Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.

17
Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006
  • date post

    20-Dec-2015
  • Category

    Documents

  • view

    212
  • download

    0

Transcript of Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.

Page 1: Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.

Team 13: All For Angkor

Presentation #3

ENGR 340

March 3, 2006

Page 2: Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.

Team Members

Kirk Starnes, Andy Lynch, Katie Anderson, Brad Jansen, and Jon Larsen

Page 3: Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.

Outline

Project Description Design Norms Design Process Project Status Obstacles/Issues Project Future Questions

Page 4: Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.

Project Description

We are working in conjunction with architecture students from Handong Global University in South Korea to design the first academic building of Angkor Global University in the Siem Reap province of Cambodia

Structural Design of Building Land Development

Page 5: Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.

Project Description

Section Cut

Air Flow DiagramFloor Layout

Page 6: Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.

Design Norms

Cultural Appropriateness Building Materials Construction Methods

Stewardship Minimizing Material Use

Page 7: Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.

Design Process

Loads & Codes ASCE 7 International Building Code (ACI18-02)

Top to Bottom Design Roof/Floor Slabs Beams/Columns Foundation

Page 8: Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.

Project Status

Load Calculations Slab Design Beam Design Column Design STAAD Model Land Development

Page 9: Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.

Project Status

Load Calculations Primary Environmental Considerations

Completed

Page 10: Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.

Project Status

Slab Design Preliminary Calculations Completed Checked for Deflection

Page 11: Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.

Project Status

Beam Design Preliminary Calculations Completed Steel Reinforcement Design Completed

Page 12: Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.

Project Status

Column Design Preliminary Calculations Completed

h d

b d'

dt

Axial Load-Moment Interaction Diagram

0

100

200

300

400

500

600

0 50 100 150 200

Moment Strength, Mn [ft*kips]

Axia

l Lo

ad

Str

en

gth

, Pn

[kip

s]

Strain Condition #1

Strain Condition #2

Strain Condition #3

Strain Condition #4

Boundary Condition #1

Boundary Condition #2

Interaction Curve

Page 13: Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.

Project Status

STAAD Model Preliminary Design

Complete

Moment Diagram

Page 14: Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.

Project Status

Land Development Site Layout

Complete Began Site

Gradation Sized Septic Tanks

Page 15: Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.

Obstacles/Issues

Communication With Architecture Students Change of Architectural Plans Interdependency of Project Components

OLD NEW

Page 16: Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.

Project Future

Finish Design Calculations Produce Structural Plan Set 3-D Model and Computer Walkthrough Write Final Report

Page 17: Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.

Questions??