Traffic Operation Infrastructure Plan
description
Transcript of Traffic Operation Infrastructure Plan
presented to Wisconsin Department of Transportation
presented byTraffic Operation Infrastructure Plan Team
3/10/08
Traffic Operation Infrastructure PlanUpdate
2
AgendaSchedule/Progress
Overview and Feedback on Summary and Appendices
Finalize Deliverables
Planning and Programming Process Integration
Communications and Outreach
Technical Scan Update
Next Steps
Overview and Feedback
5
OverviewFour components to recent submissions:• Corridor Summaries• Traffic Management and Surveillance Detailed Appendix• Traveler Information Detailed Appendix• Traffic Signal System Detailed Appendix• Technology Scan
Potential Questions• Does the information provided meet expectation?• Is the formatting of the Summary section appropriate?• What other elements should be included in the Appendices?• Are there other issues/assumptions within the cost estimates that need to be
explained or expanded?• Any feedback from regions?
* Please note: these submissions are not the final deliverables.
Summary
Traffic Management and Surveillance
Traveler Information
Traveler Information
Signals
Signals
Signals
14
Final DeliverablesOld outline for one “mother of all reports” perhaps not the best road forward given how the project has evolved
Considering a series of smaller documents• TOIP Summary Document
− Methodology/Approach (data, criteria, thresholds)− Corridor summaries – all 37− Cost summaries− Priority and Emerging Priority corridors− Statewide Maps by Technology Layer− Update Cycle
• Four stand alone Appendices− Broken out by functional area− Summaries for each corridor− Cost estimates for Top 13− Detailed cost estimate assumptions− Tech Scan
• Executive Summary (approx 10 pages)• High impact bi/tri-fold handout
15
Process Implementation and Integration
Integrate with established WisDOT processes, procedures, manuals and guidance to ensure TOIP continues.• Administratively
− Program Management Manual?− Facilities Development Manual− Other…
• Technically− TOIP data/model
♦ LRPT/Six year Improvement Plan (Bi-annual?)♦ TOPS – Maintenance
− ITS design manual− Other
16
Meetings Mar08
Apr08
May 08
Jun08
Jul08
Aug 08
Sep08
Oct08
Nov08
Dec08
Jan09
BHO Bureau Director
DTSD Executive Briefings
DTIM Executive Briefings
Ops Managers
Planning Managers
PDS Chiefs
MP3
Regional Orientations (Combined Meeting with DTSD, DTIM, PDS)
TOIP COMMUNICATIONS AND OUTREACH SCHEDULE– Who, When, How
Tech Scan
18
Tech Scan
ftp sites:• http://wisdot.projectpath.com/projects/1837141/files
• ftp://ftp.srfconsulting.com/outgoing/WI_ITS/TOIP_Technology_Scan
• Posted February 27
Send comments by email, fax, and phone• Brian L. Scott
• Phone: (763) 475-0010
• Fax: (763) 475-2429
• email: [email protected]
Next Steps
20
Next Steps
Send comments by email, fax, and phone by 3/19/08• Word version available
Finalize and initiate roll-out approach
Finalize and initiate process implementation and integration
Final documents - set deadlines• Suggestions:
− April 1, 2008 – Draft Final Reports delivered to WisDOT− April 18, 2008 – Final Comments due from WisDOT− May 16, 2008 – Final Report delivered to WisDOT