TATA POWER COMPANY TATA POWER COMPANY LIMITEDLIMITEDJAMSHEDPUR - DIVISIONJAMSHEDPUR - DIVISION
WELCOME
PRESENTATION ON
TURBINE SAFE STARTING
PROCEDURE
TURBINE START UP TURBINE START UP PROCEDUREPROCEDURECHECK LISTCHECK LIST
BEFORE STARTING FOLLOWING ACTIVITIES TO BE COMPLETED
A) CONDENSER CW CHARGEDB) TG OIL SYSTEM CHARGED & TURBINE ON TURNING GEARC) MAIN STEAM LINE CHARGEDD) APRDS CHARGED & HEATING IS GOING ONE) CONDENSATE LINE CHARGEDF) ALL DRAINS ARE OPENEDG) ALL MAL DRAINS ARE OPENEDH) CONTROL OIL PUMP RUNNING & PRESS NORMAL
TURBINE START UP TURBINE START UP PROCEDUREPROCEDURECHECK LISTCHECK LIST
I) CHECK SLC OF HPSV & IPSV -1 & 2 ARE ONJ) CHECK SLC OF HPCV & IPCV -1 & 2 ARE ONK) CHECK MANUAL SET POINT CONTROLLER OF HPCV & IPCV - 1 & 2 ARE 100% OPEN
L) TSE INFLUENCE ONM) LOAD GRADIENT ON & LOAD GRADIENT MAINTAINED 3.0 MW PER MIN
N) PRESSURE ON LIMIT CONTROLO) CMC OFF
COLD START UPCOLD START UPNo-1 ACTIVITY- GLAND STEAM CHARGINGNo-1 ACTIVITY- GLAND STEAM CHARGING
20,180 200,180
300,260
300,350
140,28020,280
Mean HP Shaft Temp
Temp Bef GSCV
600300200
600
300
200
COLD START UPCOLD START UPGLAND STEAM CHARGINGGLAND STEAM CHARGING
SATISFIED THE ABOVE CONDITION
( VACUUM BREAKER ALREADY CLOSED )VACUUM PUMP STARTEDGLAND STEAM CHARGED & GSVEF STARTEDVACUUM PULLING STARTED
VACUUM RAISED > 0.85 KG/SQ.CM
COLD START UPCOLD START UPNO -2 ACTIVITIES- HPBP & LPBP CHARGINGNO -2 ACTIVITIES- HPBP & LPBP CHARGING
• RESET HPBP & LPBP OPEN WARM UP LINE & WARM UP DRAIN• OPEN BP VALVE SLOWLY & BPE ON AUTO• KEEP LPBP FLOW LIM REF > 12 KG/SQ.CM• KEEP LPBP FIXED SET POINT 3.0 KG/SQ.CM• CHECK OPENING OF LPCV• CHECK WATER INJ FLOW CONTROL VALVE
( IF IT IS WORKING IN AUTO THEN KEEP INAUTO OTHERWISE INJ CONTROL VALVETO BE KEPT IN MANUAL AT > 50% OR FLOW > 15 KG/SEC )
COLD START UPCOLD START UPTRIPPING CONDITION OF HPBP & LPBPTRIPPING CONDITION OF HPBP & LPBP
HPBP• VACUUM PROTECTION ( <=0.7 KG/SQ.CM )• DOWN STREAM TEMP V. HIGH ( >=380 deg C )• LOSS OF OIL SUPPLY UNIT
LPBP
• VACUUM PROTECTION ( <= 0.5 KG/SQ.CM )• WATER INJ. FLOW PROTECTION ( DEV > 9.6%)• LOSS OF CONTROL OIL• OPERATION OF TRIP PUSH BUTTON
COLD START UPCOLD START UPNO-3 ACTIVITIES- HP CASING DIFF TEMP NO-3 ACTIVITIES- HP CASING DIFF TEMP SATISFYING SATISFYING
-50
3020
0
-40
0 40 125
MW
HP TOP-BOT
DIFF TEMP
COLD START UPCOLD START UPN0-3 ACTIVITIES- HP CASING DIFF TEMP ( TOP- N0-3 ACTIVITIES- HP CASING DIFF TEMP ( TOP- BOTTOM ) BOTTOM )
BEFORE SATISFYING ANY CRITERIA THISCONDITION TO BE SATISFIED
CONDITION IN RED ZONE WILL TRIP TURBINE
IF DIFF TEMP > ‘+30 deg C THEN RAISE APRDSTEMP & IF DIFF TEMP < ‘-50 deg C THEN LOWERAPRDS TEMP
COLD START UPCOLD START UPN0-4 ACTIVITIES - CRITERIA 1,2 & 3 SATISFYINGN0-4 ACTIVITIES - CRITERIA 1,2 & 3 SATISFYING
• STEAM DUMPING IS GOING ON & MS PRESSUREMAINTENED 30-40 KG/SQ.CM & TEMP =< 350 deg C
• HRH PRESSURE MAINTENED 3-8 KG/SQ.CM &TEMP =< 350 degC
• CRITERIA 1,2 & 3 SATISFIED
• CLOSE MAL VALVE 11 & 12
• OPEN ESV BY RAISING STARTING DEVICE UP TO 42%
• OPEN MAL VALVE 11 &12
COLD START UPCOLD START UPCRITERIA - X 1 & X 2 ( BEFORE OPENING ESV )CRITERIA - X 1 & X 2 ( BEFORE OPENING ESV )
CRITERIA-X 1 CRITERIA-X 2
0 600
600
300 0 600300
300 300
600
(0,100)
(600,550)CRITERION FULFILLED
(0,165)
(320,374)
CRITERION FULFILLED
MSTEMPBEFHPBP
SATTEMPBEFHPBP
Tm HP CV Tm HP CV
BEFORE OPENING ESV
COLD START UPCOLD START UPCRITERIA - X 3 ( BEFORE OPENING ESV )CRITERIA - X 3 ( BEFORE OPENING ESV )
CRITERIA - X3
0 300
300
600
600MSTEMPBEFHPBP
(0,100)
(600,550)CRITERIONFULFILLED
BEFORE OPENING ESV
Tm STRNR
COLD START UPCOLD START UPNO-5 ACTIVITIES - CRITERIA 4,5 & 6 SATISFYINGNO-5 ACTIVITIES - CRITERIA 4,5 & 6 SATISFYING
AFTER SATISFYING CRITERIA 4,5 & 6, RAISE STARTING DEVICE UP TO 70%INCREASE SPEED REFERENCE TO 690 RPM & CHECK THE ACTUAL RPM
NOTE THE TURBO SUPERVISORY PARAMETERSARE WITHIN LIMITMAINTAIN MS & HRH TEMPERATURE WITHIN370 deg C, OTHERWISE TURBINE MAY TRIP ONHIGH MS TEMP w.r.t HP SHAFT MEAN TEMP ORHIGH HRH TEMP w.r.t IP SHAFT MEAN TEMP
TO AVOID THIS REDUCE MS & HRH PRESSURE
COLD START UPCOLD START UPCRITERIA - X 4 & X 5 ( BEFORE OPENING MCV )CRITERIA - X 4 & X 5 ( BEFORE OPENING MCV )
0
300
600
300 600 0 300
300
600
600
(374,430)
CRITERIONFULFILLED (250,374)
(450,540) (540,540)
CRITERION FULFILLED
MSTEMPBEFESV
MSTEMPBEFHPBP
MS SAT TEMP BEF HPBP Tm HP SHAFT
CRITERIA - X 4 CRITERIA - X 5
BEFORE OPENING MCV
COLD START UPCOLD START UPCRITERIA - X 6 ( BEFORE OPENING MCV )CRITERIA - X 6 ( BEFORE OPENING MCV )
CRITERIA - X 6
0
300
300 600
600HRHTEMPBEFLPBP
Tm IP SHAFT TEMP
BEFORE OPENING MCV
(0,100)
(440,490)
CRITERIONFULFILLED
COLD START UPCOLD START UPSTEAM TEMP VS HP SHAFT & IP SHAFT TEMPSTEAM TEMP VS HP SHAFT & IP SHAFT TEMP
0600
300
300
600
0
300
300
600
600
MS
TEMP
HRH TEMP
(100,370)
(295,565)
(100,370)
(295,565)
Tm HP SHAFT Tm IP SHAFT
COLD START UPCOLD START UPNO-6 ACTIVITIES - CRITERIA 7 ( FULL SPEED )NO-6 ACTIVITIES - CRITERIA 7 ( FULL SPEED )
AFTER SATISFYING CRITERIA 7, INCREASE MSPRESSURE & MAINTAIN HPBP FLOW >70 TPH HRHPRESSURE ALSO TO BE INCREASED TO 8.0 KG/SQ.CM
CHECK HP SHAFT SURFACE & MEAN TEMP DIFFIS LESS THAN 10.0 deg C
INCREASE SPEED REFERENCE UPTO 3000 RPM ATA STRETCH OTHERWISE Dn/Dt WILL OPERATE
MONITOR TURBO SUPERVISORY PARAMETER
CHECK HP SHAFT MEAN TEMP, HP EXH TEMP &OUTER CASING FLANGE TEMP
COLD START UPCOLD START UPN0-8 ACTIVITIES - CRITERIA 8 ( SYNCHRONISE )N0-8 ACTIVITIES - CRITERIA 8 ( SYNCHRONISE )
MS PRESSURE & TEMP INCREASED EARLIER ORMAY BE INCREASED IN THIS STEP DEPENDINGON HP SHAFT SURFACE & MEAN DIFFERINTIALTEMP
AVR MADE ON & VOLTAGE BUILT UP BY ELECTRICAL
LOAD REF KEPT AT 15 MW & LOAD LIMITER KEPTAT 40 MWSYNCHRONIZER PUT ON AUTO
AFTER SYNCHRONIZING PUT LOAD ON LOADCONTROL
COLD START UPCOLD START UPNO-8 ACTIVITIES - LOADNO-8 ACTIVITIES - LOAD
CHECK HP SHAFT MEAN TEMP, HP EXH TEMP &OUTER CASING FLANGE TEMP. THERE MAY BE ACHANCE OF TRIPPING ON HP EXH. TEMP HIGH w.r.tOUTER CASING FLANGE TEMP
IF THIS CONDITION ARISES REDUCE HRH PRESSBY MANUAL OPENING OF LPBP & INCREASE LOAD
COLD START UPCOLD START UPHP EXH TEMP VS Tm HP SHAFT / OUTER CASING HP EXH TEMP VS Tm HP SHAFT / OUTER CASING FLANGE TEMPFLANGE TEMP
0 100 200 300 0 100 200 300
200
400
600
200
400
600
(100,380)
(250,480)
(60,380) (150,380)
(60,400)
(200,480)
HP
EXH
TEMP
HP
EXH
TEMP
OUTER CASING FLANGE TEMPTm HP SHAFT TEMP
STARTING DEVICE STARTING DEVICE CHARACTERISTICSCHARACTERISTICS
0 TURBINE TRIP7.5 TSLLE RESET12 TURBINE TRIP RESET22 ALL ESV TRIP SOLENOID ENERGISED32 ALL CV TRIP SOLENOID ENERGISED42 ALL ESV OPEN50 START TO INCREASE CONTROLLER O/P55.5 CONTROLLER O/P 15%, HPCV-5% & IPCV-1%58 CONTROLLER O/P 22%, HPCV-5% & IPCV-5%,
CRH NRV OPEN61 CONTROLLER O/P 30%, HPCV-10% & IPCV-10%
STARTING DEVICE STARTING DEVICE CHARACTERISTICSCHARACTERISTICS
64 CONTROLLER O/P 40%, HPCV-12% & IPCV-16%69 CONTROLLER O/P 50%, HPCV-15% & IPCV-28%72 CONTROLLER O/P 60%, HPCV-19% & IPCV-99%76 CONTROLLER O/P 70%, HPCV-24% & IPCV-100%80 CONTROLLER O/P 80%, HPCV-28% & IPCV-100%84 CONTROLLER O/P 90%, HPCV-39% & IPCV-100%85 CONTROLLER O/P 95%, HPCV-56% & IPCV-100%88 CONTROLLER O/P 100%,, HPCV-99% & IPCV-100%AT CONTROLLER O/P 17%, CRH NRV CLOSED
TURBINE START UPTURBINE START UPALARM & TRIP VALUE OF TURBINE PROTECTIONALARM & TRIP VALUE OF TURBINE PROTECTION
DESCRIPTION ALARM TRIP RELEASE
1. LUBE OIL PRESS V. LOW < 3.4 KG/CM2 < 3.2 KG/CM2
2. LUBE OIL LEVEL V.LOW 440 MM FROM 490 MM FROMTOP YOP
3. MS TEMP V.LOW 330 deg C 320 deg C TEMP < 500
< 480 deg C < 450 deg C TEMP > 500
4. MS TEMP V. HIGH 545 deg C 565 deg C REF TmHPS
5. IP I/L TEMP V. LOW 330 deg C 320 deG C SPEED>1980RPM
445 deg C 430 deg C LOAD > 25%37 MW
6. IP I/L TEMP V. HIGH 545 deg C 565 deg C REF TmIPS
TURBINE START UPTURBINE START UPALARM & TRIP VALUE OF TURBINE PROTECTIONALARM & TRIP VALUE OF TURBINE PROTECTION
DESCRIPTION ALARM TRIP RELEASE
7. LP EXH TEMP V. HIGH 90 deg C 110 deg C
8. HP CASING DIFF. TEMP REF CURVE V. HIGH9. COND PRESS V. HIGH REF CURVE
10. HP EXH TEMP V. HIGH 470 deg C 480 deg C BASED ON CAS. FLANGE
11. AXIAL SHIFT V. HIGH +/- 0.5 MM +/- 1.0 MM
12. HP/IP FJB VIB. V. HIGH 165 micron
13. HP/IP RJB VIB. V. HIGH 165 micron
14. LP REAR VIB. V. HIGH 160 micron
TURBINE START UPTURBINE START UPALARM & TRIP VALUE OF TURBINE PROTECTIONALARM & TRIP VALUE OF TURBINE PROTECTION
DESCRIPTION ALARM TRIP RELEASE15. GEN FJB VIB. V. HIGH 165 micron
16. GEN FJB VIB. V. HIGH 165 micron
17. HP TUR. EXH. TEMP V. 470 deg C 480 deg C HIGH18. DRUM LEVEL V. HIGH 375 MM
19. TURBINE OVERSPEED 55 HZ (3300 RPM )
20. GEN. PROTECTION
21. BOILER PROTECTION
22. EMERGENCY TRIP
23. TURBINE TRIP FROM ATRS SGC TURBINE
TURBINE START UPTURBINE START UPALARM & TRIP VALUE OF TURBINE PROTECTIONALARM & TRIP VALUE OF TURBINE PROTECTION
DESCRIPTION ALARM TRIP RELEASE
24. FIRE PROTECTION ACTIVATED PB
25. CONTROL OIL EMERGENCY TRIP
26. CONTROL OIL SUPPLY PROT. OFF
27. TSLLE < 7.5%
HOT START UPHOT START UP CHECK LISTCHECK LIST
BEFORE STARTING FOLLOWING ACTIVITIES TO BE COMPLETED
A) CONDENSER CW CHARGEDB) TG OIL SYSTEM CHARGED & TURBINE ON TURNING GEARC) MAIN STEAM LINE CHARGEDD) APRDS CHARGED & HEATING IS GOING ONE) CONDENSATE LINE CHARGEDF) ALL DRAINS ARE OPENEDG) ALL MAL DRAINS ARE OPENEDH) CONTROL OIL PUMP RUNNING & PRESS NORMAL
HOT START UPHOT START UP CHECK LISTCHECK LIST
I) CHECK SLC OF HPSV & IPSV -1 & 2 ARE ONJ) CHECK SLC OF HPCV & IPCV -1 & 2 ARE ONK) CHECK MANUAL SET POINT CONTROLLER OF HPCV & IPCV - 1 & 2 ARE 100% OPEN
L) TSE INFLUENCE ONM) LOAD GRADIENT ON & LOAD GRADIENT MAINTAINED 3.0 MW PER MIN
N) PRESSURE ON LIMIT CONTROLO) CMC OFF
HOT START UPHOT START UP CHECK LISTCHECK LIST
BETTER TO START WITH MILL-C OR MILL-D
GLAND STEAM ALREADY CHARGED
VACUUM MAINTAINED
MS PRESSURE TO BE MAINTAINED > 60.0 KG/CM2 &TEMP MAINTAINED > 460 deg C
HRH PRESS TO BE MAINTAINED 6-8 KG/CM2 & TEMPMAINTAINED > 460 deg C
HOT START UPHOT START UP CRITERIA - X1 , X2 & X3 AND X4 , X5 & X6CRITERIA - X1 , X2 & X3 AND X4 , X5 & X6
AFTER FULFILLMENT OF CRITERIA X1 , X2 & X3OPEN ESV
AFTER FULFILLMENT OF CRITERIA X4 , X5 & X6GIVE TURBINE ON SOAKING SPEED. MAITAIN FOR15 MINS.
IF HP SHAFT SURFACE & MEAN TEMP DIFF < 10 deg CROLL THE TURBINE TO FULL SPEED
SYNCHRONISED M/C AS IN COLD START