Birmingham New Street Station

.

Past:

• Train movement every 133 seconds

• 60,000 passengers/day

• Built: Victorian era Refurbished: 1960’s

• Poorest Station customer feedback

Future:

•Train movement every 37 seconds

• 140,000 passengers/day

• Complete Remodel/Function by 2015

•Light and Spacious Concourse

OUR VIDEO

.

‘SPINE’ PROJECT OVERVIEW

.

• Redevelopment eliminates existing spine to create a atrium.

• 1 level of car parking removed to create huge atrium.

• Western Spine carries power and water services for all the station and 12 platforms

• Our solution consisted of 26 modules and five risers

Design

• StructureSlab above non weight bearing

60 year old concrete columns with 20m span

Cloud Survey and Ferro Scan

Vierendeel Beam

• LogisticsFloor max loading of 3.5kN/m2,

Modules 19m Long 4.6m wide

Ground Radar Survey

• BIM ModelModel created allowing tolerance

Intelligent objects

Legacy information for Network Rail

NETWORK RAIL’S UNPRECEDENTED CHALLENGES

.

“The ‘Spine’ project demonstrates NG Bailey’s bold

and pioneering approach to engineering and

clearly highlights the benefit that BIM and offsite

solutions can deliver.

Their engineering skills ensured passengers and

trains remained undisrupted.

The team also managed to shorten the overall

project time, creating both time and costs savings

for Network Rail.” Chris Montgomery

Project director at Network Rail

OFFSITE OUTCOMES

.

• Program

Tight program with January Deadline

Delivered 6 weeks early

• Sustainability

57% reduction in Carbon Footprint

• Cost

below Onsite

• Safety

1 million Riddor free hours

10k hours removed off site

• No trains disrupted

The Buildoffsite view

1. Huge obstacles

2. Huge innovation

3. Program, cost and carbon all reduced v traditional

4. Everyone safe

5. Demonstrates the benefit of BIM and Offsite in

• Rail )

• Refurbishment ) environments

• Live )