CENTRE FOR EXCELLENCE IN MINING INNOVATION
Transforming the Metal Mining Industry
Creating Value through Innovation
Presented at: Mines and Technology
October 2-4, 2017
Vision: Help mines solve their challenges
by making the future happen, tomorrow.
Mission:
To advance innovations that will help the mining industry to:
find more ore,
mine ore more effectively and safely,
generate more value from mines,
have a more benign impact on the environment and,
a more beneficial impact on communities.
Established 2007, Not for Profit Corporation, Sudbury, Ontario
© CEMI 2017
Centre for Excellence in Mining Innovation
© CEMI 2017
DEEPMINE: Heat & Rock Stress
Reduce Technical Risk
SUSTAINMINE: Environment & Sustainability
Improve Environmental & Social Impact
VALUEMINE: Mine Productivity
Increase Operational Efficiency, NPV & ROI
FINDMINE: Exploration
Increase Discovery Rate at Lower Cost
BIZMINE: Mining Business
Business Cases & Commercialization Services
5 Strategic Themes: Targeted Approach
Reduce the Cost & Risk of Innovation
© CEMI 2017
Centre for Excellence in Mining Innovation
Research New Knowledge
Research
Basic Idea
1
Concept
Development
2
Proof of
Concept
3
Process
Validation
in lab/pilot
4
Production
Process
Validated
5
Process
Capability
Validated
6
Capability,
Economics
Validated
7
Demonstration Implementation Commercialization
Range of
Parts
Validated
8
Market Ready
9
Technology Readiness
Levels (TRLs) CEMI
INNOVATION =
Research + Demonstration + Implementation
Commercialization &
Innovation New Business
The Mining Innovation Niche
VALUEMINE: Mine Productivity
Increase Operational Efficiency, NPV & ROI
DEEPMINE: Heat and Rock Stress
Reduce Technical Risk
FINDMINE: Exploration
Increase Discovery Rate at Lower Cost
SUSTAINMINE: Environment & Sustainability
Reduce Mine Waste Impact, Enable Remote Mines
BIZMINE: Commercialization Services
Deliver Business Case Analysis
© CEMI 2017
Mine Productivity
below 2.5km
$35 million Program
5 Strategic Themes: Targeted Innovation
Step-change Innovation: target 200-300% improvement.
Reduce the Cost & Risk of Innovation
24 active
projects
76 Network
members
$35 million
private & public funds
Ultra-Deep Mining Network
Mine Productivity in extreme conditions
- High Temperature & High Rock Stress
Conditions in mines all around the world,
typical at 2.5km depth in Sudbury
Help industry adopt innovation, deliver
commercially viable R&D Results
Accelerate Deployment of Proven
Innovative Techniques & Technologies
© CEMI 2017
Business-driven Project Selection Criteria
Impact of Innovation on Mining
Tomorrow
IMPROVE
ROI
YEARS
Today
Pre
-pro
du
cti
on
an
d p
rod
ucti
on
Cash
DECREASE
INVESTMENT
ACCELERATE REVENUE
© CEMI 2017
NPV
Centre for Excellence in Mining Innovation
The Productivity Agenda
CEMI Priorities: Productivity, Energy, People, Environment
Productivity: Double Advance Rates & Production Rates
Energy: Half Fleet Demand for Vent/Cooling
People: Half Maintenance Cost & Operating Cost
Environment: Half Time to Permit & Social License
Global, Industry-wide Issues: Priorities
1) Decline in Productivity: 10-12%/yr
2) Operating Cost Increase: 10-15%/yr
3) Capex Over-runs: 20 - 40% common
4) Delay of Projects: $25-30Bn
for Social-enviro Issues
Increase Ore Flow Rate
at Lower Cost
CEMI: Targeted Approach
CLAREO: Industry Headwinds (P. Bryant & Mark Cutifani)
Since 2005…
Reduce Largest Costs;
Labour & Energy
Reduce Capital Cost
Improve Assurance of
Environmental Performance
Global, Industry-wide Issues: Priorities
1) Decline in Productivity: 10-12%/yr
2) Operating Cost Increase: 10-15%/yr
3) Capex Over-runs: 20 - 40% common
Increase Ore Flow Rate
at Lower Cost
CEMI: Targeted Approach
CLAREO: Industry Headwinds (P. Bryant & Mark Cutifani)
Since 2005…
Reduce Largest Costs;
Labour & Energy
Reduce Capital Cost
Current
Development Rates
$0
Pre
-pro
du
cti
on
an
d p
rod
uc
tio
n C
as
h F
low
YEARS
Faster Development:
Earlier Access to Ore
Access ore sooner – increase NPV
CEMI’s Rapid Development Project
LOM net income of $3bn;
LOM = 7 yrs;
Discount rate 15%:
Project Value increases $65M
for every year that production
starts earlier. ($180,000/day)
Investment Cost = $5M to innovate
Payback Period = $5/65 x 365 = 28 days (1yr.)
© CEMI 2017
Reduce Pre-production Capital Cost
<3m/day
<8m/day<4m/day
© CEMI 2017
1960 1970 1980 1990 2000 2010 2020
35
30
25
20
15
10
5
0
Record advance rates
Grand Duc Tunnel
Average >23m/day
Focused on equipment efficiency,
not the effectiveness of the system.
Reasons:
Need for Increased Safety
Increased Ground Control
Larger scale of operations
Reverse the Decline in Drill-blast Advance Rates
Declining performance with the biggest, most
powerful, most efficient, most sophisticated
equipment than any time in history.
CEMI’s Rapid Development Project
Reduce Pre-production Capital Cost
Muck
Ground
Support
Load
Blast
Drill
Productivity - utilization of the face:
use a temporary canopy to allow
concurrent activities in the heading.
Current Practice
Sequential Activities
Muck
Ground
SupportDrill/Load
Blast
CANOPY
CEMI proposed
Concurrent Activities
© CEMI 2017
Stage 1
Stage 2
CEMI’s Rapid Development Project
Primary Objective: Reduce Drift Cycle: Increase Advance >7m/day
Phase 1a - Canopy System; physical barrier to rock-related hazards.
Phase 1b - Allow concurrent activities; reduce face cycle ~ 8 hrs.
Phase 2 - Rapid transport of rock; reduce muck cycle ~ 2 hrs. (300t/hr)
3-Canopy System for Rapid AdvanceReduce Development Cycle Time: from >17 hours to <10.5-hours
Ultra-Deep Mining Network
Improve Productivity & Safety
© CEMI 2017
Discrete Event Simulations
0
1
2
3
4
5
6H
ou
rs
5m x 5m Heading with Emulsion - Process Time Comparison
No Canopy with Explosives Loader and LHD Canopy with Explosives Loader and LHD
Canopy with Face Machine and LHD Canopy with Face Machine and Continuous Mucking
No Canopy + Expl. Loader + LHD
Canopy + Jumbo Loader + LHD Canopy + Jumbo Loader + Cont. Mucker
Canopy + Expl. Loader + LHD
Critical Path Reductions
Target #1 = Bolting
CEMI’s Rapid Development Project
Discrete Event Simulations
0
1
2
3
4
5
6H
ou
rs
5m x 5m Heading with Emulsion - Process Time Comparison
No Canopy with Explosives Loader and LHD Canopy with Explosives Loader and LHD
Canopy with Face Machine and LHD Canopy with Face Machine and Continuous Mucking
No Canopy + Expl. Loader + LHD
Canopy + Jumbo Loader + LHD Canopy + Jumbo Loader + Cont. Mucker
Canopy + Expl. Loader + LHD
Critical Path Reductions
Target #1 = Bolting
Target #2 = Mucking
Saved
> 6.6 hrs.
Canopy
>4.8 hrs of Bolting
Time Eliminated.
Continuous Equip.
> 1.8 hrs of Loading
Time Eliminated
CEMI’s Rapid Development Project
Reduce Development Cycle Time: from >17 hours to <10.5-hours
0
1
2
3
4
5
6
7
8
9
10
Standard Dev (Anfo) Standard Dev (Emulsion) Canopy Face Machine Continuous Mucking
Process
Me
ters
pe
r D
ay
Meters Developed per Day - 4m Round Length
8.5
6.56.5
4.9
CEMI 2014 Target: > 7m/day 7.2
5.4
JUMBO
CHARGING
CONT.
MUCKINGCANOPYBASE
3-boom jumbo
Cont. Loader &
Transport System
5.6
3.0
For a 3km drive, saving 217 days/km,
gains 22 months & adds $120M to NPV
3m/day to 8.5m/day saves 217d/km ~ adds $40M/km of drive
© CEMI 2017
CEMI’s Rapid Development ProjectDiscrete Event Simulations
Reduce Development Cycle Time: from >17 hours to <10.5-hours
Global, Industry-wide Issues: Priorities
1) Decline in Productivity: 10-12%/yr
2) Operating Cost Increase: 10-15%/yr
3) Capex Over-runs: 20 - 40% common
Increase Ore Flow Rate
at Lower Cost
CEMI: Targeted Approach
CLAREO: Industry Headwinds (P. Bryant & Mark Cutifani)
Since 2005…
Reduce Largest Costs;
Labour & Energy
Reduce Capital Cost
2) Mitigate heat & humidity
Battery-driven equipment
Individual proximity warning
- flashing helmet brim
4) PPE & Cooling:
Jannatec
Warning of proximity to
quiet electric equipment
in dark, confined spaces.
Reduce largest costs; Labour & Energy
1) Improve Conventional Systems: BESTECH (VoD)
Maestro (Vent. Sensors)
3) Introduce Cooling:
a) Hydraulic Air Compressor: Fresh Aircompressed
b) Liquid Air Systems
© CEMI 2017
Global, Industry-wide Issues: Priorities
1) Decline in Productivity: 10-12%/yr
2) Operating Cost Increase: 10-15%/yr
3) Capex Over-runs: 20 - 40% common
Increase Ore Flow Rate
at Lower Cost
CEMI: Targeted Approach
CLAREO: Industry Headwinds (P. Bryant & Mark Cutifani)
Since 2005…
Reduce Largest Costs;
Labour & Energy
Reduce Capital Cost
Fuel Effectiveness:
20% fuel moves ore;
80% fuel moves the LHD
Increase Production Rate - move ore faster & more
effectively
CEMI Innovation Targets:
1) Design Energy- & Time-effective Systems
then 2) then Electrification & Automation
LHD Time-effectiveness:
Haul time >> Load/Dump time
< 10% time-effective
at moving ore/rock
© CEMI 2017
LHD Overall Effectiveness = 2%
Automation of Equipment: necessary & progressing
Electrification of Equipment: essential & urgent
all-electric mine - 1990’s - umbilical cables
LHD = 3 x Ore Load
Trip ratio = 6:1
Increase Ore Flow Rate at Lower Cost
Business-driven Project Selection Criteria
Tomorrow
IMPROVE
ROI
YEARS
Today
Pre
-pro
du
cti
on
an
d p
rod
ucti
on
Cash
DECREASE
INVESTMENT
ACCELERATE REVENUE
NPVStep-change Innovation: target 200-300% improvement.
Single-heading Access
Low-cost Cooling
Double Advance Rates
Top-down Mining
Double Production Rates
Half Energy Consumption
Half Labour Cost
Ore Production Process
Impact of Innovation on Mining Process
Global, Industry-wide Issues: Priorities
1) Decline in Productivity: 10-12%/yr
2) Operating Cost Increase: 10-15%/yr
3) Capex Over-runs: 20 - 40% common
4) Delay of Projects: $25-30Bn
for Social-enviro Issues
Increase Ore Flow Rate
at Lower Cost
CEMI: Targeted Approach
CLAREO: Industry Headwinds (P. Bryant & Mark Cutifani)
Since 2005…
Reduce Largest Costs;
Labour & Energy
Reduce Capital Cost
Improve Assurance of
Environmental Performance
Resourceful People in the Resource Industry
CEMI935 Ramsey Lake Rd
Sudbury, Ontario
P3E 2C6
www.cemi.ca
Team of Mining Engineers, Geologists and Business Professionals
National & Global Reach