The High School at Wildcreek ‘Due Diligence’ Report Washoe County School District Board of Trustees November 28, 2017 Attachment E

Transcript of The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence...

Page 1: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

The High School at Wildcreek‘Due Diligence’ Report

Washoe County School DistrictBoard of Trustees 

November 28, 2017

Attachment E

Page 2: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

The High School at WildcreekDue Diligence Report 

How We Got Here Timeline, Project Overview & Need

Due Diligence Report Findings Non‐Physical & Physical Constraints Site Plan Alternatives Preliminary Appraisal Report

Conclusions / Recommendation

Page 3: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

“Strategic Blueprint”for

Overcrowding and Repairs

Presented to:

Public Schools Overcrowding and Repair Needs Committee

November 20, 2015

3

Page 4: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

• 2024 – 2025 Shown (10 Year Projection)

• New 2400 student HS’s in north valley and Wooster area.

• Combine Hug and Sparks zones, build new combined 2400 student HS on central site (new Sparks)

• Increase Damonte Ranch to 2400 student capacity with additions

• Wooster boundary adjusts to relieve Damonte Ranch

• Some rezoning around new Sparks HS to disperse enrollment load

Recommendation –High Schools

4

Page 5: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

WCSD “Strategic Blueprint” Phasing – High Schools2016 ‐ 2024• Additions to Damonte Ranch HS – Phase 1• Cold Springs HS (first phase) – Phase 3 (growth dictated)• South McCarran/Butler Ranch Area HS – Phase 3 (growth dictated)• Wildcreek Area HS to replace Hug HS – Phase 3 (growth dictated)• Repurposing of existing Hug HS – Phase 3 (after Wildcreek Area HS)

(Career Tech., JROTC/Public Safety, etc.)

• Strategic purchase of Sparks HS properties – Ongoing (as available)

2025+• Expand and renovate Sparks HS –• Expand and renovate Wooster HS –• Addition to Cold Springs HS (second phase) –

5

Page 6: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Project TimelineFeb. 12, 2016:  PSORN approved the recommended projects and sales tax funding initiative (WC‐1) → forwarded to Washoe County Board of County CommissionersMar. 22, 2016:  WC‐1 ballot item approved by Washoe County Board of County Commissioners to be placed on the Nov. 8, 2016 ballotNov. 8, 2016:  WC‐1 is approved by voters; Informal conversation with Washoe County regarding Wildcreek siteDec. 9, 2016: Initial meeting with Washoe County and the RSCVAFeb. 16, 2017:  Conceptual site plan and schedule presented to Washoe County and the RSCVA Mar. 2, 2017:  Capital Funding Protection Committee Recommendation to the WCSD Board of Trustees of HS Design Budget and Construction Manager at Risk (CMAR) BudgetMar. 14, 2017: WCSD Board of Trustees Approval of HS Design Budget and CMAR Budget

Page 7: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Wildcreek Project

Special MeetingMay 1, 2017

Page 8: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Two High School Projects!• High School at Wildcreek• ≈2,500 student comprehensive High School• Opening: August, 2021!

• Career & Technical Academy at Hug• ≈1,400 student Career & Technical Academy• Opening: August 2022!

Page 9: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Project Timeline

May 1, 2017:  Washoe Co., City of Sparks, City of Reno, and WCSD approve the Wildcreek Project Letter of IntentMay 25, 2017:  RSCVA approves the Wildcreek Project Letter of IntentJun. 6, 2017: WCSD Board of Trustees approved a Professional Services Contract with Wood Rodgers, Inc. to develop a Due Diligence Report for the Wildcreek SiteSept. 19, 2017:  Wildcreek Area Site Alternatives Analysis Report releasedNov 28, 2017:  Due Diligence Report presented to WCSD Board of Trustees

Page 10: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

HIGH SCHOOL @ WILDCREEKDue Diligence ReportWASHOE COUNTY SCHOOL DISTRICT BOARD OF TRUSTEES

Page 11: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Traffic WorksJohnson | Perkins | Griffin

Cuningham GroupH+K ArchitectsClark/SullivanHolland & Hart

McGinley & Associates

Page 12: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Due Diligence Tasks:

• Master Plan and Zoning Confirmation• Preliminary Title Review• Preliminary Geotechnical Investigation• Waters of the United States Inventory• Sensitive Wildlife and Plant Species• Phase 1 Environmental Site Assessment• Preliminary Drainage Study• Preliminary Sanitary Sewer Study• Utilities• Preliminary FAA Airspace Review• Water Rights Research• Traffic Analysis• Site Plan Feasibility Study• Preliminary Appraisal Report

Page 13: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Project Location

• Wildcreek Golf Course• APN 027‐011‐05

• Primary parcel included in Due Diligence study

• APN 035‐080‐04• Not a part. Restricted to 

open space/recreation uses only.

Page 14: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Surrounding Uses

• North – undeveloped open space

• South – North McCarran/Wedekind; commercial and multifamily residential uses

• East – Single family residential• West – Sullivan Lane; mix of 

offices and small lot single family uses.

Page 15: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Master Plan & Zoning

• City of Sparks Master Plan “Community Facility”• “Public Schools” identified 

as primary use• Land and buildings intended 

to be used for public/civic use

• Uses may be regional or city wide in scale and intensity

• Generally compatible with most other urban land uses, especially residential

Page 16: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Master Plan & Zoning

• Truckee Meadows Regional Plan• Sparks Comprehensive Plan 

found in conformance• No significant Development 

Constraint Areas• Electric Utility Corridor• Not a Project of Regional 

Significance• No approvals required by 

TMRPA (if no major utility relocations)

Development Constraints Areas Existing Utility Corridors 

Page 17: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Master Plan & Zoning

• City of Sparks Zoning “Public Facility”• “Schools (public or private)” 

is a permitted use by right with the approval of an Administrative Review

• Conditional Use Permit may be required due to topographic conditions –dependent on final parcel location

Page 18: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Master Plan & Zoning

• City of Sparks Zoning “Public Facility”• “Schools (public or private)” 

is a permitted use by right with the approval of an Administrative Review

• Conditional Use Permit may be required due to topographic conditions –dependent on final parcel location/orientation

Page 19: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Title Review

• Preliminary Title Report prepared by Ticor Title Company (dated June 7, 2017)

• Title report reviewed by Holland and Hart

• Boundary survey and constraints map prepared

Page 20: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Title Review

Findings:• Vesting deed contains no 

restrictions• Numerous common easements, 

including:• 125’ wide NV Energy E/W 

transmission line• Transmission line and sewer 

adjacent to Sullivan Lane• Sanitary sewer in southwest 

quadrant• Orr Ditch

Page 21: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Soils Analysis

• Site is suitable for the proposed development

• Expansive surface clay soils will require:• 2’ to 4’ of over excavation 

under building foundations• 1’ to 2’ of over excavation 

under roadways and parking lots

• Imported structural fill will be required 

• Pockets of bedrock approaching surface (northern portion)

• Northern portion of site may provide borrow source

Page 22: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Waters of the US

• Potential jurisdictional resource includes entire length of Orr Ditch

• Modification of irrigation facilities (including rerouting and piping) is exempt• Current maintenance 

agreement with Orr Ditch Company

Page 23: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

WildlifeUS Fish and Wildlife Sensitive Species:

• Endangered Cui‐ui – not impacted• Threatened Lahontan Cutthroat Trout – not impacted• North American Wolverine – not known to occur in Truckee Meadows• Webber’s Ivesia – Highly unlikely to occur on site

NDOW Game Species:• Desert bighorn sheep, American black bear, California quail, greater sage‐grouse, mule deer, 

mountain lion, and pronghorn antelope have potential to occur.• Surrounding area is largely urbanized, with open areas to the north.• Given abundant open space surrounding and to possibly remain outside of campus footprint, no 

impacts are anticipated.

Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act:• Survey of site prior to construction activities during nesting season (generally January 1 to September 15)• Mitigation may include buffers and/or modified construction schedule

Page 24: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Phase 1 Environmental Site Assessment• Minimal staining observed in numerous locations where equipment is stored.• Leaking electrical transformer observed. NV Energy confirmed that polychlorinated biphenyl (PCB’s) are 

not utilized in this transformer.• Storage containers containing a range of petroleum and hazardous materials observed to be in good 

condition.• Two 2,000‐gallon underground storage tanks (UST’s) and one 1,000‐gallon UST previously existed on the 

subject property. Based upon available regulatory information, it appears that the UST’s did not leak and were ultimately replaced by a 1,000‐gallon aboveground storage tank (AST), which is currently located above the removed UST’s.

• No evidence of dumping of petroleum products and/or hazardous materials were observed.• The golf course maintains a National Pollutant Discharge Elimination System (NPDES) groundwater 

discharge permit associated with the utilization of reclaimed water for irrigation purposes.• No historical recognized environmental conditions were found for the subject property.• No controlled recognized environmental conditions were found for the subject property.• No recognized environmental conditions were found for the subject property.

Page 25: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Drainage

• Located downstream of Sun Valley detention dam

• Peak discharge of 100‐year storm flow must be conveyed through site• ±75‐foot wide, 5‐foot deep 

channel required to convey

Page 26: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Drainage

• Sun Valley Detention Dam designed to ½ Probable Maximum Flood (PMF)

• ½ PMF may be conveyed with no impact to critical structures, provided site grading and building locations are considered during final design 

• ½ PMF considerations are not required and are above current code requirements

Page 27: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

UtilitiesSanitary Sewer:

• Existing facilities on‐site or in proximity to serve project.• City of Sparks analysis identified potential downstream capacity improvements.

NV Energy:• Electric – Sullivan Lane distribution line sufficient to serve project without the need for off‐site 

improvements.• Transmission – dependent on development concept, E/W line may be relocated or raised to 

accommodate development.• Gas – extension of existing main in Wedekind Road required to serve campus.  Potential for off‐site 

upgrades to serve the project with shared improvement costs with NV Energy.

Truckee Meadows Water Authority:• Two TMWA mains in Sullivan Lane to serve project.• Two pressure zones will serve site to address both domestic and fire service.

Page 28: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

FAA Airspace

FAA Part 77 Approach:• 200+ feet of clearance above 

current ground elevation• Consider building and athletic 

lighting heights during final design

Page 29: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

FAA Airspace

One‐Engine Inoperative:• 150+ feet of clearance above 

current ground elevation• Consider building and athletic 

lighting heights during final design

Page 30: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

FAA Airspace

Reno/Tahoe Airport:• Noise –

• Site located outside of 65 dba noise contour

• No mitigation required, but overall noise should be considered in building design

• Lighting –• Work with RTAA staff to 

ensure athletic field lighting does not impact aircraft

• Look to provide low trespass, high cut‐off light fixtures (aka “dark skies”)

Page 31: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Water RightsSurface Water Rights:

• 69.20 acre feet (Permit No. 78564) Truckee River rights via the Orr Ditch – can be converted to domestic use with TMWA upon Application to Change with Nevada State Engineer’s Office 

• 506.78 acre feet (Permit No. 78563) Wells Creek rights – intermittent resource and not easily converted to domestic use.

Treated Effluent:• Agreement between RSCVA and City of Sparks.• RSCVA dedicated 448.88 acre feet of Truckee River water rights in return for up to 500 acre feet of 

treated effluent water for irrigation purposes.• RSCVA pays annual fee of $300,000.• Agreement expires March 31, 2022.• Upon expiration of agreement, 448.88 acre feet of Truckee River water rights are reconveyed back to 

RSCVA.

Page 32: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Traffic GenerationAffected Roadways & IntersectionsApproximated School ZonesTravel RoutesPotential Access ScenariosPotential Roadway & Intersection Improvements

Traffic Analysis

Page 33: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Preliminary Site Plan

400,000 Square Feet2,500 Students

Trip Generation:Daily – 4,275AM – 1,075Afternoon – 725PM – 325

Based on nationally accepted Institute of Transportation Engineers trip generation rates for a 2,500 student High School.

* Trip generation rates account for mode split

Project Location

Page 34: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Affected Roadways & Intersections

Study Intersections:1. El Rancho Drive / Sun Valley Blvd2. El Rancho Drive / Sullivan Lane3. Sullivan Lane / Niblick Road4. Sullivan Lane / Green Vista Drive5. McCarran Blvd / El Rancho Drive6. McCarran Blvd / Sullivan Lane7. McCarran Blvd / Wedekind Road

Project Location

Page 35: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Includes:‐ Current Hug High School zone‐ Northern portion of Sun Valley 

(currently zoned for Spanish Springs High School)

Traffic generated by the High School will be existing, re‐routed trips (trips that already travel to/from other nearby, existing high school zones –Hug, Spanish Springs)

Approximated School Zones – For Analysis Purposes Only

Page 36: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Travel Routes

Page 37: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Wedekind Traffic Signal Scenario

Project Location

Page 38: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Sullivan Lane Primary Access Scenario

Project Location

Page 39: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Potential Roadway & Intersection Improvements

Project Location

1. El Rancho Dr / Sun Valley Blvd – free WB right‐turn lane

2. El Rancho Dr / Sullivan Ln – channelized WB right‐turn lane

3. Sullivan Ln / N Project Access – single‐lane RAB or other improvement

4. Sullivan Ln / S Project Access – single‐lane RAB or other improvement

5. McCarran Blvd / Sullivan Ln – major intersection improvements (signal modification, add lanes, lengthen turn pockets, etc.)

6. McCarran Blvd / Wedekind Rd – potential traffic signal or median island to restrict movements

7. Project Connection to Wedekind Rd – potential RAB

Bike Lane Gaps – El Rancho Dr & Sullivan Ln

Sidewalk Gaps – El Rancho Dr, Sullivan Ln, & McCarran Blvd

1

2

3

4

56

7

Page 40: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Conclusions

• With the off‐site improvements shown, the Wildcreek site is viable from a transportation perspective

• Traffic analysis indicates that several access configurations are feasible

• Final off‐site improvements required for the project will be defined by the site planning process and City of Sparks administrative review

• This project is not Regionally Significant from a traffic perspective

Page 41: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Site Plan Feasibility Study

McCarran BoulevardPurpose:• To determine site viability for a high school campus and to 

demonstrate that the necessary site components are able to fit on an approximately 75± acre portion of the subject parcel.

• Developed collaboratively by the design team.• Future golf course redesign and operation will be determined by 

Washoe County and RSCVA.

Page 42: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Site Plan Feasibility Study

Page 43: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Site Plan Feasibility Study

Page 44: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Site Plan Feasibility Study

Page 45: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Appraisal Report

McCarran BoulevardPrepared by Johnson | Perkins | Griffin

Page 46: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Conclusion

McCarran Boulevard

Based upon the available information obtained during the duediligence tasks, it is our opinion that the subject propertyrepresents common physical constraints and opportunitiessimilar to a project of this scale and located in the northernReno/Sparks area and is suitable for a high school campus, withappropriate mitigations.

Page 47: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

Due Diligence Questions? 

• Master Plan and Zoning Confirmation• Preliminary Title Review• Preliminary Geotechnical Investigation• Waters of the United States Inventory• Sensitive Wildlife and Plant Species• Phase 1 Environmental Site Assessment• Preliminary Drainage Study• Preliminary Sanitary Sewer Study• Utilities• Preliminary FAA Airspace Review• Water Rights Research• Traffic Analysis• Site Plan Feasibility Study• Preliminary Appraisal Report

Page 48: The High School at Wildcreek ‘Due Diligence’ Report...The High School at Wildcreek Due Diligence Report How We Got Here Timeline, Project Overview & Need Due Diligence Report Findings

The High School at WildcreekDue Diligence Report 

Conclusion: The Wildcreek site best meets the educational and operational 

objectives of the District Location, zoning, vehicular & pedestrian access, time to acquire, utilities, cost

The Due Diligence Report does not indicate that the site has any constraints that would preclude the construction of a high school 

The site provides multiple layout options to provide for a high school, recreational and public amenities, and open space opportunities