TOWN MUNICIPAL COUNCIL, KADUR TMC Manual on Public Disclosure Schedules CMAK 5 Functions under 12th...

77
TOWN MUNICIPAL COUNCIL, KADUR

Transcript of TOWN MUNICIPAL COUNCIL, KADUR TMC Manual on Public Disclosure Schedules CMAK 5 Functions under 12th...

TOWN MUNICIPAL

COUNCIL, KADUR

Kadur TMC Manual on Public Disclosure Schedules

CMAK

2

Public Disclosure Schedule

TMC, Kadur

Kadur TMC Manual on Public Disclosure Schedules

CMAK

3

ContentSl.no Particulars Page. no

1 Urban planning including town planning 5-6

2 Regulation of Land- use and Construction of Buildings 7-26

3 Planning for Economic and Social development 27-35

4 Roads and Bridges 36-38

5 Water Supply- Domestic, Industrial and Commercial 39-42

6 Public Health, Sanitation, Conservancy and SWM 43-51

8 Urban forestry, protection of environment and ecology 52-53

10 Slum Improvement & Up-gradation 54-57

11 Urban Poverty Alleviation 58-59

12 Provision of urban amenities and facilities- parks, gardens and

playgrounds 60-63

13 Promotion of cultural, educational, and aesthetic aspects 64

14 Burials and burial grounds, cremations, cremation grounds and

electric crematoriums 65-67

15 Cattle pounds, prevention of cruelty to animals 68

16 Vital Statistics including registration of births and deaths 69-72

17 Public amenities including street lighting, parking lots, bus stops

and public conveniences 73-75

18 Regulation of slaughter houses and tanneries 76-77

Kadur TMC Manual on Public Disclosure Schedules

CMAK

4

Formats for Disclosure

TMC, Kadur

Kadur TMC Manual on Public Disclosure Schedules

CMAK

5

Functions under 12th Schedule

1. URBAN PLANNING INCLUDING TOWN PLANNING

Sl.

No

Functions as

per 12th

Schedule

Agency

Responsible

with in their

jurisdiction

Data to be Disclosed Period for which

information has to

be disclosed

Level of

Disclosure

(ULB/Ward)

Frequency of

Disclosure

Reference Remarks

1 Urban

Planning

including

town

Planning

1. Town

Planning

Authority

2. Urban

Development

Authority

(UDA)

3. Municipal

Planning

Authority

(i) Report and Maps of

Master Plans including

Zoning Regulations

Plan in force now ULB 1. Annually

2. To be

notified as

and when

changes done

Table 1.1

(ii) Maps of Planning

Districts

Plan in force now ULB 1. Annually

2. To be

notified as

and when

changes done

(iii) Details of

provisional and finally

approved layouts

(Survey No, name of

owner, Site details)

Previous three

financial years

including current

year

ULB Half Yearly Table.1.2

4. ULB (iv) Report and maps of

Comprehensive

Development Plan (CDP)

Current plan ULB 1. Annually

2. To be

notified as

and when

changes done

Kadur TMC Manual on Public Disclosure Schedules

CMAK

6

Table 1.1: Report and Maps of Master Plans including Zoning Regulations

(Please fill in following information)

Sl.

No

Name of the reports related to Master

Plan, Zoning Regulation and CDP

Enclosure in

PDF

Maps related to Master Plan, Zoning

Regulations, Planning District and

CDP

Enclosure in PDF

1 Enclosure Enclosure

2 Enclosure Enclosure

3 Enclosure Enclosure

Table 1.2: Number of provisional and final approved layouts

(Please fill in following information)

Years Number of provisional layouts Number of approved layouts Details of layout as enclosure

Current year Enclosure as per the format

Current year -1 Enclosure as per the format

Current year-2 Enclosure as per the format

Format:

Details of Provisional and final approved layouts

Sl. No Name of

Layout

Whether provisional/approved Number of sites in the approved layout Name of the

owner/developer of the

layout 30*40 40*60 Odd sites

- - - - - - -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

7

2. REGULATION OF LAND-USE AND CONSTRUCTION OF BUILDINGS

Sl.

No

Functions as

per 12th

Schedule

Agency

Responsible

with in their

jurisdiction

Data to be Disclosed Period for which

information has

to be disclosed

Level of

Disclosure

(ULB/Ward)

Frequency of

Disclosure

Reference Remarks

2 Regulation of

Land- use and

Construction of

Buildings

UDA/ULB (i) Details of Building

Commencement &

Completion Certificate

(Total application

received, total

permission granted,

location details)

Previous three

years including

current year

ULB Annually Table 2.1 (a)

& Table.2.1

(b)

(ii) Details of Industries

and commercial

complexes approved

(Survey No., Type,

Name of the owner)

Previous three

Financial years

including current

year

ULB Annually Table 2.2

Table 2.1 (a): Details of Building Commencement & Completion Certificate

Total number of application received for building

plan approval from past three years

Total number of License granted from past three

years

Current FY Current FY – 1 Current FY – 2 Current FY Current FY – 1 Current FY – 2

Kadur TMC Manual on Public Disclosure Schedules

CMAK

8

Year-2012-13 Site area(Sq/feet) Built-up area(Sq/feet) Location details

Ward Street name Property Number/ Survey Number

67*107 52.2*24.9 - n.©.gÀ¸ÉÛ PÀqÀÆgÀÄ 2814/2665 -

35*50 G.F 14.4*26.7”

F.F14.4*26.7” - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ PÀqÀÆgÀÄ 8618/2201/12 -

35*45 26.9*26.5 - ®QëöäñÀ £ÀUÀgÀ 2756/1/2607/1 -

45*66+65

2

G.F 22.9*38.7”

F.F 22.9*29.9” - UÀÄqÉÆÃf PÁ¯ÉÆä 8956/06 -

15*70 G.F 10.2*53.6

F.F 10.2”53.6 - ºË¹AUï ¨ÉÆÃqïð PÁ¯ÉÆä 7935 -

12 .5 *50

12.5*50 =25*50 7.21*41.00=295.6 - ¸ÀĨsÁµï £ÀUÀgÀ 1508/1 -

30*50 22.2*39.7=885.31 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ 7854/04 -

30*40 G.F 22.9”*32.8”=751.0 - ±À¤zÉêÀgÀ zÉêÀ¸ÁÜ£ÀzÀ »A s̈ÁUÀ 8045/60 -

40*60’ 16.4”*45.7=749.48 - PÉ.ºÉƸÀ½î 683/656 -

37.8:39.3” 31.12”*32.8=1020.73 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ 70/3p2 -

30*50 F.F 24.9”*36.6”911.34 - gÁeÉÃAzÀæ ¸Á«Ä¯ï »A¨sÁUÀ 7316/09 -

22.9+17.9*30

2 G.F 23.4”*14.16 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ 7800/24 -

29.5*46.4+46.3

2 22.9”*38.1”=872.49 - §¤ßªÀÄgÀzÀ gÀ¸ÉÛ 106/181 -

35*45 G.F 26.4*32.9” - ªÀĹâ »A s̈ÁUÀ gÀ¸ÉÛ 3561/13375/1 -

26*36 F.F19.4*23.5 - §¸ÁÖAqï gÀ¸ÉÛ 6019/962/1

6018/962.42.43

6020/962/1.44

-

45*30 23.4”*28.3”=666.22 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ 8764/35 -

30*40+36 G.F=23.4”29.4” - - 8136/3853/13 -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

9

2 F.F=23.4”*29.4”

14.80*5.77+542

2

(48.5”*28.7”+27.

6

2

I.F35’.6”*37.8’ - ªÉAPÀmÉñÉégÀ £ÀUÀgÀ 158/2p4&5 -

16.4”*54.9” 4.95*45.1=428.45 - zÉÆqÀØ¥ÉÃmÉ 4516/4428 -

31’*50” 2.4”39.8=931.32 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ 73/p7/02 -

45’*40’ 23.4”25.2” - qÁ||.CA¨ÉÃqÀÌgï £ÀUÀgÀ 8666 -

22*34’+12*32 GF.22.3*6.7

FF.22.3’*6.7’ - PÉÆÃmÉ CgÀ¸ÀÄ ªÀÄPÀ̼À ©Ã¢ 143/141 -

58*30&57*5 20*32’ - ®QëöäñÀ £ÀUÀgÀ 2708/2561/18&2709/

2562/17. -

62’*40’=2480. GF.42.97*28.5

FF.25.3”*28.5 - ®QëöäñÀ £ÀUÀgÀ 4193 -

6.10*15.25 11.45*4.10 - PÁA¥ÉÆøïÖ AiÀiÁqïð 4066/1 4009/1 -

6.40*44.55m 7.90*4.40m - bÀvÀæzÀ ©Ã¢ 4322/4239 -

25’*30’ 23’.5’*18.5’431.76 - PÁA¥ÉÆøïÖ AiÀiÁqïð 7793/1/5951/A -

30’*40’ 21.6”31.5” - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ 7426/9 -

35’*50’ 27’*26.6” - ±À¤ÃzÉêÀgÀ zÉêÀ¸ÁÜ£À gÀ¸ÉÛ 5270/5135/17 -

30’*14’ 23.5*8.8” - PÀ®ÄèºÉÆ¼É gÀ¸ÉÛ 4140/1/4079/1 -

56+57*30 F.F. 23.35*43.82” - ®QëöäñÀ £ÀUÀgÀ 2670/2523 -

13*54

12.6”40’0” 18.9”*33.4” - PÉÆÃmÉ gÁWÀªÉÃAzÀæ ªÀÄoÀzÀ gÀ¸ÉÛ 243/234 -

30’*36’ 23.0”*27.8” - n.©.gÀ¸ÉÛ ZÉÃvÀ£À D¸ÀàvÉæ ºÀwÛgÀ 2991/1 2650/1 -

30’*75 22.14”*36.24” - AiÀÄÄ.©.gÀ¸ÉÛ 2310/7105 -

25’*45 18.43*33.48’ - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ 8659/2 -

26.5*10 6’*18.26 - n.©.gÀ¸ÉÛ ¥ÀæzÉñÀ 3131/2971/1 -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

10

6’*18.26”

26.5*10 GF.6*18.26”

FF.6*18.26” - n.©.gÀ¸ÉÛ ¥ÀæzÉñÀ 3132/2971/2 -

9.00*6 11.6’ GF.15.4”31.5”

FF.15.4”*31.5 - ±À¤zÉêÀgÀ zÉêÀ¸ÁÜ£À gÀ¸ÉÛ 9291/13 -

152*77+76

2

GF-122.14*46.22

FF-122.14*46.22

SF-122.41*46.22

- ºÉƸÀ §¸ÁÖAqï gÀ¸ÉÛ 2783/2634 -

9.00*11.60 7.00*9.60=67.20 - ±À¤zÉêÀgÀ zÉêÀ¸ÁÜ£À gÀ¸ÉÛ 9290/12 -

30*50 10.30*42.32 - PÀ®ÄèºÉÆ¼É gÀ¸ÉÛ 4115/4054 -

33*50 26.44’*41.79 - PÉÆÃmÉ 87/83 -

18*14 12.73*8.72’ - ªÀÄÆwðºÁ¼ï ¥ÀæzÉñÀ 6467/5601/91 -

30*50’ 23.42”*33.0’ - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ 7981/3592. -

21.48”*26.75” 21”4”*8.15” - n.©.gÀ¸ÉÛ M¼À¨sÁUÀ 2873/3/2721/3 -

35+37 * 50+52

2 2 22.96*41’.0 - 57/p1 -

44.48*29.88+28.

7

2

FF35.69*20.86 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ 158/2¦ -

“30*50” 22.24”*39.72 - ªÀiÁ¸ÁÛA©üPÀ UÀÄr ©Ã¢ 4200/4132 -

9’*12’ 5.05’*6.72” - ¹.¦.¹.PÁ¯ÉÆä 6004/962/1/28/1 -

30*40 GF-17.45*26.40

FF-17.45*26.40 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ 7631/23 -

30*40 25.49”26.86” - ¸ÀéuÁðA¨sÀ PÁ¯ÉÆä 403/385 -

40*40=1600 33.42*19 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ 8244/1 4107/1 -

50*30 41.79*23.42” - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ 8764/02 -

17.5*40’ 11.84*33.42 - ¸ÀĨsÁµï £ÀUÀgÀ 1831/1 1771/1 -

30’*26’ GF-22.96*19.42” - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ 2251/1 2170/2 -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

11

FF-22.96”*19.42”

25.98*134.97 17’.78*60.84” - n.©.gÀ¸ÉÛ ¥ÀæzÉñÀ 3120/2964 -

26.5*67 GF-19.55*51

FF-19.55*31.22 - zÉÆqÀØ¥ÉÃmÉ 4509/4416 -

90+60 *36+30

2 2

F.F-19.32+29-98*

12.76+21.7

2 2

-

ªÉAPÀmÉñÀégÀ £ÀUÀgÀ

2250/2169

-

53*27.5 21*40 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ 6581/4/J -

53*27.5 21*40 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ 6001/4/© -

18+55*50

2 880 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ 2329/2208 -

24*31.5 18.30*9.15m - ¸ÀĨsÁµï £ÀUÀgÀ 1453/1408 -

49*25 41*19 - C£ÀߥÀÆtð avÀæ ªÀÄA¢gÀ »A s̈ÁUÀ 7873/13 -

20*50 14.4*41.7 - PÁA¥ÉÆøïÖ AiÀiÁqïð 4061/1 4004/1 -

40*60 GF-36.7*22.9

FF-29.9*22.9 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ 3908/17 -

25*35 19*29 - ¸ÀĨsÁµï £ÀUÀgÀ 1543/1 1505/1 -

20*30 14.7*23.2 - gÁfêï UÁA¢ü §qÁªÀuÉ 6664/5416/108 -

20*53 GF-15*45

FF-15*46 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ 221/2140/5 -

20*30 14.43*23.42 - gÁfêï UÁA¢ü §qÁªÀuÉ 6667/5419/111 -

20*30 13.42*23.42 - gÁfêï UÁA¢ü §qÁªÀuÉ 6620/5372/64 -

20*20 13.41*14.47 - PÉ.JA.gÀ¸ÉÛ 1423/1378 -

40+32*50+52

2 2

29.6*25.42+9.84*10.82

8.60*5.0 - ªÉAPÀmÉñÀégÀ zÉêÀ¸ÁÜ£À »A s̈ÁUÀ 8764/13 -

80*48 GF-42.97*39.78 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ 2341/2221 -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

12

FF-22.00*39.78 2342/2220

35*47 28.4*26.14

- ªÀÄgÀªÀAf gÀ¸ÉÛ 7361/4305/11 -

5.00*13.60m 3.40*10.19 - ±À¤zÉêÀgÀ zÉêÀ¸ÁÜ£ÀzÀ gÀ¸ÉÛ 107/¦1 -

20*25 4.39*5.62 - PÁ¦ü PÉÆåjAUï ¥ÀæzÉñÀ 2007/1993 -

12.00*18.00 11.95*3.33+15*67.7 -

ºÀ¼ÀîgÀ ©æqïÓ 200 «dAiÀÄ®Qëöä avÀæ ªÀÄA¢gÀzÀªÀgÉUÉ (n.r.J¸ï.

¯ÉÃOmï) 8955/18 -

60*35 GF-15.78*8.05

FF-15.78*8.05 - ®QëöäñÀ £ÀUÀgÀ 7926/4150 -

37*9

60*9

20.5*97

20.5*27

Parking(23.60*6.00)+(2.81*

5.34)

GF-

(23.60*6.00)*2.81*5.34)

FF-

(23.60*6.00)*(2.81*5.34)

- ªÉAPÀmÉñÀégÀ avÀæ ªÀÄA¢gÀ gÀ¸ÉÛ

2858/2707 2860/2709 2861/2710

2862/1 2711/1

-

50*30

36.8”*23.4” - ªÉAPÀmÉñÀégÀ zÉêÀ¸ÁÜ£À »A s̈ÁUÀ 55/3&56/2 07/1 -

20*30

23.41*14.43 - gÁfêï UÁA¢ü §qÁªÀuÉ 6684/5436/128 -

40*20 10.19*4.40.44.84

4.46*4.40 - PÉÆÃmÉ 7836/© -

23*60 GF-15.20*4.55

FF-12.20*4.55 - PÉ.ºÉƸÀ½î

1286/1260 1287/1251 -

30*40

23.41”*23.41 - ¸ÀéuÁðA¨sÀ PÁ¯ÉÆä -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

13

Year-2011-12 Site area(Sq/feet) Built-up area(Sq/feet) Location details

Ward Street name Property Number/ Survey Number

30*40 22.9*13.2 - PÉ.n.ªÀÄÄ¢AiÀÄ¥Àà §qÁªÀuÉ PÀqÀÆgÀÄ

7383/29 -

44.25*73.83

16 ¼*79.83

16 ¼*30

44.25*36

44.25*87.75

44.50*88*50

27.75*39.25+19.75*11.50

- §¸ï¸ÁÖöåAqï gÀ¸ÉÛ, PÀqÀÆgÀÄ 7282, 7282/A,

7282/A1 & 7282/1

-

30*40 G.F 22.9*31.4

F.F 22.9*31.4

- ±À¤zÉêÀgÀ zÉêÀ¸ÁÜ£ÀzÀ gÀ¸ÉÛ, PÀqÀÆgÀÄ

8309/3 -

35*60 G.F 28.4*51.3

F.F 28.4*51.3

- ®QëöäñÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 2613/2466 -

24*39 17.4*32.1 - ¸ÀĨÁµÀ £ÀUÀgÀ, ¨ÉÆë PÁ¯ÉÆä, PÀqÀÆgÀÄ

1717/1663 -

50*30 22.2*39.7 - ªÉAPÀmÉñÀégÀ zÉêÀ¸ÁÜ£ÀzÀ »A¨sÁUÀ, «zÁå £ÀUÀgÀ, PÀqÀÆgÀÄ

8764/11 -

50*30 22.9*37.8 - C£ÀߥÀÆtð avÀæªÀÄA¢gÀ »A¨sÁUÀ, ªÉAPÀmÉñÀégÀ £ÀUÀgÀ, PÀqÀÆgÀÄ

9263/8792/9 -

30*42 22.4*33.6 - ®QëöäñÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 4025/4026 -

22.1/2*29 G.F 22.4*17.7

F.F 22.4*17.4

- eÉÊ£ï ªÀÄA¢gÀzÀ gÀ¸ÉÛ, PÀqÀÆgÀÄ 3414/3245 -

30*35 22.9*28.2 - eÉ.¦.¯ÁqïÓ »A¨sÁUÀ, PÀqÀÆgÀÄ 5620/16 -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

14

30*48 23.4*39.7 - ªÉAPÀmÉñÀégÀ §qÁªÀuÉ, PÀqÀÆgÀÄ 2458/2331 -

35*47 G.F 28.4*18.1

F.F 28.4*18.1

F.F

- ªÀÄgÀªÀAf gÀ¸ÉÛ, PÀqÀÆgÀÄ 5277/5141 -

30*50 23.4*36.9 - ªÀĺÁ®Qëöäà ¸Á«Ä¯ï »A¨sÁUÀ, PÀqÀÆgÀÄ

8155/r ¨ÁèPï, ¸ÉÊ.£ÀA.3 -

40*45 28.5*9.5 - ¸ÀéuÁðA§ PÁ¯ÉÆä, PÀqÀÆgÀÄ 395/376, 377, 378 -

24*35 17.4*28.4 - JªÉÄä zÉÆrØ gÀ¸ÉÛ, PÀqÀÆgÀÄ 457/436 -

50*30 22.9*34.4 - ªÉAPÀmÉñÀégÀ zÉêÀ¸ÁÜ£ÀzÀ »A¨sÁUÀ, PÀqÀÆgÀÄ

8720/3973 -

35*45 23.4*36.7 - ªÉAPÀmÉñÀégÀ §qÁªÀuÉ, PÀqÀÆgÀÄ 8764/29 -

30*45 23.4*33.4 - UÀuÉñÀ ¸Á«Ä¯ï »A¨sÁUÀ, PÀqÀÆgÀÄ

8627/2201/21 -

30*50 24.9*32.7 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 2430/2304 -

26*27, 20*27 F.F 34.5*20.4 - PÉÆÃmÉ, PÀqÀÆgÀÄ 162/160, 163/161 -

35*60 G.F 25.1*44.3

F.F 25.1*44.3

- ®QëöäñÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 7959/4016 -

40*30 F.F 23.3*33.3 - PÉ.n.ªÀÄÄ¢AiÀÄ¥Àà §qÁªÀuÉ, PÀqÀÆgÀÄ

7397/43 -

53.33*30 F.F 25.2*41.2 - §¤ß ªÀÄgÀzÀ gÀ¸ÉÛ, PÀqÀÆgÀÄ 8670 -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

15

30*40 G.F 23.4*23.4

F.F 23.4*23.4

- CA¨ÉÃqÀÌgï £ÀUÀgÀ, PÀqÀÆgÀÄ 7777/4283/8 -

50*40 F.F24.9*30.1 - ªÉAPÀmÉñÀégÀ zÉêÀ¸ÁÜ£ÀzÀ »A¨sÁUÀ, PÀqÀÆgÀÄ

4009/44 -

30*73+68/2 22.4*33.6 - ªÉAPÀmÉñÀégÀ §qÁªÀuÉ, PÀqÀÆgÀÄ 2521/2392 -

60*40 G.F 33.4*22.9

F.F 33.4*22.9

- ªÉAPÀmÉñÀégÀ zÉêÀ¸ÁÜ£ÀzÀ »A¨sÁUÀ, PÀqÀÆgÀÄ

3908/16 -

40*29+30/2 G.F 25.2*20.1

F.F 25.2*20.1

- ªÉAPÀmÉñÀégÀ zÉêÀ¸ÁÜ£ÀzÀ »A¨sÁUÀ, PÀqÀÆgÀÄ

8764/14 -

9.15*8.85+16.40

/2

23.4*22.4 - ªÀÄÆwð ºÁ¼ï, PÀqÀÆgÀÄ 1943/8811 -

30*50 G.F 23.4*41.7

F.F 23.4*41.7

- ªÀĺÁ®Qëöäà ¸Á«Ä¯ï »A¨sÁUÀ, PÀqÀÆgÀÄ

8155/r ¨ÁèPï, ¸ÉÊ.£ÀA.3 -

30*42 F.F 22.4*33.6 - ®QëöäñÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 4025 -

20*30 F.F 17.05*22.05 - PÁA¥ÉÆøïÖ AiÀiÁqïð, PÀqÀÆgÀÄ 7229 -

30*50 25.02*31.7 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 5870/7092 -

24*18 17.4*12.7 - ªÉÄʯÁgÀ zÉêÀgÀ UÀÄr ©Ã¢, PÀqÀÆgÀÄ

4999/4881 -

30*40 23.4*39.7 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 2456/2329 -

10.65*18.30 16.07*13.18 - ©.ºÉZï.gÀ¸ÉÛ, PÀqÀÆgÀÄ 3006/2853 -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

16

24*35 G.F 17.4*28.4

F.F 17.4*28.4

- «.PÉ.¨ËAræ, PÀqÀÆgÀÄ 461/440 -

18+42/2*70+78/

2

62.5*37.09 - J.¦.JA.¹ AiÀiÁqïð, PÀqÀÆgÀÄ 2501/2374 -

40*30 33.4*23.4 - PÁA¥ÉÆøïÖ AiÀiÁqïð, PÀqÀÆgÀÄ 7793/2/3951/2 -

30*40 23.4*33.4 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 7425/03 -

80*40 20.4*46.4 - ªÉAPÀmÉñÀégÀ mÁQøï gÀ¸ÉÛ, PÀqÀÆgÀÄ

2854/2704 -

50*30

30*30

22.4*29.7 - ªÉAPÀmÉñÀégÀ mÁQøï gÀ¸ÉÛ, PÀqÀÆgÀÄ

2852/1 2702/1 -

22*28 14.2*18.4 - ¹zÉÝÃzÉêÀgÀ UÀÄr ©Ã¢, PÀqÀÆgÀÄ 7893/3001/1 -

40*40 G.F 31.1*26.2

F.F 31.1*26.2

- ¥ÉèÃV£ÀªÀÄä zÉêÀ¸ÁÜ£ÀzÀ »A¨sÁUÀ, PÀqÀÆgÀÄ

7599/3934/13 -

50*30 G.F 22.9*41.0

F.F 25.4*22.9

- ªÀÄgÀªÀAf gÀ¸ÉÛ, PÀqÀÆgÀÄ 57/P16 Site no.3 -

30*55 22.14*45.6 - CA¨ÉÃqÀÌgï £ÀUÀgÀ, PÀqÀÆgÀÄ 5487/2 5342/2 -

60*40 7.31*21.32 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 6018/8 -

37*35 25.1*30.4 - n.©.gÀ¸ÉÛ M¼À¨sÁUÀ, PÀqÀÆgÀÄ 2893/1/2737/1 -

30*20 15.2*25.2 - PÁA¥ÉÆøïÖ AiÀiÁqïð, PÀqÀÆgÀÄ 4057/2, 4000/2 -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

17

30*30 17.3*25.2 - PÁA¥ÉÆøïÖ AiÀiÁqïð, PÀqÀÆgÀÄ 4057/1, 4000/1 -

20*50 G.F 13.4*36.7

F.F 13.4*36.7

- PÁA¥ÉÆøïÖ AiÀiÁqïð, PÀqÀÆgÀÄ 4066/4009 -

30*40 G.F 23.4*33.4

F.F 23.4*33.4

- ªÀÄgÀªÀAf gÀ¸ÉÛ, PÀqÀÆgÀÄ 5546/4 -

9.00*11.60 22.4*31.4 - ±À¤zÉêÀgÀ zÉêÀ¸ÁÜ£ÀzÀ gÀ¸ÉÛ, PÀqÀÆgÀÄ

9288/10 -

1.18 UÀÄAmÉ G.F 42.9*34.9

F.F 42.9*34.9

- ZÉPï ¥ÉÆøïÖ, PÀqÀÆgÀÄ 5554/5407/1 -

30*50 G.F 22.9*33

F.F 22.9*33

- ªÉAPÀmÉñÀégÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 2378/2257 -

45*35 22.4*36.7 - AiÀÄÄ.©.gÀ¸ÉÛ, PÀqÀÆgÀÄ 8217/7289 -

34*65 26.7*26.1 - 31 JPÀgÉ, PÀqÀÆgÀÄ 5851/5598 -

11.9*90.6 7.2*47.9 - zÉÆqÀØ ¥ÉÃmÉ ©Ã¢, PÀqÀÆgÀÄ 4385/4298 -

12.00*18.00 m G.F 29.5*45.9

F.F 29.5*45.9

- zÀvÁÛwæ ¯ÉÃOmï, PÀqÀÆgÀÄ 8955/24 -

30*40 33.4*23.4 - ªÉAPÀmÉñÀégÀ zÉêÀ¸ÁÜ£ÀzÀ »A¨sÁUÀ, PÀqÀÆgÀÄ

7939/4087 -

11*36 5.74*29.92 - ±ÀÄPÀÆÌgÀÄ ¸Á¨ï ©Ã¢, PÀqÀÆgÀÄ 4546/1, 4454/1 -

60*30

30*35

G.F 23.4*69.01

F.F 23.4*69.01

S.F 23.4*69.01

- ªÉAPÀmÉñÀégÀ avÀæªÀÄA¢gÀzÀ »A¨sÁUÀ, PÀqÀÆgÀÄ

2850/2700, 2941/2752 -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

18

32.9*50.8 22.9*31.4 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 70/4 -

28*50 G.F 21.4*41.7

F.F 21.4*41.7

- ªÉAPÀmÉñÀégÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 70/4 Site no.2 -

37*30 32.2*29.9 - n.©.gÀ¸ÉÛ, PÀqÀÆgÀÄ 2921/2755 -

20+63/2*50 35.9*29.9 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 2333/2212 -

67*47 29.5*28.7 - ªÉAPÀmÉñÀégÀ avÀæªÀÄA¢gÀzÀ »A¨sÁUÀ, PÀqÀÆgÀÄ

8753/1 -

10*15, 7 ½*30,

15*40

G.F 17.22*21.7

F.F 17.22*21.7

- n.©.gÀ¸ÉÛ, PÀqÀÆgÀÄ 3155/2983/1 2985

3155/1/2983/1 2985

-

60*33 F.F 31.4*24.1 - ®QëöäñÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 5841/4264 -

14.80*(8.77+8.4

2)/2

32.8*21.5 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 158/2P Site no. 4 & 5 -

44.4*(29.5+28.7)

/2

32.8*21.03 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 158/2P Site no. 3 & 4 -

12 ½ *38 7.2*27.9 - ¸ÀĨsÁµÀ £ÀUÀgÀ, ¨ÉÆë PÁ¯ÉÆä, PÀqÀÆgÀÄ

1753/1698 s̈ÁUÀ © -

12 ½ *38 7.21*27.9 - ¸ÀĨsÁµÀ £ÀUÀgÀ, ¨ÉÆë PÁ¯ÉÆä, PÀqÀÆgÀÄ

1753/1698 -

20*30 14.7*23.2 - PÉ.ºÉZï.ªÀÄÄ¢AiÀÄ¥Àà §qÁªÀuÉ, PÀqÀÆgÀÄ

7030/7679/256 -

30*40 F.F 23.4*35 - ¸ÀéuÁðA§ PÁ¯ÉÆä, PÀqÀÆgÀÄ 503/481 -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

19

27*34, 19*33,

37*30

G.F 41.4*18.4

F.F 23.6*18.4

- ®QëöäñÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 8324/2/4247

2920/2754

-

60*23 ½ 20.20*36.7 - PÉ.ºÉƸÀ½î, PÀqÀÆgÀÄ 650/1, 624/1 -

52*26 40.5*19.1 - ¥ÀæªÁ¹ ªÀÄA¢gÀ gÀ¸ÉÛ, PÀqÀÆgÀÄ 2898/2740 -

17*50 10.4*41.9 - §¤ß ªÀÄgÀzÀ gÀ¸ÉÛ, PÀqÀÆvÀÄ 4225 -

43*30 23.4*34.7 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 8655/2 -

26 ½*15.6 G.F 17.2*10.2

F.F 17.2*10.2

- ºÀ¼Éà ¥ÉÃmÉ, PÀqÀÆgÀÄ 3173/2999 -

60*35 15.4*15.7 - J£ï.ºÉZï.206, PÀqÀÆgÀÄ 2565/2435 -

34.9*60.02 14.9*18.5 - J£ï.ºÉZï.206, PÀqÀÆgÀÄ 3005/2852 -

30*40

30*10

F.F 20.07*25.15 - ¸ÀéuÁðA§ PÁ¯ÉÆä, PÀqÀÆgÀÄ 499/477

7334

-

60*48+47/2 44.95*36.96 - ®QëöäñÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 2652/2535 -

20*30 15.2*23.4 - gÁfêï UÁA¢ü §qÁªÀuÉ, PÀqÀÆgÀÄ

6706/5459/151 -

34*50 G.F 24.43*24.40

F.F 24.43*24.40

- JªÉÄä zÉÆrØ gÀ¸ÉÛ, PÀqÀÆgÀÄ 355/266 -

30*38 21.7*26.8 - C£ÀߥÀÆtð mÁQÃ¸ï »A¨sÁUÀ, PÀqÀÆgÀÄ

2499/2372 -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

20

25*20, 15*20 31.7*11.9 - JªÉÄä zÉÆrØ gÀ¸ÉÛ, PÀqÀÆgÀÄ 569/546, 570/549 -

30*59+63/2 G.F 23.4*44.21

F.F 23.4*26.6

- ªÀĺÁ®Qëöäà ¸Á«Ä¯ï »A¨sÁUÀ, PÀqÀÆgÀÄ

2493/2366 -

23*35 G.F 18.2*28.4

F.F 18.2*28.4

- ¨ÉÆë PÁ¯ÉÆä, PÀqÀÆgÀÄ 1720/1666 -

30*90 15.2*23.4

29.9*88.8

- ªÉAPÀmÉñÀégÀ avÀæªÀÄA¢gÀzÀ »A¨sÁUÀ, PÀqÀÆgÀÄ

8903 -

30*40 23.4*33.4 - PÉ.n.ªÀÄÄ¢AiÀÄ¥Àà §qÁªÀuÉ, PÀqÀÆgÀÄ

7394/40 -

30*50, 47.2*50 G.F 170.47 ZÀ.«ÄÃ

F.F 154.17 ZÀ.«ÄÃ

S.F 154.17 ZÀ.«ÄÃ

- n.r.J¸ï §qÁªÀuÉ, PÀqÀÆgÀÄ 8955/66, 8955/67 -

14.78*8.42+8.05

/2

36.9*19.8 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 158/2P, Site no 5 & 6 -

13.00+12.25/2*9

.75+9.43/2

24.3*28.7 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 158/2 Site no 1 & 2 -

30*66 G.F 22.9*34.8 F.F 22.9*34.8

- ®QëöäñÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 2639/2490 -

80*30 23.3*49.2 - ªÉAPÀmÉñÀégÀ avÀæªÀÄA¢gÀzÀ »A¨sÁUÀ, PÀqÀÆgÀÄ

2847/2696 -

30*11 5.74*22.9 - ¹zÀÝ£ÁAiÀÄÌ£À ©Ã¢, PÀqÀÆgÀÄ 4632/4534/1 -

40*75 15.2*23.4 - ®QëöäñÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 7047 -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

21

40*25, 40*25,

80*25

21.09*49.9 - UÀuÉñÀ ¸Á«Ä¯ï »A¨sÁUÀ, PÀqÀÆgÀÄ

7925/4198, 7930/4205 -

30*40 23.4*33.4 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 5962/2189/3 -

30*40 22.9*32.8 - AiÀÄÄ.©.gÀ¸ÉÛ zÀQët ¨sÁUÀ, PÀqÀÆgÀÄ 5609/5 -

10.04*20.08 6.7*15.2 - C±ÀéxÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 3733/3526/1 -

5.80*7.30 G.F 19.02*23.94 F.F 19.02*23.94

- ®Qëöäà zÉêÀgÀ UÀÄr ©Ã¢, PÀqÀÆgÀÄ

4997/4879 -

60*20 15.25*38.01 - ¹.¦.¹ PÁ¯ÉÆä, PÀqÀÆgÀÄ 2808/2659 -

56*78 41*57.4 - J¯ï.L.¹ »A¨sÁUÀ, PÀqÀÆgÀÄ 1)7787, 2)8324/1,

4247/1

-

60*35 28.4*35.2 - 31 JPÀgÉ ¥ÀæzÉñÀ, PÀqÀÆgÀÄ 3842/145 -

30*20 11.47*19.97 - PÉ.n.ªÀÄÄ¢AiÀÄ¥Àà §qÁªÀuÉ, PÀqÀÆgÀÄ

5548/1 5396/1 -

22*17 17.2*9.21 - ªÀÄÆwð ºÁ¼ï ¥ÀæzÉñÀ, PÀqÀÆgÀÄ 6474/5601/59 -

30*40 G.F 23.4*33.4 F.F 23.4*33.4

- «£ÁAiÀÄPÀ D¬Ä¯ï «Ä¯ï »A¨sÁUÀ, PÀqÀÆgÀÄ

5579/10 -

43.5*40 24.9*28.9 - ªÀÄÆwð ºÁ¼ï ¥ÀæzÉñÀ, PÀqÀÆgÀÄ 1917/1556 -

30*60 15.2*23.4 - ªÀÄÄgÀÄUÀ£ï PÁ¯ÉÆä, PÀqÀÆgÀÄ 8143/7243/1 -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

22

50*30 36.4*22.9 - ªÀÄgÀªÀAf gÀ¸ÉÛ, PÀqÀÆgÀÄ 8/57/p/4 -

50*30 23.4*41.7 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 8764/04 -

20*40 13.4*33.42 - PÉ.ºÉƸÀ½î, PÀqÀÆgÀÄ 1025/996 -

45*60 33.4*21.4 - PÉ.JA.gÀ¸ÉÛ, PÀqÀÆgÀÄ 1970/1907 -

21*19 G.F 13.7*15.7 F.F 13.7*15.7

- zÉêÉÃUËqÀ §qÁªÀuÉ, PÀqÀÆgÀÄ 6193/5600/30 -

32*20 G.F 13.4*25.2 F.F 13.4*25.2

- ¹.¦.¹ PÁ¯ÉÆä, PÀqÀÆgÀÄ 6019/962/195 -

30*77 21.9*39.3 - n.©.gÀ¸ÉÛ, PÀqÀÆgÀÄ 2799/2650 -

25*70 17.4*34.9 - ¸ÀĨsÁµÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 1304/1268 -

30*40 G.F 22.96*31.48 F.F 22.96*31.48

- AiÀÄÄ.©.gÀ¸ÉÛ, PÀqÀÆgÀÄ 7203 -

20*30 17.67*23.4 - gÁfêï UÁA¢ü £ÀUÀgÀ, PÀqÀÆgÀÄ 7519/80 -

26*62 19.4*21.1 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 2175/2097 -

10*35 4.7*28.4 - ªÉAPÀmÉñÀégÀ mÁQøï gÀ¸ÉÛ, PÀqÀÆgÀÄ

2855/1/2705/1 -

60*40 15.2*23.4 - 31 JPÀgÉ ¥ÀæzÉñÀ, PÀqÀÆgÀÄ 7078 -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

23

40*60 29.5*45.9 - «dAiÀÄ ®Qëöäà mÁQÃ¸ï ºÀwÛgÀzÀ ¥ÀæzÉñÀ, PÀqÀÆgÀÄ

8955/14 -

43*30 33.4*34.7 - ªÉAPÀmÉñÀégÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 8655 -

26 ½ *46 ¾ 19.9*38.5 - qÁ||CA¨ÉÃqÀÌgï £ÀUÀgÀ, PÀqÀÆgÀÄ 5494/5348 -

28*50 G.F 21.4*41.7 F.F 21.4*41.7

- ªÉAPÀmÉñÀégÀ £ÀUÀgÀ, PÀqÀÆgÀÄ 70/4/02 -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

24

Table 2.1 (b): Details of the building plan approval for three years

Table 2.2: Details of approved Industries/Commercial Areas

Current FY year (year to be displayed

in numeric like 2010-11)

Enclosure in the format displayed below

Current FY – 1 (year to be displayed in

numeric like 2009-10)

Enclosure in the format displayed below

Current FY – 2(year to be displayed in

numeric like 2008-09)

Enclosure in the format displayed below

Current FY year (year to be displayed

in numeric like 2010-11)

Enclosure in the format displayed below

Current FY – 1 (year to be displayed in

numeric like 2009-10)

Enclosure in the format displayed below

Current FY – 2(year to be displayed in

numeric like 2008-09)

Enclosure in the format displayed below

Kadur TMC Manual on Public Disclosure Schedules

CMAK

25

Format reference to table 2.2

Details Ward Number Street Name Survey Number Site

Area(Sq/feet)

Built-up area

(Sq/feet)

Owner name

Current FY 1

Current FY-1

Current FY-2

Current FY 1

Current FY-1

Current FY-2

Current FY 1

Current FY-1

Current FY-2

Current FY 1

Current FY-1

Current FY-2

Current FY 1

Current FY-1

Current FY-2

Current FY 1

Current FY-1

Current FY-2

Details in

enclosure

Kadur TMC Manual on Public Disclosure Schedules

CMAK

26

Kadur TMC Manual on Public Disclosure Schedules

CMAK

27

3. PLANNING FOR ECONOMIC AND SOCIAL DEVELOPMENT

Sl.

No

Functions as per

12th Schedule

Agency

Responsible

with in their

jurisdiction

Data to be Disclosed Period for which

information has to

be disclosed

Level of

Disclosure

(ULB/War

d)

Frequency

of

Disclosure

Referenc

e

Remark

s

3 Planning for

Economic and

Social

development

ULB List and brief of the Social and

Economic Development Schemes.-

eg; 18% scheme, Ashraya and such

other Govt. programs

Details of budget allocation and

expenditure of these schemes

Details of Beneficiaries

Previous three

financial years

including current

year

ULB Annually Table 3.1

Table 3.1

List and brief of the social and economic Development Schemes for three years

Current FY 1 2012-13

Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed

1 22.75% 23,95,000

60,000

2012-13 £Éà ¸Á°UÉ ±ÉÃ.22.75 gÀ AiÉÆÃd£ÉAiÀÄr À̧ºÁAiÀÄ zsÀ£À ¤ÃrzÀ ¥sÀ�Á£ÀĨsÀ«UÀ¼À «ªÀgÀ. 1. gÁPÉÃ±ï ©£ï gÀªÉÄñï 2. ±ÉéÃvÀ ©£ï ZÀAzÀÛ¥Àà 3. ªÉÊ.n.ªÀĪÀÄvÀ ©£ï UÉÆëAzÀ¥Àà 4. VjÃ±ï ©£ï UÉÆëAzÀ¥Àà 5. Dgï ªÁt²æà ©£ï gÀAUÀ¸Áé«Ä

Kadur TMC Manual on Public Disclosure Schedules

CMAK

28

6. ªÀÄ£ÀÄ JA. ©£ï ªÀĺÉñï 7. ®vÁ PÉ. ©£ï PÀȵÀÚ¥Àà 8. ªÀÄAdÄ£Áxï PÉ.©. ©£ï ©üêÀÄ¥Àà 9. PÀ¯ÁªÀw ©£ï £ÁUÉñï 10. PÀ«vÀ ©.n. ©£ï wªÀÄä¥Àà

2012-13 £Éà ¸Á°UÉ ±ÉÃ.22.75 gÀ AiÉÆÃd£ÉAiÀÄr EvÀgÉ SÁ¬Ä�ÉUÀ½UÀ À̧ºÁAiÀÄ zsÀ£À ¤ÃrzÀ ¥sÀ�Á£ÀÄ s̈À«AiÀÄ «ªÀgÀ.

1. PÀĪÀiÁgï ¨sÉÆë ©£ï ªÀiÁgÁ ¨sÉÆë. 2. PÀĪÀiÁj ¥ÀÄtå ©£ï ªÀÄAdÄ£Áxï 3. ®PÀëöäªÀÄä PÉÆÃA gÀAUÀ¥Àà 4. ªÀÄAdÄ£Áxï PÉ.« ©£ï ªÉAPÀlgÁªÀÄ

2 7.25% 7.41,000 87,000 2012-13 £Éà ¸Á°UÉ ±ÉÃ.7.25 gÀ AiÉÆÃd£ÉAiÀÄr ¨Áj

±À À̧Ûç aQvÉìUÉ À̧ºÁAiÀÄ zsÀ£À ¤ÃrzÀ ¥sÀ�Á£ÀĨsÀ«UÀ¼À «ªÀgÀ. 1. ªÀÄĤÃgï CºÀªÀÄzï 2. ªÀÄAdÄ£Áxï 3. PÉ.JA.¸Àwñï 4. ²ªÀPÀĪÀiÁgï 5. «dAiÀÄ 6. R®AzÀgï 7. PË À̧gï eÁ£ï 8. PÉ.JA.¢Ã¥Á 9. À̧ÄavÀæ

Kadur TMC Manual on Public Disclosure Schedules

CMAK

29

10. UÀÄ®Ógï ¨Á£ÀÄ 11. D±Á PÉÆÃA CgÀÄuï PÀĪÀiÁgï 12. ªÀgÀ®QëöäÃ.

Current FY-1 2011-12 Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed

1 22.75% 52,00,000 2011-12 £Éà ¸Á°£À ±ÉÊPÀëtÂPÀ À̧ºÁAiÀÄzsÀ£À ¥ÀqÉzÀ ¥sÀ�Á£ÀÄ s̈À«UÀ¼À «ªÀgÀ

1. CgÀÄuï.f ©£ï UÉÆëAzÀ ¸Áé«Ä 2. gÁeÉñï.PÉ ©£ï PÀȵÁÚ ¨sÉÆë 3. ©.n.ªÀÄzsÀÄPÀĪÀiÁgï ©£ï

wªÀÄäAiÀÄå 4. ©.n.PÀ«vÀ ©£ï ©.PÉ.wªÀÄä¥ 5. ªÉÊ.f.ªÀĪÀÄvÀ ©£ï UÉÆëAzÀ¥Àà 6. ªÉÊ.f.VjÃ±ï ©£ï UÉÆëAzÀ¥Àà 7. PÉ.©.ªÀÄAdÄ£Áxï ©£ï ©ÃªÀÄ¥Àà 8. PÀĪÀiÁgï Dgï ©£ï gÁªÀÄ°AUÀA 9. PÉ.J£ï.¸ÉÆêÀıÉÃRgï ©£ï

£ÁUÁ¨ÉÆë 10. ¥ÁªÀðw.n. ©£ï wªÀÄäAiÀÄå 11. GªÉÄñï Dgï ©£ï

gÁªÀÄPÀȵÀÚ¥Àà 12. ªÀiÁ¯Á.n ©£ï wªÀÄäAiÀÄå 13. gÁPÉñï.Dgï ©£ï gÀªÉÄñï

Kadur TMC Manual on Public Disclosure Schedules

CMAK

30

2011-12 £Éà ¸Á°£À s̈Áj ±À¸ÀÛç aQvÉìUÉ AiÀıÀ¹é¤ AiÉÆÃd£ÉAiÀÄAvÉ À̧ºÁAiÀÄzsÀ£À ¤ÃrzÀ ¥sÀ�Á£ÀĨsÀ«UÀ¼À «ªÀgÀ

1. aPÀ̪ÀÄä PÉÆÃA £ÁUÀgÁeï 2. ©.ZÀAzÀæªÀÄä PÉÆÃA ¯ÉÃmï ZÉ£ÀßAiÀÄå 3. Dgï.JA.§¸ÀªÀgÁdÄ ©£ï ¯ÉÃmï

ªÀÄgÀļÀ ¹zÀÝ¥Àà 4. £ÁUÀªÀÄä PÉÆÃA gÁªÀÄAiÀÄå 5. ±ÁgÀzÀªÀÄä PÉÆÃA ¯ÉÃmï wªÀÄäAiÀÄå 6. PÉ.J¸ï ªÀÄAdÄ£Áxï ©£ï

¸ÀÄqÀÄUÁqÀ¥Àà 7. ©.J¸ï.PÀĪÀiÁj PÉÆÃA

PÉ.J¸ï.¥ÀæPÁ±ï 8. ªÀÄAdªÀÄä PÉÆÃA ºÉÆ£ÀßAiÀÄå 9. ®PÀëöäªÀÄä PÉÆÃA £ÁUÀt 10. PÉ.¦.ªÀiÁgÀÄw ©£ï ¥ÀÄlÖAiÀÄå 11. F.gÁeÁ¨sÉÆë ©£ï

gÁªÀiÁ¨ÉÆë 12. PÀĪÀiÁgï ©£ï J¯Áè¨sÉÆ« 13. F.±ÉÆèÁ ©£ï FgÀ¥Àà 14. ºÉÆ£ÀߪÀÄä PÉÆÃA UÉÆëAzÀ¥Àà 15. J®èªÀÄä PÉÆÃA ¯ÉÃmï wªÀÄäAiÀÄå

2 7.25% 21,52,000 60,000 2011-12 ¸Á°£À ±ÉÃ.7.25 gÀ AiÉÆÃd£ÉAiÀÄr ¨Áj ±À¸ÀÛç aQvÉìUÉ À̧ºÁAiÀÄ

Kadur TMC Manual on Public Disclosure Schedules

CMAK

31

zsÀ£À ¤ÃrzÀ ¥sÀ�Á£ÀĨsÀ«UÀ¼À «ªÀgÀ. 1. ¸ÀºÉÃgÁ ¨sÁ£ÀÄ PÉÆÃA C£Àégï 2. ¥ÀæªÉÆÃzÀ PÉÆÃA ºÉZï.f.UÀÄgÀÄgÁd 3. UËgÀªÀÄä PÉÆÃA n.ªÀÄAdªÀÄä 4. ¥ÀeÁð£À vÀ§¸ÀªÀiï PÉÆÃA ¥sÀAiÀiÁeï 5. £ÀÆgÀįÁè ©£ï UË¸ï ¸Á¨ï 6. dAiÀÄ¥Àà ©.Dgï ©£ï ¯ÉÃ.gÉêÀtÚ 7. UÉÆæ ©£ï ºÀÄZÀÑ¥Àà 8. ²æêÀÄw PÉ.Dgï.ªÀÄAdļÀ PÉÆÃA gÁªÀÄ¥Àæ¸Ázï 9. ²æêÀÄw £ÀAdªÀÄä PÉÆÃA ¯ÉÃ.¸ÀtÚ¥Àà

Current FY-2 2010-11 Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed

1 22.75% 47,86,000 2010-11 £Éà ¸Á°£À°è ZÀªÀÄðzÀ GvÁàzÀ£É ªÀiÁqÀ®Ä lÆ�ï Qmï ¤ÃrzÀ ¥sÀ�Á£ÀĨsÀ«UÀ¼À «ªÀgÀ 1. £ÀA¢Ã±ï ©£ï ªÀÄAdÄ£Áxï 2. ¸Á«vÀæªÀÄä PÉÆÃA gÁdtÚ 3. ZÀAzÀæ¥Àà ©£ï ¯ÉÃmï ±ÀAPÀgÀ¥ 4. ªÀÄAdÄ£Áxï ©£ï ²ªÀtÚ 5. ªÉÊ.ªÀÄAdÄ£Áxï ©£ï ¯ÉÃmï

Kadur TMC Manual on Public Disclosure Schedules

CMAK

32

AiÀÄ®è¥Àà 6. ZÀAzÀæ¥Àà ©£ï ºÀ£ÀĪÀÄAvÀ¥Àà 7. ¥ÀgÀªÉÄÃ±ï ©£ï ªÀÄ®èAiÀÄå 8. ªÀÄÆwð ©£ï ¸ÀtÚ ºÀ£ÀĪÀÄAvÀ¥Àà

2010-11 £Éà ¸Á°£À s̈Áj ±À¸ÀÛç aQvÉìUÉ À̧ºÁAiÀÄzsÀ£À ¤ÃrzÀ ¥sÀ�Á£ÀÄ s̈À«UÀ¼À «ªÀgÀ. 1. UÀAUÀªÀÄä PÉÆÃA ªÉAPÀmÉñï 2. ªÉAPÀl ¸Áé«Ä ©£ï ¥ÀÆeÁj

wªÀÄäAiÀÄå 3. JA.¸ÀÄgÉÃ±ï ©£ï ¯ÉÃmï ªÀiÁgÁ

¨sÉÆë 4. JA.PÀĪÀiÁgï ©£ï ¯ÉÃmï

ªÀiÁgÁ¨sÉÆ« 5. ¥ÁªÀðvÀªÀÄä PÉÆÃA PÀȵÀÚ¥Àà 6. ®QëöäèÁ¬Ä PÉÆÃA ¯ÉÃmï

®PÀëöät £ÁAiÀÄÌ 7. £ÁUÀªÀÄä PÉÆÃA ZÉ£ÀߥÀà 8. J®èªÀÄä PÉÆÃA £ÁUÀgÁeï 9. ZÀAzÀæ¥Àà ©£ï ¯ÉÃmï ±ÀAPÀgÀ¥Àà 10. vÀªÀiÁä ¨sÉÆë ©£ï ¯ÉÃmï

vÀªÀÄäAiÀÄå 11. §AUÁgÀªÀÄä PÉÆÃA ¯ÉÃmï

ªÀÄÄgÀÄUÉñï

Kadur TMC Manual on Public Disclosure Schedules

CMAK

33

2 7.25% 16.51.000 4.50.000 2010-11 £Éà ¸Á°£À ±ÉÃ.7.25 gÀ AiÉÆÃd£ÉAiÀÄr ¨Áj ±À¸ÀÛç aQvÉìUÉ À̧ºÁAiÀÄ zsÀ£À ¤ÃrzÀ ¥sÀ�Á£ÀĨsÀ«UÀ¼À «ªÀgÀ. 1. ªÉÊ.dAiÀĹAºÀ 2. ²æêÀÄw CPÀ̪ÀÄä 3. ²æêÀÄw PÉ.¦.±ÁAvÀ 4. ²æêÀÄw ®PÀëöäªÀÄä 5. ²æêÀÄw EAzÀæªÀÄä 6. ²æêÀÄw ±ÁgÀzÀªÀÄä 7. ¥ÁªÀðvÀªÀÄä 8. ºÁfÃgÁ©Ã 9. AiÀÄÄ£À¸ï CºÀäzï 10. ZÉÆÃlÄ ¸Á¨ï ©£ï gɺÀªÀiÁ£ï µÀjÃ¥sï 11. J£ï.©Ã© eÁ£ï PÉÆÃA UÀįÁªÀiï zÀ¸ÀÛVgï 12. ¨sÁUÀå ®Qëöäà 13. PÉ.ºÉZï.jAiÀiÁeï CºÀäzï 14. DgÀw PÉÆÃA ¯ÉÆÃPÉñï 15. PÉ.JA.«zÁå±ÀAPÀgï ©£ï ¯ÉÃ.ªÀÄAdÄ£Áxï 2010-11 £Éà ¸Á°£À ±ÉÃ.7.25 gÀ AiÉÆÃd£ÉAiÀÄr ºÉaÑ£À «zÁå¨sÁå À̧PÉÌ

Kadur TMC Manual on Public Disclosure Schedules

CMAK

34

À̧ºÁAiÀÄzsÀ£À ¤ÃrzÀ ¥sÀ�Á£ÀÄ s̈À«UÀ¼À «ªÀgÀ. 1. C«ÄÃgï ºÀĸÉãï 2. ¸ÀAzsÁå PÉ.JA 3. ®vÁ PÉ.Dgï 4. JA.©.¸Àwñï 5. PÀ«vÀ PÉ 6. ¸ÉÆêÀıÉÃRgï PÉ 7. £ÀAiÀiÁeï JA 8. J£ï.gÁWÀªÉÃAzÀæ 9. ºÀjñï PÀĪÀiÁgï 10. gÀZÀ£À Dgï 11. £ÁfêÀÄ ¥À«Ãð£ï 12. ¥ÀĤvï PÉ 13. ªÀÄ£ÉÆúÀgï Dgï 14. ZÉÊvÁæ PÉ.n 15. ¥Àæ«Ãuï PÀĪÀiÁgï PÉ.J£ï 16. «£ÀAiÀiï Dgï 17. ZÉÃvÀ£ï PÉ.J£ï 18. C«£Á±ï ±ÉnÖ PÉ.J£ï 19. ¸ÀÄ»Ã¯ï ±ÀjÃ¥sï 20. ªÉƺÀ£ï PÀĪÀiÁgï JA 21. ZÉÃvÀ£ï PÉ 22. ZÉÃvÀ£ï PÀĪÀiÁgï PÉ.ºÉZï 23. ªÉÆúÀ£ï J¸ï

Kadur TMC Manual on Public Disclosure Schedules

CMAK

35

24. QèAmÉÆà 25. ¥Ë°£ï ¸ÀÄavÀ 26. ¥À®è« J¸ï 27. ¦.«zÁå²æà 28. jAiÀiÁeï SÁ£ï 29. ¥ÉæêÀiÁ ºÉZï.¦ 30. £À¢ÃªÀiï 31. £À«Ãzï JA 32. gÁdÄ PÉ.Dgï 33. ¸ÀéuÁðA§ J.PÉ 34. SÁzÀgï ªÉÆ»¢ÝÃ£ï ¹.JA 35. ²æÃPÁAvï J¸ï 36. gÀ«ZÀAzÀæ PÉ.¦ 37. ºÉêÀÄAvï Dgï 38. £ÀÆgï eÁ£ï ¨ÉÃUÀªÀiï 39. ¸ÀĤïï 40. ¥Àæ¢Ã¥ï PÉ.J£ï 41. ZÀAzÀ£À PÉ.J¸ï 42. gÁWÀªÉÃAzÀæ J¸ï 43. ¥sÁwªÀiÁ ¨Á£ÀÄ PÉ.f 44. gÀavÀ Dgï 45. ªÁ¢gÁd ºÉZï.J£ï

Kadur TMC Manual on Public Disclosure Schedules

CMAK

36

4. ROADS & BRIDGES

Sl.

No

Functions as per

12th Schedule

Agency

Responsible

with in their

jurisdiction

Data to be Disclosed Period for which

information has

to be disclosed

Level of

Disclosure

(ULB/Ward)

Frequency

of

Disclosure

Reference Remarks

4 Roads and

Bridges

ULBs & UDA (i) Total Road Length

(type of road, its length

and width)

Current status ULB/Ward Annually Table 4.1 MIS

(ii) Details of Roads

proposed & executed for

carpeting/ re-carpeting.

Current year ULB Annually Table 4.2

(a) and 4.2

(b)

(iii) Percentage of

footpath to the total road

length of main roads

current status ULB Annually Table 4.3

Table 4.1: Road types

Total existing road length in kms

Water bound macadam

(WBM)

Bituminous Cement Concrete (CC) Mud road Total

4.32 21.64 0.90 22.13 48.99

Table 4.2.a: Abstract of roads approved for carpeting and re-carpeting in current Financial year (year to be mentioned

numeric like 2010-11)

Type of road Total Road length approved and

tendered for carpeting in kms

Total Road length

approved and tendered for

Kadur TMC Manual on Public Disclosure Schedules

CMAK

37

re-carpeting in km

Water bound macadam (WBM) 4.32 k.m

Bituminous 21.64 k.m

Cement Concrete (CC) 0.90 k.m

Mud road 22.13 k.m

Total 48.99 k.m

Table 4.2.b: Details of roads approved and tendered for carpeting and recarpeting in current financial year (year to

be mentioned numeric like 2010-11)

Format for enclosure reference table 4.2.b

Type of road Total Road length

approved and tendered for

carpeting in kms

Total Road length approved and

tendered for re-carpeting in km

Water bound macadam (WBM) Enclosure as per the format given below

Enclosure as per the format given below

Bituminous Enclosure as per the format given below

Enclosure as per the format given below

Cement Concrete (CC) Enclosure as per the format given below

Enclosure as per the format given below

Mud road Enclosure as per the format given below

Enclosure as per the format given below

Kadur TMC Manual on Public Disclosure Schedules

CMAK

38

Road length Approved and tendered for carpeting, WBM,

Bituminous and CC road (newly surfacing of the roads)

Road length Approved and Tendered for re-

carpeting, WBM, Bituminous and CC road

Type of

road

Ward Number Street Name Length of road in Kms Type of

Road

Ward

Number

Street Name Length of road

in Kms

- - - - - - - -

Table 4.3: Footpath coverage to main roads

Total length of the main roads in ULB Jurisdiction: 5.00 kms

Total length of the footpath built against main road: - kms

Kadur TMC Manual on Public Disclosure Schedules

CMAK

39

5. WATER SUPPLY DOMESTIC, COMMERCIAL & INDUSTRIAL

Sl.

No

Functions as per

12th Schedule

Agency

Responsible

with in their

jurisdiction

Data to be Disclosed Period for which

information has

to be disclosed

Level of

Disclosure

(ULB/Ward)

Frequency

of

Disclosure

Reference Remarks

5 Water Supply-

Domestic,

Industrial and

Commercial

Water Board/

ULB

(i) Percentage of total

water supply (Surfaced,

Underground and external

source)

current status ULB Level Half yearly Table 5.1 SLB1

(ii)Total number of

connection & percentage

of Coverage (Household/

public stand posts/

Commercial and

Industrial Connection),

quantity of w/s

current status ULB Level Half yearly Table 5.2 SLB

(iii) Frequency and

Timing for Water Supply.

current status ULB Level Half yearly Table 5.3 SLB

(iv) Quality of Water

Supply (percentage of

samples complied with

the Water Act norms)

current status ULB Level Half yearly Table 5.4 SLB

(v) Cost Recovery in

Water Supply Services

(Revenue Generated per

KL of water/Cost incurred

per KL of Water

Previous three

financial years

including current

year

ULB Level Annually Table 5.5 SLB

Kadur TMC Manual on Public Disclosure Schedules

CMAK

40

Supplied)

(vi) Water tariff Current status ULB Level Annually Table 5.6

Format 5.1 -Per capita production of water

Water supplied through Surface Source ----- -in MLD

Water Supplied through Underground Source—1.24--in MLD

Water supplied through external source-0.0030 in MLD

Format 5.2- Water Supply Coverage

Total Number of Households……..in numbers

Number of house holds with direct water supply connections……in numbers

Total number of Public Stand Posts 6.25 in numbers

Total number of industrial connections………in numbers

Format 5.3- frequency & Timings of water supply

Frequency and Timing for Water Supply

Kadur TMC Manual on Public Disclosure Schedules

CMAK

41

Number of days of water supply per week in

Normal season

Number of hours of water supply on any supplied day (Normal

season)

7 days once 1 hour

Format 5.4- Quality of water supply

Total number of water samples collected at the consumer end 3 in Numbers/6 months

Number of water samples that meet potable water standards 3 in Numbers/6 months

Format 5.5- Cost recovery in water supply (same as in SLB)

Expenditure

1 Total contractual (if outsourced) cost for Bore wells, O & M of

piped network, O & M of vented dam/ Impounding structure/

Jack well/ Intake well, valves, replacement of distribution

network, supplying of spare materials, salaries of Contract

labours, vehicles etc)

Curren

t Year

15.00

Curren

t FY-1

4.50

Current

FY -2

7.2

2 Total expenditure borne by ULB on Bore wells, O & M of

piped network, O & M of vented dam/ Impounding structure/

Jack well/ Intake well, valves, replacement of distribution

network, supplying of spare materials, vehicles etc

12.00

8.00

14.40

3 Salaries of employees under water supply (Permanent and Daily

wages 18.02 6.25 11.25

4 Purchase of items (for water treatment, for pumping machinery

and spare parts if any - 2.50 1.8

5 Electricity Bill for water supply (Surface source and Ground

water)

72.96 18.29 30.6

Kadur TMC Manual on Public Disclosure Schedules

CMAK

42

Format 5.6- Water Tariff

Revenue

1 Amount collected out of current year demand - - -

2

Amount collected for providing new connection - - -

Water Tariff

Present water charges (which ever is

applicable)

Resindential

Commercial

Industrial

55

200

200

Kadur TMC Manual on Public Disclosure Schedules

CMAK

43

6. PUBLIC HEALTH, SANITATION, CONSERVANCY and SOLID WASTE MANAGEMENT

Sl.

N

o

Functions as per

12th Schedule

Agency

Responsible

with in their

jurisdiction

Data to be Disclosed Period for which

information has

to be disclosed

Level of

Disclosure

(ULB/Ward)

Frequency

of

Disclosure

Reference Remarks

6 Public Health,

Sanitation,

Conservancy and

SWM

ULBs/ Water

Board/ UDA

(i) Street Sweeping

(road wise street

sweeping schedule)

Current status as

per action plan

ULB/Ward Half

Yearly

Table

6.(a).1 &

6.(a).2

SWM

Action

Plan

(ii) General statistics on

Solid Waste Management

(Generation quantity,

Details of the Secondary

Collection Points, landfill

location, user fee)

current status ULB Annually Table

6.(a).3.1&

6.(a).3.2

SWM MIB

(iii) Percentage of HH

covered under Door-to-

Door Collection

current status ULB Half

Yearly

Table

6.(a).4

SLB and

MIB

(iv) Percentage of

households participating

in segregation

current status ULB Half

Yearly

Table

6.(a).5

(v) Extent of Scientific

treated and Disposal of

MSW (%)

current status ULB Annually Table

6.(a).5

SLB and

MIB

Kadur TMC Manual on Public Disclosure Schedules

CMAK

44

(vi) Cost recovery under

SWM (Revenue

generated per ton of SW/

Expenditure per ton of

SWM (in Rs.))

Previous three

financial years

including current

year

ULB Annually Table

6.(a).6

SLB

Sewerage & Drainage:

(vii) Percentage of

coverage of UGD

current status ULB Annually Table

6.(b).1

SLB

(viii) Percentage of Waste

Water Treated

current status ULB Annually Table

6.(b).2

SLB

(ix) Percentage of extent

of reuse and recycle of

treated waste water

current status ULB Annually Table

6.(b).3

SLB

(x) Cost recovery under

UGD (Revenue generated

under UGD/ Expenditure

under UGD (in Rs.))

previous three

financial years

including current

year

ULB Annually Table

6.(b).4

SLB

Storm Water Drains

(xi) Statistics of storm

Water Drains ( location,

length and its cleaning

frequency)

current status ULB Annually Table

6.(c).1

(xii) % age roadside

drains to road length (

Paved and unpaved)

current status ULB Annually Table

6.(c).2

SLB

Kadur TMC Manual on Public Disclosure Schedules

CMAK

45

(xiii) Incidences of

Water Logging and

Flooding (No.s of cases

per year/ total number of

identified points)

current status ULB Annually Table

6.(c).3

SLB

Public Health (if applicable)

(xiv) No of Municipal

Hospitals and its location

details

Current Status ULB Annually Table

6.(d).1.1

And 1.2

(xv) Facilities available &

OPD Timings

Current Status ULB Annually

(xvi) Number of cases of

vector Born Diseases per

1000 population

ULB Annually Table

6.(d).2

(xvii) Number of cases of

Water Born Diseases per

1000 population

Annually

Table 6(a).1 Private sector participation details for SWM

Package Number Scope of work Name of the contractor Contract period

(dd/mm/yyyy to

dd/mm/yyyy)

Contract value in

Rs. In lakhs

WARD NO.13 TO 23

Roads & Drainage

Cleaning

Chikamma Nagara Shri

Shakthi Sanga 1 Year 9.54

Kadur TMC Manual on Public Disclosure Schedules

CMAK

46

Table 6(a).2 Street Sweeping Schedule

Package

number

ward

number

Road ID

if

avaliable

Road name Road length in

Kms

Sun Mon Tue Wed Thu Fri Sat

A* type - - - - - - -

..

A type 9.5 Roads are Swept daily

..

B type 20.8 These roads are swept twice in a week( daily 7 kms will be swept)

..

… These roads are swept once in a week ( daily 4 kms will be swept)

C type 24.31

..

… Once in fortnight

D type 3.0

..

Source: SWM Action Plan

Kadur TMC Manual on Public Disclosure Schedules

CMAK

47

Details

Handled by SHG

(No.s)

Handled by Service Provider, if

applicable (No.s)

Handled by ULB

(No.s)

Handled by

RWA/NGO (No.s)

Non slum Household’s 4861 - - -

Slum Household’s 2235 - - -

commercial establishments Shops:664

Small Hotels:59

Meat

Shops(chiken):10

Vegetables:8

- - -

Bulk generators Major

Hotels/Restaurant

s:6

Choultaries:13

Markets:1

Slautghter

houses:1

- 1 -

Expected User fee generation (demand) - - - -

Table.6 (a) 3.2

General statistics on Solid Waste Management

Total Quantity of waste

generated in the city per

day(TPD)

Total Quantity of waste

Collected (TPD)

User fee Slab details

enclosed

Resolution date

passed from

Council

Land fill location Number of

secondary

transportation

vehicles under

SWM

15 14

-

- Haralagatta

2+1=3

Kadur TMC Manual on Public Disclosure Schedules

CMAK

48

Secondary storage

containers Location Map

Enclosure

Source: SWM Action Plan

Table 6(a).4

Number of Households participating in segregation

Nil

Table 6(a).5 Scientific Disposal of MSW

Total waste collected & transported to disposal sites 09 in tones/day

Total waste processed in scientific manner in tones/day

Table 6(a).6 Cost recovery under SWM in Rs Lakhs

Expenditure

1. Salary of the employees under SWM

26.29 In Rs Lakhs

2 Total Contractual cost if outsourced under

MSWM for hiring services, vehicles or

equipments, O& M of vehicles, fuel cost, labour

cost etc.

21.13 In Rs Lakhs

Kadur TMC Manual on Public Disclosure Schedules

CMAK

49

3 Total expenditure borne by ULB on SWM for O

&M of vehicles, purchase of tools and

equipments, insurance cost for vehicles, landfill

management cost like tipping fee etc.

10.20 In Rs Lakhs

Revenue

1 Total Revenue generated under SWM

-

Sewerage

UGD IS NOT APPLICABLE

Table.6 (b) 1. UGD Coverage

Total Number of households with direct UGD Connection ----in Numbers

Table.6 (b) 2 Percentage Waste Water treated

Total waste water collected at sewage treatment plant ---- in MLD

Quantity of waste water treated ------- in MLD

Table.6 (b) 3 extent of reuse and recycle of waste water

Kadur TMC Manual on Public Disclosure Schedules

CMAK

50

Quantity of waste water recycled & reused out of treated waste water……..in MLD (when mouse is moved on MLD then it

should show “million Liters per day”)

Table.6 (b) 4 Cost recovery under UGD (Input screen)

Expenditure

1. Electricity bill for sewage treatment plant -

2 Total salaries of ULB employees working in STP & UGD system -

3 Total O& M Contractual cost (if Outsourced) under UGD and STP (purchase of items,

repair and replacement of spares, labour cost etc.)

-

Total O& M cost born by ULB under UGD and STP (purchase of items, repair and

replacement of spares etc.)

-

Revenue

1 Total revenue collected from UGD In Rs Lakhs

Storm Water Drains

Table.6(c).1

Statistics of storm water drains

Name of major storm water drains Length in kms Cleaning frequency per annum

- - -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

51

Table.6 (c) 2

Length of road side drains

39.5 KMS

Table.6 (c) 3

Number of water logging and flooding cases per year in numbers 9

Total number of identified point .in Numbers 9

Public Health to be filled by the ULBs if they are managing this function

Table 6 (d).1.1

Public Health

Name of the Municipal

hospitals

Location details Detail of facilities

Number of

beds

Number of

staff

OPD2

Timings of

the OPD

Lab Facility

(yes/No)

Others if any

- - - - - - -

Table 6(d). 1.2

Number of vector borne disease cases per 1000 population Number of water borne disease cases per 1000

population

2 Out Patient department

Kadur TMC Manual on Public Disclosure Schedules

CMAK

52

- -

Function 7 is not managed by ULB in Karnataka State hence the details are not mentioned

8. URBAN FORESTRY, PROTECTION OF ENVIRONMENT AND ECOLOGY

Sl.

No

Functions as

per 12th

Schedule

Agency

Responsible

with in their

jurisdiction

Data to be Disclosed Period for

which

information

has to be

disclosed

Level of

Disclosure

(ULB/Ward)

Frequency of

Disclosure

Reference Remarks

8 Urban

forestry,

protection of

environment

ULB Trees (if applicable)

(i) Number of tree cut/uprooted

to the number of existing trees

current

status

ULB Half Yearly Table 8.1

Kadur TMC Manual on Public Disclosure Schedules

CMAK

53

and ecology (ii) Number of sapling planted

to the number of trees

cut/uprooted to the number of

existing trees

Current year ULB Half Yearly

Water bodies (if applicable)

(iii) Existing number, New

Proposals for Revival of water

bodies, budget and expenditure

current

status

ULB Annual Table 8.2

Table.8.1 (To be filled by the ULBs if they are managing this function)

Urban forestry

Total Number of existing trees Total Number of trees cut/uprooted Total Number of new saplings planted

--- --- ---

Table.8.2

Protection of Environment and Ecology

Sl. No Name existing water bodies

like lake, tanks, pond etc.

Proposed for revival in Yes/No Amount budgeted for revival in Rs.

in lakhs

Expenditure

met in Rs. in

Lakhs

Function 9 is not managed by ULB in Karnataka State hence the details are not mentioned

Kadur TMC Manual on Public Disclosure Schedules

CMAK

54

10. SLUM IMPROVEMENT & UP-GRADATION

Sl.

No

Functions as per

12th Schedule

Agency

Responsible

with in their

jurisdiction

Data to be Disclosed Period for which

information has

to be disclosed

Level of

Disclosure

(ULB/Ward)

Frequency

of

Disclosure

Reference Remarks

10 Slum

Improvement &

Up-gradation

ULB/UDA (i) Details on declared

and undeclared slums

(numbers, location,

number of households,

population, area)

current status ULB/Ward Half yearly Table 10.1

(ii) Details of slum

improvement schemes

(schemes, slums

benefited, budget and

expenditure)

Previous three

financial years

including current

year

ULB/Ward Half yearly Table 10.2.

(iii) Beneficiary list under

each scheme

current status ULB/Ward Half yearly Table 10.2

Kadur TMC Manual on Public Disclosure Schedules

CMAK

55

(iv) Status of Basic

Services in Slums

(a) No of connections -

Water Supply &

sanitation (% coverage)

(b) Length of Roads and

drains (paved and

unpaved)

(c) No and % of houses

(pacca and katcha houses)

current status ULB/Ward Half yearly Table 10.3

Table 10.1 Details on declared and undeclared slums (Input Screen & Output screen are same)

Details of declared slums Enclosure as per the format given Below

Details of un declared slums Enclosure as per the format given Below

Format for enclosure as mentioned in table 10.1

Details of declared and undeclared slums

Name of the slum Declared/

Undeclared

Extent in Sq.

mt

Population Number of Households

Kote agalu Declared 0.016 400 80

Murugan colony Declared 0.003 200 20

Murthy hal Declared 0.060 815 163

Benky colony Declared 0.024 470 94

Narabhovi colony Declared 0.054 2934 489

A.K.Colony Declared 0.063 960 160

Kadur TMC Manual on Public Disclosure Schedules

CMAK

56

Chatrada beedi Declared 0.040 225 45

Gudoji colony Declared 0.080 325 65

Modaliyar colony Declared 0.010 210 40

Subhash nagar Declared 0.012 215 43

Kampost yard Declared 0.030 540 108

K.M.Road Declared 0.030 390 78

Porte Area Declared 0.022 360 72

Tyagaraja nagara Declared 0.020 850 120

C.P.C Colony Declared 0.013 515 103

Edga nagara Declared 0.053 525 105

Kampost yard 2nd

stage

Declared 0.020 318 53

Table.10.2 Details of slum improvement Schemes (Input & Output Screen are same)

Current Year

Name of the slum Improvement Schemes

Total Number of Budget and under each Scheme (in Rs Lakhs)

Expenditure met under each scheme( in Rs Lakhs)

Beneficiary list as enclosure Slums Beneficiaries

enclosure

Current Year - 1

Name of the slum Improvement Schemes

Total Number of Budget and under each Scheme (in Rs Lakhs)

Expenditure met under each scheme( in Rs Lakhs)

Beneficiary list as enclosure

Slums Beneficiaries

Kadur TMC Manual on Public Disclosure Schedules

CMAK

57

enclosure

Current Year - 2

Name of the slum Improvement Schemes

Total Number of Budget and under each Scheme (in Rs Lakhs)

Expenditure met under each scheme( in Rs Lakhs)

Beneficiary list as enclosure

Slums Beneficiaries

enclosure

Table 10.3 Basic Service status in Slums

Status of Basic services in Slums

Total number of

households with

direct water

supply

connections

(numeric)

Total number

of public

taps/mini

water cisterns

(numeric)

Total length

of roads

paved and

unpaved in

Kms

Total

households

connected to

UGD

(numeric)

Total

length of

road

side

drains in

Kms

Total

number of

HH with

individual

toilets

(numeric)

Number of

Functional

Community

Toilets

(numeric)

Total number of

pacca/kaccha

houses

(numeric)

- - - - - - - -

Note: ULBs needs to disclose information under table 10.2, 10.3 and 10.4 with a note that “All the information in this table are the works undertaken by ULB” (plz Insert this without fail)

Kadur TMC Manual on Public Disclosure Schedules

CMAK

58

11. URBAN POVERTY ALLEVIATION

Sl.

No

Functions as per

12th Schedule

Agency

Responsible

with in their

jurisdiction

Data to be Disclosed Period for which

information has

to be disclosed

Level of

Disclosure

(ULB/Ward)

Frequency

of

Disclosure

Reference Remarks

11 Urban Poverty

Alleviation

ULBs

/DMA/UDA

(i) Details of the Urban

Poverty Alleviation

Schemes (eg.

Components of SJSRY )

Current status ULB Annually Table 11.1

Table 11.1 Details of Urban Poverty Alleviation

Name of

Schemes under

urban poverty

alleviation

(multiple entries)

Budget for

the schemes

Expenditure

met for the

scheme

Number of

beneficiaries

under the

scheme

list of the beneficiaries to be enclosed

U.S.E.P

S.J.S.R.Y

17,00,000/-

15,00,000/-

75 Name of the

beneficiary Father Name Address

Basavaraj naik

O.G Govinda naik Halepete, Kadur

S.Balu Lt.Shrinivas Kote agalu, Kadur

Kiran kumar Nagaraj C.P.C Colony, Kadur

Kadur TMC Manual on Public Disclosure Schedules

CMAK

59

Kumar K.L Lakshmanappa Doddapete, Kadur

Nataraj K.R Ranganath T.K K.M.Road, Kadur

Nanjudaswany Lt.Somanna Doddapete, Kadur

H.S.Ravikumar Shivappa

Siddartha complex,

Kadur

V.Krishna Veeraswamy T.B.Road, Kadur

Vijay J Lt.Jhoseph B.H.Road, Kadur

K.T.Naveen K.Tippeswamy B.H.Road, Kadur

Jabbi Khan Lt.Rasul khan K.M.Road, Kadur

Lokesh M Malleshappa Near S.B.M, Kadur

K.R.Manjunath Rangaswamy Benki colony, Kadur

K.Jayaprakash Krishnappa Subhash nagar, Kadur

Manjunath K.T.Govindappa Kote , Kadur

Ajay B.K B.B.Krishnappa Doddapete, Kadur

Suresh Ramanna Pete, Kadur

Santhosh K.N Nagaraj Halepete, Kadur

Mahesh kumar

K.P Prakash K.N Doddapete, Kadur

M.Muruli S.Mahadeve rao Pete, Kadur

Kiran kumar Nagaraj C.P.C Colony, Kadur

Sampath Kumar Ranganath K.M.Road, Kadur

Kumar Naik S Soma Naik

Near Railway station,

Kadur

Manju Naik Raju Naik T.B.Road, Kadur

Kadur TMC Manual on Public Disclosure Schedules

CMAK

60

All the information in this table are the works undertaken by ULB” (plz Insert this without fail)

12. PROVISION OF URBAN AMENITIES AND FACILITIES-PARKS, GARDENS & PLAY GROUNDS

Sl.

No

Functions as per

12th Schedule

Agency

Responsible

with in their

jurisdiction

Data to be Disclosed Period for which

information has

to be disclosed

Level of

Disclosure

(ULB/Ward)

Frequency

of

Disclosure

Reference Remarks

12 Provision of

urban amenities

and facilities-

parks, gardens

and playgrounds

ULBs/UDAs Playground/ Parks/Gardens

(i) Percentage of area

under parks and gardens

to the total ULB area

Current status ULB Annually Table 12.1

(ii) Percentage of

developed parks and

gardens (%)

Current status ULB Annually Table 12.1

(iii) Number, Location,

Area, Amenities, details

of the maintaining agency

Current Status ULB Annually Table 12.2

(a) and 12.2

(b)

Table.12.1. Area reserved under Parks & Gardens

1. Total ULB area 6.24 in Sq.kms

2. Area reserved under Parks & Garden 33857.75 in Sq.meters

3. Area of developed parks and gardens 6624.41 in sq. mts

Kadur TMC Manual on Public Disclosure Schedules

CMAK

61

Table.12.2 (a) Amenities under parks & Gardens

Locations of the park Park

Area in

sq. mt

Amenities available under each park (yes/no) Contact details of the

Maintaining Agency

Children

play area

Seating

facility

Track for

walking/joggin

g

Facility

for

exercise

Name Contact

number(nu

meric)

(multiple

entries)

1.Dattari layout 3617.19

2.Upendranatha layout 1481.94

3. K.T.Manjunath layout 349.17

4. K.G.Thammaigh bin

Halubingi Govindappa layout

459.63

5.(a) Manjunath bin siddappa

layout

153.33

(b) 153.33

(c)Sri Thippesh bin Siddappa

layout

437.22

6.Sri Lakshmi lalanaik layout 853.85

7.K.Hosalli, Near police

quarters

744.84

8.Behind Tiles factory 2772.63

Kadur TMC Manual on Public Disclosure Schedules

CMAK

62

9.Halakattanayakana badavane 1280.20

10.Honnappa badavane 695.17

11.Thamiah badavane 1142.5

12.Swarnamba badavane 303.62

13.S.M.Krishna badavane 613.28

14.Rajeev Gandhi (1st Stage) 444.43

15. Rajeev Gandhi (2nd Stage) 2312.846

16.Omkara murthy badavane 1398.70

17.K.H.Mudiyappa badavane 5866.63

18.Dr.Shadakshari, Nagamma

& Dr.Murthy layout

1626.21

19.Salamma colony 344.09

20.Near Highway school

Veerana shetty layout

1787.149

21.K.M.Sreenivas & Mohan

layout

416.48

22.Smt Roja Krishna layout 278.66

23.Rathnamma & Honnamma

w/o Binganna layout

111.41

24.Lakshmeesha nagara 370.72

25. Lakshmeesha nagara 669.04

26.M.S.R Park 245.94

27.Behind Ganesha sawmill 743.40

28.Beeramma Iralappa layout 912.16

29.Opposite to Govt school in 446.09

Kadur TMC Manual on Public Disclosure Schedules

CMAK

63

Venkateshwara nagara

30.Behind Gas Agency

belongs to Chandrappa

501.14

31.Near K.B.Chandrashekar’s

house

325.22

Table 12.3.(b) Play ground details

Locations of the

playgrounds

playground Area in sq. mt Contact details of the Maintaining

Agency

Name Contact

number(numeric)

- - - -

13. PROMOTION OF CULTURAL, EDUCATIONAL AND AESTHETIC ASPECTS

Sl.

No

Functions as per

12th Schedule

Agency

Responsible

with in their

jurisdiction

Data to be Disclosed Period for which

information has

to be disclosed

Level of

Disclosure

(ULB/Ward)

Frequency

of

Disclosure

Reference Remarks

Kadur TMC Manual on Public Disclosure Schedules

CMAK

64

13 Promotion of

cultural,

educational, and

aesthetic aspects

ULBs (i) Details of Community

halls, Cultural Centers,

marriage halls, municipal

educational institutes

Current Status ULB Annually Table 13.1

(a) and 13.1.

(b)

(ii) Details of

advertisement hoardings,

rates, revenue generated

Current Status ULB Annually Table 13.2.1

and 13.2.2

Table 13.1.a Details of cultural Centers

Table 13.1 (b) Details of educational institutes (only if applicable)

Community halls/Auditorium Details

Name Address Booking office address

and contact details

Kanaka Bhavana, Rama Devara Gudi Beedi, Kadur

Community hall Beside L.I.C Office, Kadur

Community hall in Ambedkar Nagar, Kadur

Community hall in K.M.Road, Kadur

Community hall in Ashwath Nagara, Kadur

M.R.M Rangamandira, K.M.Road, Kadur

Name of the Municipal Educational Institutes Number of teachers in each

municipal Educational Institutes(in

numbers)

Name Address Numbers

- - -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

65

Table13.2.1 Details of Advertisement Hoardings (Input & Output screens are same)

Details of Advertisement hoardings

Number of Hoardings Slab rates for advertisement

(As Enclosure)

Advertisement tax demand

for the current year in Rs. in

lakhs

Advertisement tax collected

in the current year in Rs. in

lakhs

- - - -

14. BURIALS AND BURIAL GROUNDS, CREMATIONS, CREMATION GROUNDS AND ELECTRIC CREMATORIUMS

Sl.N

o

Functions as per

12th Schedule

Agency

Responsible

with in their

jurisdiction

Data to be Disclosed Period for which

information has

to be disclosed

Level of

Disclosure

(ULB/Ward)

Frequency

of

Disclosure

Reference Remarks

14 Burials and

burial grounds,

cremations,

cremation

grounds and

electric

crematoriums

ULBs (i) Numbers, type,

Location of burial

grounds and cremation

facilities available, fee

charged if any

Current Status ULB Annually Table 14.1

(a). and

14.1(b)

(ii) Details of facility of

“Herse/ Corpse

Vehicles”(number and

contact details)

Current Status ULB Annually Table 14.2

Kadur TMC Manual on Public Disclosure Schedules

CMAK

66

Table.14.1 (a) Details of Burial grounds, cremation grounds & electric crematoriums

Details of Burial grounds, cremation grounds & electric crematoriums

Name of the

Community burial

ground with

locations

Name and

location of

the

Crematoriu

ms/Burial

ground

Facilities available in the Crematoriums ( Yes / No)

Electric Burning Burial Availabilit

y of wood

Water

facility

Cleaning

facility

Others

if any

Maintaining agency

Name Contact

details

Multiple (entries)

1.Bhovi smashana - - - Yes Yes - - -

2.Hindu Okkaliga

smashana

- - - - - - - - -

3.Kristha smashana - - - - - - - - -

4.Muslim smashana - - - - Yes Yes - - -

5.Makkala smashana - - - - - Yes Yes - - -

6.Adhi Karnataka

smashana

- - - - - - - - -

7.Arya vyshya Sanga

smashana

- - - - - - - - -

8.Marata smashana - - - - - - - -

9.Hindu smashana - - - - Yes Yes - - -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

67

Table 14.1 (b) Fee slab for each crematorium (Input and Out put screens are same)

Fee slab for each crematoriums and burial grounds Enclosure

Table 14.2: Details of Hearse Vehicles

Hearse/Corpse vehicle details

Number of hearse vehicles

available

Fee details for the vehicle(

in Rs)

Contact details

to hire the

vehicle

Maintaining agency

Contact Number Name Contact

Number

- - - - -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

68

15. CATTLE PONDS, PREVENTION OF CRUELTY TO ANIMALS

Sl.

No

Functions as per

12th Schedule

Agency

Responsible

with in their

jurisdiction

Data to be Disclosed Period for which

information has

to be disclosed

Level of

Disclosure

(ULB/Ward)

Frequency

of

Disclosure

Reference Remarks

15 Cattle ponds,

prevention of

cruelty to

animals

ULBs (i) Numbers of stray

animals, vaccinated

Current Status ULB Annually Table 15.1

(a) and 15.1

(b)

(ii) List of ‘Kanji House’

(care centers for stray

animals).

Current Status ULB Annually Table 15.1

(a)

Table.15.1.1 Details of stray animals (input & output screen are same)

Number of stray animals Number of stray dogs

vaccinated

Location of Kanji House

(care centers for Stray

animals) if applicable Dogs Cows Pig Others if applicable

- - - - - -

Table 15.1.2 Details of Veterinary & Animal Welfare Centers (input & output screen are same)

List of location of Veterinary hospitals As Enclosure

Kadur TMC Manual on Public Disclosure Schedules

CMAK

69

List of Animal Welfare Association (if available) As Enclosure

Name and location of NGOs working for animal

welfare( if available)

As Enclosure

16. VITAL STATISTICS INCLUDING REGISTRATION OF BIRTHS AND DEATHS

Sl.

No

Functions as per

12th Schedule

Agency

Responsible

with in their

jurisdiction

Data to be Disclosed Period for which

information has

to be disclosed

Level of

Disclosure

(ULB/Ward)

Frequency

of

Disclosure

Reference Remarks

16 Vital Statistics

including

registration of

births and deaths

ULBs (i) General information

pertaining to city

(population, area,

households etc.)

Current Status

and recent census

details

ULB Annually Table 16.1 City

website

(ii) List of citizen service

centers with location

Current status ULB Annually Table 16.2

(iii) Total Births and

Deaths recorded along

with Birth and Death

rates.

Current status ULB Half

Yearly

Table 16.3

(iv) Citizen Charter to be

published

Current status ULB Annually Table 16.4

Table 16.1: City General information as per recent census details (should be added in their respective ULB website

City General information

Kadur TMC Manual on Public Disclosure Schedules

CMAK

70

Present

population

Present area in

sq.km

Total number

of households

Population

density

Total male

population

Total female

population

Total SC/ST

Population

Total Slum

population

Literacy rate

34187 6.24 7944 - 17126 17060 6550 10525 77.18%

Table 16.2: List of Citizen Service centers

Sl. No Address of the Citizen Service centers if applicable

1

PGR CELL, TOWN MUNICIPAL COUNCIL, KADUR

Table 16.3: Details of Birth & Death

Total births recorded Total deaths recorded

2004 276

Kadur TMC Manual on Public Disclosure Schedules

CMAK

71

Table 16.4 Citizen Charter (ULBs who have already maintaining the Charter can enclose the same, other ULBs can follow the below format

Service Details Period of

catering

the

service

Procedure to Apply Officer incharge

Designation Contact

Number

Birth Certificate & Death

certificate

3 Days Application Health

Inspector

08267-221221

Khatha Certificate 7 Days 1) Application

2) Property Tax Paid Receipt.

F.D.A 08267-221221

Building Licence 30 Days 1) Application

2) RTC Copy

3)LandConversion certifivate.

4) Estimate copy.

5) Building measurement

6) Architect licence copy

7) Building plan & NOC

8) Property Tax Paid Receipt

Senior Health

Inspector

08267-221221

UGD & Water supply

connection

15 Days 1) Application

2) Location sketch

3) Estimate copy

S.D.A 08267-221221

Kadur TMC Manual on Public Disclosure Schedules

CMAK

72

4)Tax Paid Receipt

Trade Licence 30 Days 1) Application

2) Water supply fee paid receipt

3) Location sketch.

4) NOC

5) Rent agreement copy

Junior Health

Inspector

08267-221221

Kadur TMC Manual on Public Disclosure Schedules

CMAK

73

17. PUBLIC AMENITIES INCLUDING STREETLIGHTING, PARKING LOTS, BUS STOPS AND PUBLIC CONVENIENCES

Sl.

No

Functions as per

12th Schedule

Agency

Responsible

with in their

jurisdiction

Data to be Disclosed Period for which

information has

to be disclosed

Level of

Disclosure

(ULB/Ward)

Frequency

of

Disclosure

Reference Remarks

17 Public amenities

including street

lighting, parking

lots, bus stops

and public

conveniences

ULBs (i) number of street lights Current status ULB Annually Table 17.1 SLB

(ii) No. of Street Lights/

Km of Road Length

(No.s)

Current status ULB Annually Table 17.1 SLB

(iv) Details of agency

maintaining street lights

(name and contact details)

Current status ULB Annually Table 17.2

(v) List of Authorized

Parking Areas along with

parking capacities and fee

Current status ULB Annually Table 17.3

(vi) Number and locations

of bus stops and public

toilets (Community and

commercial) with its user

charge.

Current status ULB Annually Table 17.4

Kadur TMC Manual on Public Disclosure Schedules

CMAK

74

Table.17.1: Details of streetlights

Total number of streetlights Types of streetlights with number

Tube light High Mast Others Mercury vapor Sodium vapor

2187 1111 27 32 100 917

Table 17.2: Details of Agency Maintaining Streetlight

Package Number Wards Covered details of the agency Maintaining the streetlights

Name Phone Number

- 23 H/S SAMBRAMA

ELECTRICALS,

THIRTHAHALLI.

9743923299

Table.17.3: Details of Parking Lots

Details of parking lots

Enclosure as per the format

Format

Parking lot location Parking Capacity Fee Slab

Two

wheeler

Four

wheeler

Two

wheeler

Four

wheeler

- - - - -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

75

Table.17.4 Details of toilets

Table17.5: Details of Bus

Public toilets Community Toilets

Location Fee slab Location Fee slab

1.Marvanji Circle

Rs.2/- per head

- -

2.T.B Road - -

3.Ambedkar Nagar - -

4.Near Govt Hospital - -

5.C.P.C Colony - -

Location of Bus stop( As Enclosure)

Area Address

U.B.Road, Kadur

Location of Public toilets User charges for Pay and Use toilets in Rs.

Pay and use toilets Community based Toilets Pay and use toilets Community based Toilets

K.L.V Circle - 2 Rs -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

76

18. REGULATION OF SLAUGHTER HOUSES AND TANNERIES

Sl.

No

Functions as per

12th Schedule

Agency

Responsible

with in their

jurisdiction

Data to be Disclosed Period for which

information has

to be disclosed

Level of

Disclosure

(ULB/Ward)

Frequency

of

Disclosure

Reference Remarks

18 Regulation of

slaughter houses

and tanneries

ULBs (i) Number, Location of

Slaughter House /

Tanneries along with

facilities available and

capacity

Current status ULB Annually Table

18.1(a) and

(b)

Table.18.1(a): list of Slaughter houses

Number of Slaughter Houses

Functional

Number of slaughter houses

Non functional

-

Railway Station Road - 2 Rs -

Kadur TMC Manual on Public Disclosure Schedules

CMAK

77

Table 18.1 (b): Details of Slaughter House

Location of

the

slaughter

House

Whether the

Slaughter

house is been

regulated by

KSCB

(Yes/No)

Capacity Number of

animals

slaughtered

per week

Facilities

Washing Medical

Examin

ation

Remo

val of

Waste

Others

if any

- - - - - - - -