TMT.OPT.PRE.15.020.REL01 1
SSA Tower Rework Instructions(for composite sleeve bearings)
F. Kamphues
SSA Tower rework
Reason: Implementation of composite sleeve bearings for the Tower Locks
TMT.OPT.PRE.15.020.REL01 2
Scope of Work
Required modifications in accordance with drawing M1S-100-01301 Prototype V3 Rework Composite Brg REV A– Tower M1S-100-01301:
Tower Lock holes to be increased from 22 to 27 mm
Drill, tap and install M4 helicoil in each “ear” for end stop
Install GGB 222718GF sleeve bearings (press fit)
Drill and tap through side of sleeve bearing (for Spring Plunger) 3X 1/2-13 UNC-2B THROUGH TO BORE, BACK SIDE CHAMFER 2.00 X 45
– Lock Assembly M1S-100-01400:
Deburr edges of spring plunger detents
TMT.OPT.PRE.15.020.REL01 3
Scope of Work
TMT.OPT.PRE.15.020.REL01 4
M1S-100-01301 Prototype V3 Rework Composite Brg REV A:
TMT furnished equipment
TMT provides GGB 222718GF sleeve bearings
TMT provides 1/2-13 UNC-2B Delrin Spring Plungers
TMT provides Machining Fixture– With registration pins and datum surface for accurate location of Tower– A setup for bearing holes and M4 helicoil hole machining– B setup for drilling & tapping spring plunger holes
TMT.OPT.PRE.15.020.REL015
A B
TMT Machining Fixture
Machining Fixture (arrow side is datum)
TMT.OPT.PRE.15.020.REL016
Preparation of Towers
Anodize Tower in accordance with drawing
Install Registration Inserts M1S-100-01304
TMT.OPT.PRE.15.020.REL017
Installation Procedure Setup A - 1/5
Installing brass registration pins in Machining Fixture (location A)
TMT.OPT.PRE.15.020.REL01 8
Installation Procedure Setup A - 2/5
Install and Align Machining Fixture on CNC machine. Arrow side is datum and should be perpendicular to machining axis.
TMT.OPT.PRE.15.020.REL01 9
Installation Procedure Setup A - 3/5
Install Tower on brass registration pins.
Install clamps
TMT.OPT.PRE.15.020.REL01 10
Installation Procedure Setup A - 4/5
Install anti-chatter support (with very light preload to prevent deformation in the clamped state!).– Support is not provided by TMT (use a threaded rod with two nuts, or
similar)
TMT.OPT.PRE.15.020.REL01 11
Installation Procedure Setup A - 5/5
Check alignment and CNC software before starting machining!
TMT.OPT.PRE.15.020.REL01 12
Machining Setup A
Machine holes to 27.000 – 27.021 mm
Drill and tap for M4 helicoil
Repeat for other two “ears” (rotate 120°, 240°)
TMT.OPT.PRE.15.020.REL01 13
Install sleeve bearings
Press fit sleeve bearings (3x) in accordance with GGB Composite Bearing Handbook section 6.1– Bearings shall be installed 0.2 - 0.5 mm deeper than flange (to
accommodate lock barrel radius)
TMT.OPT.PRE.15.020.REL01 14
Fit check lock barrels
Fit check lock barrels (bearing does not require lubricant)
TMT.OPT.PRE.15.020.REL01 15
Installation Procedure Setup B - 1/3
Move brass registration pins from location A to B)
TMT.OPT.PRE.15.020.REL01 16
Installation Procedure Setup B - 2/3
Install Tower on brass registration pins.
Install clamp
TMT.OPT.PRE.15.020.REL01 17
Installation Procedure Setup A - 3/3
Check alignment and CNC software before starting machining!
TMT.OPT.PRE.15.020.REL01 18
Machining Setup B
Drill and tap for Spring Plunger– Carbide drills should be used for drilling GGB filament wound bearings.
To avoid fiber breakout, use a mandrel to support the ID.
TMT.OPT.PRE.15.020.REL01 19
Machining Setup B
Apply backside chamfer in tapped hole (may be done by hand; chamfer size is not critical)
Repeat for other two “ears” (rotate 120°, 240°)
TMT.OPT.PRE.15.020.REL01 20
Fit check Spring Plunger
Fit check Spring Plungers (should be able to go all the way through)
TMT.OPT.PRE.15.020.REL01 21
Deburring Spring Plunger Detents
Hand deburr detent edges with round grinding wheel and fine Emery cloth. Edges shall be round and smooth!
TMT.OPT.PRE.15.020.REL01 22