TOD Illustrated - RTD...Avenida Senior Living 229 units –Planned 2019 Oak Street Townhomes 81...
Transcript of TOD Illustrated - RTD...Avenida Senior Living 229 units –Planned 2019 Oak Street Townhomes 81...
TOD Illustrated:Transit-Oriented Development at RTD Stations
as of June 2019
The following pages depict the high density development that has occurred within a half-mile walk of rail and Flatiron Flyer stations, both shortly before and following the opening of the transit lines.
2
Overview
P. 3 Central
P. 4 L Line
P. 6 Southwest
P. 7 Central Platte Valley
P. 8 Southeast
P. 11 W Line
P. 13 CU A Line
P. 15 B Line
P. 16 G Line
P. 17 R Line
P. 18 Flatiron Flyer
P. 19 N Line
P. 20 Denver Union Station
P. 21 Summary
Central
Downtown Development
Wellington Apartments253 units – Planned 2019
Tapiz100 affordable units – 2013
Arches93 affordable units – 2014
Mariposa87 affordable units – 2014
The Zephyr77 affordable units – 2014
The Aerie94 affordable units
– 2014
DHA HQ172k SF office & retail
– 2019
IMT Alameda Station338 units – 2014
The Denizen275 units, 2k SF retail – 2015
PDG Design District354 units – Planned 2019
Alta SOBO Station187 units – Planned 2019
Broadway Junction60 affordable units – 2008
Windsor at Broadway Station419 units – 2009
1000 S. Broadway Apts260 units – 2014
The Henry403 units – 2019
Endeavor Real EstateOffice, residential, retail – TBD
D
F
H
E
C
3
Platt Park Townhomes30 townhomes – 2015
Hanover Platt Park303 units – 2018
North Lincoln Mid-Rise75 affordable units – 1996
Atlantis Apartments60 affordable units – Planned 2019
All Copy Products HQ81k SF office – Planned 2019
L Line, Part I
Uptown Square696 units – 2003
Tower on the Park168 condos
– 2004
One Lincoln Park184 units – 2007
AMLI Park Ave193 units – 2009
2020 Lawrence231 units – 2012
One City Park302 units – 2014
Point 21212 units – 2014
Renaissance Stout St78 affordable units
– 2014
Radius Uptown372 units – 2016
SkyHouse364 units – 2016
Radiant329 units – 2019
SOVA211 units – 2019
Alexan 20th St Station354 units – 2019
Renaissance Off Broadway Lofts
81 affordable units – 2001
L
4
Portofino Tower54 units – 2003
Beldame Apartments28 affordable units
– 1998
Grant Park112 condos, 3k SF retail – 2008
Renaissance Downtown Lofts
101 affordable units – 2018
Drehmoor Apartments75 affordable units
– 2007
5
L
L Line, Part II
Park Ave West122 units – 2003
Benedict Park Place396 affordable units
– 2008
Mile High United Way63k SF – 2014
The Lydian130 units, 25k SF
– 2018
Welton Park223 affordable units
– 2016
Alexan ArapahoeSquare
353 units – 2018
600 Park Ave238 units
– TBD
The Point35 affordable units, 33 condos, 13k SF – 2003
The Brownstones at King Stroud Court
26 townhomes – 2015
The Rossonian41 keys, 7k SF retail
– TBD
Downing Sq Apts50 units – 1998
Fourth Quarter36 affordable units
– 2010
29th & Welton50 condos, 13 affordable
– Planned 2020
The Wheatley82 affordable units, 14
townhomes – 2016
Blair Caldwell Library
40k SF – 2003
Cornerstone Residences
51 units– 2009
Villages at Curtis Park155 affordable units, 168 market rate units – 2001
Lofts at Downing St Station
33 condos, 8.5k SF – 1998
Posner Center25k SF– 2013
Champa Square50 units, 30 affordable
– 2003
Wise Harris Arms22 affordable units– renovated 2017
The Hooper101 units
– TBD
California Park East70 affordable units – renovated 2017
3030 Welton Hostel80 beds– TBD
Southwest
Evans Station Lofts50 affordable units – 2013
Encore Evans Station224 units – 2018
Cherokee Flats139 units, 5k SF retail – Planned 2020
Englewood Civic Center140k SF office – 2000
ArtWalk CityCenter445 units – 2001
Liv Apartments30 units – 2016
Broadway Acoma Lofts111 affordable units – 2018
Oxford Station Apartments238 units – 2016
Vita160 senior units – 2017
C
D
6
Berkshire Aspen Grove280 units – 2011
Littleton Station37 condos, 10k SF office – 2008
Nevada Place31 condos – 2011
Central Platte Valley
River MileMixed use redevelopment
Planning ongoing
Campus Village at Auraria119 units, 695 beds
– 2005
SpringHill Suites150 keys – 2012
W
E
C
7
Meow Wolf90k SF entertainment space
– Planned 2020
Southeast, Part I
University Station Apartments
60 senior affordable units – 2014
Colorado Center Tower 3220k SF office, 12k SF retail
– 2017
Millennium Colorado Station350 units – Planned 2019
Yale Station50 senior affordable units – 2011
Garden Court at Yale Station64 affordable units – 2016
Yale 25 Station112 units – 2018
The District276 units, retail – 2004
Camden Belleview Station270 units – 2009
Cielo201 units – 2009
Milehouse353 units, retail – 2014
Pearl DTC408 units – 2015
The DEN325 units, retail – 2016
Carillon Belleview163 senior units – 2018
One Belleview Station315K SF office – 2018
Denver Tech Center900 acres
25M SF of development150k jobs
Landmark271 condos/apartments,
168k SF retail – 2008
R
F
H
E
8
Monaco Row204 units – 2013
One DTC West75K SF office – 2018
Wash Park Station32 units – 2015
Louisiana StationLofts
29 condos – 2007
6900 Layton385K SF office, 7k retail
– Planned 2020
Observatory Heights70 townhomes – 2018
DTC Union392 units
– Planned 2020
Southeast, Part II
Wingate by Wyndham
86 keys – 2004
Palazzo Verdi300k SF office, 100k
SF event space – 2008
Village Center Station 234k SF office, retail – 2009
360⁰
304 units – 2014CoBank
274k SF office – 2015Granite Place
300k SF office – 2017
Village Ctr Station II324k SF office
– 2018
Panorama Corporate Ctr143k SF office – 2008
The Rail at Inverness220 units – 2008
AMLI at Inverness 308 units – 2009
Capstone at Vallagio272 units – 2013
AMLI Dry Creek256 units
– 2017
169 Inverness 120k SF office
– 2017
The Glenn 306 units – 2018
Elevation 265 units – 2014
R
F
E
9
9151 E Panorama220k SF office – 2017
Bambino Terzo250k SF office
– TBD
Vallagio North90 condos – 2008
Vallagio at Inverness277 condos – 2008
Dry Creek Crossing249 condos – 2009
The Jones District3+ million SF office &
residential – TBD
SpringHill Suites88 rooms– 2019
10
Westview431 units – 2005
Lincoln Square Lofts140 condos
– 2005
One Lincoln Station197k SF office, 10k SF
retail – 2008
Aspect230 units – 2015
Lofts at Lincoln Station101 units – 2015
Camden267 units – 2016
Arcos236 units – 2018
AMLI RidgeGate281 units – 2013
Charles Schwab800k SF office, 45k SF retail
– 2014-2019
IMT RidgeGate219 units – 2018
Lone Tree City Center and East Villages
2,200 acres, 50k jobs, 10k units – TBD
Southeast, Part III
Waterford Lone Tree400 units – 2003
Marriott Denver South279 keys – 2003
Regency at RidgeGate281 units – 2013
Hampton Inn106 keys – 2013
The Marq at RidgeGate244 units, 5k SF retail – 2013
Ovation190 units, 6k SF retail – 2015
R
F
E
W Line, Part I
West Line Village175 townhomes
– 2018
Sheridan Sta. Apts133 affordable units
– Planned 2020
Brandon Flats104 affordable units
– Planned 2020
Regatta Sloan’s374 units – 2015
Perry Row32 townhomes
– 2018
Arroyo Village130 affordable units
– 2018
Decatur Place106 affordable units
– 2014
Avalon Apts.80 affordable units
– 2014
Corky Gonzales Public Library
25,000 SF – 2015
CDOT HQ175k SF – 2018
Luxe at Mile High382 units – 2019
Stadium District Master Plan
Mixed use redevelopment
– Planning ongoing
W
11
1315 Sheridan15 units – 2011
Renaissance West End128 units – 2012
Mulroy Apartments50 affordable units
– 2008
Villas at Sloan’s Lake63 affordable units
– 2007
Julian Heights63 units
– Planned 2019
W Line, Part II
Outlook Golden Ridge172 units– 2015
Beacon 85343 units – 2017
WestLink244 units– 2015
Avenida Senior Living229 units
– Planned 2019
Oak Street Townhomes81 townhomes
– 2018
Oak Street Station291 units
– 2019
Indy Street Flats115 affordable units
– Planned 2019
Pearson Grove82 townhomes – Planned 2020
Zephyr Line95 affordable units
– 2015
Lamar Sta. Crossing138 affordable units
– 2014
West Line Flats155 units– 2017
40-West Residences60 affordable units
– 2017
Flats at Two Creeks78 affordable units
– Planned 2020
W
12
Fairfield Inn128 keys
– Planned 2019
Lamar Sta. Crossing II 65 affordable units
– TBD
Brickhouse293 units
– Planned 2021
University of Colorado A Line, Part I
Larimer Row28 townhomes – 2015
Link 3566 units, 10k SF retail – 2015
Great Divide Brewery65k SF retail – 2016
Zeppelin Station100k SF retail/office – 2018
Ride at RiNo84 units – 2018
HUB South225k SF office, 25k SF retail
– 2019
World Trade Center250k SF office, 30k SF retail,
200 keys – Planned 2020
Catalyst180k SF office – 2018
Revolution 3600130k SF office, 20k SF retail
– TBD
Camden RiNo233 units, 3,500 SF retail
– Planned 2020
Denver Rock Drill180 units, 318k SF office, 65k
retail, 175 keys – Planned 2020
A
13
Factory Flats24 condos – 2018
Dry Ice Factory20k SF office – 2009
3463 Walnut382 units, 18 affordable
– TBD
The Mission Ballroom64k SF event space
– Planned 2019
4180 Wynkoop64k SF event space
– Planned 2020
T3 RiNo250k SF office, 20k SF retail
– TBD
Walnut Street Lofts66 affordable units
– Planned 2020
1420 38th
347 units, 5k SF office, 11k SF retail – TBD
HUB North95k SF office, 10k SF retail
– Planned 2020
North WynkoopUp to 1M SF office, 500 units
– TBD
Novel RiNo475 units, 10k SF retail
– Planned 2020
35th and Blake Offices26k SF office, 5k SF retail
– Planned 2020
University of Colorado A Line, Part II
A
14
Village at Central Park Station
120 condos, 12 townhomes, 54k SF retail
– TBD
FBI Office220k SF office
– 2010
Panasonic100k SF office, expo
– 2014
Elevate at Peña Station 219 units – 2019
Peña Station Hyatt225 keys – Planned 2019
Panasonic NEXT382 acres – TBD
Central Park Station One220k SF office – Planned 2020
Renaissance at N. Colorado Station
103 affordable units – 2016
Park Hill Station Apartments
156 affordable units – 2016
Park Hill 4000192 units – 2014
Park Hill Town Center Condos28 condos – 2015
B Line
Alto Apts70 affordable units – 2018
Zia312 units, 119 condos, 7.5k SF retail – Planned 2019
Denver Post Redevelopment3k units, 661k SF office, 85k SF retail – TBD
B
G
15
G Line
Arvada Station Apartments378 units – 2013
Gateway at Arvada Ridge296 units – 2019
Water Tower Flats327 units – 2007
Park Place153 units – 2015
Solana352 units – 2017
Hilton Garden Inn136 keys – 2017
Olde Town Residences252 units – Planned 2020
Trammell Crow Phase IIRetail – TBD
G
16
Hance Ranch280 units – Planned 2020
Remington Home Townhomes75 units – TBD
Toll Brothers Townhomes200 units – TBD
R Line
21 Fitzsimons 600 units – 2008
Comfort Suites90 keys – 2016
Forum Fitzsimons409 units, 29k SF retail
– 2018
Holiday Inn Express & Suites126 keys – 2019
Alta Fitzsimons294 units
– Planned 2019
Legacy at Fitzsimons Village
364 units – Planned 2019
Citadel on Colfax100 units, 150 condos, 100k
SF retail – Planned 2019
Fitzsimons South288 units – 2008
Parkside at City Center 250 units, 25k SF retail
– Planned 2019
Parq at Iliff424 units
– 2018
Spur at Iliff Station316 units, 12k SF retail
– 2019
The Point at Nine Mile Station500+ units, 100k SF retail, 250k SF
commercial – TBD
Village at Hampden Town Ctr.
132 units – 2005
R
H
17
Courtyard by Marriott139 keys – 2019
The Savoy at Dayton Station372 units – 2012
Town CenterTerrace
169 units – 2005
SpringHill Suites153 keys– 2011
Hyatt Regency249 keys – 2016
Solana Stapleton280 units
– TBD
Fitzsimons 100151k SF office, 15k SF retail
– 2011
Fairfield Inn and Suites
82 keys – 2010
Extended Stay America
82 keys – 2010
Fitzsimons Innovation Village
Office & residential – TBD
Flatiron Flyer
Forum Fitzsimons409 units, 29k SF retail – 2018
Ascent Westminster255 affordable units, 22k SF retail – Planned 2019
Eaton St Apts118 affordable units, 22K SF retail – Planned 2019
Alamo Draft House40k SF retail
– Planned 2019
Origin Hotel125 keys, 15k SF retail
– Planned 2020
GRID / Solera80k SF office, 30k SF retail
– Planned 2020
Sherman Apts226 units, 34k SF
Retail – Planned 2020
AMLI Arista524 units – 2008
1st Bank Center60k SF expo – 2010
Arista Uptown272 units – 2013
Harvest Station297 units – 2014
8000 Uptown360 units – 2015
Atria Arista240 units – 2016
Two Nine North238 units – 2010
3060 Pearl Condos113 condos, 3k SF retail – 2012
Griffis 3100 Pearl319 units – 2014
Depot Square71 affordable units – 2015
Boulder Commons100k SF office
– 2017
Google 200k SF office
– 2018
30 + Pearl Phase I120 affordable units
– Planned 2021Sync36
392 units – 2018
FF
18
Hyatt Place Boulder150 keys – 2015
Spark200 units, 140k SF office,
40k SF retail – TBD
Nickel Flats100k SF office
– 2017
The Steelyards90 units, 140k SF – 2004
Venue at Arista 124 units – 2009
aLoft Hotel at Arista139 keys – 2010
Flatiron Marketplace Phase I
300 units – TBD
30 + Pearl Phase IIOffice and residential
– TBD
N Line
N
19
South Platte Crossing80k SF office – 2019
70 affordable units – TBD
48th and RaceAffordable housing
– TBD
DUS Real Estate Development1900 16th STREET
(2009)17 Story Office,
Retail & Living Space
DAVITA WORLD HEADQUARTERS
(2012)14 Story Office
N. WING BUILDING(2013)
5 Story Office, Retail, Restaurants & Parking
S. WING BUILDINGONE UNION STATION
(2014)5 Story Office, Retail
CADENCE APARTMENTS(2013)
13 Story, 219 Apartments, Retail & Parking
DUS HISTORIC BUILDING(2014)
112 Room Crawford Hotel & Retail
ALTA CITY HOUSE(2015)
5 Story, 281 Apartments
PLATFORM(2015)
21 Story, 287 Apartments
1601 WEWATTA(2015)
10 Story Office Building, Retail, Parking
ALARA(2015)
313 Apartments, King Soopers Grocer
TRIANGLE BUILDING(2015)
11 Story Office, Parking, Retail
UNION TOWER WEST(2017)
203 keys, 100K Office, 10K Retail
ASHLEY UNION STATION
(2017)4 Story, 107 Apartments
(Affordable)
HOTEL BORN & 1881 OFFICE
(2017)200 keys, 5 Story
Office & Retail
UNION SQUARE/PIVOT DENVER
(2017)579 Apartments,
Whole Foods Market
16 CHESTNUT(2018)
19 Story Office, Parking, Retail
HILTON GARDEN INN
(2019) 233 keys
THE GRAND1709 CHESTNUT PL.
(2018)12 & 24 stories, 508
Apartments, Retail, Parking
COLORADAN(2019)
334 Condos, 28K Retail
THE PULLMAN(2019)
14 Stories, 3K Retail, 164 Apartments
9 10
11 12
1 2 8543 6 7
19 2014 15 16 17 1813
• 2,800 residential units • 1.9 million SF office • 250,000 SF retail• 750 hotel rooms
COMPLETED
UNDER CONSTRUCTION
1
2
8
16
9
11
4 3
510
6
15
7
12
14
1718
19
20
13
DUS MET
District
DDA District
TOD Summary
RTD’s transit investment has had a significant impact on development in the region.
Transit-oriented development within a half-mile walk of a high frequency station*:• 46,000 Residential Units• 10,700,000 Square Feet Office• 1,500,000 Square Feet Retail• 3,700 Hotel Rooms
*Denver and Boulder downtowns excluded
21
Lines Resi Units Office S.F. Retail S.F. Hotel KeysB Line 3,504 661,000 93,486 -
Existing TOD 70
Planned TOD 3,434 661,000 93,486 -
Central 3,170 253,000 23,000 -
Existing TOD 2,316 172,000 18,000 -
Planned TOD 854 81,000 5,000 -
Central Platte Valley 119 - - 150
Existing TOD 119 - - 150
Planned TOD - - - -
CU A Line 3,107 2,129,800 353,800 600
Existing TOD 900 775,000 100,000 -
Planned TOD 2,207 1,354,800 253,800 600
Denver Union Station 2,792 1,885,994 257,593 748
Existing TOD 2,628 1,885,994 254,675 748
Planned TOD 164 2,918
Flatiron Flyer 4,176 610,000 218,700 414
Existing TOD 2,957 440,000 15,700 289
Planned TOD 1,219 170,000 203,000 125
G Line 2,313 - - 136
Existing TOD 1,506 - - 136
Planned TOD 807 - - -
L Line 6,850 204,192 107,300 41 Existing TOD 6,461 166,192 107,300 - Planned TOD 389 38,000 - 41
N Line 70 80,000 - -
Existing TOD - - - -
Planned TOD 70 80,000 - -
R Line 4,614 401,700 198,500 976
Existing TOD 2,710 151,700 73,500 837
Planned TOD 1,904 250,000 125,000 139
Southeast 9,450 4,166,579 302,858 559
Existing TOD 8,708 2,730,587 250,950 559
Planned TOD 742 1,435,992 51,908 -
Southwest 1,738 155,000 - -
Existing TOD 1,599 150,000 - -
Planned TOD 139 5,000 - -
W Line 4,258 175,000 - 128
Existing TOD 3,096 175,000 - 128
Planned TOD 1,162 - - -
Grand Total 46,161 10,722,265 1,555,237 3,752
Existing TOD 33,070 6,646,473 820,125 2,847
Planned TOD 13,091 4,075,792 735,112 905
22
RTD Rail and BRT Opening Years
2006
2016
2016
2016
2019
2020
2013
2000
2002
1994
TBD
2019
• 1994 – Central
• 2000 – Southwest
• 2002 – Central Platte Valley
• 2006 – Southeast
• 2013 – W Line
• 2016 – U of C A, FF, B, R Lines
• 2019 – SERE, G Line
• 2020 – N Line
• TBD – B Line Completion