TfL Liverpool Street Station, London hannel Drain...

2
TfL Liverpool Street Staon, London Channel Drain Reinstatement www.nufins.com 1966 - 2016

Transcript of TfL Liverpool Street Station, London hannel Drain...

Page 1: TfL Liverpool Street Station, London hannel Drain ...media.brintex.com/Occurrence/163/Brochure/4485/brochure.pdf · TfL Liverpool Street us Station, London - hannel Drain Reinstatement

TfL Liverpool Street Station, London Channel Drain Reinstatement

www.nufins.com 1966 - 2016

Page 2: TfL Liverpool Street Station, London hannel Drain ...media.brintex.com/Occurrence/163/Brochure/4485/brochure.pdf · TfL Liverpool Street us Station, London - hannel Drain Reinstatement

TfL Liverpool Street Bus Station, London - Channel Drain Reinstatement

Client:

EPIFLEX is a flexibilised, self-compacting, resinous material that develops high bond strengths to metal, asphalt and

concrete. Loading and stresses between channel drain and all types of substrate are evenly distributed by this

waterproof material and eliminates water ingress. A waterproof transition mortar was critical for this application, since

Liverpool Street Rail Station concourse is situated immediately below the Bus Station road deck.

Suitable for use with ironwork or composite channel-drain, gullies, frames and covers. When installed correctly in

accordance with our guidelines, this innovative system can be expected to provide a service life of 20 years and

eliminate early collapses and pothole development.

Company A For more information contact:

Head Office: 3 Walton Road, Pattinson North, Washington, Tyne & Wear, UK

t: +44(0)191 416 8360 f: +44(0)191 415 5966 e: [email protected]

w: www.nufins.com

1966 - 2016

Technical & Sales: +44(0)191 416 8360

At Liverpool Street Bus Station, the channel drain was set to height using CONFIL BEDDING MORTAR and the

transition slot was then filled to the running surface with EPIFLEX.