FIELD CHECK LIST SUPERVISION COMMISIONING E-HOUSE

GBC PROJECTProject Name : E-HOUSE GBC PROJECTContract No : Scope of supply : Customer : PT.FREEPORT INDONESIAUpdate :

No

1

2

3

4

Page 2: To Do Check List at Site Activity GBC Project

5

Page 3: To Do Check List at Site Activity GBC Project
Page 4: To Do Check List at Site Activity GBC Project

6

7

Page 5: To Do Check List at Site Activity GBC Project

7

9

Page 6: To Do Check List at Site Activity GBC Project

FIELD CHECK LIST SUPERVISION COMMISIONING E-HOUSE

GBC PROJECTProject Name : E-HOUSE GBC PROJECTContract No : Scope of supply : Customer : PT.FREEPORT INDONESIAUpdate :

Jobs Description

Report- Take Picture- Check If Okay- Enter Note if deficient- Enter N/A if not Applicable

E- House Building & Utility PO231-901- Inspect physical and mechanical condition of e-house, - Make sure e-house has been installed on pedestal properly- Inspect e-house building has been connected to grounding grid customer- Make sure e-house has been joined between section properly- Make sure cover coupling has been installed- Make sure the canopy over a single door has been installed- Make sure the canopy over a double door has been installed- Make sure Door Closer at the Single door has been installed - Make sure Door Closer at the Double door has been installed Utillity

- Make sure outdoor lighting has been installed- Make sure indoor power outlet has been operate- Create report

Punch List of Utility Installation

Installation HVAC unit 1, HVAC unit 2 and HVAC unit 3 PO231-801- Compare equipment nameplate data with drawings and spesifications- Inspect physical and mechanical condition - Inspect the unit is clean- Make sure HVAC Unit is properly mounted- Make sure proper torque is applied to the bolt- Make sure prefillter has been installed inside HVAC unit- Make sure supply grill has been installed- Make sure retrun grill has been installedElectrical Installation HVAC Unit - Verify termination cable control from HVAC controller to HVAC unit has been connected properly- Inspect exposed section of cable for physical damage and correct connection in accordance with schematic drawing.- Make sure proper torque is applied to the bolt cable connection- Inspect for correct identification and phase squence - Make sure wiring Y connected to Y terminal LV control HVAC unit - Verify control wiring HVAC unit accordance with schematic- Perform function test accordance checklist document FAT- Create report

F&G System PO231-801- Compare equipment nameplate data with drawings and spesifications- Inspect physical condition of F&G equipment- Inspect that the unit is clean- Make sure FACP Unit is properly mounted- Inspect exposed section of cable for physical damage and correct connection in accordance schematic drawing ( Refer to Field modification wiring at DMLZ project ) Drawing number- Make sure proper torque is applied to the bolt cable connection- Verify control wiring FACP unit accordance with schematic- Verify F&G setting unit accordance with FAT ducument section F&G Setting - Make sure Cylinder FM200 + Support has been installed - Make sure pressure switch has been installed - Make sure Flexible Discharge Hose has been installed propely- Make sure Electric Control Head c/w Lever Operated Control Head has been installed on the Cylinder FM200- Verify Electrical control head has been connected to FACP accordance with schematic- Make sure Battery 2 x 12 VDC, 12AH has been installed - Verify power supply have voltage 120 VAC,60Hz from proper feeder- Make sure fire Ion smoke and photo electric detector has been installed- Make sure fire gas discharge sign and evacuation sign has been installed - Inspect Pipe F&G has been installed properly - Perform pressure test for Pipe F&G

F&G Function TestPerform function test F&G see guidance checklist function test F&G ( Document FAT )- Create report

Punch List of F&G Installation- Installation support pipe F&G building 1

MV Switchgear 13,8 kV Feeder J01 Incoming Feeder 1. Visual and Mechanical Inspection1. Compare equipment nameplate data with drawings and specifications.2. Inspect physical and mechanical condition3. Inspect ground connections to switchgear ground bus.4. Verify the unit is clean ( CB Copartement, Busbar Compartement and Cable compartement )5. Perform mechanical operator tests in accordance with Site Acceptance Test MV Switchgear6. Verify operation and squencing of interlocking system

8. Inspect insulating assemblies for evidence of physical damage or contaminated surfaces.9. Verify that each fuseholder has adequate support and contact integrity.10. Verify that fuse sizes and types are in accordance with drawings, short-circuit studies, and coordination study.

12. Inspect operation of the drawout mechanism including mechanical interlocks, position indicators, and safety features13. Confirm correct operation and squencing of electrical and mechanical interlock system14. Inspect insulators for evidence of physical damage of contaminated surfaces.15. Verify corret barrier and shutter installation and operation16. Inspect mechanical indicating devices for correct operation17. Perform visual mechanical inspection of instrument transformers section 7.1018. Inspect control power transformers 1. Inspect for physical damage, cracked insulation, broken lead, tightness of connections, defective wiring and overall general condition 2. Verify the primary and secondary fuse or circuit breaker rating match drawings. 3. Verify correct functioning of drawout disconnecting VT Truck

2. Electrical Tests1. Perform electrical test on instrument transformer in accordance with section 7.102. Perform ground resistance test in accordance with section 7.133. Perform resistance measurement through bolted electrical connection with a low resistance ohmmeter in accordance with section 7.1.14. Perform insulation resistance test on each bus section phase to phase and phase to ground for one minute in accordance with tabel 100.1

DrawingReference

- Make sure interior lighting, outdoor lighting and control lighting in good condition and operate properly

7. Inspect bolted electrical connections for high resistance using of the following methode 1. Use of low resistance ohm meter 2. Verify tightness of accessible bolted electrical connections by calibrated toque-wrench methode in accordance with manufacture publish data

11. Lubrication requirements 1. Verify appropriate lubrication on moving current carrying parts 2. Verify appropriate lubrication on moving and sliding surface

5. Perform an overpotensial test each bus section, each phase to ground with phases not under test grounded, in accordance with manufacturer publish data. If manufacturer has no recommendation for this test, it shall be in accordance with tabel 100.2 The test voltage shall be applied for one minute

6. Perform current injection test on the entire current in each section of switchgear. 1. Perform current test by secondary injection with magnitude sich that a minimum current of 1.0 ampere flow in the secondary circuit. Verify correct magnitude of current at each device in the circuit. 2. Perform current test by primary injection with magnitude such that a minimum of 1.0 ampere flows in the secondary circuit. Verify correct magnitude of current at each device in the circuit.

Page 7: To Do Check List at Site Activity GBC Project

7. Determine accuracy of all meters and calibrate watthour meters .Verify multipliers8. Perform phasing check on double ended or dual source switchgear to insure correct bus phasing from each source

13. Verify operation of cubicle switchgear space heaters.

Feeder J02 BBVT 1. Visual and Mechanical Inspection1. Compare equipment nameplate data with drawings and specifications.2. Inspect physical and mechanical condition3. Inspect ground connections to switchgear ground bus.4. Verify the unit is clean ( CB Copartement, Busbar Compartement and Cable compartement )5. Perform mechanical operator tests in accordance with Site Acceptance Test MV Switchgear6. Verify operation and squencing of interlocking system

8. Inspect insulating assemblies for evidence of physical damage or contaminated surfaces.9. Verify that each fuseholder has adequate support and contact integrity.10. Verify that fuse sizes and types are in accordance with drawings, short-circuit studies, and coordination study.

12. Inspect operation of the drawout mechanism including mechanical interlocks, position indicators, and safety features13. Confirm correct operation and squencing of electrical and mechanical interlock system14. Inspect insulators for evidence of physical damage of contaminated surfaces.15. Verify corret barrier and shutter installation and operation16. Inspect mechanical indicating devices for correct operation17. Perform visual mechanical inspection of instrument transformers section 7.1018. Inspect control power transformers 1. Inspect for physical damage, cracked insulation, broken lead, tightness of connections, defective wiring and overall general condition 2. Verify the primary and secondary fuse or circuit breaker rating match drawings. 3. Verify correct functioning of drawout disconnecting VT Truck

2. Electrical Tests1. Perform electrical test on instrument transformer in accordance with section 7.102. Perform ground resistance test in accordance with section 7.133. Perform resistance measurement through bolted electrical connection with a low resistance ohmmeter in accordance with section 7.1.14. Perform insulation resistance test on each bus section phase to phase and phase to ground for one minute in accordance with tabel 100.1

7. Determine accuracy of all meters and calibrate watthour meters .Verify multipliers8. Perform phasing check on double ended or dual source switchgear to insure correct bus phasing from each source

13. Verify operation of cubicle switchgear space heaters.

Feeder J03 Outgoing to TR 1. Visual and Mechanical Inspection1. Compare equipment nameplate data with drawings and specifications.2. Inspect physical and mechanical condition3. Inspect ground connections to switchgear ground bus.4. Verify the unit is clean ( CB Copartement, Busbar Compartement and Cable compartement )5. Perform mechanical operator tests in accordance with Site Acceptance Test MV Switchgear6. Verify operation and squencing of interlocking system

8. Inspect insulating assemblies for evidence of physical damage or contaminated surfaces.9. Verify that each fuseholder has adequate support and contact integrity.10. Verify that fuse sizes and types are in accordance with drawings, short-circuit studies, and coordination study.

12. Inspect operation of the drawout mechanism including mechanical interlocks, position indicators, and safety features13. Confirm correct operation and squencing of electrical and mechanical interlock system14. Inspect insulators for evidence of physical damage of contaminated surfaces.15. Verify corret barrier and shutter installation and operation16. Inspect mechanical indicating devices for correct operation17. Perform visual mechanical inspection of instrument transformers section 7.1018. Inspect control power transformers 1. Inspect for physical damage, cracked insulation, broken lead, tightness of connections, defective wiring and overall general condition 2. Verify the primary and secondary fuse or circuit breaker rating match drawings. 3. Verify correct functioning of drawout disconnecting VT Truck

2. Electrical Tests1. Perform electrical test on instrument transformer in accordance with section 7.102. Perform ground resistance test in accordance with section 7.133. Perform resistance measurement through bolted electrical connection with a low resistance ohmmeter in accordance with section 7.1.14. Perform insulation resistance test on each bus section phase to phase and phase to ground for one minute in accordance with tabel 100.1

7. Determine accuracy of all meters and calibrate watthour meters .Verify multipliers8. Perform phasing check on double ended or dual source switchgear to insure correct bus phasing from each source

13. Verify operation of cubicle switchgear space heaters.

Feeder J04 Outgoing to CV 1. Visual and Mechanical Inspection1. Compare equipment nameplate data with drawings and specifications.2. Inspect physical and mechanical condition3. Inspect ground connections to switchgear ground bus.4. Verify the unit is clean ( CB Copartement, Busbar Compartement and Cable compartement )5. Perform mechanical operator tests in accordance with Site Acceptance Test MV Switchgear6. Verify operation and squencing of interlocking system

8. Inspect insulating assemblies for evidence of physical damage or contaminated surfaces.9. Verify that each fuseholder has adequate support and contact integrity.10. Verify that fuse sizes and types are in accordance with drawings, short-circuit studies, and coordination study.

12. Inspect operation of the drawout mechanism including mechanical interlocks, position indicators, and safety features13. Confirm correct operation and squencing of electrical and mechanical interlock system14. Inspect insulators for evidence of physical damage of contaminated surfaces.15. Verify corret barrier and shutter installation and operation16. Inspect mechanical indicating devices for correct operation17. Perform visual mechanical inspection of instrument transformers section 7.1018. Inspect control power transformers 1. Inspect for physical damage, cracked insulation, broken lead, tightness of connections, defective wiring and overall general condition 2. Verify the primary and secondary fuse or circuit breaker rating match drawings. 3. Verify correct functioning of drawout disconnecting VT Truck

2. Electrical Tests1. Perform electrical test on instrument transformer in accordance with section 7.102. Perform ground resistance test in accordance with section 7.133. Perform resistance measurement through bolted electrical connection with a low resistance ohmmeter in accordance with section 7.1.14. Perform insulation resistance test on each bus section phase to phase and phase to ground for one minute in accordance with tabel 100.1

7. Determine accuracy of all meters and calibrate watthour meters .Verify multipliers8. Perform phasing check on double ended or dual source switchgear to insure correct bus phasing from each source

13. Verify operation of cubicle switchgear space heaters.

MV Switchgear 4,16 kV Feeder M05 Incoming 1. Visual and Mechanical Inspection1. Compare equipment nameplate data with drawings and specifications.2. Inspect physical and mechanical condition3. Inspect ground connections to switchgear ground bus.4. Verify the unit is clean ( CB Copartement, Busbar Compartement and Cable compartement )

9. Control power transformer 1. Perform insulation-resistance tests. Perform measurements from winding to winding and each winding to ground. Test voltage shall be in accordance table 100.1 unless otherwise specified by manufacturer. 2. Perform secondary wiring integrity test. Disconnect transformer at secondary terminals and connect secondary wiring to a rated secondary voltage source. Verify correct potential at all devices. 3. Verify correct secondary voltage by energizing primary winding with system voltage.Measure secondary voltage with the secondary wiring disconnected. 4. Verify correct function of control transfer relays located in switchgear with multiple control power sources.

12. Voltage Transformer 1. Perform insulation resistance tests. Perform measurements from winding to winding and each winding to ground. Test voltages shall be in accordance with tabel 100.1 2. Perform secondary wiring integrity test. Verify correct potential at all devices. 3. Verify secondary voltages by energizing primary winding with system voltage.

7. Inspect bolted electrical connections for high resistance using of the following methode 1. Use of low resistance ohm meter 2. Verify tightness of accessible bolted electrical connections by calibrated toque-wrench methode in accordance with manufacture publish data

11. Lubrication requirements 1. Verify appropriate lubrication on moving current carrying parts 2. Verify appropriate lubrication on moving and sliding surface

5. Perform an overpotensial test each bus section, each phase to ground with phases not under test grounded, in accordance with manufacturer publish data. If manufacturer has no recommendation for this test, it shall be in accordance with tabel 100.2 The test voltage shall be applied for one minute

6. Perform current injection test on the entire current in each section of switchgear. 1. Perform current test by secondary injection with magnitude sich that a minimum current of 1.0 ampere flow in the secondary circuit. Verify correct magnitude of current at each device in the circuit. 2. Perform current test by primary injection with magnitude such that a minimum of 1.0 ampere flows in the secondary circuit. Verify correct magnitude of current at each device in the circuit.

9. Control power transformer 1. Perform insulation-resistance tests. Perform measurements from winding to winding and each winding to ground. Test voltage shall be in accordance table 100.1 unless otherwise specified by manufacturer. 2. Perform secondary wiring integrity test. Disconnect transformer at secondary terminals and connect secondary wiring to a rated secondary voltage source. Verify correct potential at all devices. 3. Verify correct secondary voltage by energizing primary winding with system voltage.Measure secondary voltage with the secondary wiring disconnected. 4. Verify correct function of control transfer relays located in switchgear with multiple control power sources.

12. Voltage Transformer 1. Perform insulation resistance tests. Perform measurements from winding to winding and each winding to ground. Test voltages shall be in accordance with tabel 100.1 2. Perform secondary wiring integrity test. Verify correct potential at all devices. 3. Verify secondary voltages by energizing primary winding with system voltage.

7. Inspect bolted electrical connections for high resistance using of the following methode 1. Use of low resistance ohm meter 2. Verify tightness of accessible bolted electrical connections by calibrated toque-wrench methode in accordance with manufacture publish data

11. Lubrication requirements 1. Verify appropriate lubrication on moving current carrying parts 2. Verify appropriate lubrication on moving and sliding surface

5. Perform an overpotensial test each bus section, each phase to ground with phases not under test grounded, in accordance with manufacturer publish data. If manufacturer has no recommendation for this test, it shall be in accordance with tabel 100.2 The test voltage shall be applied for one minute

6. Perform current injection test on the entire current in each section of switchgear. 1. Perform current test by secondary injection with magnitude sich that a minimum current of 1.0 ampere flow in the secondary circuit. Verify correct magnitude of current at each device in the circuit. 2. Perform current test by primary injection with magnitude such that a minimum of 1.0 ampere flows in the secondary circuit. Verify correct magnitude of current at each device in the circuit.

9. Control power transformer 1. Perform insulation-resistance tests. Perform measurements from winding to winding and each winding to ground. Test voltage shall be in accordance table 100.1 unless otherwise specified by manufacturer. 2. Perform secondary wiring integrity test. Disconnect transformer at secondary terminals and connect secondary wiring to a rated secondary voltage source. Verify correct potential at all devices. 3. Verify correct secondary voltage by energizing primary winding with system voltage.Measure secondary voltage with the secondary wiring disconnected. 4. Verify correct function of control transfer relays located in switchgear with multiple control power sources.

12. Voltage Transformer 1. Perform insulation resistance tests. Perform measurements from winding to winding and each winding to ground. Test voltages shall be in accordance with tabel 100.1 2. Perform secondary wiring integrity test. Verify correct potential at all devices. 3. Verify secondary voltages by energizing primary winding with system voltage.

7. Inspect bolted electrical connections for high resistance using of the following methode 1. Use of low resistance ohm meter 2. Verify tightness of accessible bolted electrical connections by calibrated toque-wrench methode in accordance with manufacture publish data

11. Lubrication requirements 1. Verify appropriate lubrication on moving current carrying parts 2. Verify appropriate lubrication on moving and sliding surface

5. Perform an overpotensial test each bus section, each phase to ground with phases not under test grounded, in accordance with manufacturer publish data. If manufacturer has no recommendation for this test, it shall be in accordance with tabel 100.2 The test voltage shall be applied for one minute

6. Perform current injection test on the entire current in each section of switchgear. 1. Perform current test by secondary injection with magnitude sich that a minimum current of 1.0 ampere flow in the secondary circuit. Verify correct magnitude of current at each device in the circuit. 2. Perform current test by primary injection with magnitude such that a minimum of 1.0 ampere flows in the secondary circuit. Verify correct magnitude of current at each device in the circuit.

9. Control power transformer 1. Perform insulation-resistance tests. Perform measurements from winding to winding and each winding to ground. Test voltage shall be in accordance table 100.1 unless otherwise specified by manufacturer. 2. Perform secondary wiring integrity test. Disconnect transformer at secondary terminals and connect secondary wiring to a rated secondary voltage source. Verify correct potential at all devices. 3. Verify correct secondary voltage by energizing primary winding with system voltage.Measure secondary voltage with the secondary wiring disconnected. 4. Verify correct function of control transfer relays located in switchgear with multiple control power sources.

12. Voltage Transformer 1. Perform insulation resistance tests. Perform measurements from winding to winding and each winding to ground. Test voltages shall be in accordance with tabel 100.1 2. Perform secondary wiring integrity test. Verify correct potential at all devices. 3. Verify secondary voltages by energizing primary winding with system voltage.

Page 8: To Do Check List at Site Activity GBC Project

5. Perform mechanical operator tests in accordance with Site Acceptance Test MV Switchgear6. Verify operation and squencing of interlocking system

8. Inspect insulating assemblies for evidence of physical damage or contaminated surfaces.9. Verify that each fuseholder has adequate support and contact integrity.10. Verify that fuse sizes and types are in accordance with drawings, short-circuit studies, and coordination study.

12. Inspect operation of the drawout mechanism including mechanical interlocks, position indicators, and safety features13. Confirm correct operation and squencing of electrical and mechanical interlock system14. Inspect insulators for evidence of physical damage of contaminated surfaces.15. Verify corret barrier and shutter installation and operation16. Inspect mechanical indicating devices for correct operation17. Perform visual mechanical inspection of instrument transformers section 7.1018. Inspect control power transformers 1. Inspect for physical damage, cracked insulation, broken lead, tightness of connections, defective wiring and overall general condition 2. Verify the primary and secondary fuse or circuit breaker rating match drawings. 3. Verify correct functioning of drawout disconnecting VT Truck

2. Electrical Tests1. Perform electrical test on instrument transformer in accordance with section 7.102. Perform ground resistance test in accordance with section 7.133. Perform resistance measurement through bolted electrical connection with a low resistance ohmmeter in accordance with section 7.1.14. Perform insulation resistance test on each bus section phase to phase and phase to ground for one minute in accordance with tabel 100.1

7. Determine accuracy of all meters and calibrate watthour meters .Verify multipliers8. Perform phasing check on double ended or dual source switchgear to insure correct bus phasing from each source

13. Verify operation of cubicle switchgear space heaters.

7. Inspect bolted electrical connections for high resistance using of the following methode 1. Use of low resistance ohm meter 2. Verify tightness of accessible bolted electrical connections by calibrated toque-wrench methode in accordance with manufacture publish data

11. Lubrication requirements 1. Verify appropriate lubrication on moving current carrying parts 2. Verify appropriate lubrication on moving and sliding surface

5. Perform an overpotensial test each bus section, each phase to ground with phases not under test grounded, in accordance with manufacturer publish data. If manufacturer has no recommendation for this test, it shall be in accordance with tabel 100.2 The test voltage shall be applied for one minute

6. Perform current injection test on the entire current in each section of switchgear. 1. Perform current test by secondary injection with magnitude sich that a minimum current of 1.0 ampere flow in the secondary circuit. Verify correct magnitude of current at each device in the circuit. 2. Perform current test by primary injection with magnitude such that a minimum of 1.0 ampere flows in the secondary circuit. Verify correct magnitude of current at each device in the circuit.

9. Control power transformer 1. Perform insulation-resistance tests. Perform measurements from winding to winding and each winding to ground. Test voltage shall be in accordance table 100.1 unless otherwise specified by manufacturer. 2. Perform secondary wiring integrity test. Disconnect transformer at secondary terminals and connect secondary wiring to a rated secondary voltage source. Verify correct potential at all devices. 3. Verify correct secondary voltage by energizing primary winding with system voltage.Measure secondary voltage with the secondary wiring disconnected. 4. Verify correct function of control transfer relays located in switchgear with multiple control power sources.

12. Voltage Transformer 1. Perform insulation resistance tests. Perform measurements from winding to winding and each winding to ground. Test voltages shall be in accordance with tabel 100.1 2. Perform secondary wiring integrity test. Verify correct potential at all devices. 3. Verify secondary voltages by energizing primary winding with system voltage.

Page 9: To Do Check List at Site Activity GBC Project

Motor Feeder M04 1. Visual and Mechanical Inspection 1. Compare equipment nameplate data with drawings and specifications 2. Inspect physical and mechanical condition 3. Inspect anchorage, alignment, and grounding 4. Verify the unit is clean

6. Test all electrical and mechanical interlock systems for correct operation and sequencing 7. Verify correct barrier and shutter installation and operation 8. Exercise all active components nad confirm correct operation of all indicating devices

10. Verify overload protection rating is correct for its application. Set adjustable or programmable devices according to the protective device coordiantion study

2. Electrical Tests 1. Perform resistance measurements through bolted connections with a low resistance ohmmeter, if applicable. 2. Perform insulation resistance tests on contactors, phase to ground, phase to phase, and across the open contacts for one minute in accordance with table 100.1 3. Perform system function test 4. Test control power transformer 5. Perform overpotential test in accordance with manufacturer's publish data. If manufacturer has no recommendation for this test, it shall be in accordance with table 100.9

7. Perform contact resistance tests 8. Measure blowout coil circuit resistance 9. Measure resistance of power fuse 10. Energize contactor using an auxiliary source. Adjust armature to minimize operating vibration where applicable 11. Test motor protection devices in accordance with manufacturer's published data. In the absence of manufacturer's data. 12. Test starting transformers, if applicable. 13. Verify operation of cubicle space heater.

Motor Feeder M031. Visual and Mechanical Inspection 1. Compare equipment nameplate data with drawings and specifications 2. Inspect physical and mechanical condition 3. Inspect anchorage, alignment, and grounding 4. Verify the unit is clean

6. Test all electrical and mechanical interlock systems for correct operation and sequencing 7. Verify correct barrier and shutter installation and operation 8. Exercise all active components nad confirm correct operation of all indicating devices

10. Verify overload protection rating is correct for its application. Set adjustable or programmable devices according to the protective device coordiantion study

2. Electrical Tests 1. Perform resistance measurements through bolted connections with a low resistance ohmmeter, if applicable. 2. Perform insulation resistance tests on contactors, phase to ground, phase to phase, and across the open contacts for one minute in accordance with table 100.1 3. Perform system function test 4. Test control power transformer 5. Perform overpotential test in accordance with manufacturer's publish data. If manufacturer has no recommendation for this test, it shall be in accordance with table 100.9

7. Perform contact resistance tests 8. Measure blowout coil circuit resistance 9. Measure resistance of power fuse 10. Energize contactor using an auxiliary source. Adjust armature to minimize operating vibration where applicable 11. Test motor protection devices in accordance with manufacturer's published data. In the absence of manufacturer's data. 12. Test starting transformers, if applicable. 13. Verify operation of cubicle space heater.

Motor Feeder M021. Visual and Mechanical Inspection 1. Compare equipment nameplate data with drawings and specifications 2. Inspect physical and mechanical condition 3. Inspect anchorage, alignment, and grounding 4. Verify the unit is clean

6. Test all electrical and mechanical interlock systems for correct operation and sequencing 7. Verify correct barrier and shutter installation and operation 8. Exercise all active components nad confirm correct operation of all indicating devices

10. Verify overload protection rating is correct for its application. Set adjustable or programmable devices according to the protective device coordiantion study

2. Electrical Tests 1. Perform resistance measurements through bolted connections with a low resistance ohmmeter, if applicable. 2. Perform insulation resistance tests on contactors, phase to ground, phase to phase, and across the open contacts for one minute in accordance with table 100.1 3. Perform system function test 4. Test control power transformer 5. Perform overpotential test in accordance with manufacturer's publish data. If manufacturer has no recommendation for this test, it shall be in accordance with table 100.9

7. Perform contact resistance tests 8. Measure blowout coil circuit resistance 9. Measure resistance of power fuse 10. Energize contactor using an auxiliary source. Adjust armature to minimize operating vibration where applicable 11. Test motor protection devices in accordance with manufacturer's published data. In the absence of manufacturer's data. 12. Test starting transformers, if applicable. 13. Verify operation of cubicle space heater.

Motor Feeder M011. Visual and Mechanical Inspection 1. Compare equipment nameplate data with drawings and specifications 2. Inspect physical and mechanical condition 3. Inspect anchorage, alignment, and grounding 4. Verify the unit is clean

6. Test all electrical and mechanical interlock systems for correct operation and sequencing 7. Verify correct barrier and shutter installation and operation 8. Exercise all active components nad confirm correct operation of all indicating devices

10. Verify overload protection rating is correct for its application. Set adjustable or programmable devices according to the protective device coordiantion study

2. Electrical Tests 1. Perform resistance measurements through bolted connections with a low resistance ohmmeter, if applicable. 2. Perform insulation resistance tests on contactors, phase to ground, phase to phase, and across the open contacts for one minute in accordance with table 100.1 3. Perform system function test 4. Test control power transformer 5. Perform overpotential test in accordance with manufacturer's publish data. If manufacturer has no recommendation for this test, it shall be in accordance with table 100.9

7. Perform contact resistance tests 8. Measure blowout coil circuit resistance 9. Measure resistance of power fuse 10. Energize contactor using an auxiliary source. Adjust armature to minimize operating vibration where applicable 11. Test motor protection devices in accordance with manufacturer's published data. In the absence of manufacturer's data. 12. Test starting transformers, if applicable. 13. Verify operation of cubicle space heater.

Battery1. Visual and Mechanical Inspection 1. Verify ventilation of battery room or enclosure 2. Verify existence of suitable eye wash equipment 3. Compare equipment nameplate data with drawings and specifications 4. Inspect physical and mechanical condition 5. Inspect anchorage, alignment, and grounding 6. Verify adequacy of battery support rack or cabinets, mounting, anchorage, and clearances 7. Verify the units are clean. 8. Verify the application of an oxide inhibitor on battery terminal connections.

2. Electrical Test 1. Perform resistance measurement through all bolted connections with a low resistance ohmmeter 2. Measure negative post temperature 3. Measure charger float and equalizing voltage level 4. Verify all charger function and alarms 5. Measure each monoblock/ cell voltage and total battery voltage with charger energized and in float mode of operation 6. Measure intercell connection resistances 7. Perform internal ohmic measurements tests 8. Perform a laod test in accordance with manufacturer's specifications or ANSI/IEEE 1188 ( Options )

Direct Current systems , Chargers1. Visual and Mechanical Inspection 1. Compare equipment nameplate data with drawings and specifications 2. Inspect for physical and mechanical condition 3. Inspect anchorage, alignment, and grounding 4. Verify the unit is clean

6. Inspect filter and tank capacitors 7. Verify operation of cooling fans. Clean filter in provided2. Electrical test 1. Perform resistance measurements through all bolted connections with a low resistance ohmmeter 2. Verify float voltage, equalize voltage, and high voltage shutdown settings 3. Verify current limit 4. Verify correct load sharing ( parallel chargers ) if applicable 5. Verify calibration of meters 6. Verify operation of alarms

5. Inspect bolted electrical connections for high resistance using of the following methode 1. Use of low resistance ohm meter 2. Verify tightness of accessible bolted electrical connections by calibrated toque-wrench methode in accordance with manufacture publish data or table 100.12 3. Perform thermographic survey in accordance.

9. Inspect contactors 1. Verify mechanical operation 2. Verify contact gap, wipe, alignment, and pressure are in accordance with manufacturer's published data.

11. Lubrication requirements 1. Verify appropriate lubrication on moving current carrying parts 2. Verify appropriate lubrication on moving and sliding surface

6. Perform vacuum bottle integrity test (overpotential), if applicable, across each vacum bottle with the contacts in the open position in strict accordance with manufacturer's publish data. DO NOT EXCEED MAXIMUM VOLTAGE stipulated for this test

5. Inspect bolted electrical connections for high resistance using of the following methode 1. Use of low resistance ohm meter 2. Verify tightness of accessible bolted electrical connections by calibrated toque-wrench methode in accordance with manufacture publish data or table 100.12 3. Perform thermographic survey in accordance.

9. Inspect contactors 1. Verify mechanical operation 2. Verify contact gap, wipe, alignment, and pressure are in accordance with manufacturer's published data.

11. Lubrication requirements 1. Verify appropriate lubrication on moving current carrying parts 2. Verify appropriate lubrication on moving and sliding surface

6. Perform vacuum bottle integrity test (overpotential), if applicable, across each vacum bottle with the contacts in the open position in strict accordance with manufacturer's publish data. DO NOT EXCEED MAXIMUM VOLTAGE stipulated for this test

5. Inspect bolted electrical connections for high resistance using of the following methode 1. Use of low resistance ohm meter 2. Verify tightness of accessible bolted electrical connections by calibrated toque-wrench methode in accordance with manufacture publish data or table 100.12 3. Perform thermographic survey in accordance.

9. Inspect contactors 1. Verify mechanical operation 2. Verify contact gap, wipe, alignment, and pressure are in accordance with manufacturer's published data.

11. Lubrication requirements 1. Verify appropriate lubrication on moving current carrying parts 2. Verify appropriate lubrication on moving and sliding surface

6. Perform vacuum bottle integrity test (overpotential), if applicable, across each vacum bottle with the contacts in the open position in strict accordance with manufacturer's publish data. DO NOT EXCEED MAXIMUM VOLTAGE stipulated for this test

5. Inspect bolted electrical connections for high resistance using of the following methode 1. Use of low resistance ohm meter 2. Verify tightness of accessible bolted electrical connections by calibrated toque-wrench methode in accordance with manufacture publish data or table 100.12 3. Perform thermographic survey in accordance.

9. Inspect contactors 1. Verify mechanical operation 2. Verify contact gap, wipe, alignment, and pressure are in accordance with manufacturer's published data.

11. Lubrication requirements 1. Verify appropriate lubrication on moving current carrying parts 2. Verify appropriate lubrication on moving and sliding surface

6. Perform vacuum bottle integrity test (overpotential), if applicable, across each vacum bottle with the contacts in the open position in strict accordance with manufacturer's publish data. DO NOT EXCEED MAXIMUM VOLTAGE stipulated for this test

9. Inspect bolted electrical connections for high resistance using one of the following methods : 1. Use of low resistance ohmmeter in accordance with section 7.18.1.3.2. 2. Verify tightness of accessible bolted electrical connections by calibrated torque wrench methode in accordance with manufacture's published data or tabel 100.12 3. Perform thermographic survey under load in accordance with section 9

5. Inspect all bolted electrical connections for high resistance using one of the following methode 1. Use of low resistance ohmmeter. 2. Verify tightness of accessible bolted electrical connections by calibrated torque wrench methode in accordance with manufacturer's publish data or tabel 100.12 3. Perform thermographic survey under load .

Page 10: To Do Check List at Site Activity GBC Project

7. Measure and record input and output voltage and current 8. Measure and record ac ripple current and/or voltage imposed on the battery 9. Perform full load testing of charger ( Optional )

ACDC Distribution Board1. Visual and Mechanical Inspection 1. Compare equipment nameplate data with drawings and specifications. 2. Inspect physical and mechanical condition. 3. Inspect anchorage, alignment, grounding, and required clearances. 4. Verify the unit is clean 5. Verify correct blade alignment, blade penetration, travel stops, and mechanical operation 6. Verify that fuse sizes or circuit breaker and type are in accordance with drawing,short circuit studies, and coordination study. 7. Verify that each fuse has adequate mechanical support and contact integrity

9. Verify operation and squencing of interlocking systems 10. Verify correct phase barrier installation 11. Verify correct operation of all indicating and control devices

2. Electrical Test 1. Perform resistance measurements through bolted connections with a low resistance ohmmeter 2. Bolt torque levels should be in accordance with table 100.12 unless otherwise specified by the manufacturer.

4. Minimum insulation resistance shall be in accordance with manufacturer's publish data or tabel 100.1 5. Investigate fuse resistance value that deviate from each other by more than 15 percent

Final Report - Time sheet- Vendor representative daily report - Onsite work report- Acceptance Letter- Outstanding point and recommendation if Any- Progress report

PT. Schneider Indonesia

EKO FUJISYAH MAULWANTO

8. Inspect bolted electrical connections for high resistance using one of the following methode 1. Use of low resistance ohmmeter 2. Verify tightness of accessible bolted electrical connections by calibrated torque wrench method in accordance with manufacturer's publish data or table 100.12 3. Perform thermographic survey.

12. Lubrication requirements 1. Verify appropriate lubrication on moving current carrying parts 2. Verify appropriate lubrication on moving and sliding surfaces.

3. Microhm or millivolt drop values shall not exceed the high levels of the normal range as indicated in the manufacturer's published data. If manufacturer's data is not available, investigate any value which deviate from adjacent poles or similiar switches by mor than 50 percent of the lowest value.

Page 11: To Do Check List at Site Activity GBC Project

Page 11 of 32PROGRESS

COMMISIONING E-HOUSE DMLZ CV 511

Project Name : DMLZ CV 511Contract No : TP1400071-001-002Scope of supply : Commissioning DMLZ CV 511 and DMLZ CV510Customer : PT.Freeport IndonesiaPeriode Report : 11 February 2015 s/d 26 February 2015Update : 26 - February - 2015

No Jobs Description Progress Remark

1 E- House Building & Utility 66%- Installation Door Closer at the Single door 100%- Installation Door Closer at the Double door 100%

- Installation Ballast Emergency Lamp H7,H13,H2 0%

- Installation Outdoor lamp TL18 watt, at the Double door,H18 100%

95%

- Installation end cover top PIX-M (M01) 0% Material not found, waiting information from construction team PT.FI

2 Testing HVAC Unit 92%

Installation HVAC unit - Compare equipment nameplate data with drawings and spesifications 100%- Inspect physical and mechanical condition 100%- Inspect the unit is clean 100%- Make sure HVAC Unit is properly mounted 100%- Make sure proper torque is applied to the bolt 100%- Make sure prefillter has been installed inside HVAC unit 100%- Make sure supply grill has been installed 100%- Make sure retrun grill has been installed 100%Electrical Installation HVAC Unit - Verify termination cable control from HVAC controller to HVAC unit has been connected properly 100%- Inspect exposed section of cable for physical damage and correct connection in accordance with schematic drawing. 100%- Make sure proper torque is applied to the bolt cable connection 100%- Verify control wiring HVAC unit accordance with schematic 100%- Inspect for correct identification and phase squence 0%- Perform function test accordance checklist document FAT 0%

3 F&G System 75% FACP HAS BEEN OPERATE- Installation support pipe F&G building 1 100% Long bolt with nut not match - Verify F&G setting unit accordance with FAT ducument section F&G Setting 100%

- Pressure test for Pipe F&G 0%

Waiting delivery material from JakartaETA in the MP68 tgl 20-Feb-15

date : 20/02/2015==> Material already in E-House DMLZ CV511

On Progress

Waiting delivery material from JakartaETA in the MP68 tgl 19-Feb-15

==> Material already in E-House DMLZ CV511date : 23/02/2015==> Outdoor lamp tcw 097 1x18 watt has been installed

- Installation Reflector for outdoor lamp HPS 70 Watt H15,H16,H17

Waiting delivery material from JakartaETA in the MP68 tgl 20-Feb-15

date : 20/02/2015==> Material already in E-House DMLZ CV511

date : 23/02/2015==> Reflector for outdoor lamp HPS 70 Watt for equipment number H15 & H17 has been installed==> Reflector for outdoor lamp HPS 70 Watt for equipment number H16 Not yet Installed because light mounted above a height of more than 2 meters from the ground so need special tools/support

Ready to energizedWaiting for the availability of power supply

Perform Pressure testIn collaboration with Freeport Commissioning & QC Team ==> As per discussion with team Commissioning (Pak Tri) is QC team did not perform tests

Page 12: To Do Check List at Site Activity GBC Project

Page 12 of 32PROGRESS

COMMISIONING E-HOUSE DMLZ CV 511

Project Name : DMLZ CV 511Contract No : TP1400071-001-002Scope of supply : Commissioning DMLZ CV 511 and DMLZ CV510Customer : PT.Freeport IndonesiaPeriode Report : 11 February 2015 s/d 26 February 2015Update : 26 - February - 2015

No Jobs Description Progress Remark

- Perform function test F&G 100%

4 MV Switchgear 13,8 kV RMU 26A0571 Progress Total Progress

J01 J02 J03 J04 98%4.1 INSTALLATION CHECK

Main Busbar- Cleanness of the Cross Connection of Bus bar 100% 100% 100% 100% 100%- Cleanness of Bus bar Compartment 100% 100% 100% 100% 100%Circuit Breaker Compartement- Cleanness of CB'S Spout 100% 100% 100% 100% 100%- Cleanness of CB'S Compartment 100% 100% 100% 100% 100%- Cleanness of Unit CB 100% 100% 100% 100% 100%- Door Condition 100% 100% 100% 100% 100% - Install the Unit CB Into CB Compartment 100% 100% 100% 100% 100%Cable Compartement- Cleanness of Cable Compartment 100% 100% 100% 100% 100%- Check Tightness of Cable Connection 100% 100% 100% 100%

Main Bus bar Resistance Measurement 100% 100% 100% 100% 100%

4.2 VISUAL CHECKPurpose of check is to ensure all equipment, main and/or auxiliary, shall comply with the requirement specified in the tender specification, applicable regulation, and the respected design.The specifications to check consist of:

- Type of designation 100% 100% 100% 100% 100%- Ratings 100% 100% 100% 100% 100%- Physical fitness 100% 100% 100% 100% 100%- Physical damage 100% 100% 100% 100% 100%

- Completeness of equipment 100% 100% 100% 100% 100%

4.3 MECHANICAL OPERATION CHECK 100% 100% 100% 100% 100%Mechanical / manual operation tests are made to ensure that switching devices and removable parts comply with the prescribed operating conditions and that mechanical interlocks work properly after transportation, handling and installation. During test, no voltage in the main circuit may apply.

4.4 INTERCONNECTION WIRING CHECK 100% 100% 100% 100% 100%

Perform function test F&G system In collaboration with Freeport Commissioning & FSME Team

Function test date : 17/02/2015tested by : Eko Fujisyah M >> Schneider Indonesiawitnessed by : Karta (84913) >> team FSME pt.FI Tri Budianto >> Team Commissioning pt.FI

Attachment fire alarm & suppression system function test

Note :

Perform contact resistance test In collaboration with Freeport Commissioning team

At the Panel J04 Phase L2, Capacitive devider p/n AMT000155-05 not yet installed.Qty 1 Unit ,Waiting delivery material from jakartaETA in the MP68 tgl 20-Feb-15

date : 20/02/2015==> Material already in E-House DMLZ CV511

Date 23/02/2014 Capacitive Insulator has been installed with use two bolt M10 x 20 take from GBC EBB Panel J23

Page 13: To Do Check List at Site Activity GBC Project

Page 13 of 32PROGRESS

COMMISIONING E-HOUSE DMLZ CV 511

Project Name : DMLZ CV 511Contract No : TP1400071-001-002Scope of supply : Commissioning DMLZ CV 511 and DMLZ CV510Customer : PT.Freeport IndonesiaPeriode Report : 11 February 2015 s/d 26 February 2015Update : 26 - February - 2015

No Jobs Description Progress Remark

The inter panel wiring connections shall be verified in the conformance with the wiring diagram to ensure no miss wiring before energized the control supply.

Page 14: To Do Check List at Site Activity GBC Project

Page 14 of 32PROGRESS

COMMISIONING E-HOUSE DMLZ CV 511

Project Name : DMLZ CV 511Contract No : TP1400071-001-002Scope of supply : Commissioning DMLZ CV 511 and DMLZ CV510Customer : PT.Freeport IndonesiaPeriode Report : 11 February 2015 s/d 26 February 2015Update : 26 - February - 2015

No Jobs Description Progress Remark

4.5 ELECTRICAL OPERATION CHECK 100% 100% 100% 100% 100%All main/critical equipment shall be verified in demonstration of correct functionHowever, the switchgear manufacturer does not verify the accuracy and precision of the equipment that are warranted by the manufacturing origin.

4.6 PROTECTION RELAY TEST

Ensure that the protection relay is working based on system requirement and 100% 100% 100% 100% 100%

Logic diagram

4.7 MEASUREMENTEnsure that the measurement equipment is working properly with in tolerance.

4.8 AC HIGH VOLTAGE AND MEGGER TEST 50% 50% 50% 50% 50%

The power frequency test on the main circuit of switchgear is to demonstrate the insulation capability. The switchgear shall pass the test if no flash over or disruptive leakage current occur.

5 MV Switchgear 4,16 kV Progress Total Progress

M01 M02 M03 M04 M05 88%5.1 INSTALLATION CHECK

Main Busbar- Cleanness of the Cross Connection of Bus bar 100% 100% 100% 100% 100% 100%- Cleanness of Bus bar Compartment 100% 100% 100% 100% 100% 100%Contactor Compartement- Cleanness of Contactor Spout 100% 100% 100% 100% 100% 100%- Cleanness of Contactor Compartment 100% 100% 100% 100% 100% 100%- Cleanness of Unit Contactor 100% 100% 100% 100% 100% 100%- Door Condition 100% 100% 100% 100% 100% 100%- Install the Unit Contactor Into Contactor Compartment 100% 100% 100% 100% 100% 100%Cable Compartement- Cleanness of Cable Compartment 100% 100% 100% 100% 100% 100%- Check Tightness of Cable Connection 0% 0% 0% 0% 0% 0%

Main Bus bar Resistance Measurement 100% 100% 100% 100% 100% 100%

5.2 VISUAL CHECKPurpose of check is to ensure all equipment, main and/or auxiliary, shall comply with the requirement specified in the tender specification, applicable regulation, and the respected design.The specifications to check consist of:

- Type of designation 100% 100% 100% 100% 100% 100%

Perform protection relay test In collaboration with Freeport Commissioning team

As per discussion morning with Pak Heru, 21/02/2015, about testing relay protection. The relay portection has been tested by team ROYAL

Perform contact resistance test In collaboration with Freeport Commissioning and QC Team

== >Megger test has been completed

Insulation measurement by DC megger aims at observing insulation level before and after power frequency test. If insulation value “after” is considerably much lower than “before” power frequency test, the switchgear or equipment tested is considered experiencing insulation degradation; thereafter, the equipment is subject to further examination.

Megger test is made to measure insulation between phases and each phase to ground. For Main circuit of MV switchgear, the megger tension shall not exceed 10 kV dc with duration maximum of 5 seconds.

Perform contact resistance test In collaboration with Freeport Commissioning team

Page 15: To Do Check List at Site Activity GBC Project

Page 15 of 32PROGRESS

COMMISIONING E-HOUSE DMLZ CV 511

Project Name : DMLZ CV 511Contract No : TP1400071-001-002Scope of supply : Commissioning DMLZ CV 511 and DMLZ CV510Customer : PT.Freeport IndonesiaPeriode Report : 11 February 2015 s/d 26 February 2015Update : 26 - February - 2015

No Jobs Description Progress Remark

- Ratings 100% 100% 100% 100% 100% 100%- Physical fitness 100% 100% 100% 100% 100% 100%- Physical damage 100% 100% 100% 100% 100% 100%

' - Completeness of equipment 100% 100% 100% 100% 100% 100%

Page 16: To Do Check List at Site Activity GBC Project

Page 16 of 32PROGRESS

COMMISIONING E-HOUSE DMLZ CV 511

Project Name : DMLZ CV 511Contract No : TP1400071-001-002Scope of supply : Commissioning DMLZ CV 511 and DMLZ CV510Customer : PT.Freeport IndonesiaPeriode Report : 11 February 2015 s/d 26 February 2015Update : 26 - February - 2015

No Jobs Description Progress Remark

5.3 MECHANICAL OPERATION CHECK 100% 100% 100% 100% 100% 100%Mechanical / manual operation tests are made to ensure that switching devices and removable parts comply with the prescribed operating conditions and that mechanical interlocks work properly after transportation, handling and installation. During test, no voltage in the main circuit may apply.

5.4 INTERCONNECTION WIRING CHECK 100% 100% 100% 100% 100% 100%

5.5 ELECTRICAL OPERATION CHECK 100% 100% 100% 100% 100% 100% - Panel M05 From TR 26TX0511 13.8kV-4.16kV/480V Circuit Breaker not properly All main/critical equipment shall be verified in demonstration of correct function

However, the switchgear manufacturer does not verify the accuracy and precision of the equipment that are warranted by the manufacturing origin.

5.6 PROTECTION RELAY TEST 100% 100% 100% 100% 100% 100%

Ensure that the protection relay is working based on system requirement and Logic diagram

5.7 MEASUREMENT 0% 0% 0% 0% 0% 0%Ensure that the measurement equipment is working properly with in tolerance.

5.8 AC HIGH VOLTAGE AND MEGGER TEST 50% 50% 50% 50% 50% 50%

The power frequency test on the main circuit of switchgear is to demonstrate the insulation capability. The switchgear shall pass the test if no flash over or disruptive leakage current occur.

Prepared by Aknowledge AknowledgePT. Schneider Indonesia PT. Freeport Indonesia PT. Freeport Indonesia

Heru Sulistiyono Tri BudiantoID. ID.

The inter panel wiring connections shall be verified in the conformance with the wiring diagram to ensure no miss wiring before energized the control supply.

'operation ( Pumping) ==>The problem has been resolved date 16-02-2015

- Contactor Panel M01 and Panel M04 not Operate properly ==>The problem has been resolved date 18-02-2015

Perform protection relay test In collaboration with Freeport Commissioning team

As per discussion morning with Pak Heru, 21/02/2015, about testing relay protection. The relay portection has been tested by team ROYAL

Insulation measurement by DC megger aims at observing insulation level before and after power frequency test. If insulation value “after” is considerably much lower than “before” power frequency test, the switchgear or equipment tested is considered experiencing insulation degradation; thereafter, the equipment is subject to further examination.

Perform Ac High Voltage and Megger test In collaboration with Freeport Commissioning and QC Team

- Megger test has been completed

Megger test is made to measure insulation between phases and each phase to ground. For Main circuit of MV switchgear, the megger tension shall not exceed 10 kV dc with duration maximum of 5 seconds.

Eko Fujisyah Maulwanto

Page 17: To Do Check List at Site Activity GBC Project
Page 18: To Do Check List at Site Activity GBC Project
Page 19: To Do Check List at Site Activity GBC Project
Page 20: To Do Check List at Site Activity GBC Project
Page 21: To Do Check List at Site Activity GBC Project
Page 22: To Do Check List at Site Activity GBC Project
Page 23: To Do Check List at Site Activity GBC Project

Wiring Scheme

Setting Parameter

Page 24: To Do Check List at Site Activity GBC Project
Page 25: To Do Check List at Site Activity GBC Project
Page 26: To Do Check List at Site Activity GBC Project
Page 27: To Do Check List at Site Activity GBC Project
Page 28: To Do Check List at Site Activity GBC Project
Page 29: To Do Check List at Site Activity GBC Project
Page 30: To Do Check List at Site Activity GBC Project
Page 31: To Do Check List at Site Activity GBC Project

REMAINING WORKCOMMISIONING E-HOUSE

DMLZ CV 511 & DMLZ CV 510Project Name : DMLZ CV 511 & DMLZ CV 510Contract No : TP1400071-001-002Scope of supply : Commissioning DMLZ CV 511 and DMLZ CV510Customer : PT.Freeport IndonesiaPeriode Report : 11 February 2015 s/d 26 February 2015Update : 26 - February - 2015

No Jobs Description

1 E- House Building & Utility DMLZ CV 511

Installation Ballast Emergency Lamp H7,H13,H2

Installation Outdoor lamp TL18 watt, at the Double door,H18

Installation end cover top PIX-M (M01)FACP DMLZ CV 511

2 E- House Building & Utility DMLZ CV 510- Installation Cover Elbow Conduit at FACP - Repair Lamp 2x36 Watt at rear panel 13,8 kV Switchgear, Equipment number H14- Repair Emergency lamp 2x36 Watt, equipment number H7- Repair Outdoor Lamp 1x18 Watt at top single door , equipment number H194,16 kV Switchgear

Make sure for power supply control panel M01 and M02 4,16 kV Switchgear ,supply by

UPS Panel 26-UP-0510,CKT -Q5 20A

Installation Reflector for outdoor lamp HPS 70 Watt H15,H16,H17

RF-4R 4 COS ARTHECE dengan type RXM4AB, 4 COS 24 VDC Manufacture Schneider.

Page 32: To Do Check List at Site Activity GBC Project

REMAINING WORKCOMMISIONING E-HOUSE

DMLZ CV 511 & DMLZ CV 510

Recommendation for Correction

Misising

Please pick up material from DHL

Coordination with team construction DMLZ CV 510Replacement Normal Ballast 2 x 36 wattReplacement Ballast Emergency, battery ,wiring see attachmentReplacement Normal Ballast 2 x 36 watt

CKT -Q25 should be for power supply heater and lamp only for panel M03

Replacement Ballast Emergency, battery and Normal Ballast, wiring see attachment

Outdoor lamp has been installed but lamp is not illuminated, please check wiring and ballast

Reflector for outdoor lamp HPS 70 Watt for equipment number H16 Not yet Installed because light mounted above a height of more than 2 meters from the ground so need special tools/support

for Installation please see drawing schematic F&G DMLZ CV 511 PO080-701_02_2

Tracing cable for correction wiring,make sure cable from panel 26-UP-0510 CKT -Q5 connected to wiring control M01 and M02

Currently wiring control panel M01 and M02 have power supply from panel 26-P-0510B, CKT -Q25