The Change Proposal
Review of the Elements
Chuck Vergon / 6933
![Page 2: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/2.jpg)
The Needs Statement
A compelling proposal clearly defines the problem to be addressed through the findings of a thorough needs assessment.
![Page 3: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/3.jpg)
Needs Statement CLEARLY states the problem; Uses multiple methods to document the
problem; Uses multiple data sources; Uses local data to document problem; Uses easily measurable, quantitative data; Uses qualitative data;
![Page 4: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/4.jpg)
Needs Statement (also)
• States who is affected by the problem;• States when and where the problem exists;• Documents the factors contributing to the
problem;• Discusses consequences of not dealing with
problem
![Page 5: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/5.jpg)
Types data Demographics Survey Data Interviews / Focus Groups Antedotal Data
![Page 6: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/6.jpg)
What’s the Problem?
What data will demonstrate it?
![Page 7: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/7.jpg)
General statement of what issought and approach forachieving it.
Goal
![Page 8: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/8.jpg)
Goal
A general statement regarding the nature of the change desired and the approach for promoting the change.
Improve the reading comprehension of fourth grade students by means of an after school tutoring program.
![Page 9: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/9.jpg)
What’s your goal?
?
![Page 10: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/10.jpg)
Objectives are the measurable outcomes of the program.
They define methods.
They are tangible, specific, concrete, and achievable in specified time
Objectives
![Page 11: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/11.jpg)
Objectives
Limited in number Specific and measurable Related to goal Responsive to needs and causes
![Page 12: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/12.jpg)
Types of Objectives Process Product Outcome
![Page 13: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/13.jpg)
A human action is anticipated.
80% of children will learn how to swim after participating in the program
Behavioral Objective
![Page 14: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/14.jpg)
A specific time frame within which a behavior will occur, at an expected level of proficiency
85% of the children participating in the program will learn to swim within eight weeks and will pass a basic swimming proficiency test administered by a Red Cross-certified lifeguard.
Performance Objective
![Page 15: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/15.jpg)
The manner in which something occurs is an end in itself.
The staff development program will bedesigned with the active participationof those to be trained as evidenced byminutes of the LPDC.
Process Objective
![Page 16: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/16.jpg)
A tangible item results
A manual of best practice tutoring strategies will be created by Sept. 1st to be used in the after school program.
Product Objective
![Page 17: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/17.jpg)
Your Objectives
?
![Page 18: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/18.jpg)
Innovation Description
describes the approach and specific activities that will take place to achieve the objectives.
![Page 19: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/19.jpg)
Helps others visualize the change
Convinces them you know what your are doing
Innovation Description
![Page 20: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/20.jpg)
Identifies the major components orfeatures of the innovation
Explains how the components fittogether
The What
![Page 21: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/21.jpg)
Explains what will occur from the time the project begins until it is completed.
The How
![Page 22: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/22.jpg)
Establishes the order and timing for the tasks or activities
The When
![Page 23: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/23.jpg)
Explains why innovation will lead to outcomes
Identifies research to support its effectiveness
Points out successes in settings like your own
Notes own prior successes with such approach
The Why
![Page 24: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/24.jpg)
Intervention description must clearly set out
• Who will guide the intervention
• Responsibilities of key actors or groups
• Who will carry out specific activities
The Who
![Page 25: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/25.jpg)
Innovation to be Recommended
?
![Page 26: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/26.jpg)
Proposal Tool Kit
http://www.coe.ysu.edu/~vergon2
![Page 27: The Change Proposal Review of the Elements Chuck Vergon / 6933.](https://reader036.fdocuments.us/reader036/viewer/2022062422/56649ee55503460f94bf45de/html5/thumbnails/27.jpg)
A. Personnel: $10,292B. Fringe Benefits: 1,808C. Travel: 15,990D. Equipment: 8,107E. Supplies: 807F. Construction: 0G. Consultants 9,900H. Other: 2,640A. Total Costs: $49,544I
The Resources