Subject: Reply of EDS dated 11.12.18 against amendment in ToR application for the proposed project for the Proposed Greenfield Manufacturing unit of Herbal extracts, Active pharmaceutical ingredient, Biomolecules and Natural Food Colours at Plot-03, Sector-18, phase-3, Industrial Estate Barhi, District - Sonipat, Tehsil –Gannaur, State – Haryana.
Proposal No - IA/HR/IND2/81580/2018 MOEF&CC File No - IA-J-11011/316/2018-IA-II(I)
Dear Sir,
Point wise reply of EDS observations is given below:
S.No. Observation Reply
1
(1)Please submit the copy of Notification of the said industrial area.
Environmental Clearance for the development of Industrial Estate and CETP at I.E. Barhi, Phase-III near Gannaur, District –Sonepat, Haryana (under Category 8(b) project) was applied on 18.04.2012 & again on 08.08.2013.
HSIIDC request MoEF&CC to consider the case of Environmental Clearance for the next meeting agenda along with the project chronology (Copy of the letter is attached as Annexure-1)
Public hearing for the project was conducted on 07.11.2013 (copy of PH advertisement is attached as Annexure-2) & the case was heard in 104
th
SEAC meeting dated 12.05.2014 & 76th
SEIAA meeting dated- 13.10.2014 (copy is attached as an Annexure-3)
As the Haryana State Committee was dissolved the SEIAA has transferred the proposal to MoEF&CC for further actions vide memo no- SEIAA/HR/2015/378-381 dated- 24.03.2015. When the Haryana state committee was again reconstituted on 21.08.2015 thus the MoEF&CC transferred the file to SEAC/SEIAA dated 31.08.2015.
The case was taken up in the 83rd
SEIAA meeting held on 28.09.2015 & Authority decided to refer back this case to SEAC due to shortcoming & after re-appraisal the case was again taken up in the 110
rd SEIAA meeting held on
02.02.2018 where the Authority decided to agree with the recommendations of SEAC to accord Environment Clearance to this project. (copy is attached as an Annexure-4)
The Master Plan of the industrial area showing the location of the proposed project is also attached as an Annexure-5
We hope the above reply is satisfactory and we request you to grant us the amended TOR with exemption of Public hearing in view of the point no-(ii) of O.M. dated- 27
th April, 2018 (MOEF&CC).
Thanking you, Authorized Signatory
HARYANA STATE POLLUTION CONTROL BOARD C-11, SECTOR-6, PANCHKULA
Website – www.hspcb.gov.in E-Mail - [email protected] Tele Fax No. – 0172-2577870-73
Notice For Public Hearing It is for the information of all concerned that M/s Haryana State Industrial & Infrastructural Development Corporation Ltd has proposed to develop an Industrial Estate, Phase- III in the revenue estate of Village Barhi, Tehsil Ganaur, District Sonepat, Haryana. The project is covered under the ambit of Environment Impact Assessment Notification No. S.O. 1533 (E) dated 14th Sep, 2006 issued by Ministry of Environment & Forest, Govt. of India, New Delhi and thus Environmental Clearance is mandatory for the proposed project. Accordingly the project proponent has applied to the concerned authority for Environmental Clearance.
As a part of procedure for seeking the Environmental clearance, as notified by the Ministry of Environment and Forest, Govt. of India, New Delhi vide Notification No. S.O. 1533 (E), dated 14.9.06, the project proponent mentioned above have applied to the Haryana State Pollution Control Board, for conducting a Public Hearing of its proposed Industrial Estate Project. Accordingly the Public Hearing for the above said project has been fixed on 07.11.2013 at 2.30 PM at the Project Site mentioned above.
Copies of executive summary of the project and EIA study report, submitted by the project proponent, are available in the Head Office of the Board as well as in the following offices, which can be perused during office hours, on any working day : -
1. Deputy Commissioner, Sonipat. 2. Regional Officer, Haryana State Pollution Control Board, Sonipat Region, Star Complex, Opposite General Hospital, Delhi Road, Sonipat 3. O/o Zila Parishad, Sonipat. 4. O/o Municipal Council, Sonipat 5. Joint Director, District Industries Centre, Sonipat
Notice is hereby given to all concerned, to file suggestions, views, comments and objections, if any, on the proposed project, to the Chairman, Haryana State Pollution Control Board, C-11, Sector -6, Panchkula as well as Regional Officer, Haryana State Pollution Control Board, Sonipat Region, Star Complex, Opposite General Hospital, Delhi Road, Sonipat (Haryana) within 30 days of the publication of this notice. Besides, a Public Hearing will also be held on the Date, Time & Venue mentioned above at the proposed site of the project, which can be attended by any person including Environmental Groups, bonafide residents and others, located at the project site/ sites of displacement / sites likely to be affected. Oral/Written suggestion, if any can also be made during the Public Hearing.
No TA/DA will be admissible for attending the Public Hearing.
Vijai Vardhan, IAS Chairman
KEEP HARYANA CLEAN AND POLLUTION FREE
1
List of the projects to be taken-up in the 110th meeting of SEIAA held on 02.02.2018 at 11.30 AM Sr
No.
File Number Address and Name of
Applicant.
Name of the Project and
Location
Date of
receipt of application
Action Taken by
the SEAC
Remarks
1 SEIAA/HR/15/ 107 SEIAA/HR/14/ 659
The Lalit Suri Education & Charitable Trust, Lower Ground Floor, World Trade Centre, Barakhamba Lane, New Delhi.
EC for construction of Lalit Suri Education & Charitable Trust, Food craft complex, Badkhal road, Faridabad, Haryana.
Transferred by MOEF on 31.08.2015
Recommended to SEIAA for de-list on 16.6.2017
2 SEIAA/HR/15/ 97 SEIAA/HR/2013/539
M/s Rurban Development Corporation Pvt. Ltd. Regd. Office 820, 8th floor, Wave Silver Tower, Sector-18, Noida-201301
EC for the development of Group Housing Colony “Rudco Golf Greens”located at Revenue Estates of Village Palwal, Sector-7, Palwal, Haryana
Transferred by MOEF on 31.08.2015
Recommended for De-list on 08.11.2016
3 SEIAA/HR/16/ 303
M/s. Haat Supreme Wastech Pvt. Ltd. VPO Bazida Jattan, Distt. Karnal-132001.
EC for proposed Common Bio Medical Waste Treatment Facility (CBWTF) located at Khatoni No. 157, Village Bazida Jatan, near railway crossing, Tehsil & District-Karnal, Haryana
21.11.2016 Recommended to SEIAA for further necessary action on 21.11.2017
4 SEIAA/HR/16/ 304
M/s Esskay Hygienic Services, VPO Bagwala, Teh. Barwala, Distt-Panchkula.
Environmental Clearance for proposed Common Bio-Medical Waste Treatment Facility (CBWTF) located at Khewat no 1, Khatoni no 1 kite. No 50, Tadadi No 314, village VPO Bagwala, Tehsil Barwala, District Panchkula, Haryana.
21.11.2016 Recommended to SEIAA for further necessary action on 21.11.2017
5 SEIAA/HR/16/ 308
Synergy Waste Management Pvt. Ltd., 517-518, 5th Floor D Mall, Sector-10, rohini West, New Delhi-110085
Environment Clearance for proposed Common Bio-Medical Waste Treatment Facility (CBWTF), at Plot no. 66, Roz Ka Meo Industrial area, Sohna, Mewat, Haryana
23.11.2016 Recommended to SEIAA for further necessary action on 21.11.2017
3
11 SEIAA/HR/15/11
HSIIDC, C- 13-14, Corporate Office Building, Sector-6, Panchkula- 134109, Haryana, India.
Environmental Clearance for the development of Industrial Estate and CETP at I.E. Barhi, Phase-III near Gannaur, District – Sonepat, Haryana (under Cateogory 8(b) project.
Transferred by MOEF on 31.08.2015
Recommended to SEIAA for EC on 04.06.2014 Again ecommended to SEIAA for EC on 23.01.2018
12 SEIAA/HR/17/ 345
M/s Emaar MGF Land Limited, Emaar MGF Business Park, MG Road, Sikanderpur Chowk, Sector-28, Gurgaon, Haryana-122002.
EC for expansion of “Commercial Complex” at Village Badshahpur, Sector-66, Gurgaon, Haryana.
07.09.2017 Recommended to SEIAA for EC on 23.01.2018
13 SEIAA/HR/17/ 348
M/s Bharat Petroleum corporation Limited Depot, Station Road, Near Double Fatak, Hisar, Haryana 125001
EC for proposed POL Depot at Village-Bir Hisar, Disttrict- Hisar, Haryana
22.09.2017 Recommended to SEIAA for approval of TOR on 23.01.2018
14 SEIAA/HR/17/ 359
M/s Active Promoters Pvt. Ltd. & Others, Emaar MGF Business Park, MG Road, Sikanderpur Chowk, Sector-28, Gurgaon, Haryana-122002
EC for “Expansion cum Modification” of I.T. Park project located at Village-Ghatta, Sector-61, Gurugram,Haryana
31.10.2017 Recommended to SEIAA for approval of TOR on 23.01.2018
15 SEIAA/HR/17/ 361
M/s Shri Colonizers & Developer Pvt. Ltd, S-14, IInd Floor, Jai Hind Commercial, B.N Road, Lucknow-226001.
EC for construction of “Affordale Group Housing scheme” at Sector-67-A, Gurugram, Haryana.
14.11.2017 Recommended to SEIAA for EC on 23.01.2018
16 SEIAA/HR/17/ 365
M/s Emperium Realty Pvt. Ltd, Two Horizon Centre, 618-619, 6th Floor, Corporatedge Service Office, Golf Course Road, DLF-5, Gurgaon-122002.
EC for proposed Affordable Group Housing Colony on an area measuring 5.08339 acres at Village Taraf Insar & Rajputan, Sector 1-A, Panipat, Haryana.
15.11.2017 Recommended to SEIAA for EC on 23.01.2018
1
Minutes of the 110th meeting of State Environment Impact Assessment Authority
held on. 2nd February, 2018 under the Chairmanship Sh. Bharat Bhushan IAS
(Retd.), Chairman, SEIAA held in the meeting room of office of SEIAA Haryana,
Sector-2 Panchkula, regarding Environmental Clearance under EIA Notification
dated 14.9.2006.
All the members are present. The project proposals as recommended by SEAC for
Environmental Clearance or otherwise and listed in the Agenda item circulated vide letter
No. 43 to 45 dated 16.01.2018 were discussed following decisions were taken:-
Item No.[1] Environmental Clearance for construction of Lalit Suri Education & Charitable Trust, Food craft complex, Badkhal road, Faridabad, Haryana by The Lalit Suri Education & Charitable Trust.
The case was lastly taken up in the 109th meeting of the SEIAA held on
22.12.2017 and the Authority unanimously opinion that it needs more time to study and
analyze the case, therefore it has been deferred for the next meeting.
In the today’s meeting after detailed deliberations the Authority
unanimously decided that it needs more time to study and analyse the case, therefore it
has been deferred for the next meeting.
Item No.[2] Environmental Clearance for the development of Group Housing Colony “Rudco Golf Greens”located at Revenue Estates of Village Palwal, Sector-7, Palwal, Haryana M/s Rurban Development Corporation Pvt. Ltd.
The case lastly considered in the 101st meeting of SEIAA held on
22.03.2017 and the Authority decided to defer this case with the decision that Sh. G. R.
Goyat Chairman SEAC and Sh. A. K. Bhatia, Member SEAC shall visit the site for
inspection and shall submit the report on the point as indicated above within 15 days
period.
The case has been taken up in the today’s meeting and as per the site
inspection report submitted by the sub-committee dated 14.12.2017 the authority decided
to go with recommendations of SEAC to de-list this case. It was also decided that the
decision of the Authority should be conveyed to the Project Proponent and copy of the
same be forwarded to the Haryana State Pollution Control Board, DGTCP, Haryana &
R.O. MOEF, GOI for information and necessary action.
Item No.[3] Environmental Clearance for proposed Common Bio Medical Waste Treatment Facility (CBWTF) located at Khatoni No. 157, Village BazidaJatan, near railway crossing, Tehsil & District-Karnal, Haryana by M/s. Haat Supreme Wastech Pvt. Ltd..
The case was lastly considered in the 106th meeting held on 07.09.2017 and
the Authority decided that the said project being the “Existing” may be exempted from
“Public Consultation/Hearing” as per the para 7(ii) dated 23rd Nov., 2016 of the MoEF
notification, 2006 subject to:
6
During discussion, it was revealed from the Site Inspection Report dated
23.08.2017 of Advisor, Northern Zonal Officer, Ministry of Environment, Forest &
Climate Change, Government of India wherein it is clearly mentioned in the conclusion
that the area proposed for expansion was under development. In the above said inspection
report there are 3 photographs which is showing construction in the proposed expansion
area. This is a clear case of violation of EIA Notification, 2006 since PP has started
construction in proposed expansion area prior to obtaining environment clearance.
In the today’s meeting after detailed deliberations the Authority was of the
unanimous opinion that it needs more time to study and analyse the case, therefore it has
been deferred for the next meeting.
Item No.[11] Environmental Clearance for the development of Industrial Estate and CETP at I.E. Barhi, Phase-III near Gannaur, District – Sonepat, Haryana (under Cateogory 8(b) project by HSIIDC.
The case was taken up in the 83rd meeting held on 28.09.2015 and it was
observed that the project proponent has failed to submit the permission for withdrawal of
Ground water and the Authority decided to refer back this case to SEAC with the advice
to re-appraise the project proposal in terms of deficiencies pointed out above and send its
recommendations within stipulated period as prescribed in the Notification.
In the today’s meeting it was found that the PP has submitted the
permission for withdrawal of Ground water from CGWA.
In view of the above the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project.
Item No.[12] Environmental Clearance for expansion of “Commercial Complex” at Village Badshahpur, Sector-66, Gurgaon, Haryana by M/s Emaar MGF Land Limited,
The SEAC has recommended this project for Environmental Clearance
subject to stipulation stated therein. The Project Proponent has proposed the expansion of
“Commercial Complex” at Village Badshahpur, Sector-66, Gurgaon, Haryanaon a total
plot area of 9105.464 sqm (2.25 Acres). The total built up area shall be 41007.6 sqm
(existing 36439.033 sqm + expansion 4568.567 sqm). The project proposed shall
comprise of 1 Tower 4 Basement G + 18 Floors, Retail shops. The proposed project shall
have 153 Service apartment room (keys). The maximum height of the building shall be
83.55 meter. The total water requirement shall be 170 KLD. The fresh water requirement
shall be 102 KLD. The waste water generation shall be 106 KLD which will be treated in
the STP of 130 KLD capacity. The total power requirement shall be 3277.9 KW which
will be supplied by DHBVN. The Project Proponent has proposed to develop green belt
on 1859.84 sqm (25.50%) of project area (658.11 sqm Green Belt Plantations + 886.1
sqm Lawn + 201.22 sqm Peripheral Plantation + 109.72 sqm Avenue Plantation). The
Project Proponent proposed to construct 03 rain water harvesting pits. The solid waste
M
IN
OR
M
I
N
O
R
T
O
G
A
N
N
A
U
R
TO
D
RAIN
N
O.6
BO
UN
DARY, EM
BAN
KM
EN
T BO
TTO
M (U
ND
EM
ARCATED
)
BO
UN
DARY (U
ND
EM
ARCATED
)
BOUNDARY OFPHASE -3
RAJPU
R
DISTRIBU
TARY
PHASE-2
H.T.PO
W
ER LIN
E (132KV)
H.T.PO
W
ER LIN
E (132KV)
SECTOR-14(RESIDENTIAL)
SECTOR-15(RESIDENTIAL)
SECTO
R-19
(IND
USTR
IAL)
SECTOR-14
T
O
L
A
L
H
E
R
I
H
.
T
.
P
O
W
E
R
L
I
N
E
O
N
P
Y
L
O
N
S
(
2
2
0
K
V
)
R
A
J
P
U
R
D
I
S
T
R
I
B
U
T
A
R
Y
H
.
T
.
P
O
W
E
R
L
I
N
E
O
N
P
Y
L
O
N
S
(
2
2
0
K
V
)
SECTOR-17(RESIDENTIAL)
PHASE-3
SECTOR-18(INDUSTRIAL)
R
A
J
P
U
R
D
I
S
T
R
I
B
U
T
A
R
Y
R
A
J
P
U
R
D
I
S
T
R
I
B
U
T
A
R
Y
SECTOR-22(INDUSTRIAL)
SECTOR-23(INDUSTRIAL)
IH-6
IH-5
IH-4
IH-3
IH-2
IH-1
IH-8
IH-9
IH-10
IH-12
IH-11
IH-7
SECTOR-24(INDUSTRIAL)
R
A
J
P
U
R
D
I
S
T
R
I
B
U
T
A
R
Y
MEGA FOOD PARK
SECTOR-16(RESIDENTIAL)
HSIIDCI.E. BARHI, PHASE -3
REVISED LAYOUT PLANTOTAL AREA OF BARHI PHASE-III
AREA STATEMENT (GENERAL INDUSTRY) IN ACRES
646.86 AC.
AREA UNDER INDUSTRIAL PLOTS 146.06
56.4719.75
16.606.07
43.14
4.35
19.81
AREA UNDER GROUP HOUSING SITESAREA UNDER COMMERCIAL USE
AREA RESERVED FOR INSTITUTIONAL PURPOSEAREA RESERVED FOR LABOUR HOUSING
AREA UNDER R&R RESIDENTIAL PLOTS
AREA UNDER COMMUNITY CENTRE (2 Nos)
AREA UNDER UTILITIES
12345678
10
238.12AREA UNDER GREEN BELTS, OPEN SPACES ANDROADS ETC.
N
9
LEGENDOPEN SPACESACQUISITION BOUNDARY
RELEASED LANDDRG. NO. HSIIDC/IPD/ 980, DATED:-07-08-15 VERSION-09
DETAIL OF INDUSTRIAL PLOTS (PHASE-III)S.NO. SIZE (in mtrs) TOTALAREA (IN AC.)
123456
1.0 AC. 5345 x 90
7
0.44 AC. 2730 x 60
8
0.25 AC. 6922.5 x 450.11 AC. 10815 x 30
277TOTAL
DETAIL OF GROUP HOUSING SITESS.NO. SIZE (Meters) TOTALAREA (Acres)
1 2.51 AC.01
50m wide
2 2.44 AC.02
56
SEC-22 SEC-23 SEC-24
108184
--27
--06
69------27--
------
2.20 AC. 01
01
01
160.99 AC.
25
50 x 80
3
56
10
12
Sqm.
989010150
TOTAL
8892
4000
0.74 AC. 40 x 75 3000
1.15 AC. 4645
1.20 AC. 4864
0101
78
1.05 AC. 42371.10 AC. 4438
019
1.00 AC. 4038
50m wide50m wide50m wide50m wide
0.95 AC. 50m wide11
3842 01
SEC-17
0102
40
01
01
01
--
25
010101
01
SEC-15
16
16--
----
------
--
------
AREA UNDER FLATTED FACTORIES 14.61
11
SEC-18
--60
----
531.56 AC. 70 x 90 --01 01-- --1.78 AC. 0660 x 120 ----06 --
86.5 X 112.8
----
1.25 AC. 014 5003 01----
NOTE:- THIS DRAWING SUPERCEDES DRG. NO. HSIIDC/IPD/956,DATED:-21/11/14
60 x 80 041.20 AC. 4800 04--
13
0.96 AC. 0643 x 90 ----06--
DETAIL OF RESIDENTIAL PLOTS/R & R PLOTS
2.50AREA RESERVED FOR SCHOOL
12
CATEGORY SIZE14 MARLA
TOTAL NO. OF PLOTS246
4 MARLA6 MARLA 155
86
10 MARLA 788 MARLA 144
3 MARLA 112
14m x 25m12m x 21m10m x 20m8.5m x 18m7m x 14m6m x 12.5m
821TOTAL
S.NO.123456
4.38AREA UNDER SUB-STATION
01116.2m WIDE ------ 01
DETAIL OF MEGA FOOD PARK (SECTOR-23)S.NO. SIZE (in mtrs) TOTALAREA (IN AC.)
1234 0.25 AC. 0822.5 x 45
0.44 AC. 30 x 60 440.87 AC. 0237 x 951.06 AC. 1845 x 95
5 0.33 AC. 02--4 0.25 AC. 1220 x 22.5
TOTAL 86
TOTAL AREA PLANNED 571.86
AREA STATEMENT OF MEGA FOOD PARK IN ACRES
AREA UNDER INDUSTRIAL PLOTS 44.49
1.781.78
1.041.04
1.781.78
AREA UNDER ADMIN COMPLEXAREA UNDER COLD STORE
AREA UNDER STEAM GENERATION AREA UNDER RAW GOODS WAREHOUSE
AREA UNDER SILOSAREA UNDER FINISHED GOODS WAREHOUSE
12345678
AREA UNDER SHED 1.33
0.8918.20
0.89AREA UNDER PACKING & SORTINGAREA UNDER GREEN BELTS, OPEN SPACES
AREA UNDER IQF/MA CHAMBER 678
AND ROADS ETC.
TOTAL AREA 75.00
5.50 AC.
5.02 AC.01
145m WIDE
4.68 AC.
01
90m WIDE4.85 AC. 0190m WIDE
----
-------- 01
01
01--
----5.11 AC.
01
101.7m WIDE
--------
01----
01---- 01--4.96 AC. 91.5m WIDE
2.31 AC. 01-- ------ 01
91011121314
DRAWN BY:-MANOJ KUMAR (-SD-)
A.T.P:- RAVISH JANI(-SD-)
D.T.P.:- DEVENDER PAL (-SD-)
C.T.P.:- ARVIND MEHTANI(-SD-)
DIRECTOR CONTROLLED AREA CUM M.D. HSIIDC:- VINEET GARG(-SD-)
ALLOTTED PLOTS
VACANT PLOTS
11/10/2018 Industrial Estates | HSIIDC, Government of Haryana Undertaking, India
http://hsiidc.org.in/industrial-estates 1/2
Home » Activities and Services » Infrastructure Development » Industrial Estates
Industrial EstatesAn industrial estate developed over an area upto 1500 acres at a particular place is defined as an Industrial Estate (IE).
List of IE developed/ being developed by HSIIDC is as follows:
Location: 57 kms from Delhi on the NH-1, near Gannaur in Sonepat District.
(Status - Planned & Developed).
Salient Features of IE Barhi
Total area of Industrial Estate (in acres) Year of establishment
Phase-I 275.25 Phase-I 1999
Phase-II 332.95 Phase-II 2007
Phase- III 646.86 Phase- III 2012
Total no. of carved out plots 1131
Allotted plots 704
Unallotted plots 427
Units in production 315
Main products being manufactured in theEstate: Mfg. of Textile, Dyeing & Washing
Facilities:
Industrial Estate with state of art infrastructure viz Roads Network, Portable Good Quality Water, Underground
Sewerage System etc.
Strom water drainage, Provision for CETP/ STP, Electricity from HVPN System
Convenience Shopping, Telecommunication Network, OHSR
Major Allottees and their details
Name of theallottee/PlotNo.
ProjectPlotSize
(sqm)
PresentStatus
InvestmentRs. in Cr. Employment Turnover
Rs. in Cr.
M/s KaicoDeer AbrasivePvt. Ltd. Dir.In Joo Yoon
Mfg. ofAbrasiveProducts
9000 Running 3.05 128 6.44
M/s EOCPolymersIndia Pvt. Ltd.
Mfg. of SBRLatexPolymerization& Adhesive
18000 Running 63.49 81 39.02
M/s ManoharFilaments Pvt.Ltd.
WeavingDyeing &Finishing
8174.83 Running 22.4 472 31.88
M/s SrishtiMetal Pvt.Ltd.
Fabrication ofTelecomeTowersShalters etc.
9000 Running 40.54 36 12.8
M/sParamountBlankets Pvt.Ltd.,
Mfg. of AcrylicKnittedBlankets
10800 Running 20 70 48
A Government of Haryana Undertaking
Haryana State Industrial & Infrastructure Development
Corporation Limited.
AA+
Skip to main content
Ambala
Bahadurgarh
Barhi (District Sonipat)
Advantage
Haryana
AboutUs
Activitiesand Services
Acts, Rules &Policies
Tenders andAdvertisement
s
Foreign Investment& NRI Cell
LatestAnnouncement
s
11/10/2018 Industrial Estates | HSIIDC, Government of Haryana Undertaking, India
http://hsiidc.org.in/industrial-estates 2/2
Rate of allotment
Development Plans
Layout plans
List of Major Industrial Units: Seasons Textiles, Wooltex Industries, Kaico Deer, EOC Polymer India etc.
For guidelines governing, mode of allotment, offer of possession, period for completion of project and commencementof business, surrender/ resumption, leasing and renting, transfer etc. may refer to EMP 2015.
ResidentialRate of allotment
Layout Plans
For guidelines governing eligibility, mode of allotment, mode of payment etc. may refer to EMP 2015
InstitutionalRate of allotment
Layout Plans
For guidelines governing description of site, mode of allotment, mode of payment etc. may refer to EMP 2015
CommercialRate of allotment
Layout Plans
For guidelines governing description of site, mode of allotment, mode of payment etc. may refer to EMP 2015.
Barwala
Dharuhera
Faridabad
Growth Centre Saha
IIDC Sirsa
Kalka
Karnal
Khutana (Distrit Rohtak)
Kundli
Manakpur
Murthal
Narnaul (Informal Sector)
Panipat
Rai
Roz-Ka-Meo
Samalkha
Sonepat
Tohana and Jind
Udyog Vihar, Gurgaon
Yamunanagar
Scanned by CamScanner
Scanned by CamScanner