The Effectiveness of Installation and Commissioning Processes in Delivering New Mass Low Carbon Social Housing Presentation by Dr Terry Keech B Eng(Hons) C Eng PrD MCIBSE MEI MIET

Transcript of The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and...

Page 1: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

The Effectiveness of Installation and Commissioning Processes in Delivering New Mass Low Carbon Social Housing

Presentation by Dr Terry Keech B Eng(Hons) C Eng PrD MCIBSE MEI MIET

Page 2: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

CONTENTS

• Introduction

• Framework for Research

• Research Scope and Methodology

• Industry Makeup

• Commissioning Process

• Findings

• Conclusions

• Future

• References

Page 3: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

Performance of low carbon homes is failing on a number of levels, indicating that ‘design’ and ‘as built’ construction vary considerably (Zero Carbon Hub, 2011). BelizOzorhon (2016) identifies that quality and process is underperforming, giving cause for concern in the construction industry’s response to housing low carbon challenges. My research investigated aspects of this underperformance witnessed through practitioner engagement on low carbon housing projects.

INTRODUCTION

Page 4: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

FRAMEWORK FOR THE RESEARCH

Fig 1

Page 5: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

• The performance of new build low carbon dwellings is a substantial subject area with a considerable quantity of literature and research concentrated on post occupancy behaviour and technology operation. There is much less research focused on training and commissioning of the technologies at the construction stages, with most of the research based on commercial buildings. Hopkins et al (2017) point to the apparent silence on the subject for UK housing development, recognising the need for the capture of the link from installation and commissioning to handover of the development.

• Data gathering has been achieved through the use of questionnaires, in-depth interviews and site observations.

• The questionnaires were circulated to over 600 contacts with a return of 255 respondents giving a return rate of 42.5%.

• Questionnaire surveys were enhanced by in-depth semi-structured interviews with a number of the construction professionals that had completed the survey, and site observations and interventions.

RESEARCH SCOPE AND METHODOLOGY

Page 6: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

The Construction Statistics Annual Tables show the UK registered construction companies in the third quarter of 2014 (Office for National Statistics, 2015). These indicate that the employee make-up of the 66,533 Building Services construction companies, split into Electrical, Plumbing and Heating Ventilation and Air-conditioning (HVAC), operating within the UK are as follows:

INDUSTRY MAKE UP

Page 7: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

Noyne et al (2013) identify the five primary steps to the commissioning process, with Level 3 being the predominate level, and Levels 4 and 5 rarely used.

COMMISSIONING PROCESS

Mostly not Achieved

Page 8: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

FINDINGS – PARTICIPATION IN THE STUDY

Fig 2 Fig 3

Page 9: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

FINDINGS – EXPERIENCE

Fig 4

Page 10: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

FINDINGS – FORMAL / INFORMAL KNOWLEDGEThe questionnaire identified key areas with regards to training and education in low carbon technologies. Figures 5 and 6 indicate that there is a low level of formal qualification in the survey group, whilst the main form of knowledge transfer is short duration seminars and ‘in house’ staff led seminars.

Fig 5 Fig 6

Page 11: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

FINDINGS – FORMAL / INFORMAL KNOWLEDGEThe chart illustrates that practical information from the stakeholder organisation and site experience are the two main areas identified in the survey.

Tacit – Explicit Knowledge Exchange – Social Learning Theory Walters (1963).

Fig 7

Page 12: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

FINDINGS – FORMAL / INFORMAL KNOWLEDGEWhat is evident from the responses is the perception that monitoring of low carbon technologies is uncommon within the installation process (74.4% of respondents).

Fig 8

Page 13: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

FINDINGS – COMMISSIONINGGaps highlighted in commissioning indicate that the process is considered disjointed and lacking co-ordination, with validation by the designer as the least engaged area of commissioning.

Considering that most low carbon technologies require a higher degree of co-ordination with the building and other building services to operate effectively, the deficiencies observed indicate a serious concern for efficient performance of the technology. Fig 9

Page 14: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

FINDINGS – EFFECTIVENESSFigures 10 and 11, where the survey asked questions on the effectiveness of the commissioning and the subsequent occurrence of defects during the defect period. There is a noticeable level of opinion that suggests its effectiveness is lower than should be expected for low carbon performance. When this is read in conjunction with the incidence of defects a distinct pattern is observed from failing commissioning processes through to the direct operation of the technology by residents.

Fig 10

Page 15: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

FINDINGS – DEFECTSWhere complex technologies are being used for low carbon housing, the higher rate of defects could be related to the extended ‘undeclared post-handover’ commissioning of the installed system.

Commissioning is continuing long after the building is handed over, hidden within defect rectification, as Lohne et al (2016) suggests ‘fuzzy commissioning’. Consequently uncoordinated commissioning is taking place whilst the residents are living in the dwelling. In this way, dependent on the level and duration of the intervention, the resident perceives the technology to be faulty and subsequent trust in operation is lost at the important early stage of occupation.

Fig 11Only 2% stated less defects

Page 16: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

FINDINGS – BARRIERSBarriers identified as installation standards; challenge to performance and actual performance not assessed at completion.

Fig 12

Page 17: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

FINDINGS – INTERVENTIONSProcess adopted for Intervention Cycles:

Fig 13

Page 18: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

FINDINGS – INTERVENTIONS

Process adopted for Intervention Cycles:

Fig 14

Feedback Loop

Feedback Loop

Feedback Loop

Page 19: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

CONCLUSIONS – PROCESS PERFOMANCE MONITORING

Removing the lack of process identified by Lohne et al (2015) as ‘fuzzy commissioning’ and adopting Process Performance Monitoring.

Fig 15

Page 20: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

FUTURE

SAP 10• Mains Gas and Electricity are now

much closer suggesting that Heat Pumps will possibly become more prevalent for residential schemes.

• Building Regulations – Part L1B (Existing Building) amended 2018 (latest edition of the Domestic Building Services Compliance Guide)

• Part L1A – still awaiting confirmation of new edition (also when SAP 10 comes into force).

Grid Watch October 2018

Page 21: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

REFERENCES • Bakker, R. M., Cambré, B., Korlaar, L., & Raab, J. (2011). Managing the project learning paradox: A set-theoretic approach toward project knowledge transfer. International journal of project

management, 29(5), 494-503.

• Barlow, J and Jashapara, A (1998). Organisational learning and inter-firm “partnering” in the UK construction industry. “The Learning Organization”, 5(2), 86-98.

• Berkhout, F Hertin, J and Gann, D (2006). Learning to adapt: organisational adaptation to climate change impacts. “Climatic Change”, 78, 135-156.

• BRE (2008) Egan: I’d Give Construction About Four Out of 10: Speech at Commons Reception Marking 10th Anniversary of Report. https://www.bre.co.uk/filelibrary/pdf/CLIP/SirJohnEgan21-05-08.pdf

• Carbon Trust (2012). Making buildings Work. Lessons learned from commissioning low carbon buildings. Queen’s Printer and Controller of HMSO. CTGH051.

• DCLG (2006) The Code for Sustainable Homes: Setting the standard in sustainability for new homes. London. Her Majesty’s Stationery Office, 2006

• Djuric N., Novakovic V., (2007) Review of Possibilities and Necessities for Building Lifetime Commissioning, Renewable and Sustainable Energy Reviews, 2007, 13:486-492.

• Gill, Z, Tierney, M, Pegg, I and Allan, N., (2010) Low-energy Dwellings: The Contribution of Behaviours to Actual Performance. “Building Res. and Info.”, 38(5), 491-508.

• Grey, D.E., 2011. ‘Doing Research in the Real World’. 2nd edn. Sage Publications Ltd

• Griffiths, G (1999) Construction Procurement Arrangements of Housing Associations in Liverpool. In: Hughes, W (Ed.), 15th Annual ACOM Conference, 15-17 September 1999, Liverpool John Moores University. Association of Researchers in Construction Management, Vol. 2, 725-33.

• Gann, D M and Salter, A J (2000) Innovation in Project-Based, Service-Enhanced Firms: the construction of complex products and systems. “Research Policy”, 29(7-8), 955-972

• Heffernan E; Pan W and Liang, X., (2012). Delivering Zero Carbon Homes in the UK In: Smith, S.D (Ed) Procs 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK, Association of Researchers in Construction Management, 1445-1454.

• Homes and Communities Agency (2015) Annual Report and Financial Statements 2014/15: Presented to Parliament pursuant to paragraphs 11 and 12 of Schedule 1 to the Housing and Regeneration Act 2008. HC 220.HMSO.

Page 22: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation

REFERENCES • Hopkin, T, Lu, S-L, Rogers, P and Sexton, M (2015) Detecting Defects in the UK New-build Housing. A learning Perspective In: Raidén, A B and Aboagye-Nimo, E (Eds) Procs 31st

• Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK, Association of Researchers in Construction Management, 1073-1082.

• Ivankova, N.V (2015) ‘Mixed Methods Applications in Action Research’, Sage

• Lofthouse, V.A., and Lilley, D. (2006) What They Really, Really Want: User Centered Research Methods for Design. International Design Conference - design 2006 Dubrovnik - Croatia, May 15 - 18, 2006.

• Lohne, J., Shirkavand, I.,Firing, M., Schneider, K., and Ola Lædre (2015) Ethics in Commissioning in Construction. Published by Elsevier B.V. 256 – 263

• Mills E., (2009) Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse Gas Emissions, California Energy Commission Public Interest Energy Research (PIER).

• NHBC Foundation (2012). Low and Zero Carbon Homes: Understanding the Performance Challenge. NHBC Foundation NF41. ISBN 978-1-84806-255-9

• Noye,S., Fisk,D., and North, R., (2013). Smart Systems Commissioning for Energy Efficient Buildings. CIBSE Technical Symposium, Liverpool John Moores University, Liverpool, UK, 11-12 April 2013

• Office for National Statistics, (2015). Construction Statistics Annual. http://wwwons.gov.uk/ons/search/index.html?newquery=Construction+Statistics+Annual+ London).

• Ozorhon, B (2013), 'Response of Construction Clients to Low-Carbon Building Regulations', Journal Of Construction Engineering & Management, 139, 12, p. -1, Business Source Premier, EBSCOhost.

• Taylor, C., (2004) Modern Social Imaginaries. Duke University Press, Durham, North Carolina.

• Teddlie, C., and Tashakkori, A. (2009) Foundations of Mixed Methods Research: Integrating Quantitative and Qualitative Approaches in the Social and Behavioural Sciences. Thousand Oaks, CA:Sage

• Wray,C.P., Piette, M.A., Sherman, M.H., Levinson, R.M., Matson, N.E.,Driscoll, D.A., McWilliams, J.A., Xu, T.T., and Delp, W.W. (2000) Residential Commissioning: A Review of Related Literature. Energy Performance of Building Group Environmental Energy Technologies Division, Lawrence Berkley national Laboratory , Berkley CA 94720.

• Zero Carbon Hub, Sweett Group, (2014). Cost Analysis: Meeting the Zero Carbon Standard. Zero Carbon Hub, London.

• Zero Carbon Hub (2011). Allowable Solutions for Tomorrows New Homes. Towards a Workable Framework. Zero Carbon Hub, London.

Page 23: The Effectiveness of Installation and Commissioning ... · The Effectiveness of Installation and Commissioning Processes in . Delivering New Mass Low Carbon Social Housing . Presentation