Tony Smith, commercial strategy manager, peel gas & oil
-
Upload
daniel-rankine -
Category
Environment
-
view
190 -
download
4
Transcript of Tony Smith, commercial strategy manager, peel gas & oil
![Page 1: Tony Smith, commercial strategy manager, peel gas & oil](https://reader031.fdocuments.us/reader031/viewer/2022030307/58e765f51a28ab4a278b643b/html5/thumbnails/1.jpg)
1
Manchester Ship Canal
Water Abstraction TrialDr Tony Smith
![Page 2: Tony Smith, commercial strategy manager, peel gas & oil](https://reader031.fdocuments.us/reader031/viewer/2022030307/58e765f51a28ab4a278b643b/html5/thumbnails/2.jpg)
2
Agenda
▪ Introduction
▪ Trial objective
▪ Collaboration
▪ Results
▪ Learnings & conclusions
![Page 3: Tony Smith, commercial strategy manager, peel gas & oil](https://reader031.fdocuments.us/reader031/viewer/2022030307/58e765f51a28ab4a278b643b/html5/thumbnails/3.jpg)
3
Manchester Ship Canal
▪ 36 mile waterway linking Manchester to the
Irish Sea
▪ Construction started 1887 at cost of £15m
– estimated to be £1.65 billion in 2011
▪ Opened by HM Queen Victoria in 1894
▪ Immediately became the largest river
navigation canal in the world
▪ Acquired by Peel in 1987
![Page 4: Tony Smith, commercial strategy manager, peel gas & oil](https://reader031.fdocuments.us/reader031/viewer/2022030307/58e765f51a28ab4a278b643b/html5/thumbnails/4.jpg)
4
MSC Water Trial Objective
▪ Safe abstraction, processing, storage and
discharge of water from the Manchester
Ship Canal (MSC) at appropriate quality,
rate and quantity for industrial use –
including hydraulic fracturing
![Page 5: Tony Smith, commercial strategy manager, peel gas & oil](https://reader031.fdocuments.us/reader031/viewer/2022030307/58e765f51a28ab4a278b643b/html5/thumbnails/5.jpg)
5
MSC Water Trial Objective
Collaboration:
▪ Peel: Project sponsor, land, canal & water owner
▪ Alcumus: Safety / risk assessment
▪ Selwood: Pumps, hoses
▪ Rain for Rent: Filtration and Storage
▪ Atg uv: Water UV treatment & bacterial analysis
▪ GroundGas Solutions: Trial operator & scientific
analysis
![Page 6: Tony Smith, commercial strategy manager, peel gas & oil](https://reader031.fdocuments.us/reader031/viewer/2022030307/58e765f51a28ab4a278b643b/html5/thumbnails/6.jpg)
6
Simple Trial Overview
Pump
Temporary on site Water Plant
10 µm5 µm1 µm
3 stage filtration
Flow meter
UV
70 m3storage
![Page 7: Tony Smith, commercial strategy manager, peel gas & oil](https://reader031.fdocuments.us/reader031/viewer/2022030307/58e765f51a28ab4a278b643b/html5/thumbnails/7.jpg)
7
Project Process
▪ Planning and commissioning
▪ Water abstraction
▪ 3 stage Filtration
▪ UV Treatment
▪ Water storage
▪ Analysis
▪ Water discharge
▪ Decommissioning
▪ Reporting
![Page 8: Tony Smith, commercial strategy manager, peel gas & oil](https://reader031.fdocuments.us/reader031/viewer/2022030307/58e765f51a28ab4a278b643b/html5/thumbnails/8.jpg)
8
Continuous Analysis Regime
![Page 9: Tony Smith, commercial strategy manager, peel gas & oil](https://reader031.fdocuments.us/reader031/viewer/2022030307/58e765f51a28ab4a278b643b/html5/thumbnails/9.jpg)
9
Lab Analysis
• Heavy metals
• Hydrocarbons
• BTEX
• PAHs
• TDS
• TSS
• BOD
• COD
• pH
• Chloride
• Salinity
• Total Viable Count (TVC)
• Sulphate Reducing Bacteria (SRB)
• Total Coliforms
Chemistry and MicrobiologyNORM: High resolution
Gamma Ray Spectrometry
![Page 10: Tony Smith, commercial strategy manager, peel gas & oil](https://reader031.fdocuments.us/reader031/viewer/2022030307/58e765f51a28ab4a278b643b/html5/thumbnails/10.jpg)
10Canal Perspective Water abstraction
![Page 11: Tony Smith, commercial strategy manager, peel gas & oil](https://reader031.fdocuments.us/reader031/viewer/2022030307/58e765f51a28ab4a278b643b/html5/thumbnails/11.jpg)
11Pipe road crossingSelwood pump
![Page 12: Tony Smith, commercial strategy manager, peel gas & oil](https://reader031.fdocuments.us/reader031/viewer/2022030307/58e765f51a28ab4a278b643b/html5/thumbnails/12.jpg)
123 stage filtration
![Page 13: Tony Smith, commercial strategy manager, peel gas & oil](https://reader031.fdocuments.us/reader031/viewer/2022030307/58e765f51a28ab4a278b643b/html5/thumbnails/13.jpg)
13UV unit
![Page 14: Tony Smith, commercial strategy manager, peel gas & oil](https://reader031.fdocuments.us/reader031/viewer/2022030307/58e765f51a28ab4a278b643b/html5/thumbnails/14.jpg)
14Water storage tank Water return
![Page 15: Tony Smith, commercial strategy manager, peel gas & oil](https://reader031.fdocuments.us/reader031/viewer/2022030307/58e765f51a28ab4a278b643b/html5/thumbnails/15.jpg)
15
Key Results: Chemistry
© Copyright Ground-Gas Solutions 2017
These graphs form part of the GGS DataPack®
which is a registered trademark.
They should only be relied upon and used
in the circumstances they were originally prepared
by GGS for the client. Any other use or modification
is not the responsibility of GGS.
Title:
Project:
Client:
Manchester Ship Canal Trial Continuous
Monitoring of the Holding Tank
0.000 9716.154
Peel Oil and Gas
0.000 798.863
7.175 8.848
GGS971
pH (pH)
Actual Conductivity
(µs/cm)
Minimum / Maximum Table
Parameter Minimum Maximum
Turbidity (NTU)
Water level (m) 1.946 0.000
Specific Conductivity
(µs/cm)
Salinity (PSU)
0.000
0.000 7.539
0.000 8541.685
13141.054
8.344 17.262Temperature ( ° C )
TDS (ppm)
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
0.00
100.00
200.00
300.00
400.00
500.00
600.00
700.00
800.00
900.00
To
tal D
iss
olv
ed
So
lid
s (
pp
m)
Tu
rbid
ity (N
TU
) Turbidity
Total DissolvedSolids
0
2
4
6
8
10
0
2000
4000
6000
8000
10000
12000
14000
Salin
ity (
PS
U)
Co
nd
ucti
vit
y (μ
s/cm
)
Actual Conductivity
Specific Conductivity
Salinity
0
2
4
6
8
10
12
14
16
18
20
Tem
pera
ture
( C
)
Temperature
7
7.2
7.4
7.6
7.8
8
8.2
8.4
8.6
8.8
9
01/11/16 13:40 01/11/16 19:40 02/11/16 01:40 02/11/16 07:40 02/11/16 13:40 02/11/16 19:40 03/11/16 01:40 03/11/16 07:40 03/11/16 13:40 03/11/16 19:40 04/11/16 01:40 04/11/16 07:40
pH
Date & Time
pH
0
0.5
1
1.5
2
Wate
r le
vel
(m) Water level
![Page 16: Tony Smith, commercial strategy manager, peel gas & oil](https://reader031.fdocuments.us/reader031/viewer/2022030307/58e765f51a28ab4a278b643b/html5/thumbnails/16.jpg)
16
Key Results: Lab Analysis
Polycyclic Aromatic Hydrocarbons
▪ Below Limits of detection (LOD)
▪ Pyrene detected at 0.013 µg/l
Total Petroleum Hydrocarbon (PH) and
BTEX (benzene, toluene, ethylbenzene
and ‘xylenes’)
▪ Below LOD
Chloride
▪ 600~3500 mg/l due to salinity
introduced through canal lock
pH
▪ 7.4 – 7.7
TSS and TDS
▪ No change from process
Aluminium
▪ Av 77% reduction after processing
Iron
▪ Av 64% reduction
Zinc
▪ Av 67% reduction
NORM
▪ All below LOD
![Page 17: Tony Smith, commercial strategy manager, peel gas & oil](https://reader031.fdocuments.us/reader031/viewer/2022030307/58e765f51a28ab4a278b643b/html5/thumbnails/17.jpg)
17
Key Results: Microbiology
▪ Excellent log scale reduction in bacterial
counts from filtration and uv treatment
▪ Particularly for SRBs
▪ Filtration alone reduces bacterial counts but
major effect is in combination with uv
▪ Can consider biocide reduction or removal
![Page 18: Tony Smith, commercial strategy manager, peel gas & oil](https://reader031.fdocuments.us/reader031/viewer/2022030307/58e765f51a28ab4a278b643b/html5/thumbnails/18.jpg)
18
Learnings and Conclusions
Trial positives
▪ Safety and operations
▪ Successful process for industrial water
usage
▪ Effective bacterial reduction
▪ High water quality production
▪ Excellent collaboration
▪ Water can be stored for upto 3 days
without quality deterioration
Further considerations
▪ Reduce filtration?
▪ Longer time period
▪ Longer static water storage
![Page 19: Tony Smith, commercial strategy manager, peel gas & oil](https://reader031.fdocuments.us/reader031/viewer/2022030307/58e765f51a28ab4a278b643b/html5/thumbnails/19.jpg)
19
MSC water trial successfully proved that water
from the canal can be used
for industrial purposes – including providing
water for hydraulic fracturing without the
need for expensive potable water connections or
water trucking and potentially with no
added biocides
![Page 20: Tony Smith, commercial strategy manager, peel gas & oil](https://reader031.fdocuments.us/reader031/viewer/2022030307/58e765f51a28ab4a278b643b/html5/thumbnails/20.jpg)
20
Dr Tony Smith
UK Onshore Oil & Gas: Policy, Planning and Future
Developments: Birmingham March 29th 2017