TDC2-TCC2 consolidation status report to EATM

8
TDC2-TCC2 consolidation status report to EATM 10.12.2013 In sharepoint: https://espace.cern.ch/sba-worksp ace/tcc2wg/LS1%20worksite%20meeti ng/

description

TDC2-TCC2 consolidation status report to EATM. 10 .12.2013 In sharepoint : https://espace.cern.ch/sba-workspace/tcc2wg/LS1%20worksite%20meeting/. 2013 planning. Goal end 2013: 6 hot items out of the way. Removal of hot items. Removal of hot items from the worksites: - PowerPoint PPT Presentation

Transcript of TDC2-TCC2 consolidation status report to EATM

Page 1: TDC2-TCC2 consolidation status report to EATM

TDC2-TCC2 consolidationstatus report to EATM

10.12.2013In sharepoint:

https://espace.cern.ch/sba-workspace/tcc2wg/LS1%20worksite%20meeting/

Page 2: TDC2-TCC2 consolidation status report to EATM

2013 planning

Activities Duration Group Nov'13 Dec'13 4 11 18 25 2 9 16 23

TCSC removal 1w EN-HE,STI

TT20 QNL magnet exchange 1w EN-HE

Splitter removal 3w EN-HE

MDLV removal 1w EN-HE

Contingency 1w

Goal end 2013: 6 hot items out of the way.

Page 3: TDC2-TCC2 consolidation status report to EATM

Removal of hot items• Removal of hot items from the worksites:– TCSC removed first and brought to B.955– 3 splitter2 magnets and 2 MDLV removed and stored

in TDC2

Page 4: TDC2-TCC2 consolidation status report to EATM

3 splitter2 magnets2 MDLV magnets

Removal of hot items

Page 5: TDC2-TCC2 consolidation status report to EATM

Splitters in W49

Page 6: TDC2-TCC2 consolidation status report to EATM

MDLV in W50

Page 7: TDC2-TCC2 consolidation status report to EATM

Dose planning

4-Nov

17-Nov

30-Nov

13-Dec

26-Dec

8-Jan

21-Jan3-Fe

b

16-Feb

1-Mar

14-Mar

27-Mar

9-Apr

22-Apr

5-May

18-May

31-May

13-Jun

26-Jun

9-Jul

22-Jul

4-Aug

17-Aug

30-Aug

12-Sep

25-Sep

0

10000

20000

30000

40000

50000

60000

70000

80000

90000

Dose breakdown by week

Dose/week (uSv)Cumulative dose (uSv)Achieved (uSv)

Dos

e (u

Sv)

1900 uSv achieved / 11500 uSv estimated

Page 8: TDC2-TCC2 consolidation status report to EATM

2014 Planning

Worksite Operation Worksite Op.

Activities Duration Jan'14 Feb'14 March 14 April 14 May 14 June 14 July 14 Aug' 14 Sep' 14 Oct' 14 Nov' 14 Dec' 14 Jan' 15 Feb' 15 March 15 April 15 May 15 June 156 13 20 27 3 10 17 24 03 10 17 24 31 07 14 21 28 05 12 19 26 02 09 16 23 30 07 14 21 28 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 01 08 15 22 29 05 12 19 26 02 09 16 23 02 09 16 23 30 06 13 20 27 04 11 18 25 1 8 15 22 29

Civil engineering 8w

Cooling and ventilationChilled water 12w

Demin. Water 5w

AHU control upgrade 12w AHU control upgradeHandling 2w

Electricity NA NA physics LAB Ion Run NALV 10w start Closure upCabling 14+12w Cabling phase 1 up Cabling phase 2 (if needed)

Magnets 12w

Vacuum 8w

Secondary beam lines 8 w

Collimators and targets 2w

Cleaning 4w

safety systems 6w