TECHNICAL SPECIFICATIONS FOR

SHALLOW WELLS UPGRADE

TABLE OF CONTENTS

Description Section

Measurement and Payment 01270

Submittals 01300

Administrative Requirements 01310

Preconstruction Video 01315

Quality Control 01400

Temporary Facilities and Controls 01500

Mobilization 01505

Site Clearing and Preparation 02110

Excavation, Trenching and Backfill 02315

Erosion and Sedimentation Control 02370

Sodding 02590

Piping General 02600

Fittings 02610

Polyvinyl Chloride (PVC) Pipe 02616

Injection Wells 02632

Valves 02800

Concrete 03300

Protective Coatings 09900

FDEP Bureau of Water Facilities Funding Supplementary Conditions FDEP

Geotechnical Exploration Appendix "A"

FDEP Permit Appendix "B"

Page 3: TECHNICAL SPECIFICATIONS - D.N. Higgins

01270

SECTION 01270

MEASUREMENT AND PAYMENT

Part I. GENERAL

1.01 Description

A Payment for all Work done in compliance with the Contract Documents, inclusive

of furnishing all manpower, equipment, materials, and performance of all operations

relative to construction of this project, will be made under Pay Items listed herein.

Work for which there is not a Pay Item will be considered incidental to the Contract and

no additional compensation will be allowed.

B The Contractor shall take no advantage of any apparent error or omission in the

Drawings or Specifications, and the Engineer shall be permitted to make corrections and

interpretations as may be deemed necessary for fulfillment of the intent of the Contract

Documents.

C The Engineer will make measurements and determinations as necessary to

classify the work within pay items and determine the quantities for pay purposes.

D Where pay item numbers are shown on the bid form, they generally follow FDOT

pay item number formatting; however, they are only provided in order to use them for

pay application purposes. FDOT pay item descriptions do not apply; utilize the

descriptions on the bid form and within this section to determine the work associated

with each pay item.

Part II. PAY ITEMS

2.01 Mobilization

A Work Includes preparatory work and operations in mobilizing for beginning work

on the project, including, but not limited to, those operations necessary for the

movement of personnel, equipment, supplies and incidentals to the project site.

Mobilization shall not exceed 5% of the total Bid.

B Bonds, insurance and taxes as required by the General Conditions.

2.02 Preconstruction Video

A Work Includes preconstruction documentation via videotaping plus all digital

color photographs necessary to pick up detail not easily visible or apparent on the

videotape. This work is considered incidental to the rest of the work and is not paid for

as a separate line item.

Page 4: TECHNICAL SPECIFICATIONS - D.N. Higgins

01270

2.03 Maintenance of Traffic

A Work Includes the construction and maintenance of any necessary detour

facilities; the providing of necessary facilities for access to residences and businesses

along the project; the furnishing, installation and maintenance of traffic control and

safety devices during construction; daily inspections of the traffic control devices

(including nighttime inspections); replacement of all equipment and devices found not

to be conforming with approved standards during the inspection; the control of dust,

and any other special requirements for safe and expeditious movement of traffic as may

be called for on the plans. The term “Maintenance of Traffic” shall include all such

facilities, devices, and operation as are required for the safety and convenience of the

public as well as for minimizing public nuisance; all as required by the FDOT, the

Engineer and the Owner. This work shall also consist of the removal of existing

pavement markings necessary in order to implement traffic control, temporary signs,

and the removal or relocation of existing signs in order to implement traffic control. This

item also includes any adjustments necessary to the traffic control devices under

emergency conditions. This work is considered incidental to the rest of the work and is

not paid for as a separate line item.

2.04 Erosion and Sediment Control

A Work Includes preparation and implementation of stormwater pollution

prevention control plan, including monitoring, inspecting, and reporting, providing

erosion and sediment control measures, preparing and filing EPA NPDES NOI and NOT

forms, and providing required contractor certifications. This work is considered

incidental to the rest of the work and is not paid for as a separate line item.

2.05 Silt Fence

A Work Includes installation and maintenance of silt fence per FDOT Index No. 102.

This work is considered incidental to the rest of the work and is not paid for as a

separate line item.

2.06 Shallow Wells Upgrade

A Work Includes all labor and materials necessary for installation of two (2) class V

waste water disposal injection wells, any required testing, completion reports, piping,

valves, appurtenances, and abandonment of two (2) existing Class V wells as shown on

the construction drawings. Including all field verifications, layout, shoring, bracing,

disposal of unsuitable or excess material, site clean-up and restoration of damaged sod

and pavement damaged during the installation.

B Unit of measurement is Lump Sum.

Part III. EXECUTION - NOT USED

END OF SECTION

Page 5: TECHNICAL SPECIFICATIONS - D.N. Higgins

01300

SECTION 01300

SUBMITTALS

PART I - GENERAL

1.0 Construction Schedules

1.01 The CONTRACTOR shall submit two copies of Progress Schedules indicating the starting and

completion dates of the various stages of the work and estimated payments during the next three

months to the ENGINEER. The proposed Progress Schedules shall be submitted to the ENGINEER

prior to the preconstruction meeting. The CONTRACTOR shall distribute copies of the Progress

Schedules during the preconstruction meeting for discussion. The Progress Schedules shall be

updated by the CONTRACTOR and submitted to the ENGINEER, as a part of applications for

progress payments, through completion of the Work. Failure to update progress schedule may be

the basis for rejection of applications for progress payments.

1.02 The CONTRACTOR, if applicable, shall submit two copies of Schedules of Value of the work to

the ENGINEER. A preliminary Schedule of Values shall be submitted by the CONTRACTOR prior to

the preconstruction meeting. A final Schedule of Values, prepared in accordance with Article 14.1

of the General Conditions and presented in sufficient detail to serve as the basis for payments

during construction, shall be submitted to the ENGINEER for approval at least ten (10) days prior to

submitting the first Application for payment.

1.1 Applications For Payment

1.11 The CONTRACTOR shall submit Applications for payment to the ENGINEER in accordance

with the provisions of Article 14 of the General Conditions. Applications for Payment shall be

made on forms provided by or approved by the ENGINEER.

1.2 Shop Drawings, Product Data and Samples

1.21 The CONTRACTOR shall submit shop drawings, product data and samples, as required by the

individual Specification Sections and for ALL materials used in the Project, to the ENGINEER for

review in accordance with the provisions of Paragraphs 6.24 through 6.28, inclusive, of the General

Conditions. The CONTRACTOR shall submit and maintain a submittal log with a list of all submittals

for the Project together including review status, submittal dates, review dates etc.

1.22 Shop drawings shall be presented in a clear and thorough manner. Details shall be identified

by reference to Contract Drawing Number and Detail and Contract Specification Section and Page

Number.

1.23 The product data shall be presented in a clear and thorough manner, identified the same as

the shop drawings. Included with the information shall be performance characteristics and

Page 6: TECHNICAL SPECIFICATIONS - D.N. Higgins

01300

capacities depicting dimensions and clearances required. The manufacturer's standard schematic

drawings and diagrams shall be modified to delete information which is not applicable to the work.

Manufacturer's standard information shall be supplemented to provide information specifically

applicable to the work.

1.24 Samples shall be of sufficient size and quantity to clearly illustrate functional characteristics

of the product with integrally related parts and attachment devices depicting full range of color,

texture and pattern.

1.25 The CONTRACTOR shall make submittals in accordance with the approved schedule, and in

such sequence as to cause no delay in the work or in the work of any CONTRACTOR. No damages

will be awarded or extension of time granted due to the shop drawing and product data review

process.

1.26 The CONTRACTOR shall submit an entire package of shop drawings and product data

information for major items of work so that the ENGINEER can review the package as a unit.

1.27 The number of submittals required shall be six (6) copies of each shop drawing or product

data information sheet. Submittals shall contain the following information:

1. Field dimensions, clearly identified as such.

2. Relation to adjacent or critical features of the work or materials.

3. Applicable standards, such as ASTM or Federal Specification Numbers.

4. Identification of deviations from Contract Documents.

5. Identification of revisions on re-submittals.

6. CONTRACTOR'S stamp indicating as a minimum the Project Title, Date of

Submission, Date of Previous Submission, and Contract Specification Section

Reference which shall be initialed or signed, certifying the review and approval of

submittal per General Conditions, verification of products, field measurements and

field construction criteria, and coordination of the information within the submittal

with requirements of the work and of Contract Documents.

1.28 The ENGINEER shall affix a stamp and initials or signature and indicate confirmation or

requirements for re-submittal. The ENGINEER shall return to the CONTRACTOR three (3) copies of

the product data information for distribution or for resubmission.

1.29 The CONTRACTOR shall make all corrections or changes in the submittals required by the

ENGINEER and resubmit. The CONTRACTOR shall indicate any changes which have been made

other than those requested by the ENGINEER.

1.3 Specification Section Requirements

1.31 Miscellaneous schedules, field reports, test reports, affidavits, certificates, permits,

agreements and other items identified in the Technical Specification Sections, or as requested by

Page 7: TECHNICAL SPECIFICATIONS - D.N. Higgins

01300

the ENGINEER shall be submitted to the ENGINEER in duplicate. As a minimum, these submittals

should be identified with the Project File, Date of Submission, and Contract Specification Section

Reference.

1.4 Manufacturer's Operation And Maintenance Data

1.41 The CONTRACTOR shall furnish five (5) copies of all operation and maintenance data required

by the various Technical Sections. Prior to 50 percent completion of the Project, the CONTRACTOR

shall have submitted one (1) acceptable copy to the ENGINEER for review.

1.42 The operation and maintenance data shall be bound in a suitable three-ring binder(s). A

Table of Contents shall be provided in the front of each binder to list the various sections of the

Manual.

1.43 The information to be provided in each section for each piece of equipment and project

component shall include but not be limited to: detailed equipment drawings; sections cut through

all of the major equipment and sub-assemblies; installation and operational procedures; complete

wiring and piping schematics; lubrication materials and procedures; maintenance procedures; and

parts lists complete enough to permit identification of parts by nomenclature, number and use.

1.44 At the front of each section a maintenance schedule shall be provided for each piece of

equipment in the section. The schedule shall display the daily, weekly, monthly, semi-annual,

annual or fraction thereof, lubrication and preventative maintenance required in order to meet

warranty conditions and the manufacturer's recommendations for optimum performance and life

of the unit. A common schedule format is to be developed and used for all of the sections.

1.5 Photographs

1.51 When required in the Contract the CONTRACTOR shall furnish the ENGINEER a total of four

(4) prints, two (2) black and white and two (2) color photographs each month during construction

of the project. Prints shall be 8 inches x 10 inches and shall be inserted in transparent sheet

protection suitable for binding. All photographs shall be taken at such times and of such views as

the ENGINEER directs. The following information shall be placed on the back of the photos: job

name, contract number, description of view and date of photograph. The CONTRACTOR, at the

completion of the job, shall submit to the ENGINEER all negatives.

1.52 The CONTRACTOR shall submit photographs monthly along with the Application for progress

payment as described in Article 14 of the General Conditions.

1.6 Audio-Video Survey

1.61 When required in Contract, the CONTRACTOR shall furnish the ENGINEER with an "Audio-

Video Survey" record of the existing conditions prior to the start of construction. CONTRACTOR

Page 8: TECHNICAL SPECIFICATIONS - D.N. Higgins

01300

must enlist the services of a firm having a minimum of one years experience in audio-video

recording of construction projects.

1.62 Complete coverage shall include all surface features located within the public right-of-way,

easement areas and adjacent private properties up to building line when such properties lie within

the zone of influence of construction and will be supported by appropriate audio description made

simultaneously with video coverage. Such coverage shall include but not be limited to all existing

driveways, sidewalks, curbs, ditches, roadways, landscaping, trees, culvert, headwalls and retaining

walls, or buildings located within such zone of influence.

1.63 When conventional wheeled vehicles are used, the distance from the camera lens to the

ground shall be not less than twelve (12) feet to ensure proper perspective.

1.64 All recording must be made on continuous running audio- video DVD’s.

1.65 Audio-video to be on DVD standard format suitable for play-back on video color equipment

and standard computers.

1.66 Houses and buildings shall be identified visually by house number, when visible, in such a

manner that structures of the proposed system can be located by reference. In all instances,

however, location shall be identified by audio or visual means at intervals not to exceed 100 linear

feet in the general direction of travel.

1.67 The rate of speed in the general direction of travel of the conveyance used during taping shall

not exceed 30 feet/minute. Panning rates and zoom-in, zoom-out rates shall be controlled

sufficiently such that stop action during play-back will produce clarity of detail of the object

viewed.

1.68 All recording shall be done during times of good visibility. No recording shall be done during

periods of visible precipitation, or when more than 10% of the ground area is covered with

standing water, unless otherwise authorized by the OWNER.

1.69 Any recorded coverage not acceptable to OWNER shall be re-recorded at no additional

charge.

1.70 The audio-video recording shall be done prior to placement of materials or equipment on the

construction area and furnished at a minimum of one week prior to the preconstruction meeting.

1.71 To preclude the possibility of tampering or editing in any manner, all video recordings must,

by electronic means, display continuously and simultaneously generated transparent digital

information to include the date and time of recording, as well as the corresponding engineering

stationing numbers. The date information will contain the month, day, and year. For example,

10/5/92, and be placed directly below the time information. The time information shall consist of

Page 9: TECHNICAL SPECIFICATIONS - D.N. Higgins

01300

hours, minutes, and seconds, separated by colons. For example 10:35:18. This transparent

information will appear on the extreme upper left hand third of the screen.

END OF SECTION

Page 10: TECHNICAL SPECIFICATIONS - D.N. Higgins

01310

SECTION 01310

ADMINISTRATIVE REQUIREMENTS

PART 1 GENERAL

1.01 Section Includes

Meetings, construction progress documentation, submittals, record documents

1.02 Preconstruction Meeting

The Owner will schedule a preconstruction meeting prior to beginning the Work

to review shop drawing procedures, submittal requirements, and construction

administration requirements (project coordination and communication). The

Contractor shall bring to the preconstruction meeting the proposed construction

schedule, which will be reviewed with the Owner during the meeting.

1.03 Definitions

A. Shop Drawings - Shop drawings are original drawings, prepared by the

Contractor, a subcontractor, supplier, or distributor, which illustrate some

portion of the Work; showing fabrication, layout, setting, or erection details.

Shop drawings shall be prepared by a qualified detailer and shall be identified by

reference to sheet and detail numbers on the Contract Drawings

B. Product Data - Product data are manufacturer's standard schematic drawings

and manufacturer's catalog sheets, brochures, diagrams, schedules,

performance charts, illustrations, and other standard descriptive data. Catalog

sheets, brochures, etc., shall be clearly marked to identify pertinent materials,

products, or models.

C. Samples - Samples are physical examples to illustrate materials, equipment, or

workmanship and to establish standards by which work is to be evaluated.

1.04 Submittal Requirements

A. Prior to submission, thoroughly check shop drawings, product data, and samples

for completeness and for compliance with the Contract Documents. Verify all

field measurements, quantities, dimensions, specified performance criteria,

Page 11: TECHNICAL SPECIFICATIONS - D.N. Higgins

01310

fabrication, shipping, handling, storage, assembly, installation, and safety

requirements.

B. Coordinate the submittals with the requirements for other related work.

C. Notify the Engineer, in writing at the time of submission, of deviations in

submittals from the requirements of the Contract Documents. The Contractor's

responsibility for deviations in submittals from the requirements of the Contract

Documents is not relieved by the Engineer's review of submittals, unless the

Engineer gives written acceptance of specific deviations.

D. Submit at least six (6) copies of each shop drawing and product data. The

specific number of copies required of all submittals will be determined during

the preconstruction meeting. Submit the number of samples indicated in the

individual Specification Sections.

E. Where a specific product manufacturer and model number is listed in individual

specification sections and is proposed by the Contractor to be used, full

submittal of product data is not required. In this case, submit in letter format

the name of the product, manufacturer, model number, specification section,

and name of project. Certify the identified product is proposed to be used in the

project.

F. Shop drawings, product data, and samples shall be accompanied by a letter of

transmittal referring to the name of the project and to the specification page

number and/or Drawing number for identification of each item. Submittals for

each type of work shall be numbered consecutively, and the numbering system

shall be retained throughout all revisions.

G. Submittals shall bear the Contractor's stamp of approval certifying that they

have been checked and indicate appropriate specification section and/or

drawing location. Submittals without the Contractor's initialed or signed

certification stamp and submittals which, in the Engineer's opinion, are

incomplete, contain numerous errors or have not been properly checked, will be

returned unchecked by the Engineer for resubmission.

H. Begin no work which requires submittals until return of submittals with Engineer

stamp and initials or signature indicating the submittal has been approved.

1.05 Engineer Review of Submittals

A. Engineer’s review and approval of submittals will not extend to means, methods,

techniques, sequences, procedures of construction or to safety precautions.

Page 12: TECHNICAL SPECIFICATIONS - D.N. Higgins

01310

B. The review and approval of a separate item will not indicate approval of the

assembly in which the item functions. Engineer’s review and approval of

submittals shall not relieve Contractor from responsibility for any variation from

the requirements of the Contract Documents.

C. The Engineer will review submittals with reasonable promptness. The Engineer's

review of submittals shall not be construed as a complete check and shall not

relieve the Contractor from responsibility for complete compliance with the

Contract requirements.

D. No corrections, changes, or deviations indicated on submittals reviewed by the

Engineer shall be considered as a change order.

E. Where review of submittals is required by the Owner of other agencies, the

Engineer will forward the appropriate submittal(s) to these parties after Engineer

review. Once review of all parties is complete, the submittal(s) will be returned

to the Contractor reflecting the review of all parties

F. If the submittal is not satisfactory, one copy of the submitted item will be

retained by the Engineer and all other copies returned to the Contractor for

appropriate action.

G. In the event a third submittal is required, due to previous submittals of

incomplete or incorrect data or not in compliance with the Contract Documents,

the Contractor will be charged one-half of the cost incurred by the Engineer for

the review of the third submittal. The Contractor shall bear the total cost

incurred by the Engineer for all subsequent reviews. The Engineer costs charged

to the Contractor will be at the cost plus rate generally charged by the Engineer

and will be deducted by the Owner from payments due to the Contractor.

H. Distribution of copies of acceptable submittals will be as mutually determined by

the Contractor, Owner, and Engineer on an individual item basis during or

following the preconstruction conference.

1.06 Progress Meetings

A. The frequency of progress meetings shall be determined during the

preconstruction meeting. As a minimum, progress meetings shall be held once

per month during construction.

B. The Contractor and Owner shall attend the progress meetings.

C. The Contractor shall provide a meeting agenda and keep minutes of each

progress meeting.

Page 13: TECHNICAL SPECIFICATIONS - D.N. Higgins

01310

1.07 Record Drawings

A. As the Work progresses, the Contractor shall be responsible for recording

information on the approved Contract Documents concurrently with

construction progress. This field copy shall be maintained in the field office in

clean and legible condition. It shall be available for inspection by the Owner or

Engineer at any time. It shall also be provided to the Engineer as shown in item

1.07.F.

B. Mark on the Contract Drawings all changes in direction, elevation and location of

structure, piping, equipment, electrical, and mechanical work.

C. If requested, mark on the Specifications the manufacturer, trade name, catalog,

and supplier of each product actually installed, and mark changes made by

Change Order or Field Order.

D. All Record Drawings shall be prepared by Contractor in ACAD format using base

drawings provided by Engineer. As-built information shall be field verified,

measured, certified, signed and sealed by the Contractor’s licensed Surveyor

who will be responsible for the accuracy of all dimensions and elevations.

E. The as-built information shown on the Record Drawings is to include, but not be

limited to, the following:

1. Horizontal locations and vertical elevations for all installed utility lines and

storm structures including but not limited to manholes, valves, inlets and

cleanouts, etc.

2. Distance along pipelines between valves.

3. Vertical elevations of all pipelines at crossing of potable water mains

(whether the water main is existing or new) in order to document that the

minimum required vertical separation has been met.

4. Utility pipeline tied horizontally to edge of pavement and right-of-way lines,

located every 200-ft. plus all changes in horizontal offset.

5. Horizontal and vertical data for any construction that deviates from the

approved engineering drawings.

6. Where the plans contain specific horizontal location data, such as station and

offset, the as-built drawings are to reflect the actual horizontal location.

Page 14: TECHNICAL SPECIFICATIONS - D.N. Higgins

01310

7. Where the plans contain specific vertical elevation data, the as-built drawings

are to reflect the actual measured vertical elevation.

F. Deliver to Engineer one set of Record Drawings signed and sealed by

Contractor’s surveyor plus one electronic copy (ACAD format) of the drawings.

Also deliver the original red-line field copy to the Engineer. Surveyed record

drawings must be included each month with payment application packet.

END OF SECTION

Page 15: TECHNICAL SPECIFICATIONS - D.N. Higgins

01315

SECTION 01315

PRECONSTRUCTION VIDEO

PART 1 GENERAL

1.01 Description

Provide continuous color audio-video recording along the entire length of all

proposed work prior to construction to serve as a record of pre-construction

conditions. Supplement audio-video recordings with color photographs (digital)

for areas which require details not ascertainable on the recording.

1.02 Related Requirements

Section 01300 - Administrative Requirements

1.03 Qualifications

The preconstruction audio-video recording shall be of professional quality that

will clearly log an accurate visual description of existing conditions. Any portion

of the recording not acceptable for the determination of the existing conditions

shall be re-recorded at no additional cost to the Owner.

PART 2 PRODUCTS

2.01 General

The total audio-video recording system and the procedures employed in its use

shall be such as to produce a finished product that will fulfill the technical

requirements of the project. The video portion of the recording shall produce

bright, sharp, clear pictures with accurate colors and shall be free from

distortion, tearing, rolls or any other form of picture imperfection. The audio

portion of the recording shall produce the commentary of the camera operator

with proper volume, clarity, and be free from distortion. The recording system

shall utilize EIA standard video and NTSC compatible color.

2.02 Camera

The color video camera used in the recording system shall have EIA Standard:

NTSC type color - 1.0 V 75 Ohms.

2.03 Recorder

Page 16: TECHNICAL SPECIFICATIONS - D.N. Higgins

01315

The recording shall be made in standard DVD format. The recorder shall record

the color signal with a minimum horizontal resolution of 525 lines, 60 fields;

NTSC color signal; RF modulated - 72dB.

2.04 DVD Media

The DVD media used for the recordings shall be high quality, high resolution,

media able to be played back on any computer or standard DVD player. The DVD

media shall be new and thus shall not have been used for any previous

recording.

2.05 Video Tape Playback Compatibility

The recorded DVD’s shall be compatible for playback with any standard DVD

player or computer.

PART 3 EXECUTION

3.01 General

A. The recordings shall contain coverage of all surface features located within the

construction's zone of influence. The construction's zone of influence shall be

defined (1) as the area within the permanent and temporary easements or right-

of-way, and areas adjacent to these areas which may be affected by routine

construction operations, and (2) by the direction of the Owner. The surface

features within the construction's zone of influence shall include, but not be

limited to, all roadways, pavements, curbs, driveways, ponds, sidewalks,

culverts, headwalls, retaining walls, buildings, landscaping, trees, shrubbery, and

fences. Of particular concern shall be the existence of any faults, fractures, or

defects. Recorded coverage shall be limited to one side of the street at any one

time and shall include all surface conditions located within the zone of influence

of construction supported by appropriate audio description.

B. The recording of each video segment shall be a simultaneously recorded with the

audio recording. This audio recording, exclusively containing the commentary of

the camera operator, shall assist in viewer orientation and in any needed

identification, differentiation, clarification, or objective description of the feature

being shown in the video portion of the recording. The audio recording also shall

be free from any conversations between the camera operator and any other

production technicians.

C. All DVD’s shall be permanently labeled and shall be properly identified by project

title, number and date of recording.

Page 17: TECHNICAL SPECIFICATIONS - D.N. Higgins

01315

D. Each DVD shall have a log of that media’s contents. The log shall describe the

various segments of coverage contained on that video tape in terms of the

names of streets or easements, coverage beginning and end, directions of

coverage, and video unit counter/segment numbers.

3.02 Recording Schedule

A. The recording shall be performed prior to the placement of any construction

materials or equipment on the proposed construction site.

B. The Contractor shall coordinate the recording with the construction schedule so

that those portions of the construction that will be completed first will be

recorded first. The recording company shall deliver the video tape recordings to

the Owner upon their completion. Upon delivery of the DVD’s, transfer of

ownership of those DVD’s shall be made to the Owner.

3.03 Visibility

All recordings shall be performed during times of good visibility. No recording

shall be done during periods of significant precipitation, mist, or fog. The

recording shall only be done when sufficient sunlight is present to properly

illuminate the subject, and to produce bright, sharp video recordings of those

subjects. No taping shall be performed when more than 10% of the area to be

taped contains debris or obstructions unless otherwise authorized by the

Engineer.

3.04 Continuity of Coverage

A. In order to increase the continuity of the coverage, the coverage shall consist of

a single, continuous, unedited recording which begins at one end of a particular

construction area. However, where coverage is required in areas not accessible

by conventional wheeled vehicles and smooth transport of the recording system

is not possible, such coverage shall consist of an organized, interrelated

sequence of recordings at various positions along that proposed construction

area (e.g., wooded easement area).

B. The average rate of travel during a particular segment of coverage (e.g.,

coverage of one side of the street) shall be directly proportional to the number,

size, and value of the surface features within that construction area's zone of

influence.

3.05 Camera Height and Stability

Page 18: TECHNICAL SPECIFICATIONS - D.N. Higgins

01315

When conventional wheeled vehicles are used as conveyances for the recording

system, the distance between the camera lens and the ground shall not be less

than 10 feet. The camera shall be firmly mounted, such that transport of the

camera during the recording process will not cause any unsteady picture.

3.06 Camera Control

Camera pan, tilt, zoom-in, and zoom-out rates shall be sufficiently controlled

such that recorded objects will be clearly viewed during video tape playback. In

addition, all other camera and recording system controls, such as lens, focus, and

aperture, video level, pedestal, chroma, white balance, and electrical focus, shall

be properly controlled or adjusted to maximize recorded picture quality.

3.07 Viewer Orientation Techniques

The audio and video portions of the recording shall maintain viewer orientation.

To this end, overall establishing views and visual displays of all visible house and

building addresses shall be utilized. In easements where the proposed

construction location will not be readily apparent in the video tape viewer, highly

visible yellow flags shall be placed in such a fashion as to clearly indicate the

proposed centerline of construction.

3.08 Areas to be Recorded

A. The Contractor shall be able to televise and record areas with paved roads, along

easements, through parks, lawns, and open fields and inside buildings. When

recording on private property, the Contractor shall give the Owner sufficient

prior notice of such entry so that property owners may be advised of, and their

permission obtained for, the work.

B. At no time shall the Contractor be allowed to use any electrical circuits within

private property building structure. All recording shall be done during regular

business hours, unless otherwise specified by the private property owner or the

Engineer. The Contractor shall enter and leave private property in a professional

and orderly, workmanlike manner.

END OF SECTION

Page 19: TECHNICAL SPECIFICATIONS - D.N. Higgins

01400

SECTION 01400

GENERAL QUALITY CONTROL

Part I. GENERAL

1.01 DESCRIPTION OF REQUIREMENTS

(A) Definitions:

(i) Specific quality control requirements for the work are indicated throughout the

Contract Documents. In particular, quality control provisions for manufactured

products are specified in individual work sections and in other related sections of the

specifications; and are not repeated in this section. The requirements of this section

are primarily related to the performance of the work beyond the furnishing of

manufactured products. The term "Quality Control" includes, but is not necessarily

limited to, inspection and testing and associated requirements. This section does not

specify or modify the Engineer's duties relating to Contract quality review and

observation.

1.02 QUALITY ASSURANCE

(A) General Workmanship Standards:

(i) Except as more definitively specified in other sections of the specifications, comply

with the recognized workmanship quality standards within the industry as applicable

to each unit of work, including ANSI standards where applicable. It is a requirement

that each category of tradesman or installer performing the work be pre-qualified, to

the extent of being familiar with the applicable and recognized quality standards for

his category of work, and being capable of workmanship complying with those

standards.

1.03 SUBMITTALS

(A) Refer to Section 01300 for the general submittal requirements applicable to inspection

and test reports, project photographs, damage surveys, quality control samples,

maintenance agreements, guaranties, warranties, and similar documentation of quality

compliances as required. Refer to the individual work sections of the specifications for

specific certification and submittal requirements.

(B) Copies and Distribution: Where inspection and test reports and certifications are

required by governing authorities, provide additional copies as required, and, where

required, send copies directly from inspection or testing agency to governing authority.

1.04 PRODUCT DELIVERY-STORAGE-HANDLING

(A) Materials, supplies, and equipment delivered to the site shall be inspected for damage,

unloaded, and stored with a minimum of handling. Delivered items shall not be stored

directly on the ground. Handle, store and protect materials and products, including

fabricated components, by methods and means recommended by the manufacturer

which will prevent damage, deterioration and losses (and resulting delays), thereby

Page 20: TECHNICAL SPECIFICATIONS - D.N. Higgins

01400

ensuring highest quality results as the performance of the work progresses. Control

delivery schedules so as to minimize unnecessary long-term storage at the project site

prior to installation. Periodically exercise equipment stored in accordance with the

manufacturer's recommendations.

(B) The Engineer may refuse to accept, or sample for testing, materials, supplies, or

equipment that have been improperly or unsuitably stored.

(C) Materials, supplies or equipment found defective or unfit for use shall not be

incorporated in the work and shall immediately be removed from the construction or

storage site and replaced with new materials, supplies or equipment by the Contractor

at no additional cost to the Owner.

(D) If, instead of requiring removal and replacement of defective items, the Owner (and,

prior to approval of final payment, also the Engineer) prefers to accept the defective

item(s), he may do so. In such case, if acceptance occurs prior to approval of final

payment, a change order shall be issued incorporating the necessary revisions in the

Contract Documents, including appropriate reduction in the Contract price; or if the

acceptance occurs after approval of final payment, an appropriate amount shall be paid

by the Contractor to the Owner.

1.05 RESPONSIBILITY FOR INSPECTIONS AND TESTS

(A) Contractors Responsibility:

(i) It will be the Contractor's responsibility to employ and pay for the services of certified

independent testing laboratories. In addition, the Contractor shall pay for all retests

required due to failure to meet specifications.

1) The certified independent testing laboratories qualifications, test procedures, forms

and quality control program shall be submitted to the Utilities Engineer for review

and approval.

2) No failure of test agencies, whether engaged by the Owner or Contractor, to perform

adequate inspections or tests or to properly analyze or report results, shall relieve

the Contractor of responsibility for the fulfillment of the requirements of the

Contract Documents. It is recognized that the required inspection and testing

program is intended to assist the Contractor, Owner, Engineer and governing

authorities in the nominal determination of probable compliances with requirements

for certain crucial elements of work. The program is not intended to limit the

Contractor in his regular quality control program, as needed for general assurance of

compliances.

(ii) Afford access and reasonable time in the construction sequence for Owner's

inspections and tests to be performed. Cooperate with agencies and provide

incidental labor and services needed for the removal and delivery of test samples, and

for inspections and taking measurements. Provide patching and restoration services

where test samples have been removed.

Page 21: TECHNICAL SPECIFICATIONS - D.N. Higgins

01400

(B) Test Agency Responsibilities:

(i) Test agencies, regardless of whether engaged by the Owner or Contractor, are not

authorized to change or negate the requirements of the Contract Documents. Each

agency shall coordinate its assigned work with the construction schedule as

maintained by the Contractor, and shall perform its work promptly so as not to delay

the work avoidably. Observations (by agencies) having a bearing on the work shall be

reported to the Engineer, in the most expeditious way possible, and shall be recorded

in writing by the agency. Agency personnel shall not interfere with or assume the

duties of the Contractor.

Part II. PRODUCTS

2.01 EQUIPMENT AND MATERIALS

(A) All equipment and materials furnished under these specifications shall be new and

unused.

Part III. EXECUTION

3.01 INSTALLATION

(A) Pre-Installation Conferences:

(i) Well in advance of the installation of every major unit of work which requires

coordination with other work, meet at the project site with installers and

representatives of manufacturers and fabricators who are involved in or affected by

the unit of work, and in its coordination or integration with other work which has

preceded or will follow. Advise Engineer of scheduled meeting dates. At each

meeting, review the progress of other work and preparations for the particular work

under consideration including, but not limited to, the requirements of the Contract

Documents, options, related change orders, purchases, deliveries, shop drawings,

product data, quality control samples, possible conflicts, compatibility problems, time

schedules, weather limitations, temporary facilities, space and access limitations,

structural limitations, governing regulations, safety, inspection and testing

requirements, required performance results, recording requirements, and protection.

Record the significant discussions of each conference, and the agreements and

disagreements, along with the final plan of action. Distribute record of meeting

promptly to everyone concerned, including the Engineer.

(ii) The Contractor shall not proceed with the work if the associated pre-installation

conference cannot be concluded successfully. Instigate actions to resolve

impediments to the performance of the work, and reconvene the conference at the

earliest date feasible.

(B) Installer's Inspection of Conditions:

Page 22: TECHNICAL SPECIFICATIONS - D.N. Higgins

01400

(i) The Contractor shall require the Installer of each major unit of work to inspect the

substrate to receive the work, and the conditions under which the work will be

performed, and to report (in writing to the Contractor) unsatisfactory conditions. The

Contractor shall not proceed with the work until unsatisfactory conditions have been

corrected in a manner acceptable to the Installer.

3.02 INSTALLATION QUALITY CONTROL

(A) Manufacturer's Instructions:

(i) Where installations include manufactured products, the Contractor shall comply with

the manufacturer's applicable instructions and recommendations for installation, to

whatever extent these are more explicit or more stringent than applicable

requirements indicated in the Contract Documents.

(B) The Contractor shall inspect each item of materials or equipment immediately prior to

installation, and reject damaged and defective items.

(i) The Contractor shall provide attachment and connection devices and methods for

securing work properly as it is installed; true to line and level, and within recognized

industry tolerances if not otherwise indicated. Allow for expansions and building

movements. Provide uniform joint widths in exposed work, organized for best

possible visual effect. Refer questionable visual effect choices to Engineer for final

decision.

(ii) The Contractor shall recheck measurements and dimensions of the work, as an integral

step of starting each installation.

(iii) The Contractor shall install work during conditions of temperature, humidity,

exposure, forecasted weather, and status of project completion which will ensure the

best possible results for each unit of work, in coordination with the entire work.

Isolate each unit of work from incompatible work, as required to prevent

deterioration.

(iv) The Contractor shall coordinate enclosure (closing-in) of work with required

inspections and tests, so as to avoid the necessity of uncovering work for that purpose.

(C) Mounting Heights:

(i) Except as otherwise indicated, the Contractor shall mount individual units of work at

the industry-recognized standard mounting heights, for the applications indicated.

Refer questionable mounting height choices to the Engineer for final decision.

(D) Adjust, clean, lubricate, restore marred finishes, and protect newly installed work, to

ensure that it will remain without damage or deterioration during the remainder of the

construction period.

END OF SECTION

Page 23: TECHNICAL SPECIFICATIONS - D.N. Higgins

01500

SECTION 01500

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

PART I - GENERAL

1.0 Land For CONTRACTOR'S Use

1.01 Site Access and Parking - The CONTRACTOR shall maintain driveways a minimum of 15 feet

wide between and around combustible materials in storage and mobilization areas.

1.02 The CONTRACTOR shall maintain traffic areas free as possible of excavated materials,

construction equipment, products and debris.

1.03 The CONTRACTOR shall not utilize existing parking facilities for construction personnel or for

CONTRACTOR'S vehicles or equipment, unless written permission from OWNER of parking facility

is obtained.

1.04 Private or Public Roads, Sidewalks and Parking Areas - The CONTRACTOR shall at all times

provide emergency access to property in the vicinity of the construction for police and fire

equipment, ambulances or other emergency vehicles to protect life, health and property.

1.1 Traffic Maintenance and Control

1.11 Road Closing - No street, road or section thereof shall be closed to through traffic unless

otherwise provided for on the Plans, Specifications, or authorized by the agency with jurisdiction

over the roads. Prior to the closing a street, road, or section thereof, the CONTRACTOR shall

provide the ENGINEER with a copy of a detour Plan approved by the agency having jurisdiction

over the roads.

1.12 In the event roads or streets are to be closed, the CONTRACTOR shall notify the local fire

department, police department, local road authority, ambulance and emergency services, and

public school system daily as to what streets will be partly blocked or closed, the length of time the

streets will be blocked or closed and when the streets will be reopened to traffic.

1.13 Maintaining Traffic - The CONTRACTOR shall provide Maintenance of Traffic plans for all area

where construction will impede the normal flow of traffic. These MOT plans shall be submitted

and approved by the ENGINEER prior to the work commencement. Construction signs and MOT

control devices shall not be placed on utility poles or other existing signs or poles.

1.14 Existing Signs - No stop sign, traffic control or warning device shall be taken down until the

agency having jurisdiction over the roads has been notified and arrangements for the immediate

reinstallation has been made. The CONTRACTOR shall provide temporary signs, traffic control

devices, warning devices, or watchmen continuously from the time the item is removed until it is

Page 24: TECHNICAL SPECIFICATIONS - D.N. Higgins

01500

reinstalled. All signs removed shall be replaced with signs meeting requirements of the agency

having jurisdiction over the roads.

1.2 Temporary Utility Services

1.21 Electricity and Lighting - The CONTRACTOR shall be responsible for and pay all costs for the

installation and removal of circuit and branch wiring, with area distribution boxes located so that

power and lighting is available throughout the construction by the use of construction-type power

cords and shall pay all costs of electrical power used.

1.22 Electrical wiring and distribution shall conform to the National Electrical Code.

1.23 Use of Water - The CONTRACTOR shall acquire any and all permits, post any bonds and pay

all fees required by the local agency having jurisdiction prior to using any hydrant as the source of

water, and reimburse the local agency for all water consumed during course of the contract at the

current rate.

1.24 Sanitary Provisions - The CONTRACTOR shall be responsible for installation, maintenance and

removal of temporary sanitary facilities for use of construction personnel. All rules and regulations

of the State and local health officials shall be observed, with precautions taken to avoid creating

unsanitary conditions.

END OF SECTION

Page 25: TECHNICAL SPECIFICATIONS - D.N. Higgins

01505

SECTION 01505

MOBILIZATION

Part I. GENERAL

1.01 GENERAL

A Mobilization shall include the obtaining of all permits; moving onto the site of all

equipment; temporary buildings, and other construction facilities; and implementing

security requirements; all as required for the proper performance and completion of the

WORK. Mobilization shall include the following principal items:

(i)Moving on to the site of all CONTRACTOR’s equipment required for first month

operations.

(ii)Installing temporary construction power, wiring, and lighting facilities.

(iii)Developing construction water supply.

(iv)Providing field office trailer for the CONTRACTOR, complete with all furnishings normal

to a field office and all utility services including telephones.

(v)Providing all on-site communication facilities, including cellular phone for the

Superintendent.

(vi)Providing on-site sanitary facilities and potable water facilities.

(vii)Arranging for and erection of CONTRACTOR’s work, site access, and storage.

(viii)Obtaining all required permits.

(ix)Having all OSHA required notices and establishment of safety programs.

(x)Having the CONTRACTOR’ Superintendent at the job site full time.

(xi)Submitting initial submittals.

(xii)Audio-Visual pre-construction record as described in Section 01315.

(xiii)Project identification and signs.

Part II. PRODUCTS - NOT USED

Part III. EXECUTION – NOT USED

END OF SECTION 01505

Page 26: TECHNICAL SPECIFICATIONS - D.N. Higgins

02110

SECTION 02110

SITE CLEARING

Part I. GENERAL

1 .01 DESCRIPTION OF WORK

(A) The extent of site clearing shall be limited to clearing those trees and brush necessary to

provide access to the construction site. All trees, which will not interfere with

construction, shall be protected from damage. Cost to protect trees, shrubs and etc. is

incidental to the project cost.

(B) Site clearing work includes, but is not limited to, the following:

(i) Protection of existing trees.

(ii) Removal of trees and other vegetation.

(iii) Muck.

(iv) Asphalt.

(v) Curb and Gutter.

(vi) Culvert Pipes.

(vii) General Pipes.

(viii) Other types of obstructions (direct or indirect) with the construction of the project.

This does not limit to only conflicts shown on the plans.

1 .02 JOB CONDITIONS

(A) The Contractor shall:

(i) Protection of Existing Improvements:

1) Provide protection necessary to prevent damage to existing improvements indicated

to remain in place.

2) Protect improvements on adjoining properties and on the Owner's property.

3) Restore damaged improvements to their original condition, as acceptable to parties

having jurisdiction.

Page 27: TECHNICAL SPECIFICATIONS - D.N. Higgins

02110

(ii) Protection of Existing Trees and Vegetation:

1) Protect existing trees and other vegetation indicated to remain in place, against

unnecessary cutting, breaking or skinning of roots, skinning and bruising of bark,

smothering of tress by stockpiling construction materials or excavated materials

within drip lines, excess foot or vehicular traffic, or parking of vehicles within drip

line.

2) Provide temporary guards to protect trees and vegetation to be left standing.

3) Water trees and other vegetation to remain within the limits of the Contract work as

required maintaining their health during the course of construction operations.

4) Provide protection for roots over ½-inch diameter cut during construction

operations. Coat the cut faces with emulsified asphalt, or other acceptable coating,

formulated for use on damaged plant tissues. Temporarily cover exposed roots with

wet burlap to prevent roots from drying out; cover with earth as soon as possible.

Part II. PRODUCTS – NOT USED

Part III. EXECUTION

1 .01 SITE CLEARING

(A) General:

(i) The Contractor shall remove vegetation, improvements, or obstructions interfering

with installation of new construction.

(ii) The Contractor shall carefully and cleanly cut roots and branches of trees indicated to

be left standing, where such roots and branches obstruct new construction.

(B) Removal of Improvements:

(i) The Contractor shall remove above-grade and below-grade improvements necessary

to permit construction, and other work as indicated.

(C) DISPOSAL OF WASTE MATERIALS

(i) Burning on Owner's Property:

1) Burning is not permitted on the Owner's property.

Page 28: TECHNICAL SPECIFICATIONS - D.N. Higgins

02110

(ii) Removal from Owner's Property:

1) The Contractor shall remove waste materials and unsuitable and excess topsoil from

the Owner's property and dispose of legally.

END OF SECTION

Page 29: TECHNICAL SPECIFICATIONS - D.N. Higgins

02315-1

SECTION 02315

EXCAVATION, TRENCHING AND BACKFILL

PART 1 GENERAL

1.01 Section Includes

A. General excavation and fill for roads, general site work

B. Sheeting, shoring and bracing

C. Compaction

1.02 Related Sections

A. Section 02370 - Erosion and Sedimentation Control

1.03 References

A. American Association of State Highway and Transportation Officials (AASHTO) latest

edition:

1. AASHTO M145 - Classification of Soils and Soil Aggregate Mixtures

2. AASHTO T180 - Moisture-Density Relations of Soils Using a 10-lb Rammer and

18-in Drop

B. American Society for Testing and Materials (ASTM) latest edition:

1. ASTM D1557 - Laboratory Compaction Characteristics of Soil Using Modified

Effort

2. ASTM D2487 - Classification of Soils for Engineering Purposes

C. Occupational Safety and Health Administration (OSHA) Regulations, including:

1. Part 1926 Subpart P – Excavations

1.04 Horizontal Directional Drilling Alternate to Trenching

HDD can be used for the forcemain that runs parallel to the roadways in lieu of open trenching

as described herein. If the contractor elects to use HDD in lieu of trenching, then the

requirements of Section 02405, Horizontal Directional Drilling apply.

Page 30: TECHNICAL SPECIFICATIONS - D.N. Higgins

02315-2

1.05 Definitions

A. Backfill = material placed in newly excavated areas to the topsoil, paving sub-grade, or

foundation level.

B. Influence Area = the area within lines sloped downward at 45degrees from the outer

edges of paving, foundations, and utility lines.

1.06 Quality Assurance

A. Field density testing frequencies:

1. One test for each 100 square feet or fraction thereof of backfill around and

under structures.

2. One test per lift per each change in type of fill.

3. One test per 1000 square feet of pavement subgrade

4. One test per each 12” layer, every 300 feet of pipe

1.07 Preconstruction Requirements

Precondition surveys and vibration monitoring are required for those areas where residential

structures are within 100 feet of the proposed construction.

PART 2 PRODUCTS

2.01 General

The contractor shall examine the site and undertake subsurface investigations, including soil

borings, before commencing the work. Key Largo Wastewater Treatment District will not be

responsible for presumed or existing soil conditions in the work area.

Contractor shall locate existing utilities in the areas of work. If utilities are to remain in place,

the contractor shall provide adequate means of protection during earthwork operations. Should

uncharted or incorrectly charted piping or other utilities be encountered during excavation, the

contractor shall consult the owner of such piping or utility immediately for directions. Payment

for damage and repair to such piping or utilities is the contractor's responsibility.

It is intended that previously excavated materials conforming to the following requirements be

utilized wherever possible.

2.02 Materials

A. Acceptable materials (suitable material): AASHTO M145 classification A-1, A-3, A-2-4, A-

2-6; ASTM D2487 classification GW, GP, GM, SM, SW, SP; unless otherwise disapproved

within the Soil and Subsurface investigation reports. No more than 5% of acceptable

materials shall pass the number 200 sieve.

Page 31: TECHNICAL SPECIFICATIONS - D.N. Higgins

02315-3

B. Unacceptable materials (unsuitable material): AASHTO M145 classification A-2-5, A-2-7,

A-4, A-5, A-6, A-7, A-8; ASTM D2487 classification GC, SC, ML, MH, CL, CH, OL, OH, PT;

unless otherwise approved within the Soil and Subsurface investigation reports. Bedding

rock material Shall be FDOT, size no. 57 as defined in the Florida Department of

Transportation, Standard Specifications for Road and Bridge Construction, Section 901,

Article 901-l.4, Table l.

C. Controlled low strength material (“excavatable flowable fill”) shall meet the

requirements of FDOT specification section 121, with a 28-day compressive strength of

80-100 psi.

The CONTRACTOR shall, upon request by Key Largo Wastewater Treatment District, make an

appropriate sample of this material available for testing by Key Largo Wastewater Treatment

District or its designated representative.

2.03 Sheeting, Shoring, and Bracing

A. The structural strength and safety of all sheeting, shoring and bracing shall be the sole

responsibility of the Contractor. Repair any damage resulting from failure to provide

adequate supports.

B. Provide timber work, shoring, bracing, sheeting, and sheet piling where necessary to

retain banks of excavations, prevent cave-in of adjacent ground, prevent displacement

of utilities and structures, and to protect public safety.

C. Contractor is solely responsible for the design, installation, and operation of dewatering

systems and their safety and conformity with local codes and regulations.

PART 3 EXECUTION

3.01 General Construction Requirements

A. Provide suitable temporary drainage channels for any water that may flow along or

across the work as specified hereafter.

B. Provide barriers, warning lights and other protective devices at all excavations during

and after normal working hours. Open excavations must be properly barricaded and

include warning tape around the area. Areas must also be “secure and safe”, if any areas

remain open after working hours. The public must be protected from unsafe and open

excavation areas.

C. Sidewalks, roads, streets, and pavements shall not be blocked or obstructed by

excavated materials, except as authorized by the Engineer, in which case adequate

temporary provisions must be made for satisfactory temporary passage of pedestrians,

and vehicles. Minimize inconvenience to public travel or to tenants occupying adjoining

property.

Page 32: TECHNICAL SPECIFICATIONS - D.N. Higgins

02315-4

D. Where necessary to place excavated material adjacent to buildings, erect barriers to

keep earth at least 4' from such buildings. Earth deposited on lawns shall be promptly

and carefully removed to preserve the turf. All trees, shrubs, and landscaping shall be

protected. Boring and jacking shall be used, if necessary, except where written

permission is granted to remove trees and shrubs.

E. If open excavations cross existing rigid surfacing, the surfacing shall be removed for a

minimum width of eighteen (18) inches beyond the anticipated edge of the excavation

per the FDOT standard detail on the Drawings. The pavement break shall be sawed to

insure a straight joint. Surface replacement shall match existing surfacing except as

otherwise indicated on the Drawings. Where open excavation is allowed along or across

public roadways, excavation, backfill, and surface replacement shall conform to the

requirements of all permits applicable thereto. In no case shall surface replacement

edges bear on less than 24" of undisturbed soil.

F. The contractor is expected to contain all construction activities within the property

boundary, right of way and easements, and other areas designated for construction. All

areas disturbed during construction shall be restored to equal or better condition,

including but not limited to grassing, landscaping, sidewalks, mailboxes, utilities, etc. No

seeding is permitted within the FDOT right-of-way, sod and restore all disturbed areas

as existing in accordance with FDOT permit and maintain for 30 days. At no time shall

the contractor disturb surrounding properties or travel on surrounding properties

without written consent from the property owner. Any repair or reconstruction of

damaged areas in surrounding properties shall be repaired by the contractor on an

immediate basis. All costs for repairs shall be the responsibility of the contractor and no

extra compensation shall be provided.

3.02 Preparation

A. Identify required lines, levels, contours, and datum.

B. Locate and identify existing utilities that are to remain and protect from damage.

C. Notify utility companies when working in close proximity to existing utilities

D. Protect plant life, lawns, fences, existing structures, sidewalks, paving, and curbs from

excavating equipment and vehicular traffic.

E. Protect benchmarks, property corners, and other survey monuments from damage or

displacement. If marker needs to be removed it shall be referenced by licensed land

surveyor and replaced, as necessary, by same.

F. Prior to placing fill in low areas, such as previously existing ditches, ponds, or lakes,

perform following procedures:

Page 33: TECHNICAL SPECIFICATIONS - D.N. Higgins

02315-5

1. Drain water out by gravity with ditch having flow line lower than lowest

elevation in low area. If drainage cannot be performed by gravity ditch, use

adequate pump to obtain the same results.

2. After drainage of low area is complete, remove mulch, mud, debris, and other

unsuitable material by using acceptable equipment and methods that will keep

natural soils underlying low area dry and undisturbed.

3. If proposed for fill, muck, mud, and other materials removed from low areas

shall be dried on-site by spreading in thin layers for observation by Engineer.

Material shall be inspected and, if found to be suitable for use as fill material,

shall be incorporated into lowest elevation of site filling operation, but not

under building or pavement subgrade or within 10'-0" of perimeter of building

subgrade or paving subgrade. If, after observation by Engineer, material is

found to be unsuitable, unsuitable material shall be removed from site.

3.03 Sheeting, Shoring, and Bracing

A. Furnish, install, and maintain, without additional compensation, sheeting, bracing,

trench boxes and other shoring support required to keep excavations within the

easement provided, to support the sides of the excavation, and to prevent any

movement which may damage adjacent pavements or structures, damage or delay the

work, or endanger life and health. Voids outside the supports shall be immediately

filled and compacted.

B. Sheeting, where required, shall be driven below the bottom of excavation so the lowest

set of whalers and struts are above the bottom of the excavation to allow necessary

working room.

C. The Engineer may direct in writing that supports in trenches be cut off at any specified

elevation, in which case Contractor shall be paid for the supports left in place.

D. Contractor may leave in place, to be embedded in the backfill of the excavation, any or

all supports for the purpose of preventing injury to persons or property, whether public

or private. However, no supports which are within 4' of the ground or pavement

surface may be left in place without written permission of the Engineer. No extra

payment will be made for supports left in place at the Contractor's option.

E. All supports not left in place shall be removed in such manner as to avoid endangering

the piping, structures, utilities or property, whether public or private. All voids left by

the withdrawal of sheeting shall be immediately filled and compacted.

F. The right of the Engineer to order supports left in place shall not be construed as

creating an obligation on his part to issue such orders. Failure by the Engineer to

exercise this right shall not relieve the Contractor from total liability for damages to

persons or property resulting from the failure of the Contractor to leave in place

sufficient supports to prevent any caving or moving of the ground adjacent to the

excavation.

Page 34: TECHNICAL SPECIFICATIONS - D.N. Higgins

02315-6

3.04 Excavation

A. Do not excavate for any structure until that structure is scheduled for construction.

Excavate only to the depth and dimensions necessary for the construction. Slope sides

of excavations in accordance with OSHA requirements and the recommendations

contained within the project geotechnical report.

B. All such excavations shall conform to the elevations and dimensions shown on the

drawing within a tolerance of plus or minus 0.10 feet and extending a sufficient distance

from footings and foundations to permit placing and removing form work, installation of

services and other construction, inspection or as shown on the Drawings. In excavating

for footings and foundations, care shall be exercised not to disturb the bottom of the

excavation. Bottoms shall be trimmed to required lines and grades to leave a solid base

to receive concrete.

C. The bottom of all excavations shall be undisturbed earth unless otherwise indicated,

and shall be approved by the Engineer before any subsequent work is started. Over

excavate a minimum of 2 feet where excavations occur within unsuitable soils, and

replace over excavated material with suitable soils.

D. Excavations carried below depths indicated on the Drawings without the previous

approval of the Engineer shall be filled with 2500 psi concrete or flowable fill to the

correct level at the expense of the Contractor.

E. Maintain excavations in good order. If the bearing capacity of the foundation soils is

reduced because the excavation is allowed to remain open prior to commencing work,

the weathered soil shall be removed and replaced with 2500 psi concrete or flowable fill

at the Owner’s discretion at the expense of the Contractor.

F. All suitable materials removed from excavation areas shall be used for the project.

Excess excavated suitable material shall be stockpiled on site at a location of the

Owner’s choosing, and shall become the property of the Owner, unless otherwise

indicated on the Drawings.

G. Suitable onsite excavated materials containing silty or slightly clayey to clayey fine sands

shall be sufficiently dried by surface spreading and discing if necessary, or by mixing

with cleaner fine sands prior to placement in fill areas.

H. Unsuitable materials within the influence area of construction shall be excavated,

removed from the site, and disposed, unless otherwise indicated on the Drawings.

I. Excavations shall be kept dry, compacted, and stable to a depth two feet below the

bottom of the excavation.

J. If portions of the bottom of excavations consist of material unstable to such a degree

that, in the opinion of the Engineer, it cannot adequately support the construction, the

bottom shall be over excavated and stabilized with approved coarse granular

Page 35: TECHNICAL SPECIFICATIONS - D.N. Higgins

02315-7

stabilization material. Depth of stabilization shall be as directed by the Engineer.

Stabilization materials shall be incidental to the Contract.

3.05 Trenching

A. Sides of trenches shall be kept as nearly vertical as possible from the trench bottom to a

level of one foot above the top of the pipe. Slope sides of trenches in accordance with

OSHA requirements and the recommendations contained within the project

geotechnical report.

B. Excavate trenches to depth indicated or required for indicated flow lines and invert

elevations. Over excavate trenches a minimum of 2 feet where excavations occur within

unsuitable soils, and replace over excavated material with suitable soils.

C. Where rock is encountered, carry excavation 6 inches below scheduled elevation and

backfill with a 6 inch layer of crushed stone or gravel prior to installation of pipe.

D. For pipes or conduit 6 inches or larger, and other work indicated to receive subbase,

excavate to subbase depth indicated, or, if not otherwise indicated, to 6 inches below

bottom of work to be supported.

E. Except as otherwise indicated, excavate for pressure piping so top of piping is minimum

42 inch below finished grade.

F. Unsuitable excavated materials shall be removed from the site and properly disposed,

unless otherwise indicated on the Drawings.

G. Grade bottoms of trenches as indicated, notching under pipe bells to provide solid

bearing for entire body of pipe.

H. Trench bottoms shall be kept dry, compacted, and stable to a depth two feet below the

bottom of the trench.

I. Dig trenches to the uniform width required for particular item to be installed,

sufficiently wide to provide ample working room. Provide 9 -12 inch clearance on each

side of pipe or conduit.

J. If more than one pipe is to be installed in a trench, the pipes shall be spaced a minimum

of one foot apart for pipes 4 inches and larger.

K. If portions of the bottom of trenches consist of material unstable to such a degree that,

in the opinion of the Engineer, it cannot adequately support the pipe or structure, the

bottom shall be over excavated and stabilized with approved coarse granular

stabilization material. Depth of stabilization shall be as directed by the Engineer.

Stabilization materials shall be incidental to the Contract.

3.06 Trench Backfilling

Page 36: TECHNICAL SPECIFICATIONS - D.N. Higgins

02315-8

A. Following placement of pipe and inspection of joints, install tamped bedding material.

Place bedding fill materials in layers of 6 inch loose depth.

B. All bedding and backfill material shall be suitable soils or flowable fill. Backfill material

within 1 foot of pipe and appurtenances shall not contain rock or stone larger than 2

inch diameter. If a sufficient quantity of suitable material is not available from the

trench or other excavations within the site, provide additional suitable material or

flowable fill.

C. After completion of bedding and preliminary approval of piping and testing, the pipe

shall be covered to a point one foot above the top of the pipe for the full trench width,

placed in layers of 8 inch loose depth.

D. Place backfill over pipe. Where trench is within the influence area of roadways,

structures, foundations, or slabs, place backfill in layers of 8 inch loose depth. In all

other areas, place backfill in layers of 12 inch loose depth.

E. Take necessary precautions not to cause settlement or damage to adjacent slabs, walls,

structures, or foundations. Place backfill and fill materials evenly adjacent to structures,

without wedging against structures or displacement of piping or conduit.

3.07 Minor Structural Excavation and Backfilling

A. Minor structures are defined as manholes, junction boxes, inlets, valve vaults, vacuum

pits and meter vaults. Do not excavate for any structure until that structure is

scheduled for construction. Excavate only to the depth and dimensions necessary for

the construction.

B. The bottom of all excavations shall be undisturbed earth unless otherwise indicated,

and shall be approved by the Engineer before any subsequent work is started. Over

excavate a minimum of 2 feet where excavations occur within unsuitable soils, and

replace over excavated material with suitable soils.

C. Excavations carried below depths indicated on the Drawings without the previous

approval of the Engineer shall be filled with 2500 psi concrete or flowable fill at the

Owner’s discretion to the correct level at the expense of the Contractor.

D. Maintain excavations in good order. If the bearing capacity of the foundation soils is

reduced because the excavation is allowed to remain open prior to commencing work,

the weathered soil shall be removed and replaced with 2500 psi concrete or flowable fill

at the Owner’s discretion at the expense of the Contractor.

E. Do not backfill until new concrete has properly cured, coatings have been approved, and

any required tests have been accepted.

Page 37: TECHNICAL SPECIFICATIONS - D.N. Higgins

02315-9

F. Fill within the influence area of roadways, structures, foundations, or slabs, shall be

placed in layers of 8 inch loose depth. In all other areas, place fill in layers of 12 inch

loose depth.

G. Exercise care during backfilling operations to avoid any puncture, break or other

damage to waterproofing systems, if any. Backfill adjacent to waterproofing in the

presence of the Engineer.

H. Where backfilling is required on both sides of structures, backfill and compact

simultaneously on opposite sides in even layers. Other backfilling sequences shall be as

specifically noted.

3.08 Filling

A. All fill material shall be suitable soils or flowable fill. Fill placed within 1 foot of

structures shall not contain rock or stone larger than 2 inch diameter. If a sufficient

quantity of suitable material is not available from other excavations within the site,

provide additional suitable material or flowable fill.

B. Fill within the influence area of roadways, structures, foundations, or slabs, shall be

placed in layers of 8 inch loose depth. In all other areas, place fill in layers of 12 inch

loose depth.

C. Take necessary precautions not to cause settlement or damage to adjacent slabs, walls,

structures, or foundations. Place fill materials evenly adjacent to structures, without

wedging against structures.

D. Where filling is required on both sides of structures, fill and compact simultaneously on

opposite sides in even layers.

3.09 Compaction

A. Unless otherwise indicated, the type of equipment and number of passes required to

obtain the specified degree of compaction shall be determined at the site, subject to the

approval of the Engineer.

B. The contractor shall control soil compaction during construction to provide the

percentage of maximum density specified. The contractor and KLWTD shall be provided

copies of all soils testing reports, prepared by a GEOTECHNICAL/SOILS ENGINEER,

demonstrating compliance with these specifications.

3.10 Testing and Cleanup

A. Before compaction, moisten or aerate each layer as necessary to provide optimum moisture

content. Do not place backfill or fill material on surfaces that are muddy, frozen, or contain

frost or ice.

Page 38: TECHNICAL SPECIFICATIONS - D.N. Higgins

02315-10

B. In general, one compaction test shall be taken for each 12” layer of fill for each 300 feet of

pipe or between manholes, whichever is less. Compaction tests around structures shall be

taken every 100 square feet for each 12” layer of fill. Compaction tests shall be taken at

staggered locations and elevations throughout the length of the pipe section or around the

perimeter of the structure. KLWTD may determine that more compaction tests are required

to certify the installation depending on field conditions.

C. Water shall not be allowed into the filled and compacted area until density tests have

determined that the compacted area meets the specification minimum requirements.

D. Noncohesive soils shall be compacted with vibrating roller or equivalent; cohesive soils shall

be compacted with sheeps-foot roller, pneumatic tamping, or approved equivalent, unless

otherwise indicated.

E. Provide for testing and cleanup as soon as practicable, so these operations do not lag far

behind pipe installation. Perform preliminary cleanup and grading operations immediately

after backfilling.

F. All surplus excavated material shall be disposed of by the Contractor.

3.11 Field Quality Control

A. The following minimum soils compaction requirements are applicable to all work unless

a greater degree of compaction is required by the permitting authority or special

requirement of the Engineer.

a. When existing trench bottom has a density less than 95% of the maximum dry

density as determined by AASHT0/T-180, the CONTRACTOR shall compact to

required percentage of maximum density.

b. Fill or undisturbed soil from the bottom of the pipe trench to grade shall be

compacted to a minimum density of 95% of the maximum dry density as

determined by AASHTO T-180.

c. Fill under and around structures and paving, and to the extent of the excavation

shall be compacted to a minimum density of 98% of the maximum dry density

as determined by AASHTO T-180.

END OF SECTION

Page 39: TECHNICAL SPECIFICATIONS - D.N. Higgins

02370-1

SECTION 02370

EROSION AND SEDIMENTATION CONTROL

PART 1 GENERAL

1.01 Section Includes

Designing, providing, maintaining, removing temporary erosion and sedimentation controls.

1.02 Related Sections

A. Section 02230 - Site Preparation

B. Section 02240 - Dewatering

C. Section 02315 - Excavation, Trenching, and Backfilling

1.03 References

A. Florida Department of Transportation (FDOT) Standard Specifications for Road and

Bridge Construction and Roadway and Traffic Design Standards, latest editions:

1. Index No. 102 - Baled Hay or Straw Barriers and Silt Fences

2. Index No. 103 - Turbidity Barriers

3. Specification 300 - Prime and Tack Coats for Base Courses

1.04 Owner’s Instructions / Sequencing

A. Owner has authority to limit surface area of erodible earth material exposed by clearing

and grubbing, excavation, trenching, borrow and embankment operations. Owner also

has authority to direct Contractor to provide immediate permanent or temporary

erosion and sediment control measures.

B. Contractor shall respond to erosion and sediment control maintenance requirements or

implement additional measures to control erosion ordered by Owner or governing

authorities within 48 hours or sooner if required at no additional cost to the Owner.

C. Contractor will be required to incorporate permanent erosion control features into

project at earliest practical time to minimize need for temporary controls.

PART 2 PRODUCTS

2.01 Erosion Control

A. Seeding and Mulching

Page 40: TECHNICAL SPECIFICATIONS - D.N. Higgins

02370-2

B. Sodding

C. Hydro-seeding

D. Coarse Aggregate

E. Prime Coat - Per FDOT Specification 300

2.02 Sedimentation Control

A. Silt Fence - Per FDOT Index No. 102

B. Floating Turbidity Barriers - Per FDOT Index No. 103

C. Hay Bales - Per FDOT Index No. 102

PART 3 EXECUTION

3.01 Erosion Control

A. Maintain temporary erosion control systems as directed by Owner or governing

authorities to control erosion and siltation during life of contract.

B. Permanently grass cut slopes as excavation proceeds to extent considered desirable and

practical.

C. Grass all disturbed areas within 7 days of initial disturbance. Type of grassing shall be as

follows: temporary grassing to be sodding at all drainage structures, retention areas,

swales and ditches, and where slopes are steeper than 5:1. Temporary grassing can be

seed and mulch at all other locations unless otherwise indicated in the drawings or

specifications.

D. Erosion control of areas to be paved shall meet the following:

1. Install subgrade and base course materials within 48 hours of the removal/open

cutting of existing pavement consisting of streets, driveways, or sidewalk. Install

final surface courses within 14 days after removal of existing pavement.

2. Areas to receive asphalt shall receive erosion control measures no later than 48

hours after installation of base course. Temporary erosion control consists of

placement of a bituminous prime coat and sanding the surface. Permanent erosion

control consists of placement of the structural course.

3. Areas to receive concrete paving shall be either protected with a layer of FDOT

coarse aggregate material or shall be paved within 48 hours of installation of the

subgrade.

E. Dirt roads are to be stabilized and compacted within 7 days of the completion of

trenching and grading activities.

Page 41: TECHNICAL SPECIFICATIONS - D.N. Higgins

02370-3

3.02 Sedimentation Control

A. Install prior to construction.

B. Inspect every two weeks during construction.

C. Remove any sediment build-up.

D. Repair and reinstall any damaged or missing sediment control measures. Install

additional measures if inspection reveals additional sedimentation control is necessary.

E. Rough excavate and grade any proposed stormwater ponds at the start of site grading

activities. Direct site runoff to the ponds to minimize runoff to offsite areas.

END OF SECTION

Page 42: TECHNICAL SPECIFICATIONS - D.N. Higgins

02590-1

SECTION 02935

SODDING

Part I. GENERAL

1 .01 Scope

A The work to be performed under this section includes furnishing and installing all sod,

fertilizer, and other required materials as shown on the plans and as specified.

1 .02 Basis of Measurement and Payment

A Payment will be based on actual S.Y. placed for the unit price shown on the Bid Form.

1 .03 Referenced Standards

A FDOT Specifications shall mean the Florida Department of Transportation "Standards

Specifications for Road and Bridge Construction" 2010 edition unless specifically noted

otherwise.

Part II. PRODUCTS

1 .01 Materials

A Sod shall meet the requirements of Section 981-2 of the FDOT Specifications and shall

consist of Bahia grass unless shown otherwise on the drawings, or unless adjacent lawns

are of a different type.

B Fertilizer shall be as specified in Section 982 of FDOT Specifications.

Part III. EXECUTION

1 .01 Installation

A Sod shall be placed in accordance with Section 575 of FDOT Specifications and

perpendicular to the angle of sloped areas with edges in close contact, with the rows

staggered to minimize erosion. All sod will be placed within 72 hours of cutting unless

authorized by the ENGINEER. Sod will be pegged in place on slopes steeper than 3

horizontal to 1 vertical.

B All sodded areas shall be watered and maintained by the CONTRACTOR until final

acceptance of the project by the OWNER. Any washouts or other areas where sod

END OF SECTION

Page 43: TECHNICAL SPECIFICATIONS - D.N. Higgins

02600-1

SECTION 02600

PIPING – GENERAL

Part I. GENERAL

1 .01 DESCRIPTION OF WORK

(A) The work covered by this section and the related sections following consists of providing all

labor, equipment, material and supplies and performing all operations required to install the

various piping, valves, accessories, and fire hydrant assemblies for waterlines as specified and

shown on the drawings.

(B) Related Work Specified Elsewhere:

(i) Section 02315 - Excavation and Fill

(ii) Section 02614 - Ductile Iron Pipe

(iii) Section 02616 – Polyvinyl Chloride Pipe (PVC)

(iv) Section 02800 - Valves

(v) Section 02610 – Fittings

1 .02 SUBMITTALS

(A) Submittals for the various types of pipe and fittings are specified in the individual sections.

(B) Shop drawings or catalog cuts shall be submitted for all valves, boxes and restrained joints.

(C) Record drawings shall be submitted in accordance with the requirements of Section 01300 -

Submittals, and Paragraph 4 of Section 01700 - Project Closeout. The type of pipe used shall

also be noted on the drawings.

(D) Pipe elevations shall be submitted as specified under "Installation", in this Section.

(E) The manufacturer shall furnish a sworn affidavit that the pipe, fittings and lining furnished under

the Contract or Agreement comply with all applicable provisions of the ANSI and/or AWWA

Standards.

(F) Reports on pressure and leakage tests shall be submitted by the Contractor.

(G) Reports on bacteriological tests shall be submitted by the Contractor.

1 .03 JOB CONDITIONS

(A) Interruptions to utility service shall be minimized. The Contractor shall submit plans and

schedules to the Engineer for approval by the proper authority before any shutdown or any

interruption in service takes place.

Part II. PRODUCTS – NOT USED

Part III. EXECUTION

1 .01 INSPECTION

(A) All pipes shall be subject to inspection at the factory by the Engineer or Owner. The Contractor

shall provide a production schedule in sufficient time so plans can be made for in-plant

inspection of the pipe or fittings during production, should it be required.

(B) Special markings shall be plainly marked on the applicable pipe indicating the weight, proper

Page 44: TECHNICAL SPECIFICATIONS - D.N. Higgins

02600-2

location of the pipe or fitting in the line by reference to layout drawings and schedules, class of

pipe, casting period, manufacturer's mark and year pipe was produced.

1 .02 TESTS

(A) All tests shall be made in the presence of the Owner or Engineer unless waived in writing. The

Contractor shall notify the Engineer in sufficient time when tests are being conducted to allow

for travel time to the manufacturer's plant.

1 .03 INSTALLATION OF UNDERGROUND PIPING

(B) Excavation, trenching and backfilling for the installation of underground piping system shall be

as specified in Section 02222 - Trenching, Backfilling and Compacting. Pipe shall be laid in a level

trench. Irregularities shall be smoothed out or filled in with sand and tamped. Holes shall be

scooped out where the bells occur leaving the entire barrel of the pipe bearing on the pipe bed.

Locate tape shall be installed 18" below finished grade. It shall state "Caution, buried potable

main below" for water, "Caution, buried force main below" for force main, and "Caution, buried

gravity main below" for sewer.

(C) Laying of the pipe shall be commenced immediately after the excavation is started, and every

means must be used to keep pipe laying closely behind the trenching. The Engineer may stop

trenching when, in his opinion, the trench is open too far in advance of the pipe laying

operation. Pipe may be laid in the best manner adapted to securing speed and good results. It

shall, however, be in accordance with the manufacturer's instructions and recommendations.

Damaged or unsound pipe or fittings will be removed and replaced by the Contractor at no

additional cost to the Owner. Before jointing of the pipe, all lumps, blisters, excess coating

material or oil shall be removed from the bell and spigot ends of the pipe. Waterlines shall be

thrust-blocked or restrained to prevent movement of lines under pressure. Restraints or

concrete thrust-blocking shall be furnished by the Contractor. Concrete shall be a minimum

2,500 psi. For ductile iron pipe, thrust or anchor blocks or restrained joints shall be installed at

all bends, tees, crosses, wyes, plugs, and reducers as shown in details of typical thrust and

anchor block placements on the drawings. The number of feet of pipe with restrained joints

necessary for each size pipe shall be as shown on the Standard Detail drawings.

(D) Where there is no adequate natural foundation upon which to construct a pipe bed, the pipe

shall be constructed on a prepared stabilized subgrade or rock bedding of Class I materials as

defined in ASTM D2321. Unsuitable subgrade materials shall be replaced or stabilized as

described in Section 02222. Gravel or graded limerock used for pipe bedding, when ordered in

writing, shall be paid for under bid item for such material. Where dewatering is required, Class I

materials shall be used as described in ASTM D2321.

(E) Pipe and fittings shall be strung out for 1 day’s construction along the route of construction with

the spigots pointing in the direction of the flow. Pipe shall be placed where it will cause least

interference with traffic. Pipe shall be handled by mechanical equipment. Before the pipe is

lowered into the trench, it shall be swabbed or brushed out to insure that no dirt or foreign

material gets into the finished line. Trench waters shall be kept out of the pipe and the pipe

kept closed by means of a test plug whenever work is not in progress. The Contractor shall

provide the means for dewatering the trench and the cost thereof shall be included in the price

for installing the pipe.

(F) Deflections from a straight line or grade made necessary by vertical curves or horizontal curves

or offsets shall not exceed the manufacturer's recommendations. If the specified or required

alignment requires deflection in excess of those recommended, the Contractor shall either

provide special bends as approved by the Engineer or a sufficient number of shorter lengths of

pipe to provide angular deflections within the required limit.

(G) All joints shall be watertight and any leaks or defects discovered shall be immediately repaired

Page 45: TECHNICAL SPECIFICATIONS - D.N. Higgins

02600-3

to the satisfaction of the Engineer. Any pipe which has been disturbed after being laid shall be

taken up, the joints cleaned and the pipes properly relaid. Any superfluous material inside the

pipe shall be flushed or removed by means of an approved follower or scraper after joints are

made. Installation of fittings and pipe joints shall be in strict accordance with the

manufacturer's recommendations.

(H) Where water mains are stubbed out, in addition to thrust blocks, the stubouts shall be

restrained to the tee.

(I) For the protection of exposed reinforcing in anchor blocks, and any all-thread restraint methods,

the Contractor shall furnish and apply two coats of Koppers Bitumastic No. 505 protective

coating.

(J) Before backfilling, the Contractor shall take elevations on the top of the pipe barrel at 100-foot

intervals along the pipe line and at any change in grade. These elevations shall be submitted to

the Engineer.

(K) Plastic pipe shall be installed in strict accordance with the provisions of ASTM D2321-74,

including those provisions in respect to compaction of bedding and haunching material. Class IV

or Class V materials as defined in ASTM D2321 shall not be used for bedding, haunching or initial

backfill.

1 .04 CONNECTIONS TO EXISTING MAINS

(A) Where connections are required between new work and existing utility mains, the connection

shall be made in a thorough and first class manner, using proper specials and fittings to suit the

actual conditions. Use ductile iron mechanical joint sleeve for connection to existing utility

mains. In case a connection is made to an existing fitting in the line, the Contractor shall

schedule his work so that digging and locating the existing fittings can be completed prior to

starting trench work on the line. Cut-ins into lines shall be done at a time approved by the

Utilities Engineer. The Contractor shall not make any connections or service taps into existing

utility mains until their work has been tested and accepted by the Utilities Engineer.

1 .05 TESTING PIPING SYSTEM

(A) FLUSHING

(i) After the mains have been laid and pressure tested, each run of pipe shall be thoroughly

flushed so as to remove all debris and foreign matter from the lines. Flushing will ordinarily be

done by opening fire hydrants or blowoffs along the pipe line. Where fire hydrants or blowoffs

are not available or are of insufficient capacity to permit adequate flushing, the pipe line shall

be opened and flumes or piping shall be provided by the Contractor to waste the water to the

nearest approved disposal point. Sufficient flushing water shall be introduced into the mains

to produce a velocity of note less than 2-1/2-feet per second, and this rate of flow shall be

continued until the discharge is clear and no evidence of silt or foreign matter is visible.

END OF SECTION

Page 46: TECHNICAL SPECIFICATIONS - D.N. Higgins

02610-1

SECTION 02610

FITTINGS

PART 1 - GENERAL

1.1 DESCRIPTION

The Contractor shall furnish and install fittings as shown on the Drawings or as directed by the

Engineer.

1.2 QUALITY ASSURANCE

A. The Contractor shall install fittings to meet the latest revision of the AWWA specification

for the pipe material specified.

1.3 SUBMITTALS

A. Submit manufacturer's certificate of conformance.

B. Shop Drawings: Submit manufacturer's drawings and data sheets for material to be

supplied under this Section. Indicate sizes and types to be installed.

1.4 PRODUCT DELIVERY, STORAGE AND HANDLING

A. Upon delivery and before unloading, the Contractor must inspect the fittings for any

damage occurred in transit and note such damage on the delivery ticket.

B. The means by which the fittings are unloaded is the decision and responsibility of the

Contractor. The Contractor shall follow recommendations of the manufacturer.

C. The Contractor shall follow manufacturer's recommendations for storage of fittings in

order to minimize damage prior to installation.

D. The Contractor shall adhere to the standard procedures given by the manufacturer for

handling the fittings.

PART 2 - PRODUCTS

2.1 BENDS, REDUCERS AND TEES

A. Non-Pressure Pipe: All bends, reducers and tees required shall conform to the same

standards as the pipe.

B. Pressure Pipe: All bends, reducers and tees required shall conform to the following

requirement:

1. Ductile Iron Fittings: Shall be used for all pressure pipe. They shall conform

Page 47: TECHNICAL SPECIFICATIONS - D.N. Higgins

02610-2

with the latest revision of AWWA C110 "Gray-Iron and Ductile-Iron Fittings,

Three Inches Through Forty Eight Inches for Water and Other Liquids". They

shall be mechanical joint ends with a pressure rating of 350 psi. Compact

fittings, three inches through sixteen inches (3"-16") will be acceptable. The

compact fitting shall conform to the latest revision of AWWA C153 "Ductile Iron

Compact Fitting, Three Inches Through Sixteen Inches for Water and Other

Liquids". All joints materials, including rubber gaskets, glands, tee-head bolts,

and hex-head nuts, shall conform to the latest revisions of AWWA C111,

"Rubber-Gasket Joints for Ductile-Iron and Gray-Iron Pressure Pipe and Fittings".

2.2 JOINT RESTRAINT SYSTEM

All yard piping shall be restrained. Restraint system for fittings shall be "MEGA LUG 1100 Series"

Joint Restraint System as manufactured by EBAA Iron, Inc. or approved equal. Length and

location of restraining shall be determined by the Engineer. All fittings four inches (4") in

diameter and larger shall be restrained as shown on the plans. The Contractor shall submit a

pipe laying schedule.

2.3 Connection of existing pressure mains to the new mains will be accomplished with solid repair

sleeve, as approved by the Engineer. Repair clamps will not be allowed.

PART 3 - EXECUTION

A. Installation of ductile iron (DIP) fittings shall be in accordance with the latest revision of

AWWA C600, "Installation of Gray and Ductile Cast Iron Water Mains and

Appurtenances" for ductile iron. For PVC fittings, installations shall be in accordance

with manufacturer's recommendations.

B. Concrete thrust blocks or "kickers" shall be installed at all fittings (fourteen-inch (14")

and smaller as shown on the detail or unless otherwise directed by the Engineer. The

Contractor shall install a poly barrier between all concrete thrust blocks and fittings.

Where in the opinion of the Engineer, conditions prevent installing a concrete thrust

block behind a fitting, a joint restraint system shall be used in lieu of the concrete thrust

block. Joint restraint system shall be installed in accordance with manufacturer's

instructions so as to prevent joint separation under operating conditions on all fittings

sixteen inches (16") and larger. All concrete thrust block shall be inspected prior to

backfill by the Engineer. NOTE: Concrete thrust blocks shall not be installed in a "wet"

condition.

END OF SECTION

Page 48: TECHNICAL SPECIFICATIONS - D.N. Higgins

02616-1

SECTION 02616

POLYVINYL CHLORIDE (PVC) PIPE

Part I. GENERAL

1 .01 DESCRIPTION OF WORK

(A) The extent of PVC pipe is shown on the drawings.

(B) Reference to standard specifications herein shall be construed as to be in reference to the latest

revision or edition.

1 .02 SUBMITTALS

(A) One original certified test report and two copies of all required test reports shall be submitted

to the Engineer with each shipment of pipe. Certification shall include all test results required

by AWWA. Also the Contractor shall include the following data:

(i) Quick Burst Test, ASTM D1599.

(ii) Drop Impact Test, ASTM D2444.

1 .03 DELIVERY AND STORAGE

(A) In storing pipe, units shall be protected by dunnage in the same way they were protected while

loaded on the truck. Pipe shall be stored flat to protect against bending.

(B) In storing pipe, units shall be protected by dunnage in the same way they were protected while

loaded on the truck. If pipe is to be stored outside longer than 15-days the pipe shall be covered

with canvas or other opaque material to protect it from prolonged exposure to the sun.

Part II. PRODUCTS

1 .01 PVC PIPE (4-INCHES AND LARGER)

(A) SEWER:

(i) Force main pipe shall be SDR-26 and gravity pipe shall be SDR-26. Pipe shall be furnished in

standard 20' lengths. Gravity sewer pipe shall be furnished in 13' or 20’ lengths. Green pipe

for gravity and force main PVC pipe.

(ii) The joints for PVC pipe shall be rubber ring type consisting of integral, thickened, solid wall

bells which maintain the same standard dimension ration as the pipe barrel. Joint lubrication

shall be as furnished by the manufacturer of the pipe and joints made in accordance with the

manufacturer's instructions and recommendations.

(iii) Where necessary, solid repair sleeves or adaptor fittings shall be furnished and installed where

plastic pipe is connected to pipes or fittings of other materials. When pipe material changes

from one type to another, solid repair sleeves shall be used to transition.

1 .02 PVC PIPE (SMALLER THAN 4-INCHES)

(A) Unless otherwise specified, all PVC pipe smaller than four-inch (4") nominal diameter shall be

Schedule 80 PVC in accordance with ASTM D1785. Schedule 80 pipe shall have either solvent

welded or threaded joints. PVC pressure pipe shall bear the approved seal of the National

Page 49: TECHNICAL SPECIFICATIONS - D.N. Higgins

02616-2

Sanitary Foundation (NSF). PVC pipe that is exposed to sunlight shall be manufactured with

additives to provide resistance to ultraviolet deterioration.

(B) FITTINGS; Socket type, solvent welded fittings for schedule 80 PVC pipe shall be in

conformance with ASTM D2467. Threaded type fittings for Schedule 80 PVC pipe shall be in

conformance with ASTM D2464. All solvent welded or threaded joints shall be watertight.

(C) FLANGES; Flanges for Schedule 80 PVC pipe shall be rated for a 150 psi working pressure with

ANSI B16.1 dimensions and bolting pattern. Flanges shall be connected to PVC piping with

either solvent welded or threaded joints in accordance with ASTM D2467 or ASTM 2464,

respectively. Gasket shall be neoprene, full faced type with a minimum thickness of 1/8-inch.

Nuts and bolts shall be hexagonal with machine threads, manufactured of Type 316 stainless

steel in accordance with ASTM A320, Class 2. Type 316 stainless steel flat washer shall be

used against PVC flanges.

(D) SOLVENT CEMENT; PVC solvent cement shall be in compliance with ASTM D2564 and in

accordance with the pipe manufacturer's recommendations.

(E) THREAD LUBRICANT: Lubricant for Schedule 80 threaded joints shall be Teflon tape only.

1 .03 High Density Polyethylene (HDPE) Pipe

(A) Pipe shall be a PE3408 high density, extra high molecular weight polyethylene manufactured

from first-quality high density polyethylene resin containing no additives, fillers, or extenders.

The HDPE pipe shall have an ASTM D3350 cell classification of PE 345434C, and shall meet or

exceed the properties listed in the following table. The HDPE pipe shall be SDR-11 Phillips Drisco

pipe Series 1000, or approved equal, and shall bear the seal of approval of the National

Sanitation Foundation (NSF).

Property Specification Unit Nominal Value

Material

Designation PPI/ASTM PE 3408

Material

Classification ASTM D-1248 III C 5 P34

Cell

Classification ASTM D-3350 345434C

Density ASTM D-1505 gm/cm3 0.955

Melt Index ASTM D-1238 gm/10 min. 0.11

Flex Modulus ASTM D-790 psi 135,000

Tensile

Strength ASTM D-638 psi 3,200

HDB @ 730F ASTM D-2837 psi 1,600

U-V Stabilizer ASTM D-1603 % C ** 2.5

Page 50: TECHNICAL SPECIFICATIONS - D.N. Higgins

02616-3

Hardness ASTM D-2240 Shore "D" 65

Compressive

Strength

(yield) ASTM D-695 psi 1,600

Tensile Strength

@ Yield ASTM D-638

(Type VI Spec) (2"/min.) psi 3,200

Property Specification Unit Nominal Value

Elongation @

Yield ASTM D-638 % minimum 8

Tensile Strength

@ Break

(Type VI Spec) ASTM D-638 psi 5,000

Elongation @

Break ASTM D-638 % minimum 750

Modulus of

Elasticity ASTM D-638 psi 130,000

Linear Thermal

Expansion Coef. ASTM D-696 in./in./0F 1.2 x 10

-4

Brittleness

Temp. ASTM D-746 0F < -180

Vicat Softening

Temp. ASTM D-1525 0F 257

(B) Fittings shall be butt fusion type, meeting the requirements of ASTM D-3261, and shall be

pressure rated to match the system piping to which they are fused. At the point of fusion, the

outside diameter and minimum wall thickness shall meet the requirements of ASTM F-714 for

the same size pipe. Fitting shall be supplied by the pipe manufacturer. Connection to dissimilar

materials shall be joined by flanges, compression couplings, or other mechanical means as

approved by the Engineer.

END OF SECTION

Page 51: TECHNICAL SPECIFICATIONS - D.N. Higgins

02632- 1

SECTION 02632

INJECTION WELLS

PART I GENERAL

Section 1.0 Scope

1.01 The work consists of the construction of two Class V wastewater disposal injection wells for Key

Largo Waste Water Treatment Facility site, as shown on the Drawings and site plan; and

performance of all appurtenant work in accordance with the Contract Documents. The well shall

be constructed with an open hole configuration.

Section 1.1 General

1.1-1 The Contractor will take necessary measures to limit access to drilling sites to minimize public

hazards.

1.1-2 The contractor shall provide a qualification statement in order to demonstrate the experience with

installation of slotted casing wells. The statement at minimum shall demonstrate at least 3

successful projects with wells of similar depth and diameter. References shall be included in the

statement.

In addition to the statement the Contractor shall provide detailed well pre-drilling, assembly,

installation and grouting procedure for Engineer's and FDEP review and approval.

1.1-3 The Contractor shall furnish sound proofing barriers, provide mufflers on equipment, and take

other steps necessary during drilling, pumping, testing, and all other work to ensure that noise

levels conform to any applicable noise ordinances.

1.1-4 The Contractor shall furnish temporary pit casing at the well site to isolate surficial deposits from

the borehole and to prevent the collapse of the drilled hole from the elevation of the bottom of the

well control structure to the ground surface if necessary based on soil conditions. Costs for

furnishing and installation shall be included in the Contractor’s costs. The grout jacket shall

terminate within 1-foot below the bottom of the well control structure elevation. Installation shall

be in accordance with Contract Documents and Drawings.

1.1-5 The Contractor shall begin work within 14 calendar days of receiving the ‘Notice to Proceed’ from

the KLWTD. The work schedule shall continue without interruption until work is completed by the

Contractor, unless authorized by the owner. The sequence of work shall be as follows:

1. Site and access video

2. Clear site and establish vertical and horizontal control with reference to NAVD

1988

3. Mobilize drill rig and provide temporary piping for water supply, if necessary

4. Drill wells as designed by engineer and approved by FDEP.

5. Drill over-drill hole to a depth shown on the plans below the finished top of casing

elevation specified on the Project Plans. Over drill diameter shall be a minimum of

4 inches greater than the outer diameter of the well casing at the widest part.

6. Set cement basket in the borehole at the casing setting depth of at least sixty (60)

feet from the top of casing elevation to the cement basket, as approved by the

engineer.

7. Provide written notification to the DEP Fort Myers Office (David Rhodes, P.G.) and

to the DEP Marathon Office (Steve Johnson) at least 72 hours prior to grouting.

8. Set and cement final casing

Page 52: TECHNICAL SPECIFICATIONS - D.N. Higgins

02632- 2

1.2 Contractor Submittals

1.2-1 All Contractor submittals shall conform to the applicable requirements of Section 01300,

Administrative Requirements, and the supplementary requirements specified. Each item listed in

Section 01300, Administrative Requirements, shall be submitted to the Engineer with a clear

explanation or depiction of why or how the requirements, as listed, will be fulfilled by products or

services provided by the Contractor. This list shall not be considered all inclusive and maybe

extended by the Owner, Engineer, or Contractor.

1.2-2 The Contractor shall furnish capable personnel experienced in the type of work required by the

Contract Documents. In addition, the following shall apply:

a. Personnel shall be subject to Engineer’s approval. If required by the Engineer, a resume will be

submitted to the Engineer for review and approval prior to assignment of personnel to the

project.

b. The Contractor shall provide the services of drillers that are: experienced with the type of

formations expected, capable of making lithologic classifications of formations, and competent

regarding drilling fluids, additives and equipment maintenance.

c. The Contractor shall provide an adequate number of helpers.

d. The drillers shall maintain legible and clean well logs and drilling reports as instructed by the

Engineer. The Contractor is responsible for submitting the well logs to the Engineer within 2

weeks of completion of each well and to the FDEP within 30 days of completion of each well.

At a minimum, the following information shall be included in the well completion report:

1. Construction activity;

2. Information on bit assembly and drill string;

3. Drilling mud and additives;

4. Fluid losses and water and fluid level changes;

5. Footage drilled and lithological classification of formations encountered;

6. Quantity of material removed during drilling and location of disposal;

7. Length of pipe segments;

8. Cementing operations;

9. Maintenance and repair time along with details of repairs;

10. Presence and times of Contractor’s personnel and sub-contractor’s personnel;

11. Presence and times of City and Engineering personnel or others;

1.2-3 The Contractor shall submit a list of equipment proposed for use on the project. The list shall

include manufacturer’s load capabilities, horsepower, year of manufacture and year of purchase by

the present owner.

1.2-4 The Contractor shall submit a complete list of all subcontractors to be used. The Contractor may be

required to submit additional information or resumes for any of the Subcontractors proposed. As

specified in the FDEP Supplemental Conditions of the Contract Documents, the Contractor shall

provide 30.4% of the total contract value with Certified Minority Business Enterprise subcontractors

and suppliers.

1.2-5 The Contractor shall have experience cementing the type of formations encountered or provide the

services of a subcontractor with demonstrated experience in cementing.

1.2-6 The Contractor shall submit four (4) copies of a certified elevation survey to the Engineer in addition

to an electronic version. Horizontal control and vertical control (top of casing elevation) shall be

established by a State of Florida licensed land surveyor.

Page 53: TECHNICAL SPECIFICATIONS - D.N. Higgins

02632- 3

1.2-7 The Contractor shall collect samples of cement and grout during cementing of all casings. Mixed

samples shall be collected. Samples of the mixed product shall include at least three (3) two inch

cubes suitable for tests of compressive strength. Only 2-inch cubes will be acceptable as

representative cement samples for compressive strength tests. Samples shall be collected a

minimum of three (3) times during each cementing stage: Prior to pumping, at the middle, and the

end of the stage. If grout is mixed on site; mixing must be done in accordance with ASTM C 150. If

delivered by outside vendor, the vendor must demonstrate that the slurry density shall match the

specified slurry density indicated on the delivery certificate.

1.2-8 The Contractor shall ensure that the material used in sealing the casing shall consist of a neat

cement grout using Type II Portland cement conforming to ASTM C 150, and shall not contain more

than 5 gallons of water per ninety four (94) pound sack of cement. Additives may be used to speed

setting time or expand material, but shall not contain more than 2 percent by weight of calcium

chloride or 4 percent by weight of bentonite. All other additives require written FDEP approval

prior to use.

1.2-9 The Contractor shall submit to the Engineer, plans for casing installation and cementing at least 72

hours prior to commencing setting the casing and cementing the casing. The following information

shall be included:

a. tabulation of casing on site

b. length of each section of casing

c. cumulative string weight

d. locations of centralizers

e. method of emplacement of cement

f. calculation of expected mix temperature and maximum temperature well casing is

designed to withstand

g. any additives to be used

1.2-10 The Contractor shall submit to the Engineer written verification of the disposal site from the City of

Marathon prior to beginning drilling operations. The Contractor shall be responsible for providing

and maintaining all trucks, pipes, pumps, and other equipment needed to pump and haul excess

drilling fluids, drill cuttings, and produced water to authorized disposal sites in accordance with

Federal, State, and local regulations; or sub-contract with a firm capable of providing these services

when necessary.

1.2-11 The Contractor shall provide a final well description that conforms to the requirements of Section

01300, Administrative Requirements and shall show the diameter, wall thickness, depths and

lengths of casings installed; borehole diameters; depths and thickness of annular seals; quantity of

material removed during construction and any other pertinent details as required by the Engineer.

1.2-12 The Contractor shall provide one copy of any accident reports to the Engineer within 24 hours of

any accidents that occur in connection to the work.

1.2-13 The Contractor shall submit a written well abandonment plan for review by the Engineer in the

event a well must be abandoned. The plan for well abandonment shall be in accordance with

applicable rules and regulations of governmental agencies having jurisdiction. The Engineer must

approve the abandonment plan in writing prior to Contractor abandoning the well. If Contractor

voluntarily stops work and/or fails to complete a hole in a satisfactory manner in accordance with

the Contract Documents or regulatory requirements, the well will be considered abandoned. The

Contractor will not be paid for all or part of a hole declared abandoned by the Owner. Costs of

properly plugging and sealing a well or hole in accordance with applicable regulations shall be paid

by the Contractor. If Owner, upon receipt of information that indicates well completion in a

Page 54: TECHNICAL SPECIFICATIONS - D.N. Higgins

02632- 4

satisfactory manner is not warranted, the Owner may terminate work at the site. If Owner

terminates work, Contractor will be paid the value of the work completed to that time based on

unit prices in the Bid Schedule. All salvageable material furnished by the Contractor may be

removed and remain his property. Owner may direct Contractor to relocate to another site to drill

another well. Plans to abandon or relocate wells must be submitted in writing to the DEP and may

not begin until written approval from the DEP is obtained.

1.2-14 The Contractor shall submit a schedule at the Pre-Construction meeting. The schedule shall be

updated and submitted to the Engineer monthly until completion of the project. If requested by

the Engineer, the Contractor shall revise, or update the schedule, or submit a new schedule.

1.2-15 The Contractor shall maintain all records required by agencies having jurisdiction and shall submit

such records to them as required. Two copies of submitted records shall be provided to the

Engineer.

1.2-16 The Contractor shall submit applications for all necessary drilling permits from applicable State and

local regulatory agencies. The Contractor shall apply for and obtain any and all other permits that

may be required to complete the drilling of the wells.

1.2-17 The Contractor shall submit a Water Well Completion Report {South Florida Water Management

District Form LEG-R.005.00 (10/05)} to the permit issuing agency within 30 days of completion of

construction. Contractor shall submit all required DEP forms in compliance with applicable

construction permit conditions.

Section 1.3 Quality Assurance

1.3-1 At all times, all work on the well shall be in accordance with all applicable Federal, State and local

regulations.

1.3-2 If it becomes necessary to perform remedial work prior to final acceptance in order for Work to

meet regulatory requirements and/or technical specifications and contract documents due to

defective materials, accident, loss of equipment or equipment malfunction, or from any other

cause directly attributable to actions or inactions of Contractor, the Contractor shall bear the entire

cost of remediation, including any engineering costs that will be

required to meet all requirements. If problems arise, Contractor shall notify Engineer immediately.

Any work performed after well completion reports have been submitted to the DEP will require

written DEP approval.

1.3-3 The Contractor shall submit a written plan of corrective action for review to the Engineer. If

approved by the Engineer, Contractor may implement the plan of corrective action.

1.3-4 The Contractor shall properly abandon any well that is deemed unacceptable by the Engineer, and

no remuneration will be made to the Contractor for work deemed unacceptable or incomplete.

1.3-5 If Contractor must repeat work as a result of performance, all additional materials, labor, and

equipment costs shall be at Contractors expense. No claims for additional compensation shall be

allowed, except as specifically provided.

1.3-6 Contractor shall perform all work in conformance with the applicable codes and standards relating

to the referenced portions of the following documents only to the extent that the requirements are

not in conflict with the provisions of this section:

Chapter 62-528 UIC Well Regulations, Florida Administrative Code

Page 55: TECHNICAL SPECIFICATIONS - D.N. Higgins

02632- 5

Chapter 62-531 Water Well Contractor Licensing Requirements

Chapter 62-532 Water Well Permitting and Construction Requirements

ASTM C150 Specification for Portland Cement

ASTM D1784 Specification for Rigid PVC Compounds and Chlorinated PVC Compounds

ASTM D2837 Standard Test Method for Obtaining Hydrostatic Design Basis for

Thermoplastic Pipe

Materials

ASTM F480 Specification for Thermoplastic Well Casing Pipe and Couplings made in

Standard

Dimension Rations (SDR) SCH40 and SCH80.

ASTM D-2564 Standard Specification for Solvent Cements for Poly Vinyl Chloride (PVC)

Plastic Piping Systems

AWWA A100 Standard for Water Wells

Section 3.3-7 Specification for Casing Centralizers

1.3-7 Contractor guarantees that Work performed pursuant to this section and that the workmanship,

materials, and equipment supplied or used in the execution of Work are free from defects or flaws

and are furnished in strict accordance with the Contract Documents.

1.3-8 Contractor guarantees that the performance test requirements of Contract Documents shall be

met. Contractor shall repair, correct, or replace all damage to work covered by failures under this

guarantee, at his own expense. The guarantee shall remain in effect for a period of 2 years from

the date of final acceptance by the Owner.

1.3-9 Contractor shall obtain a regulated materials list from the appropriate source and shall provide

Engineer with an inventory of all regulated materials to be used on the job site. All regulated

materials, liquids, and/or substances shall be stored in secondary containment in compliance with

applicable regulations of the State. The integrity of the secondary containment shall by

demonstrated by the Contractor upon request by the Engineer.

1.3-10 Contractor shall provide safe access to the site and will assist the Engineer in the collection of

information and samples during drilling operations.

1.3-11 Contractor shall cease operations if directed by Engineer so any extra work not included in the

specifications may be performed. The Engineer will advise Contractor of the request and will work

with Contractor to schedule request so as to cause minimal delay. All standby time and extra work

is required to be approved in writing by the Engineer.

1.3-12 Contractor shall provide notice of at least 72 hours (exclusive of weekends and holidays) to

Engineer and DEP prior to any grouting or testing activities.

1.3-13 Contractor shall comply with OSHA regulations contained in 29 CFR Section 1910 (General Industry

Regulations) and Section 1926 (Construction Regulations).

Section 1.4 Storage and Protection of Materials

1.4-1 Contractor shall ensure that all materials delivered are in an undamaged condition and are stored

to provide protection against damage. Damaged materials shall be rejected. Any materials that are

damaged as a result of storage shall be replaced with new materials at the Contractors expense.

Contractor shall provide a materials storage area and shall protect both the work site and storage

area from theft, vandalism, and unauthorized entry.

Page 56: TECHNICAL SPECIFICATIONS - D.N. Higgins

02632- 6

1.4-2 Contractor shall notify Engineer immediately upon discovery of any existing structures that may

prevent construction as shown. Any field relocations 10 feet or less that do not involve locating

across a street shall be made at the discretion of the Engineer. Relocations greater than 10 feet will

be made at the direction of the Engineer, after communication with DEP has been established and

written approval to relocate the facility obtained from the DEP.

Section 1.5 Contractors Equipment

1.5-1 Contractor shall maintain all equipment so that it is clean and in good operating condition when

delivered to the job site and throughout the entire operation. All equipment shall be of adequate

size, horsepower and capacity for the project and shall be of the type successfully utilized for the

construction of similar or larger wells within the last two years. All equipment shall have required

safety devices.

1.5-2 Contractor shall be responsible for equipment maintenance, and any damage of any nature due to

the Contractors operation to the well or surrounding property and/or facilities shall be repaired or

replaced.

1.5-3 Contractor shall provide and use safety equipment at all times as required by applicable

regulations.

Section 1.6 Mobilization, Preservation, Final Cleanup and Restoration

1.6-1 Contractor shall mobilize equipment and personnel to commence drilling operations within time

limit specified.

1.6-2 Contractor shall regularly remove accumulated debris and surplus materials from work site and

store in designated yard or dispose of properly.

1.6-3 Contractor shall perform clean up work regularly and with the frequency specified by Engineer.

1.6-4 Contractor shall perform basic site restoration immediately following installation or substantial

completion of facility. Sites should be restored if partially completed facilities must remain

incomplete pending resolution of unforeseen issues. Failure to perform restoration or clean up

work may result in Engineer providing a written request to the Contractor. If, within five days of

written notification to Contractor, the requested restoration or clean up work has not been done,

Engineer may employ such labor and equipment deemed necessary to provide clean up or

restoration at Contractors expense.

1.6-5 Contractor and all subcontractors shall take all necessary precautions to prevent contaminated

water, gasoline, or other hazardous substances from entering the ground either through the well or

seepage from ground surfaces. Contractor shall maintain precautions during and after construction

of the well and until acceptance of the well by Owner. If Contractor fails to prevent contaminants

from entering the groundwater, remedial action as required by the governing regulatory agencies

shall be performed by the Contractor at the sole expense of the Contractor.

1.6-6 Contractor shall remove all equipment and unused materials upon completion of work at a site.

Any temporary structures erected for use during drilling shall be dismantled. Any minor repairs

required shall be immediately affected. All excess drilling fluids, debris and other materials used

during construction shall be removed and disposed of by the Contractor. Mud sumps and other

work excavations shall be filled, compacted and graded to return the site to a condition equal to or

Page 57: TECHNICAL SPECIFICATIONS - D.N. Higgins

02632- 7

better than the condition at the start of the work. Completion of these activities shall be within one

month of drilling.

PART II PRODUCTS

Products are listed and described throughout Part 3, Execution, and shall conform to all requirements of

Part 1.

PART III EXECUTION

Section 3.1 General

3.1-1 Contractor shall provide competent personnel and adequate equipment to complete all phases of

injection well construction.

3.1-2 Contractor shall ensure that the depth of the borehole and the length of the casings are as shown in

the drawings unless otherwise determined by the Engineer. Payment will be based on actual

quantities furnished, installed or constructed in accordance with the schedule of values.

3.1-3 Contractor shall furnish all repeat work, additional materials, labor and equipment that are a result

of performance or lack of acceptable performance. No claim for additional compensation shall be

made or be allowed except as specifically provided.

Section 3.2 Drilling Operation

3.2-1 Contractor shall evaluate the selected locations for the injection wells prior to mobilizing

equipment to determine, based on the site limitations, the appropriate method of drilling.

3.2-2 Contractor shall utilize high-grade approved clays as the drilling fluid when using the rotary method

of well construction. The drilling fluid shall possess those characteristics which will condition the

walls of the hole to prevent caving.

3.2-3 Contractor will use only fresh water in drilling fluids whether alone or in combination with drilling

additives. The only acceptable additives are calcium chloride or bentonite. The use of any other

additive must be approved in writing by the Engineer and the FDEP prior to use.

3.2-4 Contractor shall monitor drilling fluids to ensure the proper fluid is in use throughout the drilling

process. If proper control of the fluid cannot be maintained, Contractor may be required, at his

own expense, to retain or employ a qualified mud engineer during all operations in order to

supervise and maintain correct drilling fluids characteristics.

3.2-5 Contractor shall properly handle all drilling fluids during the entire drilling process. Adequate

control may include, but not be limited to, providing holding tanks for the drilling fluid, construction

of barriers to retain fluids and prevent run off to surrounding areas, erosion control, and provide

protection to the public at all times. Upon completion of drilling, all mud and cuttings resulting

from well construction shall be removed from the site and disposed of properly by the Contractor.

The ground surface shall be restored to the original, or better, condition.

3.2-6 Contractor shall not allow the use of salt or brine as a method of increasing the mud weight during

drilling. Any materials proposed for controlling the flow must be reviewed and approved by the

Engineer prior to use.

Page 58: TECHNICAL SPECIFICATIONS - D.N. Higgins

02632- 8

3.2-7 Contractor will use water as the drilling fluid for well construction when using the reverse

circulation method of construction.

3.2-8 Contractor shall maintain control over the reverse air discharge at all times and shall ensure that no

flooding or the discharge of turbid water occurs. Contractor shall submit to the Engineer a flooding

control and material disposal site for approval if the reverse air discharge method is used.

3.2-9 If auger drilling is used, the Contractor shall clear bore hole and dispose of material properly

throughout drilling process to eliminate the collection of loose material at the base of the hole.

3.2-10 Contractor shall take all measures necessary to protect the top portions of the hole from caving or

raveling.

Section 3.3 Casing

3.3-1 Contractor shall determine the depth and diameter of any surface casing required during well

construction. The casing shall be factory assembled in not less than 20 foot lengths. 20 foot

segments shall be used for the casing except shorter pieces are allowed in the final part of the well.

The ends of each joint shall be machine beveled perpendicular to the casing axis to ensure that

each section is straight. No used casing will be accepted.

3.3-2 Contractor shall not use steel casing unless approval from Engineer and FDEP is obtained prior to

use.

3.3-3 Contractor shall use casing made of un-plasticized PVC compounds having a minimum cell

classification of 12454-B as defined in ASTM D1784. Pipe shall be SDR17, SCH 40 or SCH 80 PVC

that meets the requirements of ASTM D1748 and shall be factory assembled in 20 foot lengths and

may be cut for the final part of the well. All PVC casing shall be new.

3.3-3a Slotted section of the casing shall be factory supplied with precision-machined slots. Field or

contractor shop slots cutting will not be accepted. Slot sizes and spacing shall be as shown on the

plans and details.

3.3-3b Joints shall be of mechanical kind "Certa-Lock" or Engineer approved equal.

3.3-4 Contractor shall ensure that the casing is suspended in tension from the surface. The bottom of the

casing shall be at the elevation shown on the plans. Contractor shall ensure that the hook load of

the drill rig exceeds the maximum casing weight to be encountered during the construction of the

well to prevent collapse of the casing under vertical load.

3.3-5 Contractor shall ensure that the casing is correctly positioned and at a depth acceptable to the

Engineer. If unable to correctly position casing, Contractor shall obtain prior written DEP approval

to properly abandon the hole and construct another well immediately adjacent to the original

location. This well shall be completed in accordance with Contract Documents at no additional cost

to the Owner.

3.3-6 Contractor shall withdraw and replace any collapsed casing at his expense prior to well completion.

3.3-7 Contractor shall install two casing centralizers on all casings at 0/90/180/270 degrees at twenty feet

and at forty feet. Centralizers shall be attached to PVC casing with stainless steel straps or other

Page 59: TECHNICAL SPECIFICATIONS - D.N. Higgins

02632- 9

engineer approved method. All centralizer groups shall be vertically aligned one above the other in

order to permit the passage of tremie pipes alongside the casing to the bottom of the borehole.

3.3-8 Contractor shall be responsible for ensuring the suitability of all connections along the well casing

string. Casing joints shall be standard bell joints. Casing joints shall be attached using plastic pipe

cement meeting the requirements of ASTM D-2564. No external pipe-to-pipe restraining devices

that clamp onto the pipe surface shall be allowed.

Section 3.4 Grouting

3.4-1 Contractor shall grout the annular space between borehole wall and casing by pumping cement

grout from the bottom of the casing to ground surfaces. The first stage of cement pumped into the

annulus at the base of the well casing shall be neat cement slurry. The well shall remain

undisturbed for at least 24 hours after cementing is complete.

3.4-2 Contractor shall pump cement as a slurry of thoroughly mixed components in stages that fill the

annular space without exceeding the collapse pressure of the casing pipe. Minimum setting time

between stages is 8 hours if more than one stage is required.

3.4-3 Contractor shall take whatever steps are necessary to re-open any hole that has collapsed prior to

placement of the grout seal so that the seal may be installed as required.

3.4-4 Contractor shall ensure that the casing does not move in a vertical direction during grouting.

3.4-5 Contractor shall ensure that required pressure is maintained within the casing during pressure

cementing.

END OF SECTION

Page 60: TECHNICAL SPECIFICATIONS - D.N. Higgins

02800-1

SECTION 02800

VALVES

PART I - GENERAL

1.0 Scope

1.01 This section shall cover all drain, water main, force main, air, surge, and miscellaneous valves as

shown

on the drawings and as specified.

1.1 Basis of Measurement and Payment

1.11 See Section 01270, "Measurement and Payment".

1.2 Related Technical Specifications

1.21 See Sections 02732, "force main" and 02730, “underground vacuum sewer piping”

1.3 Submittals

1.31 The CONTRACTOR shall submit complete sets of shop drawings to the ENGINEER for approval,

prior to ordering any equipment.

1.32 The CONTRACTOR shall also provide parts lists for all valves, special fittings, hangars, etc., to the

ENGINEER prior to final payment.

PART II - PRODUCTS

2.0 Gate Valves (unless specified in the plans as HDPE fusible vales)

2.01 Gate valves 3-inch diameter and smaller shall be all bronze meeting Federal Specification WW-V-

54, rated at 200 psi/WOG unless shown otherwise. Valves shall open counterclockwise with non-rising

stem and hand wheel operator unless indicated otherwise on the drawings. End connections shall be

threaded unless shown otherwise.

2.02 Gate valves 4 to 12-inch diameter shall be cast iron body solid wedge resilient seat valves meeting

AWWA C-509 requirements. All gate valves shall open counterclockwise and have non-rising stems with

2" square operating nuts unless indicated otherwise on the drawings. End connections shall be

mechanical joint unless shown otherwise. Valves shall receive a minimum 8 mil protective interior

coating in accordance with AWWA C550.

2.03 Resilient seat gate valves shall be as manufactured by Mueller, Waterious or approved equal.

Bronze gate valves shall be as manufactured by ITT Grinell or approved equal.

2.1 Mud Valves (unless specified in the plans as HDPE fusible vales)

2.11 Mud valves shall have cast iron bodies with bronze stems, stem nuts, disc rings and seat rings. All

mounting hardware and assembly bolts and nuts are to be of stainless steel. All mud valves are to have

flanged ends and be equipped with rising stems unless shown otherwise. Each mud valve is to be

equipped with a corrosion resistant extension stem, extension support bracket and handwheel. Position

the handwheels approximately 1 foot above the top of the walkway.

2.2 Butterfly Valves (unless specified in the plans as HDPE fusible vales)

2.21 Butterfly valves 12-inch and smaller shall have cast or ductile iron bodies with resilient seats and

shall meet AWWA, C- 504 requirements. Valves for above ground service shall be flanged (unless shown

Page 61: TECHNICAL SPECIFICATIONS - D.N. Higgins

02800-2

otherwise), suitable for operation at temperatures of 200 degrees F. and equipped with 10 position

locking levers for variable flow control. Valve for buried service shall have mechanical joint ends and

actuators suitable for underground use. Valves shall have a minimum 8 mil thick protective interior

coating in accordance with AWWA C550.

2.22 Butterfly valves 14 to 48-inch diameter for potable water shall be ductile iron body meeting AWWA

C504. End connections shall be flanged unless shown otherwise and shall conform to "Short Body" laying

length requirements. Valves shall be class 150B. Shaft seals shall be Rubber O-ring type. Sprayed valve

seat mating surfaces shall not be used. Valve shafts shall be stainless steel. Valves shall be furnished

with manual actuators turning counterclockwise to open, 2-inch square operating nut, valve box,

extension stem and ground level disc position indicator unless indicated otherwise on the drawings.

Valves shall be suitable for buried service unless shown otherwise. All exterior bolts, nuts, studs,

washers, etc. shall be 304 stainless steel. Valves shall receive protective interior coating in accordance

with AWWA C550, minimum 8 mils thick. Flange gaskets for butterfly valves shall be full face, employing

one or more annular rings molded into the gasket.

2.23 Butterfly valves shall be as manufactured by Mueller, American Darling or approved equal. Flange

gaskets for butterfly valves shall be "TORUSEAL" as manufactured by American Cast Iron Pipe or

approved equal. Ground level disc position indicators shall be furnished by the valve manufacturer, or

approved equal.

2.3 Check Valves (unless specified in the plans as HDPE fusible vales)

2.31 Check valves shall be bronze fitted iron body and shall meet AWWA, C-508 requirements. Valves

shall be of the clear waterway type and shall have composition to metal seat construction. All check

valves shall be flanged with outside levers and weights unless shown otherwise. Check valves shall be

installed in a horizontal position. Valves shall have a minimum 8 mil thick protective interior coating in

accordance with AWWA C550.

2.32 Check valves shall be as manufactured by Mueller, American Darling or approved equal.

2.4 Plug Valves (unless specified in the plans as HDPE fusible vales)

2.41 Plug valves shall be eccentric resilient plug design with bodies of stainless steel or bronze in sizes to

3" unless used for chlorine solution where PVC is required. Valves larger than 3" shall have bodies of

epoxy coated cast iron, and be bi- directionally sealing.

2.42 Three inch and smaller valves shall have Victaulic end connections, or true union ends on PVC

valves. Metal body valves for above ground service shall be flanged and have adjustable memory stops

and valve position indicators. Valves for buried service shall have mechanical joint ends and actuators

suitable for underground use. Valves larger than 3 inches shall have 2 inch square actuating nuts and

valves 3 inches and smaller shall be furnished with non-removable levers.

2.43 Plug valves shall be a M & H Style 820, or approved equal.

Page 62: TECHNICAL SPECIFICATIONS - D.N. Higgins

02800-3

2.5 Shear Gates

2.51 Shear gates shall be iron body valves with replaceable wedges. All valves shall have flanged ends,

unless shown otherwise on the drawings, and lifting handles of proper length to allow operation from

the walkways. All mounting hardware and handle brackets shall be provided as required. Bolts and

hardware shall be of corrosion resistant material.

2.6 Ball Valves (unless specified in the plans as HDPE fusible vales)

2.61 Ball valves 3" and smaller, utilized for air control, shall be screwed end stainless steel lever

operated valves suitable for operation at temperatures of 200 degrees F. Ball valves 3" and smaller

utilized on sewage or water lines shall be true union PVC valves with permanently lubricated Teflon

seats and Viton "O" ring seal. End connections shall be threaded or flanged and valves shall be rated for

operation at 150 psi.

2.7 Solenoid Valves

2.71 All solenoid valves shall be threaded quick acting PVC or bronze body valves with 120 volt coils and

replaceable seats and diaphragms.

2.8 Air and Vacuum Relief (unless specified in the plans as HDPE fusible vales)

2.81 Air and vacuum relief valves for sewage shall be constructed of cast iron body and cover, stainless

steel trim and float, with an adjustable Buna-N seal to insure positive seating. Valve shall be of the type

that automatically releases air, gas or vapor under pressure during system operation. The valve shall

have working pressure of 150 psi. Valves shall be equipped with flushing attachments including an inlet

shut off valve, clear water inlet valve, rubber supply hose and quick connect coupling.

2.82 Air and vacuum relief valves for sewage shall be APCO Model 400, Golden-Anderson (GA), or

approved equal.

2.83 Air release valve for potable water shall be constructed of cast iron body and cover, stainless steel

float, leverage mechanism and internal trim, with adjustable Buna-N or Viton seals to insure positive

seating. Valve shall be of the type that automatically releases air, gas or vapor under pressure during

system operation. The valve shall have working pressure of 150 psi. Valve shall have 2-inch N.P.T. inlet

and 3/16- inch discharge orifice.

2.84 Air release valve for potable water shall be as manufactured by VAL-MATIC model no. 38 or

approved equal.

2.9 Valve Box

2.91 Valve boxes for underground valves shall be three piece screw type cast iron valve box and cover.

Cover shall be marked "water" or "sewer" as required. Valve stem extension, if required shall be steel

with centering device, 2-inch operating nut and socket for valve nut.

2.92 Valve box shall be as manufactured by Tyler Pipe, U.S. Foundry or approved equal. Valve stem

extension shall be as manufactured by the General Engineering Company or approved equal.

Page 63: TECHNICAL SPECIFICATIONS - D.N. Higgins

02800-4

PART III - EXECUTION

3.0 Installation

3.01 All valves shall be located as shown on the Plans. Any underground valves shall be furnished with

an adjustable cast iron valve box and cover marked "sewer" or "water" as required. Covers on valve

boxes shall be set to finished grade and a concrete box formed around the cover as detailed on the

Plans. All valves and valve boxes shall be set plumb.

3.02 Buried valves with operating nuts greater than 3 feet below finished grade shall be provided with a

valve stem extension. Where stem extensions are used, they shall extend to within 2 feet of the finish

grade, except where ground level disc position indicators are required, and the stem extensions shall be

pinned to the valve operating nut.

END OF SECTION

Page 64: TECHNICAL SPECIFICATIONS - D.N. Higgins

03300-1

SECTION 03300

CONCRETE

PART 1 GENERAL

1.01 Section Includes

General requirements for formwork, reinforcement, accessories and cast-in-place concrete.

1.02 References

A. American Concrete Institute (ACI) latest edition:

1. ACI 301 - Structural Concrete for Buildings

2. ACI 305 - Hot Weather Concreting

3. ACI 306 - Cold Weather Concreting

4. ACI 315 - Detailing Manual

5. ACI 318 - Building Code Requirements for Structural Concrete

6. ACI 347 - Formwork for Concrete

B. American Association of State Highway and Transportation Officials (AASHTO) latest

edition:

1. AASHTO T152 - Air Content of Freshly Mixed Concrete by the Pressure Method

C. American Society for Testing and Materials (ASTM) latest edition:

1. ASTM A185 - Steel Welded Wire Reinforcement, Plain, for Concrete

2. ASTM A615 - Deformed and Plain Billet-Steel Bars for Concrete Reinforcement

3. ASTM C31 - Making and Curing Concrete Test Specimens in the Field

4. ASTM C33 - Concrete Aggregates

5. ASTM C39 - Test Method for Compressive Strength of Cylindrical Concrete

Specimens

6. ASTM C94 - Ready-Mixed Concrete

7. ASTM C138 - Test Method for Density (Unit Weight), Yield, and Air Content

(Gravimetric) of Concrete

8. ASTM C143 - Test Method for Slump of Hydraulic Cement Concrete

9. ASTM C150 - Portland Cement

10. ASTM C173 - Test Method for Air Content of Freshly Mixed Concrete by the

Volumetric Method

11. ASTM C231 - Test Method for Air Content of Freshly Mixed Concrete by the

Pressure Method

12. ASTM C260 - Air-Entraining Admixtures for Concrete

13. ASTM C309 - Liquid Membrane-Forming Compounds for Curing Concrete

14. ASTM D1751 - Preformed Expansion Joint Filler for Concrete Paving and

Structural Construction (Nonextruding and Bituminous Types)

Page 65: TECHNICAL SPECIFICATIONS - D.N. Higgins

03300-2

1.03 Submittals

A. Submit reinforcement steel shop drawings in accordance with Section 01000 and

prepared in accordance with ACI 315, Manual of Standard Practice for Detailing

Reinforced Concrete Structures. Drawings shall indicate bending diagrams, shapes,

dimensions, clearances, splicing and laps, accessories, and installation notes.

B. Submit manufacturer's literature for all admixtures proposed for the work.

C. Submit delivery tickets in accordance with ASTM C94 for each batch of ready-mixed

concrete. Information on the ticket shall include class of concrete, water content, time

of loading, truck number, admixtures, and quantity.

D. At least 35 days prior to placing of concrete, the Contractor shall submit proposed mix

proportions and samples of proposed materials.

1.04 Quality Control

A. Materials and methods of mixing and placing concrete shall conform to ACI 318,

Building Code Requirements for Reinforced Concrete.

B. Tests for slump shall be made when directed by the Engineer in accordance with ASTM

C143.

C. Air content tests shall be made, when directed by the Engineer, in accordance with

ASTM C138, C173, C231, or AASHTO T-152.

PART 2 PRODUCTS

2.01 Formwork

Formwork lumber shall be straight and clean. All nails shall be withdrawn and surfaces in

contact with concrete shall be thoroughly cleaned before reuse.

2.02 Reinforcement

A. Reinforcement bars shall be ASTM A615, Grade 60 deformed bars, except as otherwise

indicated.

B. Welded wire fabric shall conform to ASTM A185. Where welded wire fabric is shown

but not sized on Drawings, use 6" x 6" x W2.9 x W2.9 WWF.

C. Accessories for proper installation of reinforcement shall conform to CRSI "Manual of

Standard Practice for Reinforced Concrete Construction". Bar supports at exposed

surfaces shall be Class C-Plastic Protected.

Page 66: TECHNICAL SPECIFICATIONS - D.N. Higgins

03300-3

D. Reinforcement fabrication shall conform to ACI 315 and ACI 318, and approved shop

drawings.

2.03 Joint Fillers

A. Joint fillers shall be products of the following manufacturers, or equal:

1. W. R. Meadows, Inc., Elgin, Illinois

2. W. R. Grace and Co., Cambridge, Massachusetts.

B. Preformed bituminous fiber joint filler shall be non-extruding type conforming to ASTM

D1751.

C. Control joint strips shall have a minimum depth of 25 percent of slab thickness and a

minimum thickness of 1/8 inch.

2.04 Concrete Materials

A. Water shall be clean and potable

B. Portland cement shall be ASTM C150 Type I, II or III.

C. Fine and coarse aggregate shall be clean, hard, natural, or manufactured material

conforming to ASTM C33.

D. The nominal maximum size of the aggregate shall not be larger than three-fourths of the

minimum clear spacing between individual reinforcing bars. Coordinate with maximum

aggregate sizes specified hereafter for classes of concrete.

E. Admixtures shall conform to ASTM C260 (air entrainment) or C494 (water reduction)

and shall be products of one of the following manufacturers, or equal.

1. Dewey and Almy Chemical Div., W. R. Grace and Co.

2. Euclid Chemical Co.

3. Master Builders Co.

4. Sika Chemical Corp.

2.05 Miscellaneous Materials

A. Vapor barrier shall be polyethylene film 0.006 inches thick and shall conform to Product

Standard PS-17.

B. Liquid membrane curing compound shall conform to ASTM C309, Type 1 or Type 2.

Type 2 compound shall be used for P.C.C. pavement only. All permanently exposed

exterior slabs shall receive clear acrylic curing and sealing compound. Moisture loss

shall not be more than 0.055 gr./sq. cm when applied to 200 sq. ft./gal.

Page 67: TECHNICAL SPECIFICATIONS - D.N. Higgins

03300-4

C. Liquid membrane curing compound shall be products of one of the following

manufacturers, or equal:

1. W.R. Meadows "Curettard"

2. Sonneborn_Contech "Sonsil"

3. Burke Co. "Res-Xnu"

4. Lambert Corp. "Gardseal"

D. Chemical hardener shall be colorless aqueous solution containing a blend of magnesium

fluosilicate and zinc fluosilicate combined with a wetting agent, conforming to Federal

Specifications TT-C-800A and Corps of Engineers Specification CE 204.

E. Chemical hardener shall be products of one of the following manufacturers, or equal:

1. Euclid Chemical Co. "Surfhard"

2. Sonneborn-Contech "Lapidolith"

3. Master Builders "Saniseal"

4. Lambert Corp. "Solidus"

2.06 Concrete Mixtures

A. Concrete not indicated otherwise shall be Class A concrete.

B. The proportions of cement, aggregate, and water shall be selected by the Contractor in

accordance with ACI 318 to provide a plastic and workable mix. Coarse aggregate shall

be limited to prevent harshness and honeycombing. Coarse aggregate size shall not be

greater than the maximum listed for the various classes of concrete and as previously

specified under aggregate.

C. Class A structural concrete shall have a 28-day strength of 4000 psi, shall contain not

less than 540 pounds (5-3/4 bags) of cement per cubic yard of concrete, shall have a

water-cement ratio of not more than 0.47 (5-1/4 gallons per bag of cement), and shall

contain 4 percent to 6 percent entrained air, by volume, except interior slabs subject to

abrasion shall not contain more than 3 percent entrained air. In addition, Class A

concrete shall contain a water-reducing, densifying admixture and have a maximum

slump of 4 inches. The maximum aggregate size for slabs shall be 1 inch.

D. Class B lean concrete shall have a 28-day strength of 2500 psi, it shall contain not less

than 420 pounds (4-1/2 bags) of cement per cubic yard of concrete, shall have a water-

cement ratio of not more than 0.71 (8 gallons per bag of cement), and shall have a 5

inch maximum slump. The maximum aggregate size shall be 2 inches.

E. Water-reducing densifying admixture added to Class A concrete shall reduce the water-

cement ratio while maintaining slump and compressive strength. Use as manufacturer

recommends.

Page 68: TECHNICAL SPECIFICATIONS - D.N. Higgins

03300-5

F. Other admixtures may be proposed by the Contractor or requested by the Engineer and

shall be provided at no additional cost to the Owner. Subject to approval, admixtures

may be used for the following:

1. To increase slump up to 50 percent while maintaining compressive strength and

water-cement ratio.

2. To retard set during hot weather

G. Calcium chloride, admixtures containing calcium chloride, or admixtures not approved,

in writing by the Engineer, are prohibited.

2.06 Flowable Fill

Flowable fill shall meet the requirements of Sections 121-1 through 121-6, “Flowable Fill” of

FDOT Standard Specifications for Road and Bridge Construction, 2004.

PART 3 EXECUTION

3.01 General

A. Comply with ACI 305 or 306 for hot or cold weather concreting.

B. Do not mix salt, chemicals, or other foreign materials with the concrete to prevent

freezing without approval of the Engineer. Maintain the temperature of concrete above

50 degrees F for 5 days after placement. When high early strength Portland cement

concrete is used, the temperature shall not be less than 70 degrees F for 2 days or 50

degrees F for 3 days.

C. In no case shall the temperature of concrete exceed 90 degrees F at the time of

placement.

3.02 Preparation

A. Remove existing concrete and provide openings for installation of new work as indicated

on Drawings. Repair all damage to existing work caused by concrete removal.

B. Coordinate with other trades and properly place and locate in position all necessary

dowels, bolts, anchors, anchor slots, inserts, sleeves, openings, hangers, metal ties and

other fastening devices required for attachment and support of adjacent work. Securely

anchor all embedded items.

C. The subgrade and/or bedding shall be compacted and free of frost. If placement is

allowed at temperatures below freezing, provide temporary heat and protection as

required to remove all frost. Saturate the subgrade approximately 8 hours before

placement and sprinkle ahead of the placement of concrete in areas where vapor

barrier is not used. Remove all standing water, ice, mud, and foreign matter before

concrete is deposited.

Page 69: TECHNICAL SPECIFICATIONS - D.N. Higgins

03300-6

D. On porous subgrade or beddings, or where indicated on the Drawings, provide vapor

barrier. Lay vapor barrier sheets with 6 inch edge laps and tape or seal with mastic.

Stretch and weight edges and laps to maintain their positions until concrete is placed.

Coordinate with placement of reinforcement.

3.03 Formwork Requirements

A. Formwork shall comply with ACI 347 and to shape, lines and dimensions as indicated on

the Drawings. Forms shall be properly braced or tied to maintain position and shape

under all dead and live loads and to prevent leakage. Forms shall be assembled so their

removal will not damage the concrete. Tolerances for formed surfaces shall be in

compliance with ACI 301.

B. Lumber formwork may be used for surfaces which will not be exposed to view. Use

plywood or metal forms for exposed surfaces.

C. The inside surface of lumber forms shall be soaked with clean water prior to placing

concrete. All other forms shall be treated with an approved form oil or lacquer. If oil is

used, all excess oil shall be wiped off.

3.04 Reinforcement

A. The placement of reinforcing steel shall conform to "Placing Reinforcing Bars", as

published by the Concrete Reinforcing Steel Institute except as noted.

B. Provide continuous reinforcement or dowels through construction joints. One half of

reinforcement shall be discontinued across control joints unless otherwise indicated. All

reinforcement shall be discontinued across expansion joints.

C. Splice laps shall be as indicated on the Drawings.

D. Fabric reinforcement for slabs shall be overlapped at splices not less than the spacing of

the cross wires plus 2 inches. Fabric shall extend to within 4 inches of concrete edges.

E. Unless otherwise shown, place reinforcement 2 to 3 inches below the top of the finished

slab. Mesh shall either be sandwiched between two layers of fresh concrete or

supported on mesh supports. Supports that may puncture the vapor barrier, if any,

shall not be used.

3.05 Joints

A. Provide construction joints with shear transfer keyways as indicated.

B. Tops of edge forms and screeds shall be set to the finished elevations and to provide

uniform pitch to drains as indicated on Drawings.

C. For drives, pavements, parking areas, walks and slabs on grade, provide preformed non-

extruding asphalt strip or bituminous fiber joint filler set 1/8 inch below finished surface

Page 70: TECHNICAL SPECIFICATIONS - D.N. Higgins

03300-7

unless otherwise indicated. Tool concrete edges on each side of joint. No sealant is

required.

3.06 Batching

A. Materials for concrete shall be proportioned and batched according to the approved

design mix.

B. Water shall be measured to within 1 pint of the total amount required per batch.

Admixtures shall be measured by weight or volume to an accuracy of 3 percent.

3.07 Mixing and Transporting Concrete

A. Concrete shall be ready-mixed or job-mixed at the Contractor's option. Ready-mixed

concrete shall be mixed and delivered to the project in accordance with ASTM C94. Job-

mixed concrete shall be in accordance with the requirements of ACI 318.

B. Concrete shall be in its final position within one hour after the water and aggregate have

been added to the cement, except in cool weather (50 degrees F or less).

C. Concrete shall be transported from the mixer to place of final deposit in such manner to

prevent separation or loss of ingredients.

3.08 General Concrete Placement Schedule

A. All structural concrete shall be Class A Concrete.

B. Sidewalks shall be Class B Concrete.

3.09 Depositing Concrete

A. Concrete shall be placed in accordance with the requirements of ACI 318 and within 10

feet of its final position. Place concrete only during normal working hours unless the

Engineer is notified at least 24 hours in advance. Concrete shall not be placed until the

Engineer has approved the formwork, reinforcement, and embedded items and debris

has been removed.

B. Whenever new concrete is to be placed against existing surfaces, roughen and clean the

surface to improve bond.

C. Provide runways and chutes to discharge concrete close to final position to minimize

spreading and segregation.

D. Place slabs-on-grade using formed construction joints. Maximum size of pour shall be

40 feet each way for slabs with wire mesh reinforcement and 75 feet each way for slabs

with bar reinforcement. Allow 24 hours between pours of adjacent slabs. Provide joints

as specified or shown. Set continuous joint strips between slabs and abutting vertical

surfaces as indicated on the Drawings.

Page 71: TECHNICAL SPECIFICATIONS - D.N. Higgins

03300-8

3.10 Finishing Slabs and Flatwork

A. Unless otherwise indicated, provide the following slab finishes:

Description Concrete Finish

Class B concrete surfaces Float

Submerged slabs 1 Troweling

Exposed slabs 3 Trowelings

Ramps and walks Float and broom finish

B. Concrete shall be within ¼ inch of a 10 foot straightedge in all directions except where

slabs are dished for drains. Deviations from the elevation indicated shall not exceed ¼

inch.

C. Slabs sloped for drainage shall not have depressions that retain water.

D. Immediately after placement, screed concrete with straightedges or power strikeoffs.

Do not use roller screeds or vibrating screeds.

E. Stakes for wet screeds shall be driven down flush with subgrade or pulled out as work

progresses to avoid disturbing screeded concrete.

F. For drains in level slabs, form a 5 foot diameter depression approximately ½ inch below

the adjacent slab surface.

G. Unless otherwise indicated on the Drawings, slabs sloped for drainage shall be uniformly

pitched toward the drains at 1/8 inch per foot. Form a dished depression at drains

unless otherwise indicated.

H. Immediately after screeding, darby surface with wood or magnesium darby to eliminate

ridges and to fill in voids left by screeding.

3.11 Float Finish

A. Float concrete using magnesium or aluminum hand floats or power floats after the

concrete has stiffened to a point where only a ¼ inch indentation can be imparted by

normal foot pressure.

B. Float finish shall result in a uniform, smooth, granular texture. After floating, check slab

tolerances with 10-foot straightedge. Fill low spots with fresh concrete; do not sprinkle

with dry cement.

3.12 Trowel Finish

A. Where scheduled, or indicated, trowel with steel trowels after floating.

Page 72: TECHNICAL SPECIFICATIONS - D.N. Higgins

03300-9

B. Initial troweling shall be done either by power or by hand with the trowel blade kept as

flat as possible against concrete surface to prevent washboard or chatter effect.

C. Second troweling may be done by power if three trowelings are scheduled. If two

trowelings are specified, second troweling shall be done by hand.

D. Third troweling shall be done by hand and shall continue until the concrete is

consolidated to a uniform, smooth, dense surface free of trowel marks and

irregularities.

E. Allow sufficient time between successive trowelings to allow the concrete to become

harder. Each successive troweling shall be done with trowels that are progressively

smaller and are tipped more to increase compaction of the concrete surface.

3.13 Brooming

Broom at right angles to direction of traffic to give a non-skid finish. Use a fine, soft-bristled

broom for pedestrian ramps and walks, and a coarse, hard-bristled broom for vehicular

pavement.

3.14 Control Joints

A. Control joints for non-structural slabs shall consist of partial depth plastic strips set flush

with finished surface or 1/8 inch wide joints cut with a diamond saw. Control joints shall

be one- quarter to one-third the depth of the slab unless otherwise indicated.

B. Saw joints as soon as concrete has hardened sufficiently so aggregate will not be

dislodged but before shrinkage stresses develop cracks. Sawn joints shall be filled with

approved joint sealant.

C. Unless otherwise indicated on the Drawings, spacing of control joints shall not exceed

25 feet in each direction.

3.15 Protection and Curing

A. Comply with ACI 305 and 306 for protecting and curing concrete in hot and cold

weather. Fresh concrete shall be protected from rain, premature drying and excessively

hot or cold temperatures, and shall be maintained with minimal moisture loss for the

period of time necessary for the hydration of the cement and proper hardening of the

concrete. Cure all concrete for a minimum period of 7 days (3 days for high early

strength concrete) after placing.

B. Immediately after finishing, begin curing by covering with constantly saturated moisture

retaining fabrics, impervious sheeting, or membrane curing compounds. Surfaces shall

be thoroughly wetted with a fine spray before they are covered with sheeting.

Page 73: TECHNICAL SPECIFICATIONS - D.N. Higgins

03300-10

C. Sheeting shall provide complete surface coverage with all joints lapped at least 4 inches

and shall be placed and secured in a manner that will not mar or damage the concrete

surface.

D. Apply membrane-curing compound in accordance with manufacturer's

recommendations. Apply by spraying in a two coat continuous operation. Apply the

coats at right angles to each other with a coverage of 200 square feet per gallon per

coat. Begin application not later than 4 hours after finishing of the surface. The

application shall result in an uninterrupted adherent film free of defects.

E. On surfaces scheduled to receive sealants, paint, seamless flooring, or other adhesive

bonded finishes, either the membrane curing compound shall be compatible with the

bonding agent or the curing compound shall be removed with sandblasting, acid etching

or grinding, to the satisfaction of the installer of the finish surfacing. Bonded surfaces

that fail to adhere to the concrete shall be removed and replaced at no additional cost

to the Owner.

F. Apply hardener to floors of mechanical and electrical rooms and in other areas as

required. Application shall be in strict accordance with the manufacturer's

recommendations and as follows:

1. Hardener shall be applied at original container consistency without dilution to

dry, clean surfaces no sooner than 30 days following completion of curing.

NOTE: Hardener shall not be applied over surfaces covered with membrane

curing agent.

2. Application shall generally be a three-coat process adjusted to accommodate

extreme concrete densities only if prior review has been obtained from the

Engineer. Application coverage shall be made at the approximate rate of one

gallon to 100 square feet.

3. Apply first and second coats generously to surface, mop or squeegee standing

water to leave a uniformly wet surface, allow to dry. Apply third coat in a

manner similar to first two, except that surplus must be scrubbed with stiff

bristled broom and flushed from floor surface with clear water. Scrubbing and

flushing shall remove all traces of effervescence. Remove excess water and

allow to dry.

3.16 Defective Concrete

A. All concrete not formed as indicated on the Drawings within tolerances specified in ACI

347 shall be removed and replaced.

B. Temperature and shrinkage cracks which develop prior to final acceptance of the work

shall be repaired.

3.17 Miscellaneous Concrete Work

Page 74: TECHNICAL SPECIFICATIONS - D.N. Higgins

03300-11

Provide concrete equipment pads and supports as indicated and conforming to approved shop

drawings. Fastening devices and accessories shall be located by templates or setting diagrams

furnished by the manufacturer.

3.18 Clean-Up

A. All concrete floor construction shall have the surfaces thoroughly scrubbed and cleaned

with clear water. After cleaning, the floors shall be protected until they are accepted.

B. Clean all surfaces affected by the Concrete Work. No extraneous concrete or

discoloration shall be left on any construction.

3.19 Concrete Testing

A. Compressive Strength Tests: Conform to ASTM C31 and ASTM C39. One set of four

cylinders for each 50 cubic yards or fraction thereof, of each strength concrete placed in

any one day. Test one specimens at seven days; test two specimens at 28 days. One

specimen shall be retained for 56 days and tested only at the direction of the Engineer.

B. Slump Tests: Conform to ASTM C143. Perform one test for each load point of discharge

and one for each set of compressive strength test specimens.

END OF SECTION

Page 75: TECHNICAL SPECIFICATIONS - D.N. Higgins

09900

SECTION 09900

PROTECTIVE COATINGS

Part I. GENERAL

1 .01 WORK INCLUDED

A This Section covers the work required to provide all labor, materials, equipment and

incidentals to perform all of the necessary surface preparation and painting required to

complete this contract in its entirety.

B It is the intent of this specification to paint all concrete exposed miscellaneous ferrous

metals, pipes, fittings, valves, equipment and all other work obviously required to be

painted unless otherwise specified. Minor items omitted in the schedule of Work shall

be included in the Work of this Section where they come within the general intent of

the Specifications as stated herein.

C The following surfaces or items are not required to be painted:

(i) Aluminum: gratings, checkered plates, hatches, handrails, toeboards, stairways and

walkways (except as required for electrolytic protection).

(ii) Stainless Steel, brass and bronze.

(iii) Piping buried in the ground or embedded in concrete.

(iv) Ducts, pipes and other miscellaneous items covered with insulation or plastic coated.

(v) Concealed surfaces of pipe and crawl spaces.

(vi) Finish hardware.

(vii) Nonferrous architectural metals, unless specifically noted otherwise.

(viii) Packing glands and other adjustable parts and nameplates of mechanical equipment.

(ix) Concrete slabs and equipment pads.

(x) All manufactured painted electrical equipment (switchgear, transformers, motor

control centers, control panels, etc.).

1 .02 ABBREVIATIONS

A The abbreviations and definitions listed below, when used in this Section shall have the

following meanings:

(i) ANSI American National Standards Institute

(ii) ASTM American Society of Testing Materials

(iii) AWWA American Water Works Association

(iv) DFT Dry Film Thickness

(v) FRP Fiberglass Reinforced Plastic

(vi) HCL Hydrochloric Acid

(vii) MDFT Minimum Dry Film Thickness

(viii) MDFTPC Minimum Dry Film Thickness Per Coat

(ix) mil Thousandths of an Inch

(x) MIL-P Military Specification – Paint

(xi) NACE National Association of Corrosion Engineers

Page 76: TECHNICAL SPECIFICATIONS - D.N. Higgins

09900

(xii) NSF National Sanitary Foundation

(xiii) OSHA Occupational Safety and Health Act

(xiv) SFPG Square Feet Per Gallon

(xv) SFPGPC Square Feet Per Gallon Per Coat

(xvi) SP Surface PreparationSSPC Steel Structures Painting Council

1 .03 SUBMITTALS

A Submittals shall be made in accordance with the requirements specified in Section

01300 -Submittals.

B The following shall be submitted for each proposed coating system: manufacturer’s

specifications, surface preparation details, application procedures, technical data sheets

and dry film thickness or coverage.

C Schedule of Painting Operations: The CONTRACTOR shall include a complete Schedule of

Painting Operations with the overall project schedule.

1 .04 QUALITY ASSURANCE

A The paint manufacturer shall provide a representative to visit the jobsite at intervals

during surface preparation and painting as may be required for product application

quality assurance and to determine compliance with Manufacturers instructions and

these Specifications, and as may be necessary to resolve field problems attributable to,

or associated with, the manufacturer’s products furnished under this Contract.

1 .05 INSPECTION

A The CONTRACTOR shall give the ENGINEER a minimum of three (3) days advance notice

of the completion of any surface preparation work or start of coating application work.

B Before application of the base (prime) coat and each succeeding coat, all surfaces to be

painted shall be inspected by ENGINEER. Any and all defects or deficiencies shall be

corrected by the CONTRACTOR before application of any subsequent coating.

C Coating applications shall be checked for required MDFT as per these specifications. All

coated surfaces failing to meet the MDFT requirements shall be rejected.

D For all coatings subject to immersion, consult the coatings manufacturer’s written

instructions for time required after system application before immersion.

E Inspection by the ENGINEER or the waiver of inspection of any particular portion of the

Work shall not be construed to relieve the CONTRACTOR of his responsibility to perform

the Work in accordance with these Specifications.

F All equipment required for discontinuity (Holiday) testing of steel substrates and

continuity verification of concrete substrates shall be furnished and operated by the

painting contractor.

1 .06 PAINT DELIVERY AND STORAGE

A All materials shall be new and shall be delivered to the project site in unopened

containers that plainly show, at the time of use, the designated name, date of

manufacture, color, and name of manufacturer. Paints shall be stored in a suitable

protected area that is heated or cooled as required to maintain temperatures within the

range recommended by the paint manufacturer.

1 .07 PROJECT SITE CONDITIONS

A The location of this project requires observance and conformance with EPA Volatile

Organic Compound (VOC) restrictions. EPA limits the content of VOC’s in painting

Page 77: TECHNICAL SPECIFICATIONS - D.N. Higgins

09900

materials to 3.5 lbs./gallon. Information regarding the VOC content of proposed paints

will be required during submittals.

1 .08 WARRANTY

A CONTRACTOR shall warrant to the OWNER and guarantee the work under this Section

against defective workmanship and materials for a period of two (2) years commencing

on the final contract date of Final Completion of the Work.

B Warranties shall be submitted in accordance with Section 01740-Warranties and Bonds.

Part I. PRODUCTS

1 .09 GENERAL

A All products used in immersion service or in contact with potable water shall be certified

by NSF for use in contact with potable water.

B Products containing lead will not be allowed. Oil shall be pure boiled linseed oil.

1 .10 PAINT MATERIALS

A Products shall be manufactured by Tnemec Company, Inc., Xypex Chemical Corporation,

or equal.

B The following paint products are by Tnemec Company, Inc. or Xypex Chemical

Corporation, and are used for the basis of establishing the desired quality expected for

the project.

1 .11 PRODUCT TYPE

A Alkyd Primer

B Polyamine Epoxy (Primer)

C Polyamide Epoxy (Non-Potable)

D Aliphatic Acrylic Polyurethane

E Acrylic Emulsion (Flat)

F Acrylic Emulsion (Semi-Gloss)

G Polyamide Epoxy Coal Tar

H Polyamine Novolac Epoxy

I Waterborne Cementitious Acrylic

J Water Base Acrylic Epoxy

1 .12 TNEMEC COMPANY. INC. PRODUCT NAME

A Series 36 Undercoater

B Series 201 Epoxoprime

C Series 66 Hi-Build Epoxoline

D Series 73 Endura-Shield

E Series 6 Tneme-Cryl

F Series 7 Tneme-Cryl

G 46-413 Tneme-Tar

H Series 282 Tneme-Glaze

I Series 130-6602 Envirofill

J Series 113 Tneme-Tufcoat

1 .13 PRODUCT TYPE XYPEX CHEMICAL CORP. PRODUCT NAME

A Crystalline Waterproofing Concentrate

B Crystalline Waterproofing Modified

C Curing Agent Gammacure

Page 78: TECHNICAL SPECIFICATIONS - D.N. Higgins

09900

1 .14 EXTRA PAINT

A Furnish one (1) unopened container of each type and each color of paint used, properly

marked for future use by OWNER. Minimum size of one (1) gallon.

Part II. PART 3 – EXECUTION

1 .06 PROTECTION OF SURFACES NOT TO BE PAINTED

A Mask or otherwise protect hardware, lighting fixtures, switch plates, aluminum surfaces,

machined surfaces, couplings, shafts, bearings, nameplates and all other surfaces not

intended to be painted which cannot be removed.

B Provide drop cloths to prevent paint materials from falling on or marring adjacent

surfaces.

C Protect working parts of mechanical and electrical equipment from damage during

surface preparation and painting processes. Openings in motors shall be masked to

prevent paint and other materials from entering motors.

1 .07 ENVIRONMENTAL CONDITIONS

A Paint shall not be applied in temperatures exceeding the manufacturer’s recommended

maximum and minimum allowable, nor under adverse conditions such as dust, smoke-

laden atmosphere, damp or humid weather.

1 .08 SAFETY

A Painting shall be performed in strict accordance with the safety recommendations of the

paint manufacturer; with the safety recommendations of the National Association of

Corrosion Engineers contained in the publication, Manual for Painter Safety; Federal,

State, and local agencies having jurisdiction.

B Ultimate responsibility for safety is the CONTRACTOR’s.

1 .09 PREPARATION OF FERROUS METAL SURFACES

A All surfaces to be coated shall be prepared as specified herein and shall be dry and clean

before coating. Specific surface preparation shall be specified for the individual coating

systems.

B Standards for Ferrous Metal Surfaces Preparation

(i) SSPC-SP- 1 Chemical and/or Solvent Cleaning

1) Remove all grease, oil, salt, acid, alkali, dirt, dust, wax, fat, foreign matter and

contaminates, etc. by one of the following methods: steam cleaning, alkaline cleaning,

or volatile solvent cleaning.

(ii) SSPC-SP-2 Hand Tool Cleaning

1) Removal of loose rust, loose mill scale and loose paint to a clean sound substrate by hand

chipping, scraping, sanding and wire brushing.

(iii) SSPC-SP-3 Power Tool Cleaning

1) Removal of loose rust, loose mill scale and loose paint to a clean sound substrate by power

tool chipping, descaling, sanding, wire brushing and grinding.

(iv) SSPC-SP-4 Flame Cleaning

1) Dehydrating and removal of rust, loose mill scale and some light mill scale by use of flame,

followed by wire brushing.

(v) SSPC-SP-5 (NACE-1) White Metal Blast Cleaning

Page 79: TECHNICAL SPECIFICATIONS - D.N. Higgins

09900

1) Complete removal of all mill scale, rust scale, previous coating, etc., leaving the surface a

uniform gray-white color.

(vi) SSPC-SP-6 (NACE-3) Commercial Grade Blast Cleaning

1) Complete removal of all dirt, rust scale, mill scale, foreign matter and previous coating,

etc., leaving only shadows and/or streaks caused by rust stain and mill scale oxides. At

least 66% of each square inch of surface area is to be free of all visible residues, except

slight discoloration.

(vii) SSPC-SP-7 (NACE-4) Brush-Off Blast Cleaning

1) Removal of rust scale, loose mill scale, loose rust and loose coatings, leaving tightly-

bonded mill scale, rust and previous coatings. On concrete surfaces, brush-off blast

cleaning shall remove all laitance, form oils and solid contaminates. Blasting should be

performed sufficiently close to the surface so as to open up surface voids, bugholes, air

pockets and other subsurface irregularities, but so as not to expose underlying

aggregate.

(viii) SSPC-SP-8 Pickling

1) Complete removal of rust and mill scale by acid pickling, duplex pickling or electrolytic

pickling (may reduce the resistance of the surface to corrosion, if not to be primed

immediately).

(ix) SSPC-SP-10 (NACE-2) Near-White Metal Blast Cleaning

1) Removal of all rust scale, mill scale, previous coating, etc., leaving only light stains from

rust, mill scale and small specks of previous coating. At least 95% of each square inch of

surface area is to be free of all visible residues, and the remainder shall be limited to

slight discoloration.

(x) SSPC-SP-1 1-87 Power Tool Cleaning to Bare Metal

1) Complete removal of rust, rust scale, mill scale, foreign matter and previous coatings, etc.

to a standard as specified on a Commercial Grade Blast Cleaning (SSPC-SP-6, NACE-3) by

means of power tools that will provide the proper degree of cleaning and surface

profile.

C Ferrous metal shall be blasted unless otherwise specified. Blasting shall be done with a

centrifugal wheel or compressed air blasting equipment, using proper abrasives to attain

an average profile depth of 1.5 mils. Do not reuse sand or flint abrasives. Shot abrasives

must be thoroughly clean of contamination before reuse. Blow dust and grit from surface

with clean, dry air. Coat within 8 hours or before rust contamination occurs.

D Shop-Finished Surfaces: All shop-coated surfaces shall be protected from damage and

corrosion before and after installation by treating damaged areas immediately upon

detection. Abraded or corroded spots on shop-coated surfaces shall be prepared in

accordance with SSPC-SP2 (Hand Tool Cleaning) and then touched up with the same

materials as the shop coat. All shop coated surfaces which are faded, discolored, or which

require more than minor touch-up in the opinion of the ENGINEER shall be repainted. Cut

edges of galvanized sheets and exposed threads and cut ends of galvanized piping,

electrical conduit, and metal pipe sleeves, not to be finished painted, shall be cleaned in

accordance with SSPC-SP1 (Solvent Cleaned) and primed with zinc dust-zinc oxide metal

primer.

E Pre-Blast Cleaning ReQuirements

Page 80: TECHNICAL SPECIFICATIONS - D.N. Higgins

09900

(i) All oil, grease, welding fluxes, and other surface contaminants shall be removed prior to

blast cleaning. Preblast cleaning methods shall use steam, open flame, hot water, or cold

water with appropriate detergent additives followed with clean water rinsing.

(ii) Small isolated areas shall be cleaned as above or solvent cleaned with suitable solvents

and clean cloths.

(iii) All sharp edges shall be rounded or chamfered and all burrs, jagged edges, and surface

defects shall be ground smooth.

(iv) Welds and adjacent areas shall be prepared such that there is: (1) no undercutting or

reverse ridges on the weld bead, (2) no weld spatter on or adjacent to the weld or any

other area to be painted and (3) no sharp peaks or ridges along the weld bead. All

embedded pieces of electrode or wire shall be ground flush with the adjacent surface of

the weld bead.

1 .10 PREPARATION OF CONCRETE AND MASONRY SURFACES

A All surfaces to be coated shall be prepared as specified herein and shall be dry and clean

before coating. Specific surface preparation shall be specified for the individual coating

systems.

B Standards for concrete/masonry surface preparation shall be as defined and specified by

guideline No. 03732 (latest revision) as published by the International Concrete Repair

Institute.

C Concrete and masonry surfaces shall be prepared in accordance with the International

Concrete Repair Institute Guideline No. 03732 to provide the specified Concrete Surface

Profile CSP 2 -CSP 9, and the recommendations of the repair, coating and lining

manufacturer. According to ICRI, surface preparation methods that may result in a CSP 1 -

CSP 9, include acid etching, detergent scrubbing, low-pressure water blasting, abrasive

(sand) blasting, and high and ultra high pressure water jetting.

D Concrete and masonry surface preparation method shall be as selected by CONTRACTOR

to meet the specified concrete surface profile requirement and the other specified surface

preparation requirements.

E The Concrete Surface Profile (CSP) requirements shall be as follows:

(i) ICRI CSP 1 - Acid Etched.review.

F Shop finish coats may be the standard finish as ordinarily applied by the manufacturer if it

can be demonstrated to the ENGINEER that the paint system is equal to and compatible

with the paint system specified. However, all pumps, motors, valves, pipe and other

equipment shall receive at least one field applied finish coat after installation.

1 .11 COATING SYSTEM INDEX

A The following is a general index to the Coating System descriptions contained herein:

SYSTEM NUMBER TITLE

2E Below Grade Waterproofing 4 Exposed Metal - Highly Corrosive 7 Interior Metal - Highly Corrosive 23 Chemical Resistant Wall (Concrete masonry) 24 Exposed FRP, PVC 25 Interior FRP, PVC 27 Aluminum and Dissimilar Metal Insulation 100 Exterior Wood Trim ill Stucco-Cementitious Coating (Flat)

Page 81: TECHNICAL SPECIFICATIONS - D.N. Higgins

09900

I5ONS Concrete Floor - Chemical Resistant Non-Skid

1 .12 COATING SYSTEMS

A System No. 2E - Below Grade Waterproofing

(i) Surface Preparation: All curing oils, form oils, Iaitence, soluble salts and loose

concrete must be removed. Concrete must be dry and thoroughly clean before

coating.

First Coat: Crystalline Waterproofing (Concentrate) at 1.5 lbs/sy.

Second Coat: Crystalline Waterproofing (modified) at 1.5 lbs/sy.

Curing Agent: Curing agent at 800 SFPGPC.

Color: Gray.

B System No. 4 - Exposed Metal - Highly Corrosive.

Surface Preparation: Abrasive blast clean metal to an SSPC-SP1O (near-white metal

blast).

Prime Coat: Polyamide Epoxy (Non-Potable) 7.0 Mils DFT.

Sealant: Apply sealant as specified in Section 07900 - Sealants, at location where two

pieces of steel overlap, between flanges, etc.

Top Coat: Polyurethane 3.0 Mils DFT.

MDFT: 10.0 Mils for the two (2) coat system.

Color: Color as scheduled on Drawings.

C System No. 7 - Interior Metal - Highly Corrosive.

Surface Preparation: Abrasive blast clean metal to an SSPC-SP1O (near-white metal blast).

Prime Coat: Polyamide Epoxy (Non-Potable) 7.0 Mils DFT.

Top Coat: Polyamide Epoxy (Non-Potable) 3.0 Mils DFT.

MDFT: 10.0 Mils for the two (2) coat system.

Color: Color as scheduled on Drawings.

Page 82: TECHNICAL SPECIFICATIONS - D.N. Higgins

09900

D System No. 23 - Chemical Resistant Wall (Concrete Masonry)

Surface Preparation: Surface shall be clean, dry, free of dust, oil, curing compounds and

other foreign materials. Other requirements for existing surfaces as specified herein.

Prime Coat One (1) coat Epoxy waterborne cementitious acrylic at 80

SFPGPC.

Top Coat Two (2) coats Water Base Acrylic Epoxy (Semi-Gloss) at 4.0 - 6.0 rnils DFT

per coat.

Color: As scheduled on Drawings.

E System No. 24 - Exposed FRP, PVC.

Surface Preparation: Solvent cleaning, SSPC-SP1, to remove soluble contaminants.

Remove all insuluble contaminants or foreign materials by hand, SSPC-SP2, or Power Tool

Cleaning, SSPC-5P3.

Prime Coat: Polyamine Epoxy (non-potable) at 6.0 - 8.0 Mils DFT.

Top Coat: High Build Acrylic Polyurethane at 2.0 - 4.0 Mils DFT.

MDFT: 9.0 Mils for two (2) coat system.

Color: As scheduled on Drawings.

F System No. 25 - Interior FRP, PVC.

Surface Preparation: As specified herein and/or manufacturer’s recommendations.

Prime Coat: Polyamide Epoxy (Non-Potable) 3.0 Mils DFT.

Top Coat: Polyamide Epoxy (Non-Potable) 3.0 Mils DFT.

MDFT: 6.0 Mils for the two (2) coat system.

Color: As scheduled on Drawings.

G System No. 27 - Aluminum and Dissimilar Metal Insulation

Surface Preparation: Roughened surface.

Top Coat: Polyamide Epoxy Coal Tar at 10.0 mils DFT.

Page 83: TECHNICAL SPECIFICATIONS - D.N. Higgins

09900

MDFT: 10.0 mils for one (1) coat system.

Color: Black.

H System No. 100 - Exterior Wood Trim

Surface Preparation: Surface must be clean, dry and free of oil, grease and other

contaminants. Remove all loose existing coatings and sand rough areas. Seal all knots and

pitch pockets.

Prime Coat: One (1) coat alkyd primer 2.0 to 3.0 mils DFT.

Caulking: Prepare and fill all cracks, nail holes, seams and joints with sealants as

speciñed in Section 07900 - Sealants.

Top Coat: Two (2) coats acrylic emulsion (semi-gloss) at 3 mils DFT per coat.

MDFT: 8.0 mils DFT for three (3) coat system.

Color: As scheduled on Drawings.

I System No. 111 - Stucco - Cementitious Coating (Flat)

Surface Preparation: Allow cementitious finish a minimum of 28 days drying/curing time.

Surface shall be clean, dry, free of dust, oil, curing compounds and other foreign materials.

Prime Coat: Acrylic Emulsion (Flat) at 318 SFPGPC

Top Coat: Acrylic Emulsion (Flat) at 318 SFPGPC

Color: As scheduled on Drawings.

J System No. 15ONS - Concrete Floor (Chemical Resistant) Non-Skid

Surface Preparation: Allow new concrete to cure 28 days. Prepare concrete surface by

abrasive blast cleaning or acid etching to achieve a finish the roughness of 50 grit

sandpaper. Surface to be clean, dry and roughened prior to application of coating.

Prime Coat: Polyamine Epoxy (Primer) at 6.0-8.0 Mils DFT.

Intermediate Coat: Polyamine Novolac epoxy at 6.0-8.0 mils DFT. Broadcast 50 mesh

dry washed silica sand into the prime coat while still wet.

Top Coat: Polyamine Novolac epoxy at 6.0-8.0 mils DFT.

MDFT: 12.0 - 16.0 mils for two (2) coat system.

Color: Color as scheduled on Drawings.

1 .13 UNIDENTIFIED SURFACES

A Any surfaces not specifically named in the Schedule and not specifically excluded or

exempted shall be prepared, primed and painted in the manner and with materials

consistent with these Specifications. The ENGINEER shall select which of the

Page 84: TECHNICAL SPECIFICATIONS - D.N. Higgins

09900

manufacturer’s products, whether the type is indicated herein or not, shall be used for

such unidentified surfaces. This painting shall be done within the Scope of the Contract.

1 .14 WORKMANSHIP

A On metal surfaces apply each coat of paint at the rate specified by the manufacturer to

achieve the minimum dry mil thickness required. If material has thickened or must be

diluted for application by spray gun, the coating shall be built up to the same film thickness

achieved with undiluted material. One gallon of paint as originally furnished by the

manufacturer shall not cover a greater area when applied by spray gun than when applied

unthinned by the application of an additional coat(s). On masonry, application rates will

vary according to surface texture, however, in no case shall the manufacturer’s stated

coverage rate be exceeded. On porous surfaces, it shall be the painter’s responsibility to

achieve a protective and decorative finish either by decreasing the coverage rate or by

applying additional coats of paint.

B All safety equipment shall be painted in accordance with OSHA Standards as approved.

C Materials shall be mixed in proper containers of adequate capacity. All materials shall be

thoroughly stirred before use and shall be kept stirred while using. No unauthorized

thinners or other materials shall be added to any paint.

D Only skilled painters shall be used on the Work and specialists shall be employed where

required.

E Steel members, metal castings, mechanical and electrical equipment and other metals

which are shop primed before delivery at the site will not require a prime coat on the job.

All piping and other bare metals to be painted shall receive one coat of primer before

exposure to the weather, and this prime coat shall be the first coat as specified in the

painting schedule.

F Finish surfaces shall not show brush marks or other irregularities. Undercoats shall be

thoroughly and uniformly sanded with No. 00 sandpaper or equal to remove defects and

provide a smooth even surface. Top and bottom edges of doors shall be painted and all

exterior trim shall be back-primed before installation.

G Painting shall be continuous and shall be accomplished in an orderly manner so as to

facilitate inspection. All exterior concrete and masonry painting shall be performed in one

continuous manner structure by structure. Materials subject t’o weathering shall be prime

coated as quickly as possible. Surfaces of exposed members that will by inaccessible after

erection shall be cleaned and painted before erection.

H Before final acceptance of the Work, all damaged surfaces of paint shall be cleaned and

repainted as directed by the ENGINEER.

1 .15 APPLICATION SCHEDULE

A System No. 2E - Below Grade Waterproofing. This system shall be used on the exterior of

all below grade concrete walls.

B System No. 4 - Exposed Metal - Highly Corrosive. This system shall be used on all metal

surfaces exposed to weather including equipment, equipment frames, metal conduits,

pipe, valves and piping supports.

C System No. 7 - Interior Metal - Highly Corrosive. This system shall be used on the interior

metal surfaces including pumps, piping, valves, equipment, and other miscellaneous metal

surfaces.

Page 85: TECHNICAL SPECIFICATIONS - D.N. Higgins

09900

D System No. 23 - Chemical Resistant Wall (Concrete Masonry). This system shall be used on

interior walls as scheduled on the drawings.

E System No. 24 - Exposed FRP, PVC. This system shall be used for all PVC exposed to the

elements. DO NOT PAINT FLEXIBLE CONDUITS.

F System No. 25 - Interior FRP, PVC. This system shall be used on interior FRP, PVC piping for

color coding.

G System No. 27 - Aluminum and dissimilar metal insulation. This system shall be used on all

aluminum in contact with concrete. Insulate all contacting dissimilar metals with this

system. Neoprene pads may be substituted to insulate aluminum from concrete or

aluminum from steel.

H System No. 100 - Exterior Wood Trim. This system shall be used for the exterior wood trim

of the repump station building.

I System No. 111 - Stucco - Cementitious Coating (Flat). This system shall be used on

exterior concrete and concrete masonry walls as scheduled on the Drawings.

J System No. 15ONS - Concrete Floor (Chemical Resistant) Non-Skid. This system shall be

used for coating the interior concrete floor and equipment pad of the vacuum pump

station.

1 .16 COLOR CODING FOR PIPES AND EQUIPMENT

A All proposed piping, valves and equipment shall be color coded. When color coding is

specified, it shall consist of color code painting and lettering identification of all exposed

conduits, trough items and pipelines for the transport of gases, air, liquid and semi-liquids

including all accessories such as valves, insulated pipe coverings, fittings, junction boxes,

bus bars, connectors and all operating accessories which are integral to be whole function

mechanical pipe and electrical conduit system.

B All hangers and pipe support floor stands shall be painted. The system shall be painted up

to but not including the flanges attached to the mechanical equipment nor the flexible

conduit connected to electrical equipment. Colors shall be as noted in the Paint Color

Schedule.

C All systems which are an integral part of the equipment that is originating from the

equipment and returning to the same piece of equipment, shall be painted between and

up to but not including the fixed flanges or connections on the equipment.

D Color coding requirements are as indicated in the Ten State Standards

E CONTRACTOR shall submit proposed schedule for color coding pipes and equipment for

approval by ENGINEER/OWNER.

1 .17 CLEANUP

A It shall be the responsibility of the Contractor to collect and dispose of properly, all waste

materials from the site in accordance with all requirements of the Federal, State and local

Environment Protection Agencies.

B At completion of the Work, remove all paint where spilled, splashed, splattered, sprayed or

smeared on all surfaces, including glass, light fixtures, hardware, equipment, painted and

unpainted surfaces.

C After completion of all painting, the Contractor shall remove from the job site all painting

equipment, surplus materials and debris resulting from this Work.

END OF SECTION 09900

Page 86: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-1

Revision 4

September 1999

SUPPLEMENTARY CONDITIONS (CONSTRUCTION) EXHIBIT WWFS-04Li

Florida Department of Environmental Protection

Bureau of Water Facilities Funding

Supplementary Conditions

for

Formally Advertised

Construction Procurement

Page 87: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-2

Revision 4

September 1999

TABLE OF CONTENTS FOR THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

SUPPLEMENTARY CONDITIONS

Article

Number Article Title Page

1 DEFINITIONS FDEP-4

2 PRIVITY OF AGREEMENT/CONTRACT FDEP-6

3 PROCUREMENT REQUIREMENTS FDEP-6

4 RESOLUTION OF PROTESTS AND CLAIMS/DISPUTES FDEP-7

5 CHANGES TO THE BIDDING AND CONTRACT DOCUMENTS FDEP-7

6 ADVERTISEMENT FOR BIDS; SUBMISSION OF BIDS;

OPENING OF BIDS FDEP-7

7 BONDS AND INSURANCE FDEP-8

8 AWARD OF AGREEMENT/CONTRACT FDEP-9

9 CONTRACT TIME AND NOTICE TO PROCEED FDEP-9

10 ITEMIZED CONSTRUCTION COST BREAKDOWN;

CONSTRUCTION AND PAYMENT SCHEDULES FDEP-9

11 AVAILABILITY OF LANDS FDEP-10

12 FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

CONSTRUCTION PERMIT(S) FDEP-10

13 ENGINEER FDEP-10

14 APPLICATIONS FOR PAYMENT FDEP-10

15 ACCESS TO RECORDS FDEP-10

16 ACCESS TO WORK SITE(S) FDEP-10

*17 MINORITY AND WOMEN'S BUSINESS ENTERPRISES FDEP-11

*18 VIOLATING FACILITIES (SECTION 306 OF THE CLEAN AIR

ACT, SECTION 508 OF THE CLEAN WATER ACT, AND

EXECUTIVE ORDER 11738) FDEP-11

*19 DEBARMENT AND SUSPENSION (EXECUTIVE ORDER 12549) FDEP-13

Page 88: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-3

Revision 4

September 1999

20 EQUAL EMPLOYMENT OPPORTUNITY (EXECUTIVE

ORDER 11246) FDEP-13

Appendix Appendix Title Page

Letter

*A CERTIFICATION REGARDING DEBARMENT, SUSPENSION,

INELIGIBILITY AND VOLUNTARY EXCLUSION - LOWER

TIER COVERED TRANSACTIONS FDEP-16

B NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION

TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY

(EXECUTIVE ORDER 11246) FDEP-18

C GOALS AND TIMETABLES FOR MINORITIES AND FEMALES FDEP-20

D EQUAL OPPORTUNITY CLAUSE FDEP-23

E NOTICE TO BE POSTED FDEP-25

F STANDARD FEDERAL EQUAL EMPLOYMENT

OPPORTUNITY CONSTRUCTION CONTRACT

SPECIFICATIONS (EXECUTIVE ORDER 11246) FDEP-26

G CERTIFICATION OF COMPLIANCE WITH 41 CFR 60-1.7:

REPORTS AND OTHER REQUIRED INFORMATION FDEP-31

H CERTIFICATION OF NONSEGGREGATED FACILITIES FDEP-33

*NOTE: Articles 17, 18, 19 and Appendix A apply only to projects of $10,000,000 or greater.

Page 89: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-4

Revision 4

September 1999

FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

SUPPLEMENTARY CONDITIONS

The intent of the Florida Department of Environmental Protection (FDEP) Supplementary Conditions is

to complement and supplement other provisions of the Bidding Documents. However, if there is any

conflict between the FDEP Supplementary Conditions and other provisions of the Bidding Documents,

the FDEP Supplementary Conditions shall take precedence over the other provisions except when the

other provisions are similar to, but more stringent than, the FDEP Supplementary Conditions. When

other provisions of the Bidding Documents are similar to, but more stringent than, the FDEP

Supplementary Conditions, the more stringent provisions shall apply.

ARTICLE 1 - DEFINITIONS

1.1. Wherever used in these Supplementary Conditions (except in the appendices to these

Supplementary Conditions), the following terms have the meanings indicated, which are applicable to

both the singular and plural thereof.

1.1.1. Addendum - A written or graphic instrument that is issued prior to the opening of bids and

that clarifies, corrects, or changes the Bidding Documents.

1.1.2. Agreement or Contract - The written agreement between the Owner and the Contractor

covering the Work to be performed and furnished; these Supplementary Conditions and other

Contract Documents are attached to the Agreement/Contract and made a part thereof as provided

therein.

1.1.3. Application for Payment - The form that is accepted by the Engineer and used by the

Contractor in requesting progress and/or final payments and that is to include such supporting

documentation as is required by the Contract Documents.

1.1.4. Bid - The offer or proposal of a bidder submitted on the prescribed form and setting forth the

price(s) for the Work to be performed and furnished.

1.1.5. Bidder - Any person, firm, or corporation that submits a bid directly to the Owner.

1.1.6. Bidding Documents - The Advertisement for Bids or the Invitation to Bid, the Instructions to

Bidders or the Information for Bidders, the Bid Form, the proposed Contract Documents, and all

addenda.

1.1.7. Bond - An instrument of security.

1.1.8. Change Order - A document that is recommended by the Engineer and signed by the

Contractor and the Owner; that authorizes an addition, deletion, or revision in the Work or an

adjustment in the Contract Price or the Contract Time; and that is issued on or after the Effective Date

of the Agreement/Contract.

Page 90: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-5

Revision 4

September 1999

1.1.9. Contract Documents - The Agreement/Contract; the Contractor's Bid when attached as an

exhibit to the Agreement/Contract; the Performance and Payment Bond(s); the General Conditions;

the Supplementary Conditions (including these Supplementary Conditions); the Specifications

(written technical descriptions of material, equipment, construction systems, standards, and

workmanship as applied to the Work and certain administrative details applicable thereto); the

Drawings (drawings that show the character and scope of the Work to be performed and furnished);

all addenda that pertain to the Contract Documents; and all change orders.

1.1.10. Contract Price - The moneys payable by the Owner to the Contractor under the Contract

Documents as stated in the Agreement/Contract.

1.1.11. Contract Time - The number of days or the date stated in the Contract Documents for

completion of the Work.

1.1.12. Contractor - The person, firm, or corporation with whom or which the Owner enters into the

Agreement/Contract.

1.1.13. Effective Date of the Agreement/Contract - The date indicated in the Agreement/Contract on

which the Agreement/Contract becomes effective, or if no such date is indicated in the

Agreement/Contract, the date on which the Agreement/Contract is signed and delivered by the last of

the two parties to sign and deliver the Agreement/Contract.

1.1.14. Engineer - The person, firm, or corporation named as such in the Contract Documents.

1.1.15. Minority Business Enterprise (MBE) - A historically Black college or university or a

business that is (a) certified as socially and economically disadvantaged by the Small Business

Administration, (b) certified as an MBE by a state or Federal agency, or (c) an independent business

concern which is at least 51-percent owned and controlled by minority group members. (A minority

group member is an individual who is a citizen of the United States and one of the following: [i]

Black American; [ii] Hispanic American [with origins from Puerto Rico, Mexico, Cuba, or South or

Central America]; [iii] Native American [American Indian, Eskimo, Aleut, or native Hawaiian]; or

[iv] Asian-Pacific American [with origins from Japan, China, the Philippines, Vietnam, Korea,

Samoa, Guam, the U.S. Trust Territories of the Pacific, Northern Marianas, Laos, Cambodia, Taiwan,

or the Indian Subcontinent].)

1.1.16. Notice to Proceed - The written notice given by the Owner to the Contractor fixing the date

on which the Contract Time will commence to run and on which the Contractor shall start to perform

its obligations under the Contract Documents.

1.1.17. Owner - The local government (municipality, county, district, or authority; or any agency

thereof; or a combination of two or more of the foregoing acting jointly) with which the Florida

Department of Environmental Protection may execute, or has executed, a State revolving fund loan

agreement and for which the Work is to be provided.

Page 91: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-6

Revision 4

September 1999

1.1.18. Project - The total construction or facilities described in a State revolving fund loan

agreement between the Florida Department of Environmental Protection and the Owner, of which the

Work to be provided under the Contract Documents may be the whole or a part.

1.1.19. Subcontract - A direct contract between a subcontractor and the Contractor, or any other

subcontractor at any tier, for the furnishing of goods (material and equipment) or the performance of

services (including construction) necessary to complete the Work.

1.1.20. Subcontractor - A person, firm, or corporation having a direct contract with the Contractor,

or any other subcontractor at any tier, for the furnishing of goods (material and equipment) or the

performance of services (including construction) necessary to complete the Work.

1.1.21. Successful Bidder - The lowest responsive, responsible bidder to whom or which the Owner

intends to award the Agreement/Contract.

1.1.22. Women's Business Enterprise (WBE) - A business that is (a) certified as a WBE by a state or

Federal agency or (b) an independent business concern which is at least 51-percent owned and

controlled/operated by women. (Determination of whether a business is at least 51-percent owned by

women shall be made without regard to community property laws [e.g., an otherwise qualified WBE

that is 51-percent owned by a married woman in a community property state will not be disqualified

because the married woman's husband has a 50-percent interest in the married woman's share of the

business; similarly, a business that is 51-percent owned by a married man and 49-percent owned by

women will not become a qualified WBE by virtue of the married man's wife having a 50-percent

interest in the married man's share of the business].)

1.1.23. Work - The entire completed construction or the various separately identifiable parts thereof

required to be performed and furnished under the Contract Documents; Work is the result of

performing services, furnishing labor, furnishing material and equipment, and incorporating material

and equipment into the construction as required by the Contract Documents.

ARTICLE 2 - PRIVITY OF AGREEMENT/CONTRACT

2.1. The Owner expects to finance this Agreement/Contract with assistance from the Florida

Department of Environmental Protection, which administers a State revolving fund loan program

supported in part with funds directly made available by grants from the United States Environmental

Protection Agency. Neither the State of Florida nor the United States (nor any of their departments,

agencies, or employees) will be a party to this Agreement/Contract or any lower-tier subcontract.

ARTICLE 3 - PROCUREMENT REQUIREMENTS

3.1. This Agreement/Contract and the Owner's solicitation and award of this Agreement/Contract are

subject to requirements contained in Chapter 62-503 (Revolving Loan Program), Florida Administrative

Code.

Page 92: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-7

Revision 4

September 1999

ARTICLE 4 - RESOLUTION OF PROTESTS AND CLAIMS/DISPUTES

Resolution of Protests Concerning the Owner's Solicitation and/or Award of this

Agreement/Contract:

4.1. Protests concerning the Owner's solicitation and/or award of this Agreement/Contract must be filed

in writing with the Owner to be considered.

4.2. All timely written protests concerning the Owner's solicitation and/or award of this

Agreement/Contract are to be resolved in accordance with the Owner's dispute resolution process. A

copy of the ordinance(s), resolution(s), or written policy(policies) that set forth the Owner's dispute

resolution process is included elsewhere in the Bidding Documents or is to be made available by the

Owner upon request.

4.3. Neither the Florida Department of Environmental Protection (FDEP) nor the United States

Environmental Protection Agency (USEPA) will become a party to, or have any role in resolving,

protests concerning the Owner's solicitation and/or award of this Agreement/Contract. Protest decisions

made by the Owner can not be appealed to the FDEP or the USEPA.

Resolution of Claims and Disputes Between the Owner and the Contractor:

4.4. Unless otherwise provided in the Contract Documents, all claims and disputes between the Owner

and the Contractor arising out of, or relating to, the Contract Documents or the breach thereof are to be

decided by arbitration (if the Owner and the Contractor mutually agree) or in a court of competent

jurisdiction within the State of Florida.

4.5. Neither the Florida Department of Environmental Protection nor the United States Environmental

Protection Agency will become a party to, or have any role in resolving, claims and disputes between the

Owner and the Contractor.

ARTICLE 5 - CHANGES TO THE BIDDING AND CONTRACT DOCUMENTS

5.1. All changes to the Bidding Documents made subsequent to the Florida Department of

Environmental Protection's (FDEP's) acceptance of the Bidding Documents and prior to the opening of

bids are to be documented via addendum(addenda) to the Bidding Documents; all changes to the Contract

Documents made after the opening of bids are to be documented by change order(s) to the Contract

Documents. The Owner shall submit all addenda and change orders to the FDEP.

ARTICLE 6 - ADVERTISEMENT FOR BIDS; SUBMISSION OF BIDS; OPENING OF BIDS

Advertisement for Bids:

6.1. At a minimum, this Agreement/Contract is to be advertised for bids in local and statewide

newspapers.

Page 93: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-8

Revision 4

September 1999

Submission of Bids:

6.2. Bidders shall submit their bids at the place and by the deadline indicated elsewhere in the Bidding

Documents.

Opening of Bids:

6.3. Bids are to be opened and read aloud publicly at the time and place indicated elsewhere in the

Bidding Documents.

ARTICLE 7 - BONDS AND INSURANCE

Bid Guarantees:

7.1. Each bidder's bid is to be accompanied by a bid guarantee made payable to the Owner in an amount

at least equal to five percent of the bidder's maximum bid price and in the form of a certified check or bid

bond.

Performance and Payment Bond(s):

7.2. The Contractor shall furnish a combined performance and payment bond in an amount at least

equal to 100 percent of the Contract Price (or, if required elsewhere in the Contract Documents, the

Contractor shall furnish separate performance and payment bonds, each in an amount at least equal to

100 percent of the Contract Price) as security for the faithful performance and payment of all the

Contractor's obligations under the Contract Documents. This(these) bond(s) are to be delivered to the

Owner by the Contractor along with the executed Agreement/Contract. The Owner shall forward a copy

of this(these) bond(s) to the Florida Department of Environmental Protection.

Insurance:

7.3. The Owner and/or the Contractor (as required elsewhere in the Contract Documents) shall purchase

and maintain, during the period of construction, such liability insurance as is appropriate for the Work

being performed and furnished and as will provide protection from claims that may arise out of, or result

from, the Contractor's performance and furnishing of the Work (whether the Work is to be performed or

furnished by the Contractor or any subcontractor at the Work site) and the Contractor's other obligations

under the Contract Documents. This insurance is to include workers' compensation insurance,

comprehensive general liability insurance, comprehensive automobile liability insurance, and contractual

liability insurance applicable to the Contractor's indemnification obligations and is to be written for not

less than the limits of liability and coverages determined by the Owner or required by law, whichever is

greater.

7.4. The Owner and/or the Contractor (as required elsewhere in the Contract Documents) shall purchase

and maintain, during the period of construction, property insurance upon the Work at the Work site in an

amount equal to the full replacement cost of the Work or the full insurable value of the Work. This

insurance is to include the interests of the Owner, the Contractor, and all subcontractors at the Work site

(all of whom are to be listed as insureds or additional insured parties); is to insure against the perils of fire

and extended coverage; and is to include "all-risk" insurance for physical loss or damage due to

Page 94: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-9

Revision 4

September 1999

theft,vandalism and malicious mischief, collapse, water damage, and/or all other risks against which

coverage is obtainable.

7.5. Before any Work at the Work site is started, the Contractor shall deliver to the Owner certificates

of insurance that the Contractor is required to purchase and maintain in accordance with Paragraphs 7.3

and 7.4 of this Article and other provisions of the Contract Documents, and the Owner shall deliver to the

Contractor certificates of insurance that the Owner is required to purchase and maintain in accordance

with Paragraphs 7.3 and 7.4 of this Article and other provisions of the Contract Documents.

ARTICLE 8 - AWARD OF AGREEMENT/CONTRACT

8.1. If this Agreement/Contract is awarded, it is to be awarded to the lowest responsive, responsible

bidder. A fixed-price (lump-sum or unit-price or both) agreement/contract is to be used. A clear

explanation of the method of evaluating bids and the basis for awarding this Agreement/Contract are

included elsewhere in the Bidding Documents. All bids may be rejected when in the best interest of the

Owner.

ARTICLE 9 - CONTRACT TIME AND NOTICE TO PROCEED

Contract Time:

9.1. The number of days within which, or the date by which, the Work is to be completed and ready for

final payment (the Contract Time) is set forth elsewhere in the Contract Documents.

Notice to Proceed:

9.2. The Owner shall give the Contractor a notice to proceed fixing the date on which the Contract

Time will commence to run. The Owner shall forward a copy of this notice to proceed to the Florida

Department of Environmental Protection.

ARTICLE 10 - ITEMIZED CONSTRUCTION COST BREAKDOWN; CONSTRUCTION AND

PAYMENT SCHEDULES

10.1. The Contractor shall submit to the Owner, within ten calendar days after the Effective Date of this

Agreement/Contract, an itemized construction cost breakdown and construction and payment schedules.

10.1.1. The itemized construction cost breakdown, or schedule of values, is to include quantities and

prices of items aggregating the Contract Price and is to subdivide the Work into component parts in

sufficient detail to serve as the basis for progress payments during construction. Such prices are to

include an appropriate amount of overhead and profit applicable to each item of Work.

10.1.2. The construction, or progress, schedule is to indicate the Contractor's estimated starting and

completion dates for the various stages of the Work and is to show both the projected cost of Work

completed and the projected percentage of Work completed versus Contract Time.

Page 95: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-10

Revision 4

September 1999

10.1.3. The payment schedule is to show the Contractor's projected progress and final payments

cumulatively by month.

ARTICLE 11 - AVAILABILITY OF LANDS

11.1. The Owner shall furnish all lands and shall obtain all rights-of-ways and easements upon which

the Work is to be performed and furnished.

ARTICLE 12 - FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

CONSTRUCTION PERMIT(S)

12.1. The Owner shall obtain the appropriate Florida Department of Environmental Protection

construction permit(s) required for the Work.

ARTICLE 13 - ENGINEER

13.1. The Owner shall employ a professional engineer registered in the State of Florida to oversee

the Work.

ARTICLE 14 - APPLICATIONS FOR PAYMENT

14.1. The Contractor's applications for payment are to be accompanied by such certificates or

documents as may be reasonably required. The Owner shall forward a copy of such certificates or

documents as may be reasonably required to the Florida Department of Environmental Protection.

ARTICLE 15 - ACCESS TO RECORDS

15.1. Authorized representatives of the Owner, the Florida Department of Environmental Protection,

and the United States Environmental Protection Agency shall have access to, for the purpose of

inspection, any books, documents, papers, and records of the Contractor that are pertinent to this

Agreement/Contract. The Contractor shall retain all books, documents, papers, and records pertinent

to this Agreement/Contract for a period of three years after receiving and accepting final payment

under this Agreement/Contract.

ARTICLE 16 - ACCESS TO WORK SITE(S)

16.1. Authorized representatives of the Owner, the Florida Department of Environmental Protection

(FDEP), and the United States Environmental Protection Agency (USEPA) shall have access to the

Work site(s) at any reasonable time. The Contractor shall cooperate (including making available

working copies of documents and supplementary materials) during Work site inspections conducted by

the Owner, the FDEP, or the USEPA.

Page 96: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-11

Revision 4

September 1999

NOTE: Articles 17, 18 and 19 apply only to projects of $10,000,000 or greater.

ARTICLE 17 - MINORITY AND WOMEN'S BUSINESS ENTERPRISES

17.1. A goal of NINE* percent of the Contract Price is established for Minority Business Enterprise

(MBE) participation in the Work, and a goal of THREE* percent of the Contract Price is established

for Women's Business Enterprise (WBE) participation in the Work. If bidders or prospective

contrators (including the Contractor) intend to let any lower-tier goods or services (including

construction) subcontracts for any portion of the Work, they shall physically include these percentage

goals for MBE and WBE participation in all solicitations for subcontracts and shall take affirmative

steps to assure that MBEs and WBEs are utilized, when possible, as sources of goods and services.

Affirmative steps are to include the following: (a) including small, minority, and women's businesses

on solicitation lists; (b) assuring that small, minority, and women's businesses are solicited whenever

they are potential sources; (c) dividing total requirements, when economically feasible, into small tasks

or quantities to permit maximum participation by small, minority, and women's businesses; (d)

establishing delivery schedules, when requirements permit, that will encourage participation by small,

minority, and women's businesses; and (e) using the services of the Small Business Administrative and

the Office of Minority Business Enterprise of the United States Department of Commerce as

appropriate.

*The percentage goals for MBE and WBE participation are to be inserted by the Owner and are

to be based upon the percentage goals that have been, or will be, stipulated in the State

revolving fund loan agreement for the Owner's FDEP-assisted Project.

17.2. Within ten calendar days after being notified of being the apparent Successful Bidder, the

apparent Successful Bidder shall submit to the Owner documentation of the affirmative steps it has

taken to utilize Minority and Women's Business Enterprises (MBEs and WBEs) in the Work and

documentation of its intended use of MBEs and WBEs in the Work. The Owner shall keep this

documentation on file and shall forward to the Florida Department of Environmental Protection a copy

of the apparent Successful Bidder's documentation concerning its intended use of MBEs and WBEs in

the Work.

17.3. Minority and Women's Business Enterprise (MBE and WBE) participation in the Work is to be

considered in the award of this Agreement/Contract. The Owner shall not execute this

Agreement/Contract until the Florida Department of Environmental Protection has approved the extent

of MBE and WBE participation in the Work.

ARTICLE 18 - VIOLATING FACILITIES (SECTION 306 OF THE CLEAN AIR ACT, SECTION

508 OF THE CLEAN WATER ACT, AND EXECUTIVE ORDER 11738)

18.1. The Contractor, and all subcontractors at any tier, shall comply with all applicable standards,

orders, or requirements issued under Section 306 of the Clean Air Act (42 U.S.C. 1857[h]), Section

508 of the Clean Water Act (33 U.S.C. 1368), Executive Order 11738 (Administration of the Clean Air

Act and the Federal Water Pollution Control Act with Respect to Federal Contracts, Grants, or Loans),

and 40 CFR Part 15, which prohibit the use, under nonexempt Federal contracts, grants, or loans, of

facilities included on the United States Environmental Protection Agency's List of Violating Facilities.

Page 97: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-12

Revision 4

September 1999

18.2. In accordance with 40 CFR Part 15, if the price of this Agreement/Contract exceeds $100,000

and/or if this Agreement/Contract is otherwise nonexempt from 40 CFR Part 15, the Contractor agrees

to the following:

18.2.1. the Contractor will not use any facility on the United States Environmental Protection

Agency's List of Violating Facilities in the performance of this Agreement/Contract for the duration of

time that the facility remains on the List;

18.2.2. the Contractor will notify the Florida Department of Environmental Protection/United

States Environmental Protection Agency (USEPA) if a facility it intends to use in the performance of

this Agreement/Contract is on the USEPA's List of Violating Facilities or if it knows that a facility it

intends to use in the performance of this Agreement/Contract has been recommended to be placed on

the USEPA's List of Violating Facilities; and

18.2.3. in the performance of this Agreement/Contract, the Contractor will comply with all

requirements of the Clean Air Act and the Clean Water Act, including the requirements of Section 114

of the Clean Air Act and Section 308 of the Clean Water Act, and all applicable clean air standards and

clean water standards.

18.3. If the Contractor, or any subcontractor at any tier, awards any lower-tier goods or services

(including construction) subcontracts for any portion of the Work, it shall physically include in all such

subcontracts the following provision:

18.3.1. The Subcontractor shall comply with all applicable standards, orders, or requirements

issued under Section 306 of the Clean Air Act (42 U.S.C. 1857[h]), Section 508 of the Clean

Water Act (33 U.S.C. 1368), Executive Order 11738 (Administration of the Clean Air Act and

the Federal Water Pollution Control Act with Respect to Federal Contracts, Grants, or Loans),

and 40 CFR Part 15, which prohibit the use, under nonexempt Federal contracts, grants, or

loans, of facilities included on the United States Environmental Protection Agency's (USEPA's)

List of Violating Facilities. In accordance with 40 CFR Part 15, if the price of this Subcontract

exceeds $100,000 and/or if this Subcontract is otherwise nonexempt from 40 CFR Part 15, the

Subcontractor agrees to the following: (a) the Subcontractor will not use any facility on the

USEPA's List of Violating Facilities in the performance of this Subcontract for the duration of

time that the facility remains on the List; (b) the Subcontractor will notify the Florida

Department of Environmental Protection/USEPA if a facility it intends to use in the

performance of this Subcontract is on the USEPA's List of Violating Facilities or if it knows

that a facility it intends to use in the performance of this Subcontract has been recommended to

be placed on the USEPA's List of Violating Facilities; and (c) in the performance of this

Subcontract, the Subcontractor will comply with all requirements of the Clean Air Act and the

Clean Water Act, including the requirements of Section 114 of the Clean Air Act and Section

308 of the Clean Water Act, and all applicable clean air standards and clean water standards.

In addition, if the Subcontractor awards any lower-tier goods or services (including

construction) subcontracts under this Subcontract, the Subcontractor shall physically include

this provision in all such subcontracts.

Page 98: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-13

Revision 4

September 1999

ARTICLE 19 - DEBARMENT AND SUSPENSION (EXECUTIVE ORDER 12549)

19.1. If the price of this Agreement/Contract equals or exceeds $25,000, the Owner shall not award

this Agreement/Contract, nor permit any lower-tier goods or services (including construction)

subcontract with a price equaling or exceeding $25,000 to be awarded, to any party that is debarred or

suspended or is otherwise excluded from, or ineligible for participation in, Federal assistance programs

under Executive Order 12549 (Debarment and Suspension).

19.2. The attention of all bidders or prospective contractors (including the Contractor) is directed to

the certification/clause entitled "Certification Regarding Debarment, Suspension, Ineligibility and

Voluntary Exclusion - Lower Tier Covered Transactions", which has been extracted from Appendix B

to 40 CFR Part 32 and included as Appendix A to these Supplementary Conditions. The

certification/clause entitled "Certification Regarding Debarment, Suspension, Ineligibility and

Voluntary Exclusion - Lower Tier Covered Transactions" is applicable to this Agreement/Contract if

the price of this Agreement/Contract equals or exceeds $25,000.

19.3. If bidders or prospective contractors (including the Contractor), or any prospective

subcontractors at any tier, intend to let any lower-tier goods or services (including construction)

subcontracts for any portion of the Work, they shall physically include the certification/clause entitled

"Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion - Lower Tier

Covered Transactions", which is included as Appendix A to these Supplementary Conditions, in all

lower-tier goods and services (including construction) subcontracts with a price equaling or exceeding

$25,000 and in all solicitations for such subcontracts.

ARTICLE 20 - EQUAL EMPLOYMENT OPPORTUNITY (EXECUTIVE ORDER 11246)

20.1. If the price of this Agreement/Contract exceeds $10,000, the Contractor, and each construction

subcontractor awarded a lower-tier construction subcontract with a price exceeding $10,000, shall

comply with Executive Order 11246 of September 24, 1965 (Equal Employment Opportunity), as

amended by Executive Order 11375 of October 13, 1967, and as supplemented in United States

Department of Labor regulations (41 CFR Part 60).

20.2. The attention of all bidders or prospective contractors (including the Contractor) is directed to

the following, all of which are applicable to this Agreement/Contract if the price of this

Agreement/Contract exceeds $10,000:

20.2.1. the "Notice of Requirement for Affirmative Action to Ensure Equal Employment

Opportunity (Executive Order 11246)", which has been extracted from 41 CFR 60-4.2(d) and

included as Appendix B to these Supplementary Conditions;

20.2.2. the "Goals and Timetables for Minorities and Females", which are included as

Appendix C to these Supplementary Conditions;

20.2.3. the "Equal Opportunity Clause", which has been extracted from 41 CFR 60-1.4(b) and

included as Appendix D to these Supplementary Conditions;

Page 99: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-14

Revision 4

September 1999

20.2.4. the "Notice to Be Posted", which has been extracted from 41 CFR 60-1.42(a) and

included as Appendix E to these Supplementary Conditions;

20.2.5. the "Standard Federal Equal Employment Opportunity Construction Contract

Specifications (Executive Order 11246)", which have been extracted from 41 CFR 60-4.3(a)

and included as Appendix F to these Supplementary Conditions;

20.2.6. the "Certification of Compliance with 41 CFR 60-1.7: Reports and Other Required

Information", which is required by 41 CFR 60-1.7(b) and is included as Appendix G to these

Supplementary Conditions; and

20.2.7. the "Certification of Nonsegregated Facilities", which is required by 41 CFR 60-1.8(b)

and is included as Appendix H to these Supplementary Conditions.

20.3. If bidders or prospective contractors (including the Contractor), or any prospective construction

subcontractors at any tier, intend to let any lower-tier construction subcontracts for any portion of the

Work, they shall physically include in all lower-tier construction subcontracts with a price exceeding

$10,000 and in all solicitations for such subcontracts the "Notice of Requirement for Affirmative

Action to Ensure Equal Employment Opportunity (Executive Order 11246)", the "Goals and

Timetables for Minorities and Females", the "Equal Opportunity Clause", the "Notice to Be Posted",

the "Standard Federal Equal Employment Opportunity Construction Contract Specifications

(Executive Order 11246)", the "Certification of Compliance with 41 CFR 60-1.7: Reports and Other

Required Information", and the Certification of Nonsegregated Facilities", which are included as

Appendices B through H to these Supplementary Conditions.

20.4. If the price of this Agreement/Contract exceeds $10,000, all bidders shall complete and submit

to the Owner, with their bids, the "Certification of Compliance with 41 CFR 60-1.7: Reports and Other

Required Information", which is included as Appendix G to these Supplementary Conditions. In

addition, if bidders (including the Contractor), or any prospective construction subcontractors at any

tier, intend to let any lower-tier construction subcontracts for any portion of the Work, they shall obtain

the "Certification of Compliance with 41 CFR 60-1.7: Reports and Other Required Information" from

each prospective construction subcontractor that may be awarded a lower-tier construction subcontract

with a price exceeding $10,000 and shall do so at the time bids or offers for each such subcontract are

received or at the outset of negotiations for each such subcontract.

20.5. If the price of this Agreement/Contract exceeds $10,000, the apparent Successful Bidder shall

complete and submit to the Owner, within ten calendar days after being notified of being the apparent

Successful Bidder, the "Certification of Nonsegregated Facilities", which is included as Appendix H to

these Supplementary Conditions. In addition, if the Contractor, or any construction subcontractor at

any tier, intends to let any lower-tier construction subcontracts for any portion of the Work, it shall

obtain the "Certification of Nonsegregated Facilities" from each prospective construction subcontractor

that will be awarded a lower-tier construction subcontract with a price exceeding $10,000 and shall do

so before awarding each such subcontract.

20.6. If the price of this Agreement/Contract exceeds $10,000, the Owner shall give written notice to

the Director of the Office of Federal Contract Compliance Programs within ten working days of award

of this Agreement/Contract. The notice is to include the name, address, and telephone number of the

Page 100: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-15

Revision 4

September 1999

Contractor; the employer identification number of the Contractor; the dollar amount of this

Agreement/Contract; the estimated starting and completion dates of this Agreement/Contract; the

number of this Agreement/Contract; and the geographical area in which the Work is to be performed.

If the price of this Agreement/Contract equals or exceeds $50,000 and if the Contractor has 50 or more

employees, the Contractor shall file with the Florida Department of Environmental Protection

(FDEP)/United States Environmental Protection Agency (USEPA), within 30 calendar days after the

award of this Agreement/Contract, a report on Standard Form 100 (EEO-1), which has been

promulgated jointly by the Office of Federal Contract Compliance Programs, the Equal Employment

Opportunity Commission, and Plans for Progress, unless the Contractor has submitted such a report

within 12 months preceeding the date of award of this Agreement/Contract. In addition, the Contractor

shall ensure that each construction subcontractor having 50 or more employees and a lower-tier

construction subcontract with a price equaling or exceeding $50,000 also files with the FDEP/USEPA,

within 30 calendar days after the award to it of the lower-tier construction subcontract, a report on

Standard Form 100 (EEO-1) unless the construction subcontractor has submitted such a report within

12 months preceding the date of award of the lower-tier construction subcontract. (Subsequent reports

are to be submitted annually in accordance with 41 CFR 60-1.7(a) or at such other intervals as the

Director of the Office of Federal Contract Compliance Programs may require.)

Page 101: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-16

Revision 4

September 1999

NOTE: THIS APPENDIX APPLIES ONLY TO PROJECTS OF $10,000,000 OR GREATER

APPENDIX A TO THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

SUPPLEMENTARY CONDITIONS

CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND

VOLUNTARY EXCLUSION - LOWER TIER COVERED TRANSACTIONS

[Note: This certification/clause has been extracted from Appendix B to

40 CFR Part 32 and is applicable to all FDEP-assisted goods and services (including construction)

contracts and subcontracts with a price equaling or exceeding $25,000; this certification/clause is to be

included in all FDEP-assisted goods and services (including construction) contracts and subcontracts with

a price equaling or exceeding $25,000 and in all solicitations for such contracts and subcontracts.]

Instructions for Certification

1. By signing and submitting this proposal, the prospective lower tier participant is providing the

certification set out below.

2. The certification in this clause is a material representation of fact upon which reliance was placed

when this transaction was entered into. If it is later determined that the prospective lower tier participant

knowingly rendered an erroneous certification, in addition to other remedies available to the Federal

Government, the department or agency with which this transaction originated may pursue available

remedies, including suspension and/or debarment.

3. The prospective lower tier participant shall provide immediate written notice to the person to which

this proposal is submitted if at any time the prospective lower tier participant learns that its certification

was erroneous when submitted or has become erroneous by reason of changed circumstances.

4. The terms "covered transaction", "debarred", "suspended", "ineligible", "lower tier covered

transaction", "participant", "person", "primary covered transaction", "principal", "proposal", and

"voluntarily excluded", as used in this clause, have the meanings set out in the Definitions and Coverage

sections of rules implementing Executive Order 12549. You may contact the person to which this

proposal is submitted for assistance in obtaining a copy of those regulations.

5. The prospective lower tier participant agrees by submitting this proposal that, should the proposed

covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction

with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation

in this covered transaction, unless authorized by the department or agency with which this transaction

originated.

6. The prospective lower tier participant further agrees by submitting this proposal that it will include

this clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion

- Lower Tier Covered Transactions", without modification, in all lower tier covered transactions and in

all solicitations for lower tier covered transactions.

Page 102: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-17

Revision 4

September 1999

7. A participant in a covered transaction may rely upon a certification of a prospective participant in a

lower tier covered transaction that it is not debarred, suspended, ineligible, or voluntarily excluded from

the covered transaction, unless it knows that the certification is erroneous. A participant may decide the

method and frequency by which it determines the eligibility of its principals. Each participant may, but is

not required to, check the Nonprocurement List.

8. Nothing contained in the foregoing shall be construed to require establishment of a system of records

in order to render in good faith the certification required by this clause. The knowledge and information

of a participant is not required to exceed that which is normally possessed by a prudent person in the

ordinary course of business dealings.

9. Except for transactions authorized under paragraph 5 of these instructions, if a participant in a

covered transaction knowingly enters into a lower tier covered transaction with a person who is

suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition

to other remedies available to the Federal Government, the department or agency with which this

transaction originated may pursue available remedies, including suspension and/or debarment.

Certification Regarding Debarment, Suspension, Ineligibility and Voluntary

Exclusion - Lower Tier Covered Transactions

(1) The prospective lower tier participant certifies, by submission of this proposal, that neither it nor its

principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily

excluded from participation in this transaction by any Federal department or agency.

(2) Where the prospective lower tier participant is unable to certify to any of the statements in this

certification, such prospective participant shall attach an explanation to this proposal.

(3) The prospective lower-tier participant also certifies that it and its principals:

(a) Have not within a three-year period preceding this proposal been convicted of or had a civil

judgment rendered against them for commission of fraud or a criminal offense in connection with

obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract

under a public transaction; violation of Federal or State anti-trust statutes or commission of

embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements,

or receiving stolen property;

(b) Are not presently indicted for or otherwise criminally or civilly charged by a governmental

entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph (3)(a)

of this certification; and

(c) Have not within a three-year period preceding this proposal had one or more public transactions

(Federal, State or local) terminated for cause or default. Where the prospective lower-tier participant

is unable to certify to any of the above, such prospective participant shall attach an explanation to this

proposal.

Page 103: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-18

Revision 4

September 1999

APPENDIX B TO THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

SUPPLEMENTARY CONDITIONS

NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY (EXECUTIVE ORDER 11246)

[Note: This notice has been extracted from 41 CFR 60-4.2(d) and is applicable to all FDEP-assisted

construction contracts and subcontracts with a price exceeding $10,000; this notice is to be included in all

FDEP-assisted construction contracts and subcontracts with a price exceeding $10,000 and in all

solicitations for such contracts and subcontracts.]

1. The Offeror's or Bidder's attention is called to the "Equal Opportunity Clause" and the "Standard

Federal Equal Employment Specifications" set forth herein.

2. The goals and timetables for minority and female participation, expressed in percentage terms for the

Contractor's aggregate workforce in each trade on on all construction work in the covered area, are as

follows: __________________________________________________________________________________

Timetables Goals for minority Goals for female

participation for each participation in each

trade trade

__________________________________________________________________________________

NINE PERCENT THREE PERCENT

__________________________________________________________________________________

These goals are applicable to all the Contractor's construction work (whether or not it is Federal or

federally assisted) performed in the covered area. If the contractor performs construction work in a

geographical area located outside of the covered area, it shall apply the goals established for such

geographical area where the work is actually performed. With regard to this second area, the contractor

also is subject to the goals for both its federally involved and nonfederally involved construction.

The Contractor's compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be

based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations

required by the specifications set forth in 41 CFR 60-4.3(a), and its efforts to meet the goals. The hours

of minority and female employment and training must be substantially uniform throughout the length of

the contract, and in each trade, and the contractor shall make a good faith effort to employ minorities

and women evenly on each of its projects. The transfer of minority or female employees or trainees

from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's

goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-4.

Compliance with the goals will be measured against the total work hours performed.

Page 104: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-19

Revision 4

September 1999

3. The Contractor shall provide written notification to the Director of the Office of Federal Contract

Compliance Programs within 10 working days of award of any construction subcontract in excess of

$10,000 at any tier for construction work under the contract resulting from this solicitation. The

notification shall list the name, address and telephone number of the subcontractor; employer

identification number of the subcontractor; estimated dollar amount of the subcontract; estimated

starting and completion dates of the subcontract; and the geographical area in which the subcontract is

to be performed.

4. As used in this Notice, and in the contract resulting from this solicitation, the "covered area" is

_______________________________________________________________________________

(insert description of the geographical areas where the contract is to be performed giving the state,

_______________________________________________________________________________

county and city, if any)

Page 105: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-20

Revision 4

September 1999

APPENDIX C TO THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

SUPPLEMENTARY CONDITIONS

GOALS AND TIMETABLES FOR MINORITIES AND FEMALES

[Note: These goals and timetables are the goals and timetables referred to in Paragraph 2 of the "Notice

of Requirement for Affirmative Action to Ensure Equal Employment Opportunity (Executive Order

11246)"; these goals and timetables are to be included in all FDEP-assisted construction contracts and

subcontracts with a price exceeding $10,000 and in all solicitations for such contracts and subcontracts.]

Appendix A

The following goals and timetables for female utilization shall be included in all Federal and federally

assisted construction contracts and subcontracts in excess of $10,000. The goals are applicable to the

contractor's aggregate on-site construction workforce whether or not part of that workforce is

performing work on a Federal or federally-assisted construction contract or subcontract.

Area covered: Goals for Women apply nationwide.

Goals and Timetables __________________________________________________________________________________

Timetable Goals (percent)

Indefinite 6.9

___________________________________________________________________________________

Appendix B-80

Until further notice, the following goals for minority utilization in each construction craft and trade shall

be included in all Federal or federally assisted construction contracts and subcontracts in excess of

$10,000 to be performed in the respective geographical areas. The goals are applicable to each

nonexempt contractor's total onsite construction workforce, regardless of whether or not part of that

workforce is performing work on a Federal, federally assisted or nonfederally related project, contract or

subcontract.

Construction contractors which are participating in an approved Hometown Plan (see 41 CFR 60-4.5)

are required to comply with the goals of the Hometown Plan with regard to construction work they

perform in the area covered by the Hometown Plan. With regard to all their other covered construction

work, such contractors are required to comply with the applicable SMSA or EA goal contained in this

Appendix B-80.

Page 106: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-21

Revision 4

September 1999

Economic Areas

________________________________________________________________________________

State Goal (percent)

________________________________________________________________________________

Florida 30.4

043 Miami - Fort Lauderdale, FL:

SMSA Counties:

2680 Fort Lauderdale - Hollywood, FL--------------------------------------------15.5

FL - Broward

5000 Miami, FL------------------------------------------------------------------------39.5

FL - Dade

8960 West Palm Beach - Boca Raton, FL-----------------------------------------22.4

FL - Palm Beach

Non-SMSA Counties---------------------------------------------------------------------30.4

FL - Glades, Hendry, Indian River, Martin,

Monroe, Okeechobee, St. Lucie

Page 107: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-22

Revision 4

September 1999

APPENDIX D TO THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

SUPPLEMENTARY CONDITIONS

EQUAL OPPORTUNITY CLAUSE

[Note: This clause has been extracted from 41 CFR 60-1.4(b) and is applicable to all FDEP-assisted

construction contracts and subcontracts with a price exceeding $10,000; this clause is to be included in

all FDEP-assisted construction contracts and subcontracts with a price exceeding $10,000 and in all

solicitations for such contracts and subcontracts.]

During the performance of this contract, the contractor agrees as follows:

(1) The contractor will not discriminate against any employee or applicant for employment because of

race, color, religion, sex, or national origin. The contractor will take affirmative action to ensure that

applicants are employed, and that employees are treated during employment without regard to their race,

color, religion, sex, or national origin. Such action shall include, but not be limited to the following:

Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or

termination; rates of pay or other forms of compensation; and selection for training, including

apprenticeship. The contractor agrees to post in conspicuous places, available to employees and

applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination

clause.

(2) The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the

contractor, state that all qualified applicants will receive considerations for employment without regard

to race, color, religion, sex, or national origin.

(3) The contractor will send to each labor union or representative of workers with which he has a

collective bargaining agreement or other contract or understanding, a notice to be provided advising the

said labor union or workers' representatives of the contractor's commitments under this section, and

shall post copies of the notice in conspicuous places available to employees and applicants for

employment.

(4) The contractor will comply with all provisions of Executive Order 11246 of September 24, 1965,

and of the rules, regulations, and relevant orders of the Secretary of Labor.

(5) The contractor will furnish all information and reports required by Executive Order 11246 of

September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto,

and will permit access to his books, records, and accounts by the administering agency and the Secretary

of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders.

(6) In the event of the contractor's noncompliance with the nondiscrimination clauses of this contract or

with any of the said rules, regulations, or orders, this contract may be canceled, terminated, or

suspended in whole or in part and the contractor may be declared ineligible for further Government

contracts or federally assisted construction contracts in accordance with procedures authorized in

Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies

invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of

the Secretary of Labor, or as otherwise provided by law.

Page 108: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-23

Revision 4

September 1999

(7) The contractor will include the portion of the sentence immediately preceding paragraph (1) and the

provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by

rules, regulations, or orders of the Secretary of Labor issued pursuant to section 204 of Executive Order

11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or

vendor. The contractor will take such action with respect to any subcontract or purchase order as the

administering agency may direct as a means of enforcing such provisions, including sanctions for

noncompliance: Provided, however, That in the event a contractor becomes involved in, or is threatened

with, litigation with a subcontractor or vendor as a result of such direction by the administering agency

the contractor may request the United States to enter into such litigation to protect the interests of the

United States.

Page 109: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-24

Revision 4

September 1999

APPENDIX E TO THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

SUPPLEMENTARY CONDITIONS

NOTICE TO BE POSTED

[Note: This notice has been extracted from 41 CFR 60-1.42(a) and is the notice referred to in Paragraphs (1) and

(3) of the "Equal Opportunity Clause"; this notice is to be included in all FDEP-assisted construction contracts

and subcontracts with a price exceeding $10,000 and in all solicitations for such contracts and subcontracts.]

EQUAL EMPLOYMENT OPPORTUNITY IS THE LAW - DISCRIMINATION IS PROHIBITED

BY THE CIVIL RIGHTS ACT OF 1964 AND BY EXECUTIVE ORDER NO. 11246

Title VI of the Civil Rights Act of 1964 - Administered by:

THE EQUAL EMPLOYMENT OPPORTUNITY COMMISSION

Prohibits discrimination because of Race, Color, Religion, Sex, or National Origin by Employers with 75 or more

employees, by Labor Organizations with a hiring hall of 75 or more members, by Employment Agencies, and by

Joint Labor-Management Committees for Apprenticeship or Training. After July 1, 1967, employers and labor

organizations with 50 or more employees or members will be covered; after July 1, 1968, those with 25 or more

will be covered.

ANY PERSON

Who believes he or she has been discriminated against

SHOULD CONTACT

THE EQUAL EMPLOYMENT OPPORTUNITY COMMISSION

2401 E Street NW, Washington, D.C. 20506

Executive Order No. 11246 - Administered by:

THE OFFICE OF FEDERAL CONTRACT COMPLIANCE PROGRAMS

Prohibits discrimination because of Race, Color, Religion, Sex, or National Origin, and requires affirmative

action to ensure equality of opportunity in all aspects of employment.

By all Federal Government Contractors and Subcontractors, and by Contractors Performing Work Under a

Federally Assisted Construction Contract, regardless of the number of employees in either case.

ANY PERSON

Who believes he or she has been discriminated against

SHOULD CONTACT

THE OFFICE OF FEDERAL CONTRACT COMPLIANCE PROGRAMS

U.S. Department of Labor, Washington, D.C. 20210

Page 110: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-25

Revision 4

September 1999

APPENDIX F TO THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

SUPPLEMENTARY CONDITIONS

STANDARD FEDERAL EQUAL EMPLOYMENT OPPORTUNITY CONSTRUCTION

CONTRACT SPECIFICATIONS (EXECUTIVE ORDER 11246)

[Note: These specifications have been extracted from 41 CFR 60-4.3(a) and are applicable to all

FDEP-assisted construction contracts and subcontracts

with a price exceeding $10,000; these specifications are to be included in all FDEP-assisted

construction contracts and subcontracts with a price exceeding $10,000 and in all solicitations for such

contracts and subcontracts.]

1. As used in these specifications:

a. "Covered area" means the geographical area described in the solicitation from which this

contract resulted;

b. "Director" means Director, Office of Federal Contract Compliance Programs, United States

Department of Labor, or any person to whom the Director delegates authority;

c. "Employer identification number" means the Federal Social Security number used on the

Employer's Quarterly Federal Tax Return, U.S. Treasury Department Form 941.

d. "Minority" includes:

(i) Black (all persons having origins in any of the Black African racial groups not of

Hispanic origin);

(ii) Hispanic (all persons of Mexican, Puerto Rican, Cuban, Central or South American or

other Spanish Culture or origin, regardless of race);

(iii) Asian and Pacific Islander (all persons having origins in any of the original peoples of

the Far East, Southeast Asia, the Indian Subcontinent, or the Pacific Islands); and

(iv) American Indian or Alaskan Native (all persons having origins in any of the original

peoples of North America and maintaining identifiable tribal affiliations through

membership and participation or community identification).

2. Whenever the Contractor, or any Subcontractor at any tier, subcontracts a portion of the work

involving any construction trade, it shall physically include in each subcontract in excess of $10,000

the provisions of these specifications and the Notice which contains the applicable goals for minority

and female participation and which is set forth in the solicitations from which this contract resulted.

3. If the Contractor is participating (pursuant to 41 CFR 60-4.5) in a Hometown Plan approved by

the U.S. Department of Labor in the covered area either individually or through an association, its

affirmative action obligations on all work in the Plan area (including goals and timetables) shall be in

accordance with that Plan for those trades which have unions participating in the Plan. Contractors

Page 111: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-26

Revision 4

September 1999

must be able to demonstrate their participation in and compliance with the provisions of any such

Hometown Plan. Each Contractor or Subcontractor participating in an approved Plan is individually

required to comply with its obligations under the EEO clause, and to make a good faith effort to

achieve each goal under the Plan in each trade in which it has employees. The overall good faith

performance by other Contractors or Subcontractors toward a goal in an approved Plan does not excuse

any covered Contractor's or Subcontractor's failure to take good faith efforts to achieve the Plan goals

and timetables.

4. The Contractor shall implement the specific affirmative action standards provided in paragraphs

7a through p of these specifications. The goals set forth in the solicitation from which this contract

resulted are expressed as percentages of the total hours of employment and training of minority and

female utilization the Contractor should reasonably be able to achieve in each construction trade in

which it has employees in the covered area. Covered construction Contractors performing construction

work in geographical areas where they do not have a Federal or federally assisted construction contract

shall apply the minority and female goals established for the geographical area where the work is being

performed. Goals are published periodically in the FEDERAL REGISTER in notice form, and such

notices may be obtained from any Office of Federal Contract Compliance Programs office or from

Federal procurement contracting officers. The Contractor is expected to make substantially uniform

progress in meeting its goals in each craft during the period specified.

5. Neither the provisions of any collective bargaining agreement, nor the failure by a union with

whom the Contractor has a collective bargaining agreement, to refer either minorities or women shall

excuse the Contractor's obligations under these specifications, Executive Order 11246, or the

regulations promulgated pursuant thereto.

6. In order for the nonworking training hours of apprentices and trainees to be counted in meeting

the goals, such apprentices and trainees must be employed by the Contractor during the training period,

and the Contractor must have made a commitment to employ the apprentices and trainees at the

completion of their training, subject to the availability of employment opportunities. Trainees must be

trained pursuant to training programs approved by the U.S. Department of Labor.

7. The Contractor shall take specific affirmative actions to ensure equal employment opportunity.

The evaluation of the Contractor's compliance with these specifications shall be based upon its effort to

achieve maximum results from its actions. The Contractor shall document these efforts fully, and shall

implement affirmative action steps at least as extensive as the following:

a. Ensure and maintain a working environment free of harassment, intimidation, and coercion

at all sites, and in all facilities at which the Contractor's employees are assigned to work. The

Contractor, where possible, will assign two or more women to each construction project. The

Contractor shall specifically ensure that all foremen, superintendents, and other on-site

supervisory personnel are aware of and carry out the Contractor's obligation to maintain such

a working environment, with specific attention to minority or female individuals working at such

sites or in such facilities.

Page 112: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-27

Revision 4

September 1999

b. Establish and maintain a current list of minority and female recruitment sources, provide

written notification to minority and female recruitment sources and to community organizations

when the Contractor or its unions have employment opportunities available, and maintain a

record of the organizations' responses.

c. Maintain a current file of the names, addresses and telephone numbers of each minority

and female off-the-street applicant and minority or female referral from a union, a recruitment

source or community organization and of what action was taken with respect to each such

individual. If such individual was sent to the union hiring hall for referral and was not referred

back to the Contractor by the union or, if referred, not employed by the Contractor, this shall be

documented in the file with the reason therefor, along with whatever additional actions the

Contractor may have taken.

d. Provide immediate written notification to the Director when the union or unions with which

the Contractor has a collective bargaining agreement has not referred to the Contractor a minority

person or woman sent by the Contractor, or when the Contractor has other information that the

union referral process has impeded the Contractor's efforts to meet its obligations.

e. Develop on-the-job training opportunities and/or participate in training programs for the

area which expressly include minorities and women, including upgrading programs and

apprenticeship and trainee programs relevant to the Contractor's employment needs, especially

those programs funded or approved by the Department of Labor. The Contractor shall

provide notice of these programs to the sources compiled under 7b above.

f. Disseminate the Contractor's EEO policy by providing notice of the policy to unions and

training programs and requesting their cooperation in assisting the Contractor in meeting its EEO

obligations; by including it in any policy manual and collective bargaining agreement; by

publicizing it in the company newspaper, annual report, etc.; by specific review of the policy with

all management personnel and with all minority and female employees at least once a year; and by

posting the company EEO policy on bulletin boards accessible to all employees at each location

where construction work is performed.

g. Review, at least annually, the company's EEO policy and affirmative action obligations under

these specifications with all employees having any responsibility for hiring, assignment, layoff,

termination or other employment decisions including specific review of these items with onsite

supervisory personnel such as Superintendents, General Foremen, etc., prior to the initiation of

construction work at any job site. A written record shall be made and maintained identifying the

time and place of these meetings, persons attending, subject matter discussed, and disposition of

the subject matter.

h. Disseminate the Contractor's EEO policy externally by including it in any advertising in the

news media, specifically including minority and female news media, and providing written

notification to and discussing the Contractor's EEO policy with other Contractors and

Subcontractors with whom the Contractor does or anticipates doing business.

Page 113: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-28

Revision 4

September 1999

i. Direct its recruitment efforts, both oral and written, to minority, female and community

organizations, to schools with minority and female students and to minority and female

recruitment and training organizations serving the Contractor's recruitment area and employment

needs. Not later than one month prior to the date for the acceptance of applications for

apprenticeship or other training by any recruitment source, the Contractor shall send written

notification to organizations such as the above, describing the openings, screening procedures, and

tests to be used in the selection process.

j. Encourage present minority and female employees to recruit other minority persons and

women and, where reasonable, provide after school, summer and vacation employment to

minority and female youth both on the site and in other areas of a Contractor's work force.

k. Validate all tests and other selection requirements where there is an obligation to do so under

41 CFR Part 60-3.

l. Conduct, at least annually, an inventory and evaluation at least of all minority and female

personnel for promotional opportunities and encourage these employees to seek or to prepare

for, through appropriate training, etc., such opportunities.

m. Ensure that seniority practices, job classifications, work assignments and other personnel

practices, do not have a discriminatory effect by continually monitoring all personnel and

employment related activities to ensure that the EEO policy and the Contractor's obligations under

these specifications are being carried out.

n. Ensure that all facilities and company activities are nonsegregated except that separate or

single-user toilet and necessary changing facilities shall be provided to assure privacy between

the sexes.

o. Document and maintain a record of all solicitations of offers for subcontracts from

minority and female construction contractors and suppliers, including circulation of solicitations

to minority and female contractor associations and other business associations.

p. Conduct a review, at least annually, of all supervisors' adherence to and performance under

the Contractor's EEO policies and affirmative action obligations.

8. Contractors are encouraged to participate in voluntary associations which assist in fulfilling one or

more of their affirmative action obligations (7a through p). The efforts of a contractor association,

joint contractor-union, contractor-community, or other similar group of which the contractor is a

member and participant, may be asserted as fulfilling any one or more of its obligations under 7a

through p of these Specifications provided that the contractor actively participates in the group, makes

every effort to assure that the group has a positive impact on the employment of minorities and women

in the industry, ensures that the concrete benefits of the program are reflected in the Contractor's

minority and female workforce participation, makes a good faith effort to meet its individual goals and

timetables, and can provide access to documentation which demonstrates the effectiveness of actions

taken on behalf of the Contractor. The obligation to comply, however, is the Contractor's and failure

of such a group to fulfill an obligation shall not be a defense for the Contractor's noncompliance.

Page 114: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-29

Revision 4

September 1999

9. A single goal for minorities and a separate single goal for women have been established. The

Contractor, however, is required to provide equal employment opportunity and to take affirmative

action for all minority groups, both male and female, and all women, both minority and non-minority.

Consequently, the Contractor may be in violation of the Executive Order if a particular group is

employed in a substantially disparate manner (for example, even though the Contractor has achieved

its goals for women generally, the Contractor may be in violation of the Executive Order if a specific

minority group of women is underutilized).

10. The Contractor shall not use the goals and timetables or affirmative action standards to

discriminate against any person because of race, color, religion, sex, or national origin.

11. The Contractor shall not enter into any Subcontract with any person or firm debarred from

Government contracts pursuant to Executive Order 11246.

12. The Contractor shall carry out such sanctions and penalties for violation of these specifications

and of the Equal Opportunity Clause, including suspension, termination and cancellation of existing

subcontracts as may be imposed or ordered pursuant to Executive Order 11246, as amended, and its

implementing regulations, by the Office of Federal Contract Compliance Programs. Any Contractor

who fails to carry out such sanctions and penalties shall be in violation of these specifications and

Executive Order 11246, as amended.

13. The Contractor, in fulfilling its obligation under these specifications, shall implement specific

affirmative action steps, at least as extensive as those standards prescribed in paragraph 7 of these

specifications, so as to achieve maximum results from its efforts to ensure equal employment

opportunity. If the Contractor fails to comply with the requirements of the Executive Order, the

implementing regulations, or these specifications, the Director shall proceed in accordance with 41

CFR 60-4.8.

14. The Contractor shall designate a responsible official to monitor all employment related activity to

ensure that the company EEO policy is being carried out, to submit reports relating to the provisions

hereof as may be required by the Government and to keep records. Records shall at least include for

each employee the name, address, telephone numbers, construction trade, union affiliation if any,

employee identification number when assigned, social security number, race, sex, status (e.g.,

mechanic, apprentice trainee, helper, or laborer), dates of changes in status, hours worked per week in

the indicated trade, rate of pay, and locations at which the work was performed. Records shall be

maintained in an easily understandable and retrievable form; however, to the degree that existing

records satisfy this requirement, contractors shall not be required to maintain separate records.

15. Nothing herein provided shall be construed as a limitation upon the application of other laws which

establish different standards of compliance or upon the application of requirements for the hiring of local

or other area residents (e.g., those under the Public Works Employment Act of 1977 and the Community

Development Block Grant Program).

Page 115: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-30

Revision 4

September 1999

APPENDIX G TO THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

SUPPLEMENTARY CONDITIONS

CERTIFICATION OF COMPLIANCE WITH 41 CFR 60-1.7: REPORTS AND OTHER REQUIRED

INFORMATION

[Note: This certification is required by 41 CFR 60-1.7(b) and is applicable to all FDEP-assisted

construction contracts and subcontracts with a price exceeding $10,000; this certification is to be

included in all FDEP-assisted construction contracts and subcontracts with a price exceeding $10,000 and

in all solicitations for such contracts and subcontracts.]

This certification relates to a construction contract proposed by _________________________, which

(insert the name of the Owner)

expects to finance the proposed construction contract with assistance from the Florida Department of

Environmental Protection (which administers a State revolving fund loan program supported in part with

funds directly made available by grants from the United States Environmental Protection Agency). I am

the undersigned prospective construction contractor or subcontractor. I certify that:

(1) I _____ have / _____ have not participated in a previous contract or subcontract subject to the

Equal Opportunity Clause and

(2) if I have participated in a previous contract or subcontract subject to the Equal Opportunity

Clause, I ____ have / _____ have not filed with the Joint Reporting Committee, the Director of

the Office of Federal Contract Compliance Programs, or the Equal Employment Opportunity

Commission all reports due under the applicable filing requirements.

I understand that, if I have participated in a previous contract or subcontract subject to the Equal

Opportunity Clause and have failed to file all reports due under the applicable filing requirements, I am

not eligible, and will not be eligible, to have my bid or offer considered, or to enter into the proposed

contract or subcontract, unless and until I make an arrangement regarding such reports that is satisfactory

to the office where the reports are required to be filed.

I agree that I will obtain identical certifications from prospective lower-tier construction subcontractors

when I receive bids or offers or initiate negotiations for any lower-tier construction subcontracts with a

price exceeding $10,000. I also agree that I will retain such certifications in my files.

______________________________________________________ ______________

(Signature of Authorized Official) (Date)

__________________________________________________________________________

(Name and Title of Authorized Official [Print or Type])

___________________________________________________________________________

(Name of Prospective Construction Contractor or Subcontractor [Print or Type])

Page 116: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-31

Revision 4

September 1999

__________________________________________________________________________________

(Address and Telephone Number of Prospective Construction Contractor or

Subcontractor [Print or Type])

__________________________________________________________________________________

(Employer Identification Number of Prospective Construction Contractor or

Subcontractor)

Page 117: TECHNICAL SPECIFICATIONS - D.N. Higgins

FDEP-32

Revision 4

September 1999

APPENDIX H TO THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

SUPPLEMENTARY CONDITIONS

CERTIFICATION OF NONSEGREGATED FACILITIES

[Note: This certification is required by 41 CFR 60-1.8(b) and is applicable to all FDEP-assisted

construction contracts and subcontracts with a price exceeding $10,000; this certification is to be

included in all FDEP-assisted construction contracts and subcontracts with a price exceeding $10,000

and in all solicitations for such contracts and subcontracts.]

This certification relates to a construction contract proposed by _______________________________,

(insert the name of the Owner)

which expects to finance the proposed construction contract with assistance from the Florida

Department of Environmental Protection (which administers a State revolving fund loan program

supported in part with funds directly made available by grants from the United States Environmental

Protection Agency). I am the undersigned prospective construction contractor or subcontractor. I

certify that I do not and will not maintain any facilities I provide for my employees in a segregated

manner and that I do not and will not permit my employees to perform their services at any locations

under my control where segregated facilities are maintained.

I agree that I will obtain identical certifications from prospective lower-tier construction subcontractors

prior to the award of any lower-tier construction subcontracts with a price exceeding $10,000. I also

agree that I will retain such certifications in my files.

____________________________________________________ _______________

(Signature of Authorized Official) (Date)

___________________________________________________________________________________

(Name and Title of Authorized Official [Print or Type])

___________________________________________________________________________________

(Name of Prospective Construction Contractor or Subcontractor [Print or Type])

___________________________________________________________________________________

(Address and Telephone Number of Prospective Construction Contractor or Subcontractor [Print or

Type])

___________________________________________________________________________________

(Employer Identification Number of Prospective Construction Contractor or Subcontractor)

Page 118: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 119: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 120: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 121: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 122: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 123: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 124: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 125: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 126: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 127: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 128: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 129: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 130: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 131: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 132: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 133: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 134: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 135: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 136: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 137: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 138: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 139: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 140: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 141: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 142: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 143: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 144: TECHNICAL SPECIFICATIONS - D.N. Higgins
Page 145: TECHNICAL SPECIFICATIONS - D.N. Higgins