THE 1992 BASIN & RANGE PROVINCE GPS SURVEY; 2. THE FIELD ... · Project and Survey Goals The 1992...
Transcript of THE 1992 BASIN & RANGE PROVINCE GPS SURVEY; 2. THE FIELD ... · Project and Survey Goals The 1992...
U. S. DEPARTMENT OF THE INTERIOR U. S. GEOLOGICAL SURVEY
THE 1992 BASIN & RANGE PROVINCE GPS SURVEY; 2. THE FIELD SURVEY
by
G. R. Foulger1
Open-file Report 94-286
This report is preliminary and has not been reviewed for conformity withU. S. Geological Survey standards or with the North American Stratigraphic Code.
Any use of trade, product, or firm names is for descriptive purposes onlyand does not imply endorsement by the U. S. Government.
1 Menlo Park, CA 94025
TABLE OF CONTENTS
Project and Survey Goals ........................................................................ 1The network........................................................................................ 1Network measurement............................................................................ 1
Logistics................................................................................... 1Point selection, installation and point descriptions................................... 2
Measurement strategy....................................................................2Results.....................................................................................3
Data processing results ...........................................................................4Acknowledgments................................................................................^References.......................................................................................... 4Figure 1 Schematic idealization of the Basin & Range GPS network..................... 5Figure 2 Map showing the actual network installed and measured ........................ 6
Figure 3 Schematic diagram of the network, showing the point coding system ......... 7Figure 4 Schematic diagram showing the standard daily schedules....................... 8Figure 5 Schematic diagram showing the observation plan for the whole network...... 9
Figure 6 Typical data block recorded over a 24-hr period .................................. 12
Figure 7 Measurement plan and actual data archived........................................ 13Table 1 Individual schedules for installation and measurement of the network......... 16
Table 2 Trailer sites used in the 1992 survey................................................ 17Table3 Survey participants.................................................................... 18Table 4 Framework of survey schedule...................................................... 19
Table5 Daily point occupation schedules....................................................20
Table 6 Time .................................................................................... 21
Project and Survey Goals
The 1992 Basin & Range Province GPS survey was conducted as part of NASA's Dynamics of the Solid Earth (DOSE) program. The overall goal of the Basin & Range project is study of the
crustal deformation of that province. The 1992 survey was designed specifically to establish a network and measure a first epoch survey that spans the deforming zone. Remeasurement of this network in the future will enable:1. Determination of the rate of extension and shear and how they vary, across the entire Province
at about latitude 39°N,2. Determination of detailed movements in those zones that are deforming most rapidly.
The network
A network consisting of both pre-existing and new points was established, that spanned the Basin & Range Province from Lake Tahoe, CA in the west to the Wasatch Front, UT, in the east, i.e. at about latitude 39°N. The network was designed to consist of three east-west profiles, a northern, central and southern profile, which together comprise a chain of 7 quadrilaterals, each approximately 100 km square. A schematic idealization of the network is shown in Figure 1 and
the actual geometry achieved is shown in Figure 2.
The northern and southern profiles comprise 8 points each, at approximately 100 km spacings. Many of these are newly-installed points (Julian and Foulger, 1994). The central profile comprises 48 points and lies along Highway 50. Most of those points are pre-existing leveling
benchmarks and a few are new points. The points of this profile are spaced at approximately 15 km
intervals in the two westernmost and two easternmost quadrilaterals (Quads A, B, F and G, Figure 1), where the deformation rate is anticipated to be greatest, and at approximately 25 km spacings in the middle three quadrilaterals (Quads C, D and E).
The entire network contains 64 points, and a point coding scheme was devised that will enable a logical point coding scheme to be maintained if additional densiflcation points are added in the
future (Figure 3). The network was tied to point Quincy, 80 km from the northwesternmost point
of our profile (Figure 1). Quincy is a VLBI station where continuous GPS recording is conducted.
Network measurement
Logistics
Because of the scarcity of motel and restaurant services in the field area, and in order to
maintain close and centralized field headquarters, the survey was run from two trailers which
served as headquarters and for regrouping, data archiving, cooking and sleeping. The trailers were parked at trailer parks selected to be as close as possible to the centers of the Quads, and moved every two days, as the survey proceeded (Tables 1 and 2). The trailer headquarters were staffed by Jim Richardson (Table 3) who was in charge of data archiving and equipment maintenance, and a
person designated as cook and bottle-washer each day (rotated duty, Table 1).
Point selection, installation and point descriptions
Point reconnaissance was conducted simultaneously with the survey, by reconnaissance parties who worked in the network a few points ahead of the measurement parties. This proved to be a very successful strategy in this area, where most of the land is open access, many points were pre-existing and little permitting had to be done. The points were all flagged shortly before measurement and the descriptions were fresh, so the points were easily found by the receiver
parties.For each point, description materials were prepared, consisting of a map, a written description
and (for some points) photographs (Foulger and Julian, 1994). These were stored in separate envelopes for each point, at the trailers. The reconnaissance personnel filed the completed descriptions in advance of the measurements so the required material was always available to the receiver parties when needed. A copy was made of each description as a backup.
The new points installed consisted of headless, stainless steel rods with central dots in their
upper ends. They were cemented into bedrock flush with the surface. Some were marked by building caims over them.
Measurement strategy
The network was occupied during the three-week period 5th - 23rd October 1992 by a team of about 14 people (Tables 1 and 3) using up to 12 TurboRogue GPS receivers (10 used daily, and 2 spares). Selective Availability (SA) was on at the weekends (Fridays - Sundays 1800 hrs PDT, i.e. GMT weekends), and measurements were thus made on weekdays only. Pacific Daylight Time
was used throughout the survey (i.e. California local time at the time the survey started).
Fourteen days of measurements were made, and two days were spent measuring each Quad
(Figure 1, Table 4). Three points were common to adjacent Quads and those points were thus measured on four consecutive days each (Figure 1). The other points of the network were mostly
measured twice each, and a small number of the closely-spaced points at the ends of the network
were measured once each. This strategy of multiple occupancy enabled the true repeatability of
point measurements to be determined and the random errors in the final results to be reduced by a factor of approximately 1.6, by averaging.
Five mobile field parties of one or two people in each, deployed the receivers. Each party was equipped with two receivers and measured two points per day. In the cases of four of the parties, these were a point on the central profile (on Highway 50), an average of one hour's driving time from the trailer headquarters, and one "remote" point on either the northern or the southern profile, an average of one hour's driving time from Highway 50. An average of 50 mph driving on paved
road, and 30 mph for improved dirt roads was assumed. The usual daily procedure was to drive to
and install a receiver at the remote point, and then to return to occupy and guard the point on Highway 50. All the remote points were selected to be "secure", i.e. sufficiently hidden or inaccessible such that the equipment was safe from human interference and need not be guarded. It was assumed that all of the points along Highway 50 needed to be guarded at all times. The fifth (two-person) receiver party measured two points on Highway 50 each day.
Because the points of the northern and southern profiles were occupied for four days each, the surveying naturally fell into four-day cycles. The typical daily schedules are listed in Table 5 and shown schematically in Figure 4. The observation plan for the whole network is tabulated in Table
1 and shown schematically in Figure 5. Individual schedules were designed to minimize driving
times and to share out the difficult work e.g. the cooking.Long observation periods of 6 - 48 hours were achieved with this schedule, with the majority
of the remote points being occupied continuously for four days, which greatly reduced the criticality of correctly resolving the integer ambiguities at the data processing stage.
Four or more satellites were up for most of the day (Figure 6). A data collection rate of one measurement every 30 s was used, with a horizon mask of 0°. All antennas were aligned to True
North and tripod setup and receiver operation followed standard recommended practice (JPL,
personal communication, 1992). The receivers were powered by lead-acid batteries which were
recharged at the trailer headquarters by generators or 120 v electricity where available. Data from
the returning receivers were archived to a PC each evening. Data from the receivers at the remote points were archived less frequently, as those receivers recorded continuously in the field for periods of up to four days.
Results
The survey was exceptionally successful. No planned occupations were missed and no point
went unsurveyed. The plan shown in Table 5 held well for the most part, and little data were lost
as a result of late receiver set-ups. One receiver malfunctioned on one day resulting in the loss of one occupation of a planned two-occupation point (point a200). The plan was modified at the
weekends, which disrupted the four-day cycle (Table 1). Apart from this, the most notable deviation from the ideal plan was the lengthened drive times home for parties observing the westernmost points of a Quad on days when the trailers were moved to the next campground
further east.
The reconnaissance proceeded so well that those personnel were able to deploy the two spare
receivers on the last four observation days, and increase to two the occupancy of many of the planned one-occupation points in the easternmost two Quads (c.f. Figs. 1 and 2). Of 140 planned receiver sessions, 146 were thereby achieved. A small amount of data were lost in the archiving
process. The final data set available for processing is shown in Figure 7.
Data processing results
The data were processed using software based on the Bernese v. 3.2 GPS software. For the network as a whole, final point coordinate repeatabilities of about 0.24, 0.18 and 1.14 cm, and calculated accuracies (1-a scaled formal errors) of about 0.25, 0.21 and 2.25 cm were achieved in
the local north, east and up directions (Foulger, 1994b).
Acknowledgments
Jim Sutton was voted the most excellent cook for his seafood linguini in cream sauce with margaritas for which he was awarded a prize of a rusty frying-pan shot full of bullet holes that Bruce found at point C280. The project was funded by a NASA DOSE Grant. Karl Gross
reviewed and improved the manuscript.
References
Foulger, G.R., The 1992 Basin & Range Province GPS Survey: 3. Data Processing and Results,U.S. Geological Survey Open-File Report OF 94-287, 1994.
Julian, B.R. and G.R. Foulger, The 1992 Basin & Range Province GPS Survey: 1. PointDescriptions, U.S. Geological Survey Open-File Report OF 94-285, 1994.
Gurtner, W. and G. Mader, "Receiver Independent Exchange Format Version 2", International
Coordination of Space Techniques for Geodesy and Geodynamics GPS Bulletin, IAG, Vol3, No 3, pp 1-8, Sept./Oct. 1990.
SALT
UKE
CITY
QUIN
CEY
13,1
4
100 I
\ \
200
KM \
\
EXPL
ANAT
ION
4 DA
Y OC
CUPA
TION
2 DA
Y OC
CUPA
TION
1 DA
Y OC
CUPA
TION
Figu
re 1
Sc
hem
atic
idea
lizat
ion
of th
e B
asin
& R
ange
GPS
net
wor
k. T
he n
umbe
rs o
f the
obs
erva
tion
days
(1-
14) w
hen
each
poi
nt w
as
occu
pied
are
sho
wn
agai
nst e
ach
poin
t. M
ajor
hig
hway
s an
d st
ate
bord
ers
are
indi
cate
d. S
izes
of d
ots
indi
cate
the
num
ber o
f pl
anne
d m
easu
rem
ents
of i
ndiv
idua
l poi
nts.
-12
0'
-115
° -1
10'
41'
1
40'-
39'-
37'-
^
d
lOO
0 q
uin
i
w J
J.LUU
T a
c
lOO
*J
*
* *
*
f
b
300
* d
300
^
a
300
^ c
300
\^
e
lOO
f
100
9
100
1 ****
hlO
O
e3*°
° \f300
** «
g
300
^ h
300
-41
'
-40
"
-39
'
-37'
-120
° -1
15°
-110
'
Figu
re 2
M
ap s
how
ing
the
actu
al n
etw
ork
inst
alle
d an
d m
easu
red.
Siz
es o
f do
ts i
ndic
ate
the
num
ber
of a
ctua
l m
easu
rem
ents
of
indi
vidu
al p
oint
s (s
ame
conv
entio
n as
for F
igur
e 1)
.
A100
B100
C100
D10
0E1
00F1
00G
100
H10
0
A200
O «r>B2
00C2
00)2
00E2
00F2
00G2
00S
H20
0
o»
Ol
01 O
l C
O
CO
C
O
0 0 O
r»-
oo e
r»O
l 01
CM
C
O
CO
C
O04
04
o
o
o <
to
oo
O4
04
0
4<_
J C
J
<_
)
04
04
000
**
v
o
oo
O4
O4
O4
Q
O
O
C3
O
O
OO
4
«*
VO
O
OO
4
Ol
O4
04
UJ
U
J
UJ
U
J
O 0
C
Di^
~ o
o e
r>0
1
01 0
1
CD
C
D
CD
C
D O
C
D 0
4 i>
o t^
. co
o>
01 01 01
01 01 01
~ CD CD
CD CD CD
A300
B300
C300
D300
E300
F300
G30
0H
300
Figu
re 3
Sc
hem
atic
dia
gram
of t
he n
etw
ork,
sho
win
g th
e po
int c
odin
g sy
stem
.
REMOTE SITE "^H-50 SITE
REMOTE SITEH-50 SITE
REMOTE SITEH-50 SITE
REMOTE SITEH-50 SITE
090
1C
^^
0 1800
)001\///////A^
1200 1800
w////////////
09G
1
w////
p§§
0 1800
R000
')/////////§§^
1200 1800
1700
(//////
09G
1
mm0 1600
000
DAY-0.
"~ DAY-1r~ ' EXPLANATION
1 | Recording starts atri a (//////// 1000 at remote
^_ DAt-2 - site
Recording continuous'//////////// ot remote site,
H recording 1200-180012001800 ai Hi 9 hw°y 50 site
DAY-3 "" R
1000
W/IH///// Tripod reset at 1000
[I DAY-4
REMOTE SITE V/////A \ UAY-b
Figure 4 Schematic diagram showing the standard daily schedules. Hatched bars indicate planned recording periods.
MON 5th TUE 6th WED 7th THU 8th FRI 9th SAT 10th 279 , 280 , 281 , 282 , 283 , 284
1000
f//////M/////m
1200 1800
0900 1800
1000
1200 1800
1700±0900 1600
0900 1800
0900 1800
ft
1000 1700
1200 1800
0900 1800
1000
1200 1800
0900 1600
0900 1BOOR
1000
1200 1800 0900 1800
0900 1800
1000
1200 1800
1000t
PROFILE A
QUAD A
PROFILE B
QUAD B
PROFILE C
QUAD C
PROFILE D
5 Schematic diagram showing the observation plan for the whole network. For explanation, see Figure 4.
10
MON 12th 286
TUE 13th 287
WED 14th 288
THU 15th 289
FRI 16th 290
SAT 17th 291
1
§^
0900 1800
g§g
0900 1800
1000
!////////>
jig
1200 1800
I
Y/////////////A^^
0900 1800
^^
0900 1800
1000
\////mWl*
1200 1800
1 |
1700
'/////////A
^
0900 1600
IH§
0900 1800
by//////////////i^
0900 1800
Ii I I I
P 1000
17001
w///k////(///M//////m^ ^ ^^ i :^is
1200 1800* 0900 1600 i
0900 1800 1 0900 1800
1000 |
1///////M////////////////§§ ^
1200 1800 0900 1800
1000
V/////1
I
PROFILE C
QUAD C
PROFILE D
QUAD D
PROFILE E
QUAD E
PROFILE F
Figure 5 (continued)
11
MON 19th TUE 20th WED 21st THU 22nd FRI 23rd SAT 24th 293 , 294 , 295 , 296 , 297 , 298
1000
v/////m
1
090
1
20
^
0 1
i^§
800
0 1800
}00
K////////>^
1200 1800
1700
V/////////A^^
0900 1600
^^
0900 1800
w//////////////,$$§§
0900 1800
1
i i
R1000
W/t
1
090
1(
r/20
////^
////
0 1800
i§§§
0 1800
300
V
120
'Wt^0 1
'///.
!00
1700
(//////
09C
090
(/////(
09(
I/It^g
\
0 1600
,
0 1800
1700
7///L^^0 1
\
500
PROFILE F
QUAD F
PROFILE G
QUAD G
PROFILE H
5 (continued)
12
DOSE Basin & Range GPS Survey, Oct. 1992.
campaign: nevada92 station 1: quin station 2:typ of observation: phase zero differencereference epoch : 1992-10- 6 15:30: 0.00 one character - 22.00 minutestotal number of observations: 15339
svn frq #obs2 13 853! ********************3 13 809!******************
^^ j_3 1006! ************* **********12 13 929!***** ******* **********13 13 812!*** **** **************14 13 683! ***************-15 13 932! ************** *******16 13 883!*********** *********18 13 795! *******************j. y jij o D fi'20 13 804i************ **** ***.21 13 846! ********************23 13 799! ******************24 13 572!******** ********.25 13 917! ****** ***************26 13 989! *********** ************27 13 827! *******************28 13 929! ************* ********
Figure 6 Typical data block recorded over a 24-hr period (Day 1:1500 hrs - Day 2:1500 hrs) showing satellite visibility.
13
7* MON 5th , TUE 6th , WED 7th , THU 8th , FRI 9th , SAT 10th ,
PUT A1 l»MI 2?9
STATION A 1 t\c\ 1542......AlUU Aonn 1923..,A/UU A 7nn 1650....AjUU
AOOO
Aoin 1959..AziU »ocn 1830..,A/JU
A270 Aion 1942..A/oU
Rinn 1719.....D IUU
p?nn 1852..ozuu D7r\r\ 1628.....B500 R?mDZ IU
D00f\Dfc^.w
DO T rt
ft ̂ C AO«ltf U
R07nD//U
PORHD/uU
C100nooV/£ww
C300
roxnL/4U rocnL/OU
D100
D300
DATA BLOCKSPROCESSED 1542
A2 B1 B2 C1 , 280 , 281 , 282 , 283 , 284 ,
............................0002
.....0030 1809 ...1909
.............................0100
1620. ...... ..0012
....0100
.....0101 152?........ 2347
1515. ....... ...0133.....0110
1539........ ...0130
.....................................^.4 !.l................................0023
.....0059 1610.... ......0100 1859 .......0059 1622. ....... 2300
1R59 .. .0100
1554.......2300
1504. ...... ...0049
1626. ...... .00231610.... ......0026
1527.. ...... ..0049
1900. .....0100
1753.... ....01231701 ...... ......155V.6!? ........ .^2.1, .1641 ............... 10 16
2044. .....0050 1940 ......00341621... ...... 0048
1825. ................I.6..4.6..!. ...... .................................. ...1821
1539. !..... ..0103
1617. ...... ..0013
1909. .....01001502...... .....0119
1629.... .................... ...1845
1658. ........................... 2138
279 , 280 , 281 , 282 ,283,
1530 1500 1520 1500
Rgure 7 Measurement plan (dotted Unes) and actual data archived (solid lines) for all the points.
14
MQN 12th , TUE 13th , WED 14th . THU 15th . FRI 16th . SAT 17th
ruT C2 01 02 El E2 , 286 , 287 , 288 , 289 , 290 , 291 ,
STATIONC100 0048--------0055
C200 1640..........0100
C300 1740.^,2259 Q22Q 1537.........2332
1045........ 0007
C260 1909- .-0042
C280 1511.......... .0106
D20o 1832.^^.0059 1602 .^^...0048 1612...... .2203
D300 1714......................................................2344
1600..........0100 1614........2300
Q24Q 1613.........0030 1616........0029
D2gQ 1 535..........00441527.......... 0045
D280 1931.^.0102
£200 1904_.^.0059 1854 .^..0038 2001.... 0059 1639.......22451739 ^ 5.26 jl 620
E220F9An 1707........0021 1603........0029Lfc^w --.--_ .^ ~~
1907.....0102 1554.......2300
1601 ........0059
£280 1S20-..-..0041 1531..........0046
FIDO 1654.................................................. 1842
P2QQ 1858_.^.p059 1630........0059
F300 1739.................................................1731
DATA BLOCKS 286 , 287 , 288 , 289 ,290,PROCESSED 151g
Figure 7 (continued)
15
MON 19th , TUE 20th , WED 21st , THU 22nd . FRI 23rd , SAT 24th
F1 F2 G1 G2 293 , 294 . 295 , 296 . 297 , 298 ,
STATIONn 00 1724 ................................0004
F200 1907....._.0100 1636. ...... 2230F300 1712...............................2319F210 1B49 ^P22Q 1645....... 2246P23Q 1553.. ........0029 1739.. ......0102F250 1540- ''' ^^ °0381 538..........0022
P27Q 1532-......0009F280 1740.......0101 2021.....0142P29Q 1548...........01021546...........0059
G100G200 1854......0059
1648. ............ .|1........... I1........... .............. 2548.....G210
Q22Q 1628 ......... 0100
G230 1529..........0044 1521........0059
Q25Q 1517...........0041 1530..... ..1930
1548.........0055 1555.........0042
G280 1928.^.0059 1557.......2254
G290 1718....-..0059
H100 1720...............................0012
H200 1922 ...... 0100 1607.. .....2226H300 1707...............................2356
DATA BLOCKS 295 . 294 , 295 , 296 , PROCESSED 2356
Figure 7 (continued)
d.y
Sat
Sun
Mon
Tue
Wed
Thu FH Sat
Sun
Mon
Tue
Wed
Thu FH Sat
Sun
Mon
Tue
Wed
Thu
FH Sat
K.y
:re
c Q
da
te
3rd
4th
5th
6th
7th 8th
9th
10
th
11th
12th
13th
14th
15th
16th
17th
18th
19th
20th
21st
22nd
23rd
24th
Way
ne
rec
rec
rec
tr/r
ec
leav
e
I I art
tr/r
ec
rec
tr/r
ec
rec
leav
e
I I 1 1 1 1
A-A
, A
-B e
tc0
0.0
1,0
2.
03
.04
, C
tr
Bru
c*
rec
rec
rec
rec
rec
tr/r
ec
rec
rec
C30
0
rec
rec
rec
rec
rec
F290
F290
F280
G27
0G
290
G2t
OG
230
5
ROM | 1 1 1 1
arr
ev
01 O O 01
02 04
rec
rec
05 O 01
02 03
04
pack
Gra
nt
Gill
G
ary/
Kev
in
Jim
S/C
huck
K
athl
een
Mlc
helte
rec
rec
DO 00 01
03
02 "05
00 *D1
02 03
04 O O
tr/Q 01
04
and
A20
0A
2tO
A20
0A
220
C30
0C
200
C30
0C
200
C3
00
C200
C3
00
C200
C300
E1
00
E200
E1
00
E2
00
E100
E200
E100
E2
00
H1
00
G280
H1
00
G290
leav
e
poin
t re
conn
alsa
nce
trai
ntr
ain
Q
tr/Q Q 03
02 *D5
04 *01
02 03
04
01
02
03
04
driv
e to
rem
ote
poin
t re
quire
dco
ok d
uty
Cam
psite
mor
ning
/eve
ning
C100
B290
C100
C220
C100
C2
20
JC
100
E3
00
0280
E3
00
0280
E3
00
E2
20
E3
00
E2
20
G100
F2
80
jG
100
F2
30
G100
G210
G100
G220
type
of
sche
dule
- d
ayO
typ
e, d
ay 1
tyf
trai
ler
mov
ing
duty
trai
ntr
ain
01
02 03
04
01
rec
*D1
02 tr/Q 01
02 rec
*01
04 Q Q
1 data
A23
0.
E
>e,
etc
B1
00
A2
80
B1
00
A2
90
B2tO
B100
B2
20
B1
00
0100
D2
00
0100
0200
0100
0220
F100
E2
60
F1
00
F200
FtO
OF
200
F1
00
F2
00
30
0
etc
trai
ntr
ain
01
02 03
04
01
05
tr/Q O 04
*Dt
02 rec
01
04
01
04
B30
0B
200
B30
0B
200
B30
0B
200
B30
0B
200
0300
C26
00300
01
00
0220
F3
00
F200
F300
E2
60
F3
00
F210
F300
F2
20
H3
00
H200
H3
00
H200
trai
ntr
ain
01
04
01
tr/Q O 05
Dt
02 04
DO DO
05
01
03
03
04
1 re
ceiv
er o
nly
depl
oyed
data
dow
nloa
d du
typo
int
code
s
A100
A250
A100
A250
C100
B2
80
0100
0300
C2
60
0300
0200
0300
0200
E240
E2
80
E2
40
E2
80
F100
G300
G2
00
G300
G2
00
G300
G2
00
G300
G2
00
trai
ntr
ain
01
04
DO DO DO 05
DO
DO
DO Q O 05
DO
DO
DO
DO
A300
A2
30
A300
A2
70
B2
30
B2
50
B2
70
B2
50
C240
C2
80
C2
40
C2
80
0240
D260
0240
0260
F300
F230
F2
50
F270
F2
50
G250
G2
30
G250
G2
70
cam
p
A-A
A-A
A-A
A-B B-B
B-C
OC
OC
OC
C-D
D-D D-E
E-E
E-E
E-E
E-F
F-F
i F<
5
QG
GG G
Jim
ft
trai
ntr
ain
data
data
data
data
data
data
data
data
data
data
data
data
data
, da
ia
data
data
Sie
ve
trai
ntr
ain
04 04 04 I I I I 1 1 1 1 1 1 1 1 1 1 1
Gar
th
trai
ntr
ain
05 | I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Sue 1 DO
DO
DO
DO
05 1 1 1 1 1 1 1 1 1 1 1
Bria
n
1 1 1 1 1 1 1 1 1 1 1 1 1 1 DO
DO
DO
DO
Tabl
e 1
Indi
vidu
al s
ched
ules
for i
nsta
llatio
n an
d m
easu
rem
ent o
f the
net
wor
k. S
ee k
ey fo
r exp
lana
tion
of th
e sy
mbo
ls.
17
Table 2 Trailer sites used in the 1992 survey.
A Oct. 2 (Fri.) - Oct. 6 (Tue.)Washoe Lake State Park. Phone 702/687-4319$5.00/trailer/day. Disposal station. No hookups. Can charge batteries.4 miles N. of Carson City on US 395,2 miles E on Eastlake Blvd. (SR 428).Enter past fee booth (unstaffed). Right at stop sign. Continue past signs for campgroundloops A and B to equestrian area. Parking area near shelter. If ranger not about, pay viaenvelope system near entrance.
B Oct. 6 (Tue.) - Oct. 8 (Thur.)Lahontan State Recreation Area. Phone 702/867-3500Fee waived. Disposal station (probably closed). No hookups.18 miles W of Fallen (10 miles E of Silver Springs) on US 50. From US 50 turnoff(signposted), follow dirt road about 1 mile S to park entrance. Road becomes paved nearcrossing of Carson River. At fee station follow sign toward right to "River Camp".
C Oct. 8 (Thur.) - Oct. 12 (Mon.)Hickison Petraglyph Site (BLM).Free. No potable water (available at USFS in Austin).20 miles E of Austin on N side of US 50 (prominent sign).
D Oct. 12 (Mon.) - Oct. 14 (Wed.)KOA of Ely. Phone 702/289-3413About $25.00/trailer/day, $16.00/tent/day. Full hookups. Disposal station. Showers.Laundry.3 miles S of Ely on US 6,50 and 395.
E Oct. 14 (Wed.) - Oct. 18 (Sun.)Great Basin National Park. Phone 702/234-7331Free. Disposal station. No water. No electricity.Drive E on US 50 past Sacramento Pass. At tavern called "The Y", turn right toward Bakerand Great Basin NP (signposted). From Baker follow SR 488 toward the right (W) anduphill (signposted) about 5 miles to park and visitor center. "You can NOT get lost."
F Oct. 18 (Sun.) - Oct. 20 (Tue.)Oak Creek (USFS). Phone 801/743-5721$25.00/night (entire group). No hookups. No showers. Deer hunters. Water maybe.From church in Oak City, follow SR 145 (FR 40089 in National Forest) 4.5 miles SE tocampground.
G Oct. 20 (Tue.) - Oct. 23 (Fri.)Butch Cassidy Campground (private). Phone 801/529-7400$13.70/trailer/day. Disposal station. Coin laundry. Groceries. Heated pool.1 mile E of 1-70 (exit 54). 1100 State Street, Salina.
18
Table 3 Survey participants.
Name
Wayne ThatcherRoss SteinGillian FoulgerBruce JulianGrant MarshallKathleen HodgkinsonMichelle HoftonGary Hamilton/Kevin ClarkJim Sutton/Chuck StifflerSue LarsonBrian KilgoreSteve FisherJim Richardson
Garth Franklin
Primary Responsibility
point reconnaissance (3rd - 15th)field measurements (8th - 23rd)field measurementspoint rec./trailer logisticsfield measurementsfield measurementsfield measurementsfield measurementsfield measurementsvolunteer field assistant (6th - 10th)volunteer field assistant (19th - 23rd)technical assistance (3rd - 7th)data download/tech, assistanceremote receiver visitstechnical assistance (3rd - 5th)
Affiliation
uses usesUSGS/Univ. Durham, UK.USGSUSGSUniv. Durham, UK.Univ. Durham, UK.USGSUSGSUSGSUSGSJPL
JPL JPL
19
Table 4 Framework of survey schedule.
Date (October)
Fri. 2nd Drive to Camp A from Menlo Park.Sat 3rd 0900 Assembly of all survey personnel at Camp A. General briefing.
10.30 Reconnaissance parties leave. Others assemble equipment, train. Sun 4th Reconnaissance, training, organization. Mon 5th } measure Quad A, day 1 Tue 6th ) measure Quad A, day 2 Wed 7th ) measure Quad B, day 1 Thu 8th ) measure Quad B, day 2 Fri 9th ) measure Quad C, day 1
Sat 10th ) retrieve receivers still in the field, reformSun 11th ) SA on - no measurements
Mon 12th } measure Quad C, day 2Tue 13th } measure Quad D, day 1Wed 14th } measure Quad D, day 2Thu 15th } measure Quad E, day 1Fri 16th } measure Quad E, day 2
Sat 17th } retrieve receivers still in the field, reformSun 18th } SA on - no measurements
Mon 19th } measure Quad F, day 1Tue 20th } measure Quad F, day 2Wed 21st } measure Quad G, day 1 Thu 22nd j measure Quad G, day 2
Fri 23rd Pack instruments, leave.
20
Table 5 Daily point occupation schedules.
1 - Installation Da0700 - 0900 Drive to remote point0900 - 1000 Set up remote point.1000 - 1 100 Drive back to highway 50 point.1 100 - 1200 Set up highway 50 point.1200 - 1800 Guard highway 50 point.1 800 Take up highway 50 point1 800 - 1900 Drive back to trailers.
Day 2 - Non-service Day0700 - 0800 Drive to highway 50 point0800 - 0900 Set up highway 50 point.0900 - 1 800 Guaixl highway 50 point.1 800 Take up highway 50 point.1 800 - 1900 Drive back to trailers.Jim Richardson visited the remote point and reset the tripod if he arrived at 1000 or earlier.
Day 3 - Service Day0700 - 0900 Drive to remote site.0900 - 1000 Service remote site (check, change battery, reset tripod).1000 - 1 100 Drive back to highway 50 point.1 100 - 1200 Set up highway 50 point.1200 - 1800 Guard highway 50 point.1 800 Take up highway 50 point.1 800 - 1900 Drive back to trailers.
Day 4 - Takeup Day0700 - 0800 Drive to highway 50 point.0800- 0900 Set up highway 50 point.0900 - 1600 Guard highway 50 point.1600 - 1700 Drive to remote point1700 Take up remote point1700- 1900 Drive back to trailers.
Day 5 - Saturday Takeup Day 0800 - 1000 Drive to remote site. 1000 Take up remote site. 1000 - 1200 Drive back to trailers.
Day 0 - Highway 50 day (two members in receiver crew)0700 - 0900 Set off from trailers to two highway 50 points. Set them up.0900 - 1800 Guard both highway 50 points.1800 - 1900 Take down both points, return to trailers.
This plan assumed:1 . A 1 hr driving time from the trailer headquarters to the highway 50 point,2. A 1 hr driving time from the highway 50 point to the remote point,3 . 1 hr for each tripod and receiver setup.4. A 1 hr driving time from the highway 50 point back to the trailers in the evening.5 . A few minutes for tripod takedown,6. Short drive times for the party occupying the two highway 50 points.
21
Table 6 Time
Day Date DOY
Mon 5th 279Tue 6th 280Wed 7th 281Thur 8th 282Fri 9th 283Sat 10th 284Sun llth 285
Mon 12th 286Tue 13th 287Wed 14th 288Thu 15th 289Fri 16th 290Sat 17th 291Sun 18th 292
Mon 19th 293Tue 20th 294Wed 21st 295Thu 22nd 296Fri 23rd 297
Time offset Pacific Daylight Time from UHT = - 7 hours