Title: Final Fiesta Name: Natasha Kirkland Class: BSAP Semester: Spring 2007 TA Name: Allison...
-
Upload
brett-walters -
Category
Documents
-
view
222 -
download
0
Transcript of Title: Final Fiesta Name: Natasha Kirkland Class: BSAP Semester: Spring 2007 TA Name: Allison...
Title: Final Fiesta
Name: Natasha KirklandClass: BSAP
Semester: Spring 2007TA Name: Allison Mueller
I recorded data on the start time of employees at the Department of Statistics at Western Michigan
University.
• My setting, pinpoint, data, and intervention are all real.
Reason to Intervene
• Employees of the main office at the Department of Statistics are not arriving to work on time.
• Employees have to fill out timesheets and not punch a clock, so they tend to be more relaxed with when they decide to come in.
Analyze the Natural Contingencies
• Employees realize that if they do not come into work on time, then they will not get paid for full hour.
• But, that is not enough to control the behavior of the employees walking into work on time.
Analyze the Natural Contingencies
Ineffective Natural Contingency
Will not get paidfor the entire
hour.
Employees walk into work on
time.
Will get paidfor the
entire hour.
Analyze the Natural Contingencies
Natural Competing Contingency
Will be able to eat breakfast in the
morning.
Employees walk into work on time.
Will not be able to eat breakfast inthe morning.
Baseline Graph
Department of Statistics Baseline
0
20
40
60
80
100
120
Employee 1 Employee 2 Employee 3
Employees
Perc
enta
ge o
f Tim
es
Empl
oyee
s Ar
rive
to
Wor
k on
Tim
e
W/E 2/9/07
W/E 2/16/07
Baseline Graph Description
• My baseline data looks good, it almost look as though employees regularly come into work on time.
• For the first two weeks, two out of the three employees were at work exactly on time. One of the employees was only late one day!
Specify the Performance Objectives
• The ultimate goal was for employees to arrive to work on time everyday that he or she was scheduled to work.
• The following model illustrates the process through an outline of the organizational goals.
Input-Process-Output ModelEmployees that arrive to work on time everyday that they are scheduled to work.
Production: Ensuring employees arrive to work on time through PM techniques.
Employees that do not arrive to work on time everyday that they are
scheduled to work.
Goal Specification Form
Output Employees that arrive to work on time everyday that they are scheduled to work.
Standards
Quality
Current Ideal
Employees are on time about 75% of the time.
Employees are on time about 95% of the time.
Quantity 1 out of 3 employees All 3 employees
Timeliness N/A N/A
Cost N/A N/A
Process Implementing proper PM techniques
Production: XDistribution_ __ R&D__ _
InputEmployees that do not arrive to work on time everyday that they are scheduled to work.
Design the Intervention
• The steps that I used to develop an intervention were not difficult!
• First, I took baseline data from timesheets,
• Secondly, I chose to use incentives for rewards of desired behavior, and
• Finally, I designed the Three-Contingency Model of Performance Management.
Design the InterventionPerformance Management Contingency
Will not get paid for entire hour.
Employees walkinto work on time.
Will get paid for theentire hour.
No praise or prizes for
attendance.
Employees walk into work on time.
Praise and prizes for
attendance.
Implement the Intervention
• I implemented my intervention by rewarding the employee(s) that has shown up on time everyday that he or she was scheduled to work. The rewards were candy, chips, and small snacks.
Evaluate the InterventionEmployee 2
0
20
40
60
80
100
120
1 2 3 4 5 6 7
Weeks
Pe
rce
nta
ge
of
Da
ys
on
Tim
e
Employee 2
Employee 3
0
20
40
60
80
100
120
1 2 3 4 5 6 7
Weeks
Pe
rce
nta
ge
of
Da
ys
on
T
ime
Employee 3
Employee 1
020406080
100120
Weeks
Employee 1
Evaluate the Intervention
• The added incentives was a good idea especially since there was a small group of participants
BUT
• The rewards were not enough to control the behavior of the participants!!
Recycle-real or hypothetical?
• My Recycle-Phase was real and more expensive!• After recycling through the previous steps, I
realized that candy can not control college students behavior,
• But treating them to lunch will definitely control their behavior better!!!
• I recycled after the first four weeks of recording data.
Evaluate the Recycle
Employee 3
0
20
40
60
80
100
120
1 2 3 4 5 6 7
Weeks
Pe
rce
nta
ge
of
Da
ys
on
Tim
e
Employee 3
Employee 2
0
20
40
60
80
100
120
1 2 3 4 5 6 7
Weeks
Pe
rce
nta
ge
of
Da
ys
on
T
ime
Employee 2
Employee 1
0
20
40
60
80
100
120
1 2 3 4 5 6 7
Weeks
Per
cen
tag
e o
f D
ays
on
T
ime
Employee 1
Evaluate the Recycle
• I think that once after I recycled, I realized something,
• Employees of the Statistics Department have their own agenda.
• The data was pretty much the same, most of the employees were coming in on time, but not of all of them.
Personal Experience
I definitely enjoyed working with the Department of Statistics on this project, and I had a blast implementing an intervention that was a benefit to this organization. The start time was excellent by the last week of data, and I contributed.
THANKS TO EVERYONE WHO MADE IT THIS A SUCCESS!!!!
Manager and Employees’ Experience
• The Manager and Employees of the Stats Department enjoyed the project, and they said, “BSAP is cool.”
Discussions
• I found out that the employees of the Statistics Department enjoyed this project.
• They felt the Verbal Feedback and the rewards was worth the effort.
• The overall Treatment Integrity was good• And• The Manager, Cheryl Peters, conducted IOA data
with me to make sure I was correctly on task!!!
Questions or Comments???