The data collection and

transmission system

at the Tiksi HMO

D.Apartsev, T.Afanasyeva

Page 2: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

Data flow chart

CAF

Tiksi HMO

Tiksi Data Center

in AARI

Internet

NOAA

FMI

IAP RAS

Scientisis

MGO

Page 3: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

Detailed scheme of HMO LAN

Page 4: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

Problems • Low proficiency and low motivation of local staff

• Poor quality and unstable electricity

• Acquisition computers are the different old used

laptops. There is no reserve for fast replacement

• Operation system on most acquisition computers

is Windows XP. It complicates remote

management and data transfer

• Local network in Meteo building is in bad condition

Page 5: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

The report on the collected data for

the last three years

Page 6: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

The data from the NOAA

instruments

Page 7: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

Data on Baseline Surface Ratiation Network (BSRN)

• The data on BSRN have started coming from June 8, 2010.

• The data arrives on the AARI server every day. During the all observation period the problems were two times:

• 1) from Dec 24, 2010 up to Jan 12, 2011. A storm dropped a power line pole.

• 2) Aug 8 - Aug 18. There were electricity supply problems.

7 7.838.75

0

1

2

3

4

5

6

7

8

9

V monthly

average (МВ)

2010 year 2011 yaer 2012 year

Page 8: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

The data on the reflected solar radiation

• The reflected solar radiation data have started coming from April 21, 2011.

• The data arrives on the AARI server every day. During the all observation period the problem was once:

• 1) from Jul 31 up to Aug 3. There were electricity supply problems.

2.9

3.34

2.6

2.7

2.8

2.9

3

3.1

3.2

3.3

3.4

V monthly

average (МВ)

2011 year 2012 year

Page 9: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

The climate data (CRN)

• The climate data have started coming from April 27, 2011.

• The data arrives on the AARI server every day. During the all observation period the problems were two times:

• 1) from Feb 20 up to Mar 5, 2011: the fans did not work.

• 2) from Jul 29 up to Aug16. There were electricity supply problems.

14.987

15.92

14.4

14.6

14.8

15

15.2

15.4

15.6

15.8

16

V (MB)

2011 year 2012 year

Page 10: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

The sun photometer data

• The sun photometer data have started coming from June 10, 2010.

• The data arrives on the AARI server seasonally: from spring to autumn.

• in 2010: from Jun10 up to Nov 22

• in 2011: from May 26 up to Nov 23

• in 2012: the photometer has been working from May 24

2.7

5.7

8.05

0

1

2

3

4

5

6

7

8

9

V (МВ)

2010 год 2011 год 2012 год

Page 11: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

The data on Black Carbon

• The data on black carbon have started coming from September 29, 2009.

• The malfunctions were only twice:

• 1) Dec 24, 2010 the problems with air inlet.

• 2) Dec 27, 2011 the problems with air inlet.

• From Jan 28, 2012 the data have started to arrive automatically on the AARI server every day.

28.7

11.3

19.2

0

5

10

15

20

25

30

V (MB)

2010 year 2011year 2012 year

Page 12: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

Ozone data

• The data have started coming from Oct 20, 2010.

• The data are taken from the instrument by hand once every two weeks.

2.2

8.4 8

0

1

2

3

4

5

6

7

8

9

V (MB)

2010 year 2011 year 2012 year

Page 13: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

The data from the FMI

instruments

Page 14: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

Aerosol data

• The aerosol data have started coming from June 6, 2010.

• For all period the problems have been observed two times:

• 1) from Dec 24, 2010 up to Jan 12, 2011 a power line pole was dropped, no data

• 2) from Jul 18, 2012 the data have stopped coming. The problem with the hard drive.

36.6

77.1

62

0

10

20

30

40

50

60

70

80

V (MB)

2010 year 2011 year 2012 year

Page 15: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

Data on greenhouse gas emissions

• Data on greenhouse gas emissions have started coming from July 4, 2010.

• The malfunctions were several times. The main reason is short-time power

blackout.

42.5

73.3

59.4

0

10

20

30

40

50

60

70

80

V (MB)

2010 year 2011 year 2012 year

Page 16: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

The data on soil and air

• The data on soil and air have started coming from August 1, 2010.

• The malfunction was only once:

• December 24, 2010 A snowstorm dropped a power line pole.

2.6 23.3 2.9

4.5 3.2

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

V (MB)

2010 year 2011 year 2012 year

soil

air

Page 17: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

Flux and raw fails

• The flux data have started coming from October 8, 2010.

• Raw fails data have started automatically coming on the AARI server from

April 5, 2011.

5.1

6854.5

15594.4

0

2000

4000

6000

8000

10000

12000

14000

16000

V (MB)

2010 year 2011 year 2012 year

Page 18: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

The data from the tower

IAP RAS Instruments

Page 19: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

The gas analyzer data

• The data have started coming from April 26, 2011.

• The data arrives on the AARI server every day.

4596.1

8248.3

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

V (MB)

2011 year 2012 year

Page 20: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

The acoustic anemometer data

• The data have started coming since April 29, 2011 from all anemometers.

• The malfunctions:

• 1) The Sonic 3 meter data stopped coming on July 16, 2011.

• 2) On December 26, 2011 Sonic 15 meter blew away in a strong wind into

the tundra.

522.1 0

2987.5

5497.2

2456.6

0

0

1000

2000

3000

4000

5000

6000

V (MB)

3 meter 9 meter 15 meter

2011 year

2012 year

Page 21: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

The data logger

• The data of temperature, wind speed and direction have started coming on

the AARI server from April 26, 2011.

• The malfunctions: 1) The reason is short-time power blackout.

263208.6

0

50

100

150

200

250

300

V (MB)

2011 year 2012 year

Page 22: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

The data from AARI

instruments

Page 23: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

The data on standard meteorology and exhaust

thermometers

• The data on standard meteorology have been registered by the staff of Polyarka, the corresponding files arrive on the AARI server every day in proper time.

• The data from exhaust thermometers have been registered by hands.

• The malfunctions: 1) PC problems in February and April 2012.

1.71.5

1.7

1.1

0.77

1.6

0

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

1.8

V (MB)

2010 year 2011 year 2012 year

ASPD

AMT

Page 24: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

The data on actinometry and greenhouse gas

16 026

162.7

16.1 29.1

0

20

40

60

80

100

120

140

160

180

V (MB)

2010 year 2011 year 2012 year

Actinometry

CO2

• The data on actinometry have been registered by hands.

• The data on CO2 have been registered by hands from spring to autumn,

have come by e-mail.

• The malfunctions: 1) PC problems in February and April 2012.

• 2) CO2-meter does not work since July 13, 2012.

Page 25: The data collection and transmission system at the Tiksi HMOThe data on Black Carbon • The data on black carbon have started coming from September 29, 2009. • The malfunctions

Dear colleagues,

Thank you for attention

to this report on the collected

data for the last three years.

THANKS!