The Exciting Contracts Committee
“Building the Foundation”
Report to the 2006 Best Practices Conference
Dave King and Jane Sidnell
![Page 2: The Exciting Contracts Committee “Building the Foundation” Report to the 2006 Best Practices Conference Dave King and Jane Sidnell.](https://reader034.fdocuments.us/reader034/viewer/2022051319/5a4d1b647f8b9ab0599af008/html5/thumbnails/2.jpg)
Len Addinall – ShellDarryl Baron – Dow
Scott Burrell – SuncorGraham Campbell – CoSynSuzanne England – Revay
Jim Freiburger – JacobsDamian Gannon – ATCO
Mike Gordon – BantrelDavid Hamilton – Enbridge
Kathy Kendrick – Miller Thompson LLP
2005 /2006 Committee Members
![Page 3: The Exciting Contracts Committee “Building the Foundation” Report to the 2006 Best Practices Conference Dave King and Jane Sidnell.](https://reader034.fdocuments.us/reader034/viewer/2022051319/5a4d1b647f8b9ab0599af008/html5/thumbnails/3.jpg)
Bill Kenny – Miller Thompson LLPDave King – Stantec
Brian Lacey – Clark BuildersTim Mann – Suncor
John Schadan – SNC LavalinLes Shaw – Ledcor
Jane Sidnell – Miller Thompson LLPLaura Sugimoto – AMEC
Neil Tidsbury – CLRA
2005 /2006 Committee Members (Cont)
![Page 4: The Exciting Contracts Committee “Building the Foundation” Report to the 2006 Best Practices Conference Dave King and Jane Sidnell.](https://reader034.fdocuments.us/reader034/viewer/2022051319/5a4d1b647f8b9ab0599af008/html5/thumbnails/4.jpg)
Jim Freiburger – OPTI Nexen (06 Jacobs)
Don Guglielmin – CNRLSean James – AMEC
Catherine Sarsfield – Petro CanadaLaura Sugimoto – Independent (06 AMEC)
Dariel Suhan – NovaGreg Toth – Kinder Morgan
Rick Watters – EnCana (COAA Board Member)
New 2007 Committee Members
![Page 5: The Exciting Contracts Committee “Building the Foundation” Report to the 2006 Best Practices Conference Dave King and Jane Sidnell.](https://reader034.fdocuments.us/reader034/viewer/2022051319/5a4d1b647f8b9ab0599af008/html5/thumbnails/5.jpg)
Purpose: To enhance Efficiency, Profitability and Performance Develop standard forms of contract for use in Alberta Consistent approach to common issues
Goals: To equitably allocate risk and responsibility to the party best able to
manage the risk Implementation:
Standard format and organization Standard or align definitions and terminology Proper ordering of subject matter Flexibility through use of schedules
Follow up: Regular review and revisions Promotion of the use of the documents.
Guiding Principles
![Page 6: The Exciting Contracts Committee “Building the Foundation” Report to the 2006 Best Practices Conference Dave King and Jane Sidnell.](https://reader034.fdocuments.us/reader034/viewer/2022051319/5a4d1b647f8b9ab0599af008/html5/thumbnails/6.jpg)
Stipulated Price contract (SP): Published (1997) and one review cycle completed (2003)
Engineer, Procure and Construct contract (EPC): Published (2005)
Engineer, Procure an Construction Management contract (EPCM):
Guiding Principles document – Completed November 2005 Philosophy document to be issued at 2006 Best Practices –
Completed EPCM contract issued for 2007 Best Practices – On
schedule Construction Management contract (CM):
Viewed as a sub-set of the EPCM and will be developed after the EPCM is published.
Scope and Progress
![Page 7: The Exciting Contracts Committee “Building the Foundation” Report to the 2006 Best Practices Conference Dave King and Jane Sidnell.](https://reader034.fdocuments.us/reader034/viewer/2022051319/5a4d1b647f8b9ab0599af008/html5/thumbnails/7.jpg)
Build a working committee that is representative of the participants:
Owners, Contractors, Consultants, Legal
Industry sectors: Mining, Petrochemical, Power, Pipelines, Infrastructure etc.
Edit “Guiding Principles” to better reflect preferred sequence of deliverables:
Document issued to board for comment November 2005
Develop “Philosophy Document” to provide guidance for development of the EPCM contract:
Two review cycles complete
Issued for comment: Draft 2 to Board; Draft 3 to Best Practices session
Develop contract documents using EPC contract as template:
Ongoing on schedule for delivery of document to 2007 Best Practices
Establish subcommittee to develop Appendix B – Reimbursable Costs
2005 / 2006 Activities
![Page 8: The Exciting Contracts Committee “Building the Foundation” Report to the 2006 Best Practices Conference Dave King and Jane Sidnell.](https://reader034.fdocuments.us/reader034/viewer/2022051319/5a4d1b647f8b9ab0599af008/html5/thumbnails/8.jpg)
Maintain a balanced representation of all sectors from members actively working on the Committee
Continue the effort to ensure full active representation from all stakeholders
Publish final edition of EPCM Philosophy document
Complete development and issue EPCM Contract, together with all Appendices, including Appendix B – Reimbursable Costs
Work with our colleagues on the other Best Practices Committees and COAA communications staff to gauge and promote the use of COAA contracts
Establish long term plans for the Contracts Committee that ensures the development of best practices that are relevant to the needs of our industry
2006 / 2007 Activities
![Page 9: The Exciting Contracts Committee “Building the Foundation” Report to the 2006 Best Practices Conference Dave King and Jane Sidnell.](https://reader034.fdocuments.us/reader034/viewer/2022051319/5a4d1b647f8b9ab0599af008/html5/thumbnails/9.jpg)
Closing