree to the change. Those relevant experts are noted by the initials in the final column of the table. Where it was believed by an expert that an important issue was not covered by the Draft EPRs or the EPRs as recommended here, a specific item has been included in the table to reflect this view.

Transcript of Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint...

Page 1: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummaryThisjointstatementreferstothemattersrelatingtotrafficandtransportimpactsoftheMMRPasoutlinedinChapter8oftheEESandtheTransportImpactAssessmentReportpreparedbyAJMJV.

AllExpertsthatsubmittedawitnessstatementrelatedtothistopicwereinvitedtoattendtheconclaveonWednesdaythe17thAugust,2016.Thefollowingexpertsattendedtheconclave:

• ShaunSmedley,SmedleyTechnical&StrategicengagedbyMMRA(SS)• BrettYoung,RatioengagedbyMelbourneGrammarSchool(BY)• ChrisCoath,GTAengagedbyGeorgeWestonFoods(CC)• StephenHunt,CardnoengagedbyCityofStonnington(SH)• JasonSellars,GTAengagedbyUniversityofMelbourne(JS)• RichardSmithers,CityofMelbourne(RS)• JohnKiriakidis,GTAengagedbyCitywideServicesandTheBotanicaOwnersCorporation(JK)• JohnTekielirepresentingHaigPoulson,CityofMelbourne

AsJohnTekieliwasrepresentingHaigPoulson(onleaveduringthetimestheconclavewasconvened),hewasabletoraisetheissuesthatHaighadraisedinhiswitnessstatementbutwasnotinapositiontoendorsethepositionsagreed.

ContactwasnotachievedwithWilliamMcDougallrepresentingStonningtonCityCouncilpriortotheconclave.

Membersoftheconclave(apartfromthosefromtheCityofMelbourne,whichwereunabletoattend)reconvenedonThursdaythe18thAugust,2016tofinalisepositions.Itwasagreedthattoprotecttheintentoftheconclave,expertswouldnotconsultwiththeirclientstoseekfurtherinstructionbetweenthesemeetings.

DuetothelimitedtimeofallexpertsandthevolumeofissuesitwasagreedthatthemostsuitableapproachtoaddresstheissuesraisedbythetransportexpertswastofocusonthesuitabilityoftheEnvironmentalPerformanceRequirementstoaddresstheissuesraisedbytheexperts.Wherespecificchangeswererequiredtoaddressalocalisedspecificissue,onlythoseexpertsrelevanttotheissue/changewouldprovidecommentaryandeitheragreeordisagreetothechange.Thoserelevantexpertsarenotedbytheinitialsinthefinalcolumnofthetable.

WhereitwasbelievedbyanexpertthatanimportantissuewasnotcoveredbytheDraftEPRsortheEPRsasrecommendedhere,aspecificitemhasbeenincludedinthetabletoreflectthisview.

Page 2: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

ID EPR ProposedEPRorchangedEPR AgreedorNotAgreed

Discussion RelevantExpertsinitials

1 T1 ATrafficandTransportWorkingGroupmustbeformedwhichcomprisesrepresentativesfromMMRA,thecontractorandrelevantauthoritiesincludingVicRoads,PTVandrelevantcouncils.ThisworkinggroupwilldefinethetermsofreferenceforthedevelopmentoftheTransportManagementPlans(TMPs),reviewthedraftsoftheTMPsandprovideendorsement.

Keyaffectedstakeholders(includinglocalbusinesses,healthserviceprovidersandeducationalinstitutionsasappropriate)mustbeconsultedwhereappropriatetoprovideinputonareasofconcern,tobeinformedofexpectedimpactsandtoprovidefeedbackontheTMPsandanyrelevantmanagementmeasures.

Thismustincludeconsultationwith,butnotlimitedto,thefollowingparties:

• GeorgeWestonFoodsPtyLtd• CitywideServicesSolutionsPtyLtd• TheBotanicaOwnersCorporations• MelbourneGrammarSchool• UniversityofMelbourne

Agreed ItwasagreedbytheexpertsthatthenominatedStakeholderscouldbeseparatedanddefinedataprecinctlevel,ifappropriate.

SSComment:IagreewiththeEPR,butdonotagreetotheinclusionofspecificandnamedstakeholdersasIbelieveitappropriatefortheTTWGtodeterminethoseaffected.TheywillbeinformedbythesubmissionstotheEESandagreaterunderstandingofthelikelyimpactsasdesigns,constructionmethodsandothermattersarefurtherrefined.TherelevantauthoritiesalreadyneedtocomplywiththeTransportIntegrationAct2010,whichinitselfoutlinestheprincipleofstakeholderengagementandcommunityparticipation.

Inmyopinionitisnotappropriatetoidentifyaselectsmallgroupofaffectedparties.

RSagreeswiththeSScommenthere.

SS,BY,CC,SH,JS,RS,JK

Page 3: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

2 T1 RewordthefirstparagraphinT1tothefollowing:

Developandimplementtransportmanagementplansforeachprecinctinconsultationwiththerelevanttransportmanagementauthoritiestominimisedisruptiontoaffectedlocallanduses,traffic,on-roadpublictransport,carparking,pedestrianandbicyclemovementsduringconstruction,includingbutnotlimitedto:

Agreed SS,BY,CC,SH,JS,RS,JK

3 T1 ThefollowingshouldbeinsertedasanotherdotpointinthisEPR.

• Constructionroutesshouldlooktominimisehaulagealongresidentialstreets,especiallyfornighttimehaulage,wherepossible.Directroutesshouldbeusedwherepossibletolimittheamountofacceleratingandbrakingofheavyvehiclesinresidentialareas.

• Localroadsshouldbeavoidedwherepossibleandshouldnotbeusedasanalternativetoarterialroads.

• Theselocalroadsmustinclude:o FogartySt,NorthMelbourne,o GracieStreet,NorthMelbourneo LongfordSt,NorthMelbourneo BourverieSt,Parkville

Agreed Thespecificstreetsidentifiedherecouldbedefinedataprecinctlevel,ifappropriate.

SSComment:IagreewiththeEPRbutdonotagreewiththespecificityofthenamedroads.InmyopinionthiswouldbecoveredinthedevelopmentoftheTMPsandthroughtheguidanceoftheTTWG.Byspecifiyingsomeroadshereitgivesthemagreaterlevelofimportancethanotherlocalroads,whichmaynotbeappropriate.RSagreeswiththeSScommenthere.

SS,BY,CC,SH,JS,RS,JK

Page 4: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

4 T1 ThefollowingshouldbeinsertedasanotherdotpointinthisEPR.

• Monitoringofallmodesoftransportmustbeundertakenthroughouttheconstructionperiod.Ifadverseimpactsoccurduetonetworkchanges,mitigatingmeasuresaretobedevelopedandimplemented.

• TheTTWGwilloverseethedeliveryofamonitoringmethodology.

• OutcomesofthemonitoringandproposedmitigationsmustbeendorsedbytheTTWG.

Agreed SS,BY,CC,SH,JS,RS,JK

Page 5: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

5 T1 Thecurrentdotpoint:

• Provisionofcarparkingforconstructionworkerswherepossible

shouldbemodifiedtoread:

• Constructionworkersmustnotparkon-street.Provisionofsufficientoff-streetcarparking,oralternativeparkingarrangements(includingconsiderationofsatelliteparkingsiteswithdedicatedshuttleservices)mustbeprovided.

Afurtherdotpointshouldfollow:

• Agreentravelplanshouldbedevelopedforconstructionworkerstoencouragetravelto/fromtheworksitebymeansotherthanprivatevehicle.Thisshouldincludeprovisionforon-sitetoolstorage.

Agreed RS:BicyclesareclassedasvehiclesinRoadRulesVictoria.ThisEPRshouldbemodifiedtoensurewedonotdiscourageworkersfromcyclingtoworksites.

SS,BY,CC,SH,JS,RS,JK

6 T1 AnewitemshouldbeincludedforthisEPR.

Thetrafficmanagementplansmustbeinformedandsupportedbyanappropriateleveloftransportmodelling,asagreedwiththeTTWG,whichdemonstratestheexpectedtransportperformance.

Agreed Theexpertsallhadvaryingviewsonthelevelofspecificity,typeandformofthemodellingandanalysisrequired.Thesearegenerallyoutlinedineachoftheirwitnessstatements.

SShadtheviewthattheTTWGwastheappropriatebodytoinformthelevelofappropriatenessofthemodellingrequired.

SS,BY,CC,SH,JS,RS,JK

Page 6: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

7 T1 AnewitemshouldbeincludedforthisEPR.

ATransportManagementPlanshouldbepreparedinitiallyforeachprecincttoreflectthespecificaccessrequirementsbyalltransportmodesfortheprecinct,andcoordinatedtoprovideanoverallTMPfortheproject.

TheTransportManagementPlansneedtoconsiderallappropriatestagesofconstructionandanychangestositeaccessasaresult.

Agreed SS,SH,CC,JK,JS,BY,RS

8 T1 AnewitemshouldbeincludedforthisEPR.

TheTransportManagementPlansmustbedevelopedandendorsedbytheTTWGwithasufficientnoticeperiodpriortoanyconstructioncommencement.

Agreed SS,BY,CC,SH,JS,RS,JK

9 T2 Insertthefollowingtextasanotherdotpointinthissection:

• Investigate,andwhereappropriate,implement,intersectionmodifications,includingpublictransportprioritytreatmentsforaffectedbusandtramroutes.

Agreed SS,BY,SH,RS,

Page 7: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

10 T2 Insertthefollowingtextasanotherdotpointinthissection:

• Providesuitableroutesforpedestrianstomaintainconnectivitytopublictransportservices,includingDDAaccess,forusersofSouthYarraStationandtramstopsalongToorakRoadinthevicinityoftheconstructionsitewithinPrecinct8

Agreed SS,SH

11 T4 TheTravelDemandStrategyshouldincludetheprovisionofreal-timetraveltimeinformation

Agreed SS,BY,RS

12 T3 InconsultationwiththeCityofStonnington,providesuitableroutesforcyclistsandpedestrianstomaintainconnectivityandconnection,havingregardtotheremovaloftheWilliamStreetBridgeandLoversWalkpedestrianpathduringtheconstructionphase.

Agreed SS,SH

PrecinctSpecificItems

13 T3 Precinct1:Tunnels

ProvideforeaseofmovementalongtheTanTrackintheBotanicalGardensneartheLinlithgowConstructionSites,orprovideasuitablealternativealignmentshouldbeprovidedduringconstruction.

Agreed SS,RS

Page 8: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

14 T1 Precinct3:ArdenStation

TheconstructionhaulageRoute1whichfollowsLaurensStreet,MillerStreet,AndersonStreet,VictoriaStreetisnotsupported.

Agreed SS,CC,

15 T1 Precinct3:ArdenStation

Anycallforwardoperationsand/oroccupationofLaurensStreetmustnotimpactontheoperation(vehicular/pedestrian)ofGeorgeWestonFoods.

NotAgreed ThisEPRisputforwardbyCC.

SSComments:IbelievethattheintentofthisEPRisalreadycoveredinthedevelopmentoftheTMPsandoversightfromtheTTWG.FurtherIdonotbelievethatitmaybepossibleto‘notimpact’theoperationofthisbusiness.Theremayneedtobeimpactstoeffectivelycarryouttheconstructionactivitiesandaslongastheyareappropriatelymanaged,Ibelievethatshouldbeacceptable.

SS,CC

16 T1 Precinct3:ArdenStation

MMRAworkwithGeorgeWestonFoodstoestablishaweighbridgelocationthatcansuitablyservicetheGeorgeWestonFoodssitewithoutunduedisruptiontoexistingbusinesspractices.

NotAgreed ThisEPRisputforwardbyCC.

SSComments:IdonotsupportthisEPRasitisrequiringtheMMRAtogetinvolvedinassistingabusinesswithresolvinganissuewhichisoutofthecontrolofMMRAandissubjecttothebusinessinteractionsbetweentwo3rdpartybusinesses.

SS,CC

Page 9: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

17 T5 Precinct3:ArdenStation

TheultimatedesignofLaurensStreetistoconsiderthecurrentandfutureadjacentlandusessothataccessisnotcompromised.

Agreed SS,CC,RS

18 T5 Precinct3:ArdenStation

PrepareacarparkingstrategyfortheArdenStationPrecincttoaddressthecurrentabsenceofon-streetparkingcontrolsinordertobalancethevaryinguserneedsincluding:

• Protectionofcurrentresidentandstaffneeds;

• Controlofinducedcommuterparkingdemands

• Provisionofappropriateparkingturnovertosupportfuturelanduses.

Agreed JK,CC,SS

Page 10: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

19 T5 Precinct3:ArdenStation

UndertakeadetailedreviewoftrafficandtransportimpactsassociatedwiththeinstallationofpedestrianoperatedsignalsonLaurensStreetoutsideArdenStationandthepotentialforadverseoperationaloutcomeswithinthebalanceofthenetworkincludingtheintersectionofArdenStreet/LaurensStandArdenStreet/MacaulayRoad/DryburghStreet.Thisassessmentshouldincludethepreparationofamicro-simulationmodelwhichconsidersprojectedpedestrianmovementsassociatedwiththeStationandlandusepopulationandemploymentestimatesexpectedaspartoftheArdenMacaulayStructurePlan.Anyadverseimpactsaretobemitigatedoralternatedesignsprepared.

NotAgreed ThisEPRisputforwardbyJKandCC.

SSComments:IsupporttheintentofthisEPRthatthelegacyphaseinfrastructureisdesignedtorelevantstandardsconsideringtheappropriatenetworkmovementpriorities.HoweverIdonotsupportthespecificityofthisEPRandbelievethatabroadermoregenericEPRwouldsuffice.

JK,CC

20 T1 Precinct4:ParkvilleStation

ProvisionofcomplementaryimprovementstoCollegeCrescent,andothereast-westroadsintheParkvillePrecinct,toaccommodateadditionaltrafficthatmayusetheseroadsasaresultoftheGrattanStreetclosure.TheseimprovementsshouldseektobalanceimpactsacrossthenetworkandconsidertheRoadUseHierarchy.

Agreed SS,

Page 11: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

21 T1 Precinct4:ParkvilleStation

AreviewoftheexistingcarparkingconditionswithintheParkvillePrecinctmustbeundertakentoconfirmexistingsupplyanddemandlevels.Thisinformationwillberequiredtoassesstheimpactofalossofon-streetcarparkingasaresultoftheconstructionphasecombinedwithapotentialupliftincarparkingdemandsattributabletoconstructionworkers.

NotAgreed ThisEPRisputforwardbyJS.

SSComments:IbelievethatthisissueiscoveredbythepreviousEPRrecommendedregardingconstructionworkforceparking.

SS,JS

22 T1 Precinct4:ParkvilleStation

Constructionworkersmustnotparkintheoff-streetcarparksintheParkvillePrecinctwhichareoperatedbyUniversityofMelbournewithouttheirprioragreement.

Agreed SS,JS

Page 12: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

23 T1 Precinct4:ParkvilleStation

Thetrafficmanagementplansmusthaveregardtotheabilityofexistingpedestrianandcyclistfacilitiestoaccommodateupliftsindemandsasaresultofdivertedmovementsaroundtheconstructionarea.

Thetrafficmanagementplansmusthaveregardtothediversionofbusservicesandtherelocationofbusstopstoavoidadilutionofthelevelofservice.Temporarybusstoplocationsmustbeappropriatefortheexpectedpatronagelevels

NotAgreed ThisEPRisputforwardbyJS.

SSComments:IbelievethatotherEPRscovertheintentofthisissue,suchas:

• Provisionofsuitableroutesforcyclistsandpedestrianstomaintainconnectivityandsafetyforroadsandsharedpathstoprovidecontinuedaccess,including(butnotlimitedto):…GrattanStreet,SwanstonStreet….;and

• DevelopandimplementmeasurestominimisedisruptiontothetramandbusnetworksresultingfromtheconstructionofMelbourneMetroinconsultationwiththerelevantroadmanagementauthoritiesandtothesatisfactionofPTV.

SS,JS

Page 13: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

24 T1 Precinct4:ParkvilleStation

Therestrictedconstructionarea(i.e.thatareaboundedbyconstructionhoardings)musthavealayoutthatprovidesappropriatepedestrianaccesstotheeastandwestliftcoreswithinUniversitySquareprovidingaccesstothecarparkbeneaththesquare.

NotAgreed ThisEPRisputforwardbyJS.

SSComments:Thisshouldincludewordstotheeffectof‘ifpossible’andtoprovidesuitableandsafealternativeaccessifaccesstotheseliftcoresisnotpossible.

SS,JS

25 T5 Precinct4:ParkvilleStation

TransportmodellingwillberequiredtoappropriatelyassesstheimpactofthelegacyphasechangestothetransportnetworkandparticularlyGrattanStreet.

ThetransportmodellingshouldalsoassessthepotentialforclosureofGrattanStreettoprivatemotorvehiclespostdevelopmentandtoidentifytheresultingimpactsonthesurroundingtransportnetwork.

NotAgreed ThisEPRisputforwardbyJS.

SSComments:ThecurrentwordingoftheT5EPRconsiderstheultimateconfigurationofGrattanStreetandhasthisbeingdevelopedinconsultationwiththerelevantroadmanagementauthorities.

SS,JS

26 T5 Precinct4:ParkvilleStation

AcarparkingmanagementplanmustbepreparedinconsultationwiththerelevantroadmanagementauthoritiesandwithinputfromtheUniversityofMelbourne.

NotAgreed ThisEPRisputforwardbyJS.

SSComments:IbelievethatthisisalreadycoveredbythecurrentdraftinginEPRT5.

SS,JS

Page 14: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

27 T6 Precinct4:ParkvilleStation

ChangestobusroutesthatprovideservicesdirectlytotheUniversityofMelbourneshouldbedeliveredinconsultationwiththeUniversity.

NotAgreed ThisEPRisputforwardbyJS.

SSComments:EPRT6alreadyrequireschangestobusroutestobeundertakenwithPTV.IbelievethatPTVwillundertaketheappropriatelevelofconsultationasisexpectedundertheTransportIntegrationAct2010.

SS,JS

28 T1 Precinct6:CBDSouth

FlindersStreetmustbemaintainedwithatleastonelaneandthetramservicesoperatingineachdirectionunlessitcanbereasonablydemonstratedthatanyfurtherclosurescanbeappropriatelymanagedwithoutseveredisruptionandcongestiononthenetwork.

Agreed SS,

29 T1 Precinct7:DomainStation

PrepareamapwhichdetailspotentialdiversionoptionsaroundtheDomainRoadclosureandwhichincludesotherrelevantroadclosurestobeprovidedtoMGSfordistributiontotherelevantparties.

NotAgreed ThisEPRisputforwardbyBY.

SSComments:ThisEPRisalreadycoveredbytherequirementtoprepareTMPsandconsultwithaffectedstakeholdersthroughtheTTWG.

SS,BY

30 T1 Precinct7:DomainStation

Contractorsandsubcontractorsmustbebriefedonallaccessrequirementsrelatingtopropertiesaroundtheconstructionsites.

NotAgreed ThisEPRisputforwardbyBY.

SSComments:ThisisstandardpracticeandanEPRspecificforthisisnotreflectiveonhowtheseEPRswillbemanagedandenforced.

SS,BY

Page 15: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

31 T1 Precinct7:DomainStation

AffectedlandusesmustbeprovidedwithacontactfromboththecontractorandtheMMRAtorespondtoanyoperationalissuesthatariseduringconstruction.

NotAgreed ThisEPRisputforwardbyBY.

SSComments:Again,thisisstandardpracticeformajorinfrastructureprojects.ThisEPRistoospecificandifEPRsarewrittenforissueswhicharestandardpractice,theEPRlistwillbe100’sofpagesandwillbetoocumbersometoadminister.

SS,BY

Page 16: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

32 T1 Precinct7:DomainStation

AdditionaltransportmodellingtobeundertakenfortheDomainPrecinct,asagreedwiththeTTWGinconsultationwithaffectedlanduses,whichdemonstratestheexpectedtransportperformance,includingbutnotlimitedto:

- UndertakingtraveltimeanalysisfortraveltoandfromtheDomainPrecincttoincludethekeyapproachesintotheDomainStationprecinct(i.e.ToorakRoad,KingsWay,AlbertRoadandParkStreet)andprovideexpectedtraveltimesforalllikelyroutes.Thismodellingistoincorporatesensitivityanalysisthatteststheimpactsofalessernumberofdivertedtrips.

- Includetheexpectedtrafficgeneratedbytrucksandconstructionworkersinthemicrosimulationmodel.

Undertakeanalysisofthecapacityforthepublictransportnetworktoaccommodateatravelmodeshift.

NotAgreed ThisEPRisputforwardbyBY.

SSComments:ThisEPRisnotrequiredastheTTWGshouldbeabletodeterminetheappropriatelevelofmodellingandanalysis.

SS,BY

33 T1 Precinct7:DomainStation

DomainRoadshouldremainopenuptotheentrancetotheexistingEdmundHerringOval,withprovisionforavehicleturnaround,ifpossible.

Agreed SS,BY

Page 17: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

34 T1 Precinct7:DomainStation

Vehicleandpedestrianaccessistobesatisfactorilymaintainedto400StKildaRoadatalltimesincludingrequirementsassociatedwithwastecollectionandloadingacrosstheStKildaRoadfrontage.

NotAgreed ThisEPRisputforwardbyJK.

SSComments:WhileIagreewiththeintentofthisEPR,itmaysimplynotbepossibletomaintainvehicleaccessatalltimes.Theremaybesomeinstancesduringtheworkswhereaccessisrestricted.ThisEPRistoospecifictothisonelocationandmaynotprovidetheflexibilityrequiredtoconstructaprojectofthisscaleandcomplexity.

SS,JK

35 T5 Precinct7:DomainStation

EnsurethatvehicleandpedestrianaccessarrangementsarenotadverselyeffectedincludingconsiderationofdriversightlinerequirementsfortrafficexitingontoStKildaRoadandtheneedtoaccesskerbsideparkingalongStKildaRoadinsupportofwastecollectionandloadingactivitiesassociatedwith400StKildaRoad,StKilda.

Agreed SSComment:Thisisaveryspecificrequirementrelatedtooneproperty,howeveritisdirectlyaffectedbytheworksandtherequirementshereappearreasonable.

SS,JK

Page 18: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

36 T1 Precinct7:DomainStation

AllvehicularandpedestrianaccesspointstoMelbourneGrammarSchoolaretobekeptopenthroughouttheconstructionperiod,unlessotherwiseagreedbytheschool.

NotAgreed ThisEPRisputforwardbyBY.

SSComments:ThisEPRisnotappropriateasitmaysimplynotbepossibletomaintainvehicleaccessatalltimes.AslongasthisprocessismanagedappropriatelythroughtheTMPsandTTWGIbelieveittobeappropriate.

TheschoolshouldnothaveapprovalrightsovertheconstructionoftheMMRP.

SS,BY

37 T1 Precinct7:DomainStation

WorkswhichrestrictaccesstoMelbourneGrammar(suchasthetramtrackrelocationworksonStKildaRoad)tobeundertakenoutsideofcoreschooltimes(i.e.schoolholidays).

NotAgreed ThisEPRisputforwardbyBY.

SSComments:IdonotsupportthisEPR.ThereareexpectedtobeanumberofchangestotheseservicesasoutlinedinSection8.10.4oftheTIAR.Restrictingthesetoschoolholidayperiodsmayhavesignificantimpactsonconstructionstaginganddurationoftheoverallworks.Ibelievethattheseimpactscanbemanagedduringcoreschooltimes.

SS,BY

Page 19: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

38 T1 Precinct7:DomainStation

Alternatearrangementstobemadeforbuspick-upsanddropoffsinconsultationwithMelbourneGrammar,suchasabusbayonBrombyStreet(withthroughaccessavailabletoStKildaRoad)and/orabusbayonMelbourneGrammar’sStKildaRoadfrontage.

NotAgreed ThisEPRisputforwardbyBY.

SSComments:Thispointwouldrequirefurtherclarity.IexpectthatMMRAwouldbeabletoassistwithalternatearrangementsbuttheactualrequirementforthesebuspick-upsanddropoffsshouldstaywithMelbourneGrammar.

SS,BY

39 T1 Precinct7:DomainStation

ParkingalongMelbourneGrammar’sStKildaRoadfrontagetoberetainedthroughouttheconstructionperiod.

NotAgreed ThisEPRisputforwardbyBY.

SSComments:CurrentEPRwordingsays:

“Provisionofalternateparkingwherepossibletoreplaceparkinglostfrom……StKildaRoad…”

Iexpectthattomaintaintrafficflowthroughthiscomplexconstructionsite,someparkingonStKildaRoadwillneedtoberemovedandhencethecurrentEPRseekstoprovidealternativeswherepossible.Ibelievethattobeareasonableapproach.

SS,BY

40 T1 Precinct7:DomainStation

Trucksmustnotstop,propand/orstagealongtheMelbourneGrammarschoolfrontages.

NotAgreed ThisEPRisputforwardbyBY.

SSComments:IdonotseethemeritinthisEPR.

SS,BY

Page 20: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

41 T1 Precinct7:DomainStation

Thecontractormustprovideanon-siteliaisonofficerforthefirstthreemonthsatkeypickupanddropoffpointsatMelbourneGrammarSchooltoprovideassistancetoschoolrepresentatives.

NotAgreed ThisEPRisputforwardbyBY.

SSComments:Thisisnotneededasappropriatecommunicationsprotocolswillbeinplaceduringtheprojectandkeyimpactareaswillhaveappropriatetrafficmanagementpersonnel.

SS,BY

42 T2 Precinct7:DomainStation

UndertakeanassessmentofanincreaseinpublictransportuseinthevicinityoftheDomainPrecinctasaresultoftheconstructionactivities,withaplanpreparedfortheprovisionofadditionalorreplacementservicesinconsultationwithPTVwherecapacityisbeingexceededasaresultoftheconstructionworks.

NotAgreed ThisEPRisputforwardbyBY.

SSComments:ThisisnotneededastheTMPs,TTWGandmonitoringprogramalreadyrecommendedwilladdressthisissue.

SS,BY

43 T2 Precinct7:DomainStation

AsingletramtrackineachdirectionmustbemaintainedalongSt.KildaRoadthroughoutconstruction.

NotAgreed ThisEPRisputforwardbyBY.

SSComments:IwouldacceptthisEPRifitisacknowledgedthattheremaybesmallperiodsofclosuresasvariousconstructionstagesareimplementedandtracksareslewedandpointschanged.

SS,BY

Page 21: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

44 T2 Precinct7:DomainStation

Anydisruptionstotramandbusservicesandtramshutdownperiodsaretobeoutsideofcoreschooltimes(i.e.schoolholidays).

NotAgreed ThisEPRisputforwardbyBY.

SSComments:IdonotsupportthisEPR.ThereareexpectedtobeanumberofchangestotheseservicesasoutlinedinSection8.10.4oftheTIAR.Restrictingthesetoschoolholidayperiodsmayhavesignificantimpactsonconstructionstaginganddurationoftheoverallworks.Ibelievethattheseimpactscanbemanagedduringcoreschooltimes.

SS,BY

45 T2 Precinct7:DomainStation

ThetemporarytramstoponStKildaRoadistobelocatedwithin100metresoftheMelbourneGrammarfrontageandshouldbesupervised.

NotAgreed ThisEPRisputforwardbyBY.

SSComments:IdonotsupportthisEPR.TheStopwillbelocatedconsideringarangeofusers,issues,safetyconcernsanddirectionfromPTV.

SS,BY

46 T3 Precinct7:DomainStation

FootpathsalongbothsidesofStKildaRoadandDomainRoadaretobemaintainedwithappropriatelightingthroughoutconstruction.

NotAgreed ThisEPRisputforwardbyBY.

SSComments:EPRT1alreadycoversthisissue:

“Provisionofsuitableroutesforcyclistsandpedestrianstomaintainconnectivityandsafetyforroadsandsharedpathstoprovidecontinuedaccess,including(butnotlimitedto):…..StKildaRoad,…..”

SS,BY

Page 22: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

47 T3 Precinct7:DomainStation

Provideatrafficcontrollersupervisedmid-block/workscrossingacrossStKildaRoadwithin100metresoftheMelbourneGrammarfrontage.

NotAgreed ThisEPRisputforwardbyBY.

SSComments:Crossingpointsshouldbelocatedwheresuitableandsafe.TheTMPsandTTWGwillinformthis.

AllworksiteswillneedtocomplywiththeRoadManagementAct,WorksiteSafetyCodeofPractice.

SS,BY

48 T3 Precinct7:DomainStation

AsinglebicyclelanetobeprovidedineachdirectionalongStKildaRoadthroughoutconstruction.

NotAgreed ThisEPRisputforwardbyBY.

SSComments:EPRT1alreadycoversthisissue:

“Provisionofsuitableroutesforcyclistsandpedestrianstomaintainconnectivityandsafetyforroadsandsharedpathstoprovidecontinuedaccess,including(butnotlimitedto):…..StKildaRoad,…..”

SS,BY

49 T5 Precinct7:DomainStation

Parkingalongtheschool’sStKildaRoadfrontageistobeprovidedpostconstructiontocaterforpickupanddropoff.

NotAgreed ThisEPRisputforwardbyBY.

SSComments:EPRT5alreadycoversthisissueorcarparkingoptimisationincludingto“Maintainsafeoperationsthroughtheprecinct”

SS,BY

Page 23: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

50 T6 Precinct7:DomainStation

MelbourneGrammarmustbeconsultedinrelationtowhetherthetramroute8returnstoDomainRoadpostconstruction.

NotAgreed ThisEPRisputforwardbyBY.

SSComments:Anyplansregardingtramroute8willbeundertakenbyPTV.IbelievethatPTVwillundertaketheappropriatelevelofconsultationasisexpectedundertheTransportIntegrationAct2010.

SS,BY

51 T1 Precinct8:EasternPortal

TheconstructionhaulageRouteusingChambersStreetandBondStreetisnotsupported.

Agreed SS,SH

52 T1 Precinct8:EasternPortal

AccesstotheconstructionsiteshouldbecentredonOsborneStreetviaToorakRoad,withtrafficmanagementmeasuresdeterminedtofacilitateaccessandtorestrict/precludeaccesstothesouthviathelocalstreetnetwork.

NotAgreed ThisEPRisputforwardbySH.

SScomments:IdonotagreewiththisEPRasitmaybetoorestrictiveandshouldbedrivenbytheappropriateapplicationofotherEPRsinrelationtotheTTWGandTMPs.

SHcomments:IconsiderthattheEPRisrequiredtoensurethattheTMPdevelopedforPrecinct8providesforthemostdirectandappropriateaccesstotheconstructionzonefromthearterialroadnetwork.

SS,SH

Page 24: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummary

53 T1 Precinct8:EasternPortal

Accesstothesiteviaalternateroutes,includingfromthesouthviaArthurStreetandWilliamsStreetshouldbeminimisedandonlyutilisedifrequiredforspecificaccessnotavailableviaOsborneStreet.SpecifictrafficmanagementplansforalternateroutesshouldbedevelopedasidentifiedtothesatisfactionoftheTTWGandinconsultationwithaffectedresidents

NotAgreed ThisEPRisputforwardbySH.

SScomments:ThisrequirementisveryspecificandagainshouldbedevelopedbyadherencetotheotherEPRs.

SHComments:IconsiderthatthisEPRisrequiredtoensurethattheTMPthatisdevelopedforPrecinct8limitsaccesstolocalstreetstothesouthoftheconstructionzonetoonlyinstanceswhenmoredirectaccessviaOsborneStreettotheconstructionzonecannotbeprovidedorisunsuitable.

SS,SH

OtherSpecificIssuesnotaddressedintheEPRs

TheconstructionhaulagerouteintheArdenPrecinctwhichexitsCityLinkatRacecourseroad,isnotcorrectasitdoesnotappeartoconsiderthecurrentturnlimitationsandheightrestrictions.Anamendedrouteshouldbedeveloped.

Agree SS,JK,

Page 25: Transport Conclave Joint Summary Report...Traffic and Transport Expert Witness Conclave – Joint Summary 4 T1 The following should be inserted as another dot point in this EPR. •

TrafficandTransportExpertWitnessConclave–JointSummaryBysigningbelow,eachnamedexperthasendorsedthatthisdocumentisatruesummaryofthediscussionheldandthepointsagreedbetweentheexpertsattheconclave.Thesignaturesbelowendorsethatwhereaninitialisprovidedinthefarrightcolumninthetableabove,itrepresentsanagreedpositiononthattopic.

ShaunSmedley,SmedleyTechnical&Strategic JohnKiriakidis,GTA

BrettYoung,Ratio:consultants JasonSellars,GTA

StephenHunt,Cardno ChrisCoath,GTA

RichardSmithers,CityofMelbourne