TE GANZ – RÖCK Boiler and Power Equipment Co. Ltd. GANZ – RÖCK Boiler and Power Equipment Co....

13
TE GANZ – RÖCK Boiler and Power Equipment Co. Ltd. Reference list Part 1. Boilers 1990-2007 Part 2. Equipments 1999-2006

Transcript of TE GANZ – RÖCK Boiler and Power Equipment Co. Ltd. GANZ – RÖCK Boiler and Power Equipment Co....

Page 1: TE GANZ – RÖCK Boiler and Power Equipment Co. Ltd. GANZ – RÖCK Boiler and Power Equipment Co. Ltd. Reference list ... HRSG parts / modules ordered by NEM Year Units Gas turbine

TE GANZ – RÖCK Boiler and Power Equipment Co. Ltd.

RReeffeerreennccee lliisstt

PPaarrtt 11.. BBooiilleerrss 11999900--22000077 PPaarrtt 22.. EEqquuiippmmeennttss 11999999--22000066

Page 2: TE GANZ – RÖCK Boiler and Power Equipment Co. Ltd. GANZ – RÖCK Boiler and Power Equipment Co. Ltd. Reference list ... HRSG parts / modules ordered by NEM Year Units Gas turbine

Part 1 - Boilers

Waste incinerator boiler supplies – only manufacture

Rákospalota

Year Noºof units

Capacity (t/h)

Steam pressure

(bar)

Steam temperature

(Cº)

Place of installation Ordered by

1992 1 10 51 455 Solingen (D) Alstom

1992 1 38 55 455 Nünberg (D) Alstom

1995 2 49 39 400 Velsen (D) Baumgarte

1995 2 26 39 360 Ulm (D) Baumgarte

1996 1 36 42 420 Kassel (D) Alstom

1997 1 36 42 420 Kassel (D) Alstom

1997 1 50 28 340 Wuppertal (D) Baumgarte

2001 1 40 59 380 Perpignan (F) Baumgarte

2002 2 32 25 217 Dijon (F) Baumgarte

Waste incinerator boiler supplies – major projects

Year Noº of units

Capacity (t/h)

Steam pressure

(bar)

Steam temperature

(Cº)

Place of installation Ordered by

2004 4 40 57,5 420 Rákospalota (H) Lurgi-Baumgarte *

2006 1 72 40 380 Suhl (D) Martin GmbH (EPC contract with

Transelektro)** *Pressure parts design and manufacturing; erection works: Transelektro **Transelektro is in charge for turn-key supply of the complete incinerator boiler, including basic and detailed design, manufacturing, delivery and site erection.

Page 3: TE GANZ – RÖCK Boiler and Power Equipment Co. Ltd. GANZ – RÖCK Boiler and Power Equipment Co. Ltd. Reference list ... HRSG parts / modules ordered by NEM Year Units Gas turbine

Part 1 - Boilers

HRSG connected to gas turbines

Year Units Gas turbine (MW) Boiler (t/h)

Steam pressure

(bar)

Steam temperature

(Cº) Place of installation

1990 1 150 303 22/17 310 Dunamenti Power Station

1994 1 150 444/55 42/3.5 420/100 Kelenföldi Power Station

1995 1 9.5 40 12 227 Szabadegyháza

1996 1 150 233/42.5 82/17.8 520/344 Dunamenti Power Station

1998 1 45 175 75 525 Wissington (UK)

1999 1 45 175 75 525 Bury St. Edmunds (UK)

1999 2 150 184/53 89/7.2 512/186 Powergen (Csepel Budapest)

2000 1 70 181/1.8 97/7.24 512/210 NEPCO Fife Power (UK)

2001 3 37.5 72 44 399 ABQAIQ (Saudi Arabia)

2001 1 70 110/14 72/8 500/250 FORTUM (Újpest Budapest)

2001 1 265 273/53/32.6 130/40/10 550/290/290 Donaustadt (Austria)

2001 1 57.3 75/25 82.5/5 500/190 Salzburg (Austria)

2002 1 43 60/14 81.6/7 511/215 Moscow (Russia)

2003 1 25.86 62.25 80 511.5 TVK

Page 4: TE GANZ – RÖCK Boiler and Power Equipment Co. Ltd. GANZ – RÖCK Boiler and Power Equipment Co. Ltd. Reference list ... HRSG parts / modules ordered by NEM Year Units Gas turbine

Part 1 - Boilers

HRSG parts / modules ordered by CMI

Year Units Gas turbine (MW) Boiler (t/h)

Steam pressure

(bar)

Steam temperature

(Cº)

Place of installation

2001 2 GE frame 9FA (255,6 MW) 278/39/40 132/31/5,3 566/315/288 Gebze (Turkey)

2001 1 GE frame 9FA (255,6 MW) 276/38/38 129/31/5,2 569/313/287 Iznir (Turkey)

2003 1 Alstom GT 26 (265 MW) 322/28/18 129/42/6,4 568/320/237 Senoco

(Singapure)

HRSG designed and manufactured by Transelektro

Year Units Gas turbine (MW) Boiler (t/h) Steam

pressure (bar)

Stam temperature

(Cº)

Place of installation

2003 1 - 137 540 Technical Flue gas

Tecen (Turkmenistan)

2004 1 Alstom GT 10B 200 42 410 CCPP total 24,77

MW (Alstom consortium)

2005 1 RB 211-T (31,6 MW) 64,2 69,1 511

Imanta (Latvia)-project under construction

2006 2 V 94,2 A (190 MW) 156,7/127,9 265/17,9 237/151 Weiweiler (Germany)

2006 1 99/5 98/9 542/318 Nyíregyháza (just manufacturing)

HRSG parts / modules ordered by NEM

Year Units Gas turbine (MW) Boiler (t/h) Steam

pressure (bar)

Stam temperature

(Cº)

Place of installation

2000 2 Westinghouse 251 AA (49,4 MW) 158,8 63 482 Brush

(Colorado-USA)

2001 2 LM 6000 (41 MW) 41 54/7 426/204 Arapahoe

(Colorado-USA)

2003 2 GE frame 6FA (73,4 MW) 112,4 90 540 Barranco de

Tirajana (Spain)

2003 2 GE MS6 PA (73,4 MW) 112,7 91

531,9 is guaranteed, other cases max.540

Granadilla (Spain)

2003 2 GE frame 6FA (73,4 MW) 111,8 89 540 Son Reus (Spain)

2004 1 GE frame 5 (40,3 MW) 57,6 70,1 537,8 Kemal Pasa

(Turkey)

Page 5: TE GANZ – RÖCK Boiler and Power Equipment Co. Ltd. GANZ – RÖCK Boiler and Power Equipment Co. Ltd. Reference list ... HRSG parts / modules ordered by NEM Year Units Gas turbine

Part 1 - Boilers

Fluidised boilers

Pécs

Year Units Boiler (t/h) Steam

pressure (bar)

Stam temperature

(Cº) Fuel Place of

installation

2002 1 63 89 480 Waste wood Königs Wusterhausen

2002 1 90 90 500 Demolition wood Prokon-Nord

2003 1 407/352 168/34 563/563 Bituminous coal, bark West-Offaly

2003 1 162/177 40/80 490/520 Bituminous coal, bark Kvarnsveden

2003 2 100 82 500 Biomass Borsodi Eromu

2004 1 100 82 500 Biomass Pécsi Eromu

2005 1 96 90 500 Peat, bark Emmlichheim

2005 1 66,6 120 520 sludge Simmering

Page 6: TE GANZ – RÖCK Boiler and Power Equipment Co. Ltd. GANZ – RÖCK Boiler and Power Equipment Co. Ltd. Reference list ... HRSG parts / modules ordered by NEM Year Units Gas turbine

Part 1 - Boilers

Biomass and others special heat recovery steam boilers

Year Units Boiler (t/h) Steam

pressure (bar)

Stam temperature

(Cº) Fuel Place of

installation

2001 1 21 55 430 Biomass Grossaitingen

2002 1 40 48 490 Special fuel Kassel

2002 1 23 55 430 Biomass Neufahrn

2003 1 32 77 450 Biomass Kufstein

2004 1 25 55 430 Biomass Ilmenau

2004 1 9 20 Special fuel Arnoldstein

2005 2 29 75 485 Biomass Baden-Mödling

2005 1 49 70 453 Biomass Altenstadt

2005 1 30 75 485 Biomass Neustrelitz

2005 1 14 75 435 Special fuel Bamag

2006 1 25 74 485 Biomass Hasslacher

2007 2 44 65 485 Biomass Belgien

2007 1 36 63 485 Biomass Crailsheim

2007 1 50 40 320 Special fuel Vohburg

Page 7: TE GANZ – RÖCK Boiler and Power Equipment Co. Ltd. GANZ – RÖCK Boiler and Power Equipment Co. Ltd. Reference list ... HRSG parts / modules ordered by NEM Year Units Gas turbine

Part 1 - Boilers

Retrofit of pulverized coal fired boilers

Kangal

Year Units Capacity (t/h) Steam pressure (bar)

Temperature (Cº) Contract

2007 1 650/570 150/27 540/540 Tuzla

2008 2 480 170/36 538/538 Kangal 1-2.

Pulverized coal fired boilers above 250 t/h capacity for power plants

Year Units Capacity (t/h)

Steam pressure

(bar)

Steam temperature

(ºC) Fuel Place of

installation

1990 1 620 133/24 540/540 lignite Gyöngyös (reconstruction)

1996-2000 1 480 170/36 538/538 lignite Kangal III.

(Turkey) 1999-2000 1 1016/869 262/60 543/542 lignite Florina (Greece)

Page 8: TE GANZ – RÖCK Boiler and Power Equipment Co. Ltd. GANZ – RÖCK Boiler and Power Equipment Co. Ltd. Reference list ... HRSG parts / modules ordered by NEM Year Units Gas turbine

Part 1 - Boilers

Oil – gas fired boilers

Year Units Capacity (t/h)

Steam pressure

(bar)

Steam temperature

(Cº) Fuel Place of

installation

1990 1 40 32 420 Natural gas-oil Diósgyor

1993 2 20MW hot water 16 150/120 oil Székesfehérvár

1994 3 75 38 450 Flue gas,

furnace-gas waste oil

Dunaújváros

1994 2 60 72 530 oil Frankfurt am Main (Germany)

1996 1 140 510 oil Taiwan

1996-97 1 60 42 430 Oil-natural gas Nyíregyháza

1998 1 50 25 350 gas Chile

1998 1 65 64 500 gas Varel (Germany)

2001 1 15 45 450 gas Anlima (Bangladesh)

2002 1 60MW hot water 23 155 Oil-gas VW Kassel

(Germany)

2003 3 35 43 410 gas TVK

2006 2 75 38 450 Oil-gas Kaisery

Page 9: TE GANZ – RÖCK Boiler and Power Equipment Co. Ltd. GANZ – RÖCK Boiler and Power Equipment Co. Ltd. Reference list ... HRSG parts / modules ordered by NEM Year Units Gas turbine

Part 2 – Equipments

Heat Exchangers

Year qty Denomination (material) Client 2006-7 15 heat exchangers (CS) Bronswerk (Holand) 2005 4 heat exchangers (SS) Air Liquide (France) 2004 5 heat exchangers (CS) BorsodChem (Hungary) 2004 1 heat exchanger (SS) TE Slovakia (Slovakia) 2004 10 heat exchangers (CS & SS) Snamprogetti (England) 2003 29 heat exchangers (CS & SS) Linde (Germany) 2003 1 condenser (CS) APS Prefab (Norway) 2003 2 rigid tube bundle (duplex) MOL (Hungary) 2003 2 "U"-tube bundle (SS) MOL (Hungary) 2003 2 tube bundles (CS) Kunpetrol (Hungary) 2002 2 tube bundles (CS) Kunpetrol (Hungary) 2002 4 tube bundles (CS & SS) MOL (Hungary) 2002 2 heat exchangers (CS) Silica (Germany) 2002 1 heat exchangers (SS) Aramco (Holland) 2002 1 condensate pre-heater (SS) Nitrogénmuvek (Hungary) 2002 1 cross-flow heat exchanger (SS) Nitrogénmuvek (Hungary) 2002 2 heat exchangers (Ti) Nitrogénmuvek (Hungary) 2001 2 tube bundles (duplex) MOL (Hungary) 2001 1 tube bundle (CS) Budapest Power Plant (Hungary) 2001 6 heat exchangers (CS & SS) BorsodChem (Hungary) 2001 1 200 m2 condenser (Ti tube & CS) Nitrogénmuvek (Hungary) 2001 2 1700 m2 condensers (Ti tube & CS) Balcke-Dürr (Germany) 2000 2 486 m2 ammonia evaporators (duplex) HAFI (Hungary) 2000 1 200 m2 heat exchanger (Ti) Nitrogénmuvek (Hungary) 1999 3 condensers (Ti tube & CS) Balcke-Dürr (Germany) 1999 5 heat exchangers (CS & SS) MOL (Hungary)

Page 10: TE GANZ – RÖCK Boiler and Power Equipment Co. Ltd. GANZ – RÖCK Boiler and Power Equipment Co. Ltd. Reference list ... HRSG parts / modules ordered by NEM Year Units Gas turbine

Part 2 - Equpment

Vessels

Year qty Denomination (material) Client 2005 4 vessels (Ti & Ni) BorsodChem (Hungary) 2004 6 vessels (SS) Sommer (Germany) 2004 3 chlor storage tanks (CS) BorsodChem (Hungary) 2004 5 vessels (CS) BorsodChem (Hungary) 2003 14 vessels (CS) Linde (Germany) 2003 1 5 m3 conical tank (SS) Sommer (Germany) 2002 2 vessels (CS) Kunpetrol (Hungary) 2002 3 tanks (SS) Richter Gedeon (Hungary) 2002 3 tanks (CS) Silica (Germany) 2002 4 vacuum furnace (SS) PVA (Germany) 2002 5 vessels (SS) Sommer (Germany) 2001 5 vacuum furnace (SS) PVA (Germany) 2001 7 vessels (SS) Sommer (Germany) 2000 2 70 m3 vessels (CS) John Zink (Luxemburg) 2000 3 200 m3 vessels (SS) BorsodChem (Hungary) 2000 32 pulsation tanks (CS) Neumann & Esser (Germany)

Columns

Year qty Denomination (material) Client 2005 4 columns (SS) Dynea (Norway) 2004 4 columns (CS & SS, amine service) OTF-IGN (Hungary) 2004 8 columns (CS & SS) BorsodChem (Hungary) 2002 1 LNG tower (CS) Nitrogénmuvek (Hungary)

Page 11: TE GANZ – RÖCK Boiler and Power Equipment Co. Ltd. GANZ – RÖCK Boiler and Power Equipment Co. Ltd. Reference list ... HRSG parts / modules ordered by NEM Year Units Gas turbine

Part 2 - Equipment

Mixing machines

Year qty Denomination (material) Client 2006 7 mixing machines (CS & SS) LIPP Mischtechnik (Germany) 2005 6 mixing machines (CS & SS) LIPP Mischtechnik (Germany) 2004 5 mixing machines (CS & SS) LIPP Mischtechnik (Germany) 2004 1 mixing machine casing (CS) Nicolor (Hungary) 2003 1 film evaporator casing (CS & SS, cladded) BorsodChem (Hungary) 2003 6 mixing machines (CS & SS) LIPP Mischtechnik (Germany) 2002 3 mixing machines (CS) Littleford Day (USA) 2002 8 mixing machines (CS & SS) LIPP Mischtechnik (Germany) 2001 7 mixing machines (CS & SS) LIPP Mischtechnik (Germany) 2000 18 various devices (SS) Dohmen (Germany) 1999 5 chocolate mixers (CS & SS) LIPP Mischtechnik (Germany) 1999 19 mixing tanks (SS) Sommer (Germany)

Air coolers

Year qty Denomination (material) Client 2005 1 complete air cooler (CS) BorsodChem (Hungary) 2003 1 complete air cooler (CS) TVK Power Plant (Hungary) 2001 1 air cooler tube bundle (CS) Europlan Kft. (Hungary)

Page 12: TE GANZ – RÖCK Boiler and Power Equipment Co. Ltd. GANZ – RÖCK Boiler and Power Equipment Co. Ltd. Reference list ... HRSG parts / modules ordered by NEM Year Units Gas turbine

Part 2 - Equipment

High-voltage housings

Year Denomination (material) Client 2006 710 mm conducting houses (CS) Siemens AG (Germany) 2006 conducting ducts (Al) Siemens AG (Germany) 2006 switching housings (CS) Siemens AG (Germany) 2006 housings (Al) Vatech (France) 2006 switching housings (Al) ABB Calor (Germany) 2005 switching housings (CS) Siemens AG (Germany) 2005 switching housings (Al) Siemens AG (Germany) 2005 housings (Al) Vatech (France) 2005 switching housings (Al) ABB Calor (Germany) 2004 housings (Al) Vatech (France) 2004 housings (Al) Ganz Transelektro (Hungary) 2004 710 mm conducting houses (CS) Siemens AG (Germany) 2004 switching housings (CS) Siemens AG (Germany) 2004 switching housings (Al) Siemens AG (Germany) 2004 switching housings (Al) ABB Calor (Germany) 2003 switching housings (Al) ABB Calor (Germany) 2003 switching housings (CS) Siemens AG (Germany) 2003 710 mm conducting houses (CS) Siemens AG (Germany) 2003 casings (Al) Trench (Germany) 2003 spiral tube casings (Al) Ganz Transelektro (Hungary) 2003 casings (Al) Vatech (France) 2002 switching housings (Al & CS) Trench (Germany) 2002 switching housings (Al) Schneider Electric (France) 2002 switching housings (Al) Ganz Transelektro (Hungary) 2002 switching housings (Al) ABB Calor (Germany) 2002 switching housings (CS) Siemens AG (Germany) 2002 conducting houses (CS) Siemens AG (Germany) 2001 switching and conducting housings (CS) Siemens AG (Germany) 2001 switching housings (Al) Ganz Transelektro (Hungary) 2001 switching housings (Al & CS) Trench (Germany) 2000 test housing (Al) Schneider Electric (France) 2000 housings (Al) Trench (Germany) 2000 housings (CS) Siemens AG (Germany) 2000 housings (Al) Ganz Ansaldo (Hungary) 1999 housings (Al) Ganz Ansaldo (Hungary)

Page 13: TE GANZ – RÖCK Boiler and Power Equipment Co. Ltd. GANZ – RÖCK Boiler and Power Equipment Co. Ltd. Reference list ... HRSG parts / modules ordered by NEM Year Units Gas turbine

Part 2 - Equipment

HUNISTER divided hydrostatic sterilizing equipment (DHS)

Year qty Denomination (material) Client 1999 1 DHS equipment (CS & SS) Bonduelle (Hungary)

Ultra-filters (membrane separators) for Nuclear Power Plants

Year qty Denomination (material) Client 2002 1 capacity 2 m3/h Paks Nuclear Power Plant (Hungary) 1999 1 capacity 2 m3/h Paks Nuclear Power Plant (Hungary) 1998 1 capacity 250 l/h Paks Nuclear Power Plant (Hungary) 1996 1 capacity 250 l/h Paks Nuclear Power Plant (Hungary) 1995 1 capacity 250 l/h Nuclear Power Plant (Finland)

Industrial silencers

Year qty Denomination (material) Client 2003 6 industrial silencers (CS) QE Intl. B.V. (Holland) 2002 6 industrial silencers (CS) QE Intl. B.V. (Holland) 2001 32 industrial silencers (CS) QE Intl. B.V. (Holland) 2000 1 industrial silencer (CS) Cullum Ltd. (England) 2000 73 industrial silencers (CS) QE Intl. B.V. (Holland) 1999 38 industrial silencers (CS) QE Intl. B.V. (Holland)

Headers

Year qty Denomination (material) Client 2002 54 water headers (CS) Borsig (Germany) 2002 27 gas headers (CS) Borsig (Germany)