Training Presentation
-
Upload
charitha-sandaruwan -
Category
Documents
-
view
18 -
download
3
Transcript of Training Presentation
INDUSTRIAL TRAINING AT BELA INTERNATIONAL
PRIVATE LIMITEDCOLOMBO 07
SANDARUWAN W.N.D.C (RU/E/2010/153)
Department of Electrical & Information Engineering
Faculty of Engineering
University of Ruhuna
Presentation Outline
• Introduction to training establishment
•Training experiences (Technical )
•Training experiences (Other)
•Conclusion
INTRODUCTION TO TRAINING ESTABLISHMENT
• One Company of BELA Group of Companies
• Managing Director Mr. Chanaka Benjamin
• Act as electrical sub contractors
INTRODUCTION TO TRAINING ESTABLISHMENT CONT...
• Places I worked…
Bela International (Pvt) Ltd. Head office, Colombo 07.
Bio-Mass Plant, Ninthuvr, Ampara.
• Places I visited…
Cinnamon Grand Hotel,
Hingurana Sugar Factory. Ampara.
Pyramid Lanka (Pvt) Ltd.
Training Experiences
From Bio-Mass Plant
Power flow structure of the plant
Ground Resistant test
Protection between plant and grid
Transformer cooling
Power Flow Structure of the Plant
33 kV CEB Supply CEB Metering Load Break Switch
33 kV Panel33 kV/6.6kV
TransformerRemote Control Panel
Remote Control Panel
Remote Control Panel
Remote Control Panel
6.6 kV/415V
Transformer
Transformer
Incomer
Outgoing feeder
(generator)
Outgoing feeder
(Transformer)
Generator
Types of protection
• Over Current Protection
• Over Voltage Protection
• Over Frequency Protection
• Under Voltage Protection
• Under Frequency Protection
• Differential Protection
• Rate of Change of Frequency Protection (ROCOF)
• Neutral Voltage Displacement Protection (NVD)
Protection between Plant and Grid
Air cooling dry type transformers
• Air Natural (A.N) transformer
• Air Forced (A.F) transformer
Oil Immersed Transformers
• Oil Natural Air Natural (O.N.A.N) transformer
• Oil Natural Air Forced (O.N.A.F) transformer
• Oil Forced Air Natural (O.F.A.N) transformer
• Oil Forced Air Forced (O.F.A.F) transformer
Oil Immersed Water Cooling Transformers
• Oil Natural Water Forced Transformer Cooling
• Oil Forced Water Forced Transformer Cooling
Transformer Types (Cooling)
From Bela Head Office
• Relays and Contactors (Application)
• Light Levels (Calculation and Design)
• Protection Index
• Power Cable Types
Training Experiences cont…
Relays
• Use for Control Circuits
• Low currents
Contactors
• Use for Power Circuits
• Handle High Currents
Relays and Contactors (Application)
Light Levels (Calculation and Design)
Parameters we need to know…
• Average luminance required (E)
• Luminance efficiency of bulb type (n)
• Wattage of one bulb (P)
• Room Dimensions ( L x W x H )
• Utility factor (UF) and Mint factor (MF) [constants]
• Room index (A) = (L X W)/{(H-0.85)X(L+W)}
• Required bulbs = (E X A)/(MF X UF X n X P)
Non-technical Training Experiences
• Deal with industrial people with professional
Manner.
• Familiarized with office works.
• Familiarized with site works.
• By Visiting other sites also I got new
experiences about how they are working.
Conclusion
Bela International (Pvt) Ltd is good training place
for electrical engineering undergraduates,
but these days there is lack of ongoing projects
of it.
And it tends to move to the Civil engineering
field.
However I successfully completed my second
industrial training with technical and non-
technical experiences…
Emergency Stop Push Button
T M1
X M2XX
Tank Upper Level Sensor
Well Lower Level Sensor
Tank Lower Level Sensor
On Delay Timer
On Delay Timer (T) AUX
Duty Water Pump
Spare Water Pump
M1X
M1X
M2X
M2X
Manual ON Push Button
Manual OFF Push Button
Pump Selector Switch
Mode Selector Switch
Thermal Overload
Thermal Overload
M2X
M1X
110V DC Supply
0V
Tank Upper Level Sensor
Tank Lower Level Sensor
Well Lower Level Sensor
Tank
Well
M2
M1
Duty Water Pump
Spare Water Pump
S1
S2
S3
S2
S1
S3
Control Circuit Diagram
Structure
Water Pump System with Two Water Pumps (Auto/Manual)