THEMIS INSTRUMENT CDR Peer Review SYSTEM-1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that UCB define the development, engineering model, qualification, and acceptance testing approach for all of the THEMIS instruments. We think that this could be contained in an I&T test plan. For starters, however, we recommend that each instrument team (or the project-level system engineering team) develop a flow chart identifying the testing that will be conducted. The conditions of the testing such as temperature, vacuum or air, cycles, etc. should be added when available. Response: THM_SYS_005d_Instrument Payload Verification Plan and Environmental Test Specification provides the test plan for all instruments. Flow charts for each instrument are contained in the plan. The THEMIS Environmental Test Matrix contains specific test conditions such as vacuum or air, number of cycles, etc. IPDR Peer Review RFA #10

Transcript of THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10...

Page 1: THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.

THEMIS INSTRUMENT CDR Peer Review SYSTEM-1 UCB, April 19, 2004

TITLE: Test Flow RFA CODE: UCB-10

REQUESTED BY: Preble  SPECIFIC REQUEST:

We recommend that UCB define the development, engineering model, qualification, and acceptance testing approach for all of the THEMIS instruments. We think that this could be contained in an I&T test plan. For starters, however, we recommend that each instrument team (or the project-level system engineering team) develop a flow chart identifying the testing that will be conducted. The conditions of the testing such as temperature, vacuum or air, cycles, etc. should be added when available.

Response: THM_SYS_005d_Instrument Payload Verification Plan and Environmental Test Specification provides the test plan for all instruments. Flow charts for each instrument are contained in the plan. The THEMIS Environmental Test Matrix contains specific test conditions such as vacuum or air, number of cycles, etc.

IPDR Peer Review RFA #10

Page 2: THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.

THEMIS INSTRUMENT CDR Peer Review SYSTEM-2 UCB, April 19, 2004

RFA #10:Instrument Payload I&T Flow

FGMFunctional(Level 2)

SCMFunctional(Level 2)

SSTFunctional(Level 2)

HarnessBake-out

IDPU-HarnessSafe-to-Mate

PayloadThermal

PayloadEMI/EMC/MAG

ESAFunctional(Level 2)

• Test Review

InstrumentPER

MAG INTEGRATION

EFI INTEGRATION

ESA/SST INTEGRATION

PAYLOAD ENVIRONMENTALPayloadVibration

PayloadAcceptance

• Workmanship (if necessary)

MagAlignment

EFI AXBDeploy

EFI SPBDeploy

Mag BoomDeploy

EFIFunctional(Level 1)

EFIFunctional(Level 2)

EFI/SCM/FGMPhasing

ESA/SSTTiming

PayloadCPT

Page 3: THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.

THEMIS INSTRUMENT CDR Peer Review SYSTEM-3 UCB, April 19, 2004

RFA #10:FGM I&T Flow

FGSVibration

FGSThermal

IDPUSafe-to-Mate

IDPU/ESA/SCM Pre-Amp

Vibration

FGSAcceptance

FGMFunctional(Level 2)

• Inspection• Mass Properties• DC Magnetics

• 2 cycles T-V• Bake-out +60C

• Sensor in TCU

FGEAcceptance

FGMFunctional(Level 0)

• Without FGS• Inspection

IDPUThermal

• 2 cycles T-V• Bake-out +60C• FGS Functional (Level 1)

FGBVibration

FGB/SCBThermal

• 1 cycle T-V• Hot/Cold Deploy

FGBAcceptance

• Inspection• Mass Properties• DC Magnetics

• Backplane

Alignment EFI/SCM/FGM

Phasing Mag Boom

Deploy Payload

Safe-to-Mate

• Harness

PayloadThermal

PayloadEMI/EMC/MAG

• 6 cycles T-V• FGM Functional (Level 1)

IDPUAcceptance

• Inspection• Mass Properties• DC Magnetics

• Test Review

• Boom Levels

InstrumentPER

FGM BOOM (FGB)

FGM SENSOR (FGS)

FGM ELECTRONICS (FGE)

FGM / PAYLOAD INTEGRATION

PAYLOAD ENVIRONMENTALPayloadVibration

PayloadAcceptance

• Workmanship (if necessary)

Page 4: THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.

THEMIS INSTRUMENT CDR Peer Review SYSTEM-4 UCB, April 19, 2004

FGM Level 0 – Without Sensor (Aliveness)• B-field about zero if FGM in Cal Mode (preferred mode)

• B-field saturated if feedback is closed

• Interface full functional

• Power consumption reduced by about 200mW

FGM Level 1 – Sensor in Mu-metal cap (Limited Performance Test)• B-field about 10,000nT, Noise about 1nT

• Full functionality,

but B-field not representative

FGM Level 2 – Sensor in TCU (Comprehensive Performance Test) • B-field < 10nT, Noise <10pT/sqrt (Hz)

• B-field has to be available in full quality

• Delta in calibration coefficients known

FGM Test Configurations

Page 5: THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.

THEMIS INSTRUMENT CDR Peer Review SYSTEM-5 UCB, April 19, 2004

RFA #10:SCM I&T Flow

SCM SensorVibration

SCM SensorThermal

SCM Pre-AmpBake-out

IDPU/ESA/SCM Pre-Amp

Vibration

SCM SensorBake-out

Functional(Level 3)

• Bake-out +60C• 3 cycles (air)

• SCM Sensor in Mu Metal

SCM Pre-AmpThermal

SCM Pre-AmpAcceptance

IDPUThermal

• 2 cycles T-V• Bake-out +60C• SCM Functional (Level 1)

SCBVibration

• 14.1g RMS

FGB/SCBThermal

• 1 cycle T-V• Hot/Cold Deploy

SCBAcceptance

• Inspection• Mass Properties• DC Magnetics

• Bake-out +60C

Alignment EFI/SCM/FGM

Phasing Mag Boom

Deploy Payload

Safe-to-Mate

• Harness

PayloadThermal

PayloadEMI/EMC/MAG

• 6 cycles T-V• SCM Functional (Level 2)

IDPUAcceptance

• Inspection• Mass Properties• DC Magnetics

• Test Review

• Boom Levels

InstrumentPER

SCM BOOM (SCB)

SCM SENSOR (SCM)

SCM PRE-AMP

SCM / PAYLOAD INTEGRATION

PAYLOAD ENVIRONMENTALPayloadVibration

PayloadAcceptance

• Workmanship (if necessary)

SCM SensorAcceptance

• Inspection• Mass Properties• DC Magnetics

• 3 cycles (air) • Inspection• Mass Properties• DC Magnetics

Page 6: THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.

THEMIS INSTRUMENT CDR Peer Review SYSTEM-6 UCB, April 19, 2004

SCM Test ConfigurationsSCM Safety – Feedback Plug

• Required when SCM Pre-Amp is powered and sensor is not connected

SCM Level 0 – With SCM EGSE I/F Box (Aliveness)• Same Power, Command, Analog output interfaces

• Power and Cal Mode identification by LED

• Cal Signal re-injected to the input

• Signal generator connected to input

• Validation by analysis of data

SCM Level 1, 2 – Sensor in Mu Metal Box (Comprehensive Performance Test) • Sensor kept in mu metal box during integration

• Axis identification

• Re-verification of end-to-end calibration

• Phase relation

• Check of conducted noise

• SCM/EField timing reference

Page 7: THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.

THEMIS INSTRUMENT CDR Peer Review SYSTEM-7 UCB, April 19, 2004

RFA #10:ESA I&T Flow

ESAFunctional(Level 2)

• Instrument Functional• Cover Simulator Test

ESAThermal

ESAAcceptance

• Inspection• Mass Properties• DC Magnetics

ESA/SSTTiming

PayloadSafe-to-Mate

• Harness

PayloadThermal

PayloadEMI/EMC/MAG

• 6 cycles T-V• ESA Functional (Level 1)

• Test Review

InstrumentPER

ESA SENSOR

ESA ELECTRONICS (ETC)

ESA / PAYLOAD INTEGRATION

PAYLOAD ENVIRONMENTAL PayloadVibration

PayloadAcceptance

• Workmanship (if necessary)

• 2 cycles T-V• Bake-out +60C

IDPUSafe-to-Mate

IDPU/ESA/SCM Pre-Amp

Vibration

ESAFunctional(Level 0)

IDPUThermal

• 2 cycles T-V• Bake-out +60C

• Backplane

IDPUAcceptance

• Inspection• Mass Properties• DC Magnetics

ETCAcceptance

• Inspection

Page 8: THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.

THEMIS INSTRUMENT CDR Peer Review SYSTEM-8 UCB, April 19, 2004

RFA #10:SST I&T Flow

SSTFunctional(Level 2)

• SST w/ Radiation Source• Attenuator Test

SST Vibration

SSTThermal

SSTAcceptance

• Inspection• Mass Properties• DC Magnetics

ESA/SSTTiming

PayloadSafe-to-Mate

• Harness

PayloadThermal

PayloadEMI/EMC/MAG

• 6 cycles T-V• SST Functional (Level 1)

• Test Review

InstrumentPER

SST SENSOR

SST ELECTRONICS(DAP and ETC)

SST / PAYLOAD INTEGRATION

PAYLOAD ENVIRONMENTAL PayloadVibration

PayloadAcceptance

• Workmanship (if necessary)

• 2 cycles T-V• Bake-out +60C

IDPUSafe-to-Mate

IDPU/ESA/SCM Pre-Amp

Vibration

DAPAcceptance

SSTFunctional(Level 0)

• Without SST

• InspectionIDPU

Thermal

• 2 cycles T-V• Bake-out +60C

• Backplane

IDPUAcceptance

• Inspection• Mass Properties• DC Magnetics

ETCAcceptance

• Inspection

Page 9: THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.

THEMIS INSTRUMENT CDR Peer Review SYSTEM-9 UCB, April 19, 2004

RFA #10:EFI I&T Flow

EFI Pre-AmpBake-out

EFI AXBDeploy

• Sensor in Mu Metal

EFI Pre-AmpThermal

EFI Pre-AmpAcceptance

AXBVibration

AXBThermal

• 1 cycle T-V• Hot/Cold Deploy

AXBAcceptance

• Inspection• Mass Properties• DC Magnetics

• Bake-out +60C

EFI Functional(Level 2)

EFI/SCM/FGMPhasing

EFI SPBDeploy

PayloadSafe-to-Mate

• Harness

PayloadThermal

PayloadEMI/EMC/MAG

• 6 cycles T-V• EFI Functional (Level 1)

• Test Review

InstrumentPER

EFI AXIAL BOOM (AXB)

EFI RADIAL BOOM (SPB)

EFI PRE-AMP

EFI / PAYLOAD INTEGRATION

PAYLOAD ENVIRONMENTAL PayloadVibration

PayloadAcceptance

• Workmanship (if necessary)

• 3 cycles (air) • Inspection• Mass Properties• DC Magnetics

EFI ELECTRONICS(BEB and DFB)

SPBVibration

SPBThermal

• 1 cycle T-V• Hot/Cold Deploy

SPBAcceptance

• Inspection• Mass Properties• DC Magnetics

EFI Pre-AmpVibration

IDPUSafe-to-Mate

IDPU/ESA/SCM Pre-Amp

Vibration

BEBAcceptance EFI

Functional(Level 0)

• Without sensors

• Inspection

IDPUThermal

• 2 cycles T-V• Bake-out +60C

• Backplane

IDPUAcceptance

• Inspection• Mass Properties• DC Magnetics

DFBAcceptance

• Inspection

Page 10: THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.

THEMIS INSTRUMENT CDR Peer Review SYSTEM-10 UCB, April 19, 2004

RFA #10:Environmental Test Matrix

Page 11: THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.

THEMIS INSTRUMENT CDR Peer Review SYSTEM-11 UCB, April 19, 2004

RFA #10:Environmental Test Matrix

Page 12: THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.

THEMIS INSTRUMENT CDR Peer Review SYSTEM-12 UCB, April 19, 2004

RFA #10:Environmental Test Matrix

Page 13: THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.

THEMIS INSTRUMENT CDR Peer Review SYSTEM-13 UCB, April 19, 2004

RFA #10:Environmental Test Matrix