HS2 – Britain’s new high speed railway
Andy de Bell, BBV Community Engagement Manager
22nd November 2018
Contents
1. Introduction
2. Feedback
3. Balfour Beatty Vinci work in the area
4. Surveys
5. Future Engagement
What is BBV?• 50:50 JV between BB Group and VINCI,
formed in 2011
• Working together on Crossrail and the
Smart Motorways programme
• Tours-Bordeaux completed early and
recently opened – a new 300km high
speed line
• Supported by Mott MacDonald
SYSTRA as 50:50 Design JV
High Level Programme of Works
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
EWC ECOLOGY AND ARCHAEOLOGY MITIGATIONS
MWCC SURFACE ROUTE (EARTHWORKS)
EWC CIVILS CONSTRUCTION
MWCC SURFACE ROUTE (VIADUCTS & BRIDGES)
RAIL INFRASTRUCTURE INSTALLATION & TESTING
HIGHWAYS ENGLAND (M6 J4)
UTILITY DIVERSION - COLESHILL
AWARD AND DESIGN
START OF CONSTRUCTION
EARLY CONTRACTOR INVOLVEMENT
Cubbington to Stoneleigh - over bridges
Indicative timeframe:
• Start Q2 2020
• Rugby Road Q4 2020
• Coventry Road Q4 2020
• Leicester Lane Q2 2021
Stoneleigh Park
Indicative timeframes
Asset Start Finish
Stoneleigh Road Overbridge
& Roundabout
Q4 2019 Q3 2021
Stoneleigh Retaining Wall Q4 2019 Q1 2024
River Avon and Compound
Indicative timeframes:
Asset Start Finish
River Avon
Viaduct
Q2 2021 Q4 2021
Current Scheme Design
Key features in the are shown on the
area plan
KeyA – temporary signalisation of A46
B – existing Equine arena
C – proposed south
accommodation bridge
D – proposed modifications to
A46/A452 junction
E – proposed off line carriageway
& direct link to A46 southbound
F- Existing Farmers Market
BC
A
HS2 compound
Stoneleigh Park
A46
Ashow Road – currently the designated traffic routeD
E
Stoneleigh Village
F
Proposed layout of new A46
junction by WCC
A junction proposal has been designed using forecast construction traffic for HS2.
This proposal would not require rebuilding/maintaining Ashow Road or junction
improvements with A452 for mass haul, it removes the necessity for temporary signalisation of A46 and the requirement for a
new direct link to A46. There are potentially significant safety and community benefits in this
option.
This proposal would include use of land outside
the Act that will require additional consultation and planning permission.
Site of new
Farmers
Market
HS2 compound
New access
required
New roundabout
C
A
G
F
HS2
compoun
d
Potential new
link road –
Stoneleigh
bypass
Stoneleigh Village
Stoneleigh
Park
A46
New roundabout
with access to
market & compound
Ashow Road – designated
construction traffic route
until junction complete
H
D
KeyA – New roundabout on A46 junctionC – proposed south accommodation
bridgeD – proposed modifications to A46/A452 junction
F – New Equine ArenaG – New Farmers market
H – New access to HS2 compoundJ – Traffic Management on A46
Overall solution
This solution can meet stakeholder
aspirations, improve constructability,
reduce costs and leave a community
improvement as a legacy.
The costs and risk still need final
assessed to support an investment
paper to gain approval. Highways
England have also requested further
work on the traffic modelling used
to date. Timing is a key risk
J
GI Works
• Dallas Burston Polo Club and Stoneleigh Park
• Burton Green
• Kenilworth (Crackley Lane)
• Balsall Common
• Cubbington
On Going Work – GI & GPR Surveys
Leamington Road
Welsh Road
Bascote Road
Long Itchington Road
Coventry Road
Fosse Way
Rugby Road
Leicester Lane
Stareton Lane
Dalehouse Lane
Kenilworth Road
Crackley Lane
Cromwell Lane
Waste Lane
Truggist Lane
Lavendar Hall Lane
Park Lane
Stoneleigh Road
Ashow Road
GPR Survey Works – on going and
planned works
The copyright for this presentation remains with HS2 Ltd.
It cannot be reproduced as a whole or in part without written permission from HS2 Ltd.
If required, please contact our Corporate Communications Team at [email protected].
Copyright notice