The Road of Liming’s PLM Shenyang Liming Aero-Engine Group Corporation Cai Ying Director of IT department of Liming May,2006

Transcript of The Road of Liming’s PLM -  · The Road of Liming’s PLM Shenyang Liming Aero-Engine Group...

Page 1: The Road of Liming’s PLM -  · The Road of Liming’s PLM Shenyang Liming Aero-Engine Group Corporation Cai Ying Director of IT department of Liming May,2006 . Main Content Shenyang

The Road of Liming’s PLM

Shenyang Liming Aero-Engine Group Corporation

Cai YingDirector of IT department of Liming

May,2006

Page 2: The Road of Liming’s PLM -  · The Road of Liming’s PLM Shenyang Liming Aero-Engine Group Corporation Cai Ying Director of IT department of Liming May,2006 . Main Content Shenyang

Main ContentMain Content

Shenyang Liming Aero-Engine Group Corporation

1. Liming Company 1. Liming Company ‘‘s Profiles Profile

2. Key business challenges2. Key business challenges

3. The PLM road of Liming3. The PLM road of Liming

4. Next4. Next--step planstep plan

Page 3: The Road of Liming’s PLM -  · The Road of Liming’s PLM Shenyang Liming Aero-Engine Group Corporation Cai Ying Director of IT department of Liming May,2006 . Main Content Shenyang

Shenyang Liming Aero-Engine Group Corporation

Liming Company ProfileLiming Company Profile

Shenyang Liming AeroShenyang Liming Aero--Engine Group CorporationEngine Group Corporation

LocationLocation: Shenyang, China: Shenyang, China

2004 2004 RevenuesRevenues: RMB 2.1 Billion: RMB 2.1 Billion

Number of EmployeesNumber of Employees: : 10000+10000+

It is mainly engaged in production and repairs of aero It is mainly engaged in production and repairs of aero

engine products. Non aero products mainly include engine products. Non aero products mainly include

subcontracted aero parts, gas turbine, automotive turbine subcontracted aero parts, gas turbine, automotive turbine

pressure booster, aluminum extruded sections, etc. pressure booster, aluminum extruded sections, etc.

Page 4: The Road of Liming’s PLM -  · The Road of Liming’s PLM Shenyang Liming Aero-Engine Group Corporation Cai Ying Director of IT department of Liming May,2006 . Main Content Shenyang

Shenyang Liming Aero-Engine Group Corporation������

Key Business ChallengesKey Business ChallengesKey Business Challenges

Key business challenges of Liming Corporation are shorten researKey business challenges of Liming Corporation are shorten research ch and production period of new products and achieve batch productiand production period of new products and achieve batch production.on.

Existing factsExisting facts��

Rigid workflow of stringRigid workflow of string--like paper business triplike paper business tripDecentralized staff structureDecentralized staff structureBackward technical information system without collaborationBackward technical information system without collaboration

Strategy to face challengeStrategy to face challenge————establish the brand new lean establish the brand new lean enterpriseenterprise

While product life management (PLM) is the necessary IT system oWhile product life management (PLM) is the necessary IT system of f the lean enterprise. the lean enterprise.

The most important objectives of Liming PLM system: achieve The most important objectives of Liming PLM system: achieve collaboration of design and production, optimize business flow acollaboration of design and production, optimize business flow and nd shorten production preparation time period.shorten production preparation time period.

Page 5: The Road of Liming’s PLM -  · The Road of Liming’s PLM Shenyang Liming Aero-Engine Group Corporation Cai Ying Director of IT department of Liming May,2006 . Main Content Shenyang

The Road of Liming’s PLMThe Road of Liming’s PLM

1995: started using Unigraphics software2000: bought 100 seats Unigraphics software for one timeEnd of 2002: have more than 200 seats Unigraphics SWDec, 2002 to Apr, 2003: implemented Teamcenter Manufacturing

pilot projectAug, 2003 to Dec, 2003: invited EDS for detailed consultation and

evaluation of its production preparation stage and relevant environment

Feb, 2004: Prototype test of design/production collaboration at separate places

May, 2004 to Dec, 2004: finished the implementation work of the first stage of Liming PLM system

Jan, 2005 to Dec, 2005: Implementation of the second stage of Liming PLM system

Shenyang Liming Aero-Engine Group Corporation

Page 6: The Road of Liming’s PLM -  · The Road of Liming’s PLM Shenyang Liming Aero-Engine Group Corporation Cai Ying Director of IT department of Liming May,2006 . Main Content Shenyang

��Integration of CAD/CAM

and other applicationsoftware

Information inquiryby other departments

Project supervision &management

Production preparation

NC programming

Client

Application software

Teamcenterserver

Design Institute Product data

Teamcenter foundation

TC Eng. application engine TC Mfg. application engine IDSM service

Product structure management

Workflow management

System managementOther

Process

planningResource

managementWorkshop layout

Process output

Overallinquiry

Data download & synchronization

Teamcenter application interface

AUTOCAD UG NX UG NX CAMOther software

Interfaces, like ERP/MES

Multiple sitecollaboration

Routerdistribution

Auxiliary process planning

Main Process planning

Jig&Fixture design

Materialsupply

System maintenance & managementArchives management

Liming PLM System ArchitectureLiming PLM System Architecture

Shenyang Liming Aero-Engine Group Corporation

Page 7: The Road of Liming’s PLM -  · The Road of Liming’s PLM Shenyang Liming Aero-Engine Group Corporation Cai Ying Director of IT department of Liming May,2006 . Main Content Shenyang

MetaData & Data Vault Server

ODS server606

Data Vault(s) File Storage

Database ServerMetaData* Oracle Only

Portal Server(Portal Server Directory)With TcEngineering Install

IDSM

Liming ServersIDSM

Liming Clients

Portal Clients( Java Client ) Portal Client Install

JRE

Jin HangNetwork

3 Tier Clients

2 Tier clients

Liming Enterprise Network

Firewall

Shenyang Liming Aero-Engine Group Corporation

Liming PLM System Hardware ArchitectureLiming PLM System Hardware Architecture

Page 8: The Road of Liming’s PLM -  · The Road of Liming’s PLM Shenyang Liming Aero-Engine Group Corporation Cai Ying Director of IT department of Liming May,2006 . Main Content Shenyang

PLM Phase 1: PLM Phase 1: Built multi-site design/manufactu

collaboration platform

Design Institute Liming

Global Server(ODS)

Liming Server

Primary objectAssistant object

3 Import objects

4 Synchronization

2 Global inquiry

Design place server

Record table of publishing object: (Parts No., names, etc.)

1 Publishing object

Page 9: The Road of Liming’s PLM -  · The Road of Liming’s PLM Shenyang Liming Aero-Engine Group Corporation Cai Ying Director of IT department of Liming May,2006 . Main Content Shenyang

PLM Phase 1: Part process PLM Phase 1: Part process planning and managementplanning and management

Shenyang Liming Aero-Engine Group Corporation

Page 10: The Road of Liming’s PLM -  · The Road of Liming’s PLM Shenyang Liming Aero-Engine Group Corporation Cai Ying Director of IT department of Liming May,2006 . Main Content Shenyang

PLM Phase 2: System PLM Phase 2: System Optimization and ImplementationOptimization and Implementation

After the prototype system being tested, specialists and users After the prototype system being tested, specialists and users

gave some modifying and optimizing requirements after they did gave some modifying and optimizing requirements after they did

assessment to it.assessment to it.

Through many assessments and testing, we were gradually Through many assessments and testing, we were gradually

optimizing the system.optimizing the system.

Speed up the system hardware construction and generalize it withSpeed up the system hardware construction and generalize it within in

certain area.certain area.

Shenyang Liming Aero-Engine Group Corporation

Page 11: The Road of Liming’s PLM -  · The Road of Liming’s PLM Shenyang Liming Aero-Engine Group Corporation Cai Ying Director of IT department of Liming May,2006 . Main Content Shenyang

PLM

Benefits

PLM

Benefits

9% decrease of product design data 9% decrease of product design data receiving time receiving time

51% decrease of tooling applying time51% decrease of tooling applying time48% decrease of design modification 48% decrease of design modification

timetime50% decrease of process establishment 50% decrease of process establishment

(including examination and approval) time (including examination and approval) time …………

Page 12: The Road of Liming’s PLM -  · The Road of Liming’s PLM Shenyang Liming Aero-Engine Group Corporation Cai Ying Director of IT department of Liming May,2006 . Main Content Shenyang

Currently it is implementing Currently it is implementing

Jigs&Fixtures PDM and generalizing Jigs&Fixtures PDM and generalizing

process planning system process planning system

It is about to do PLM & MES system It is about to do PLM & MES system

Integration in the next stepIntegration in the next step

Implementation of assembly process Implementation of assembly process

planning and management in PLM systemplanning and management in PLM system

Gradually implement and generalize it on Gradually implement and generalize it on

each lineeach line

PLM & ERP system integrationPLM & ERP system integration

…………