Meetings Since Last TC SCP Plenary
SCP REQ#46 bis• Conference Call• 07, 17 and 31 March 2014
SCP REQ#47• Hosted by Morpho• 07 - 09 March 2014 Bremen, Germany• Accepted agenda is available in SCPREQ(14)000061
Discussions, hot topics
Multiple or Single set of Profile Management Credential• The topic has been discussed deeply in order to define all the options
we have today on the field.• No agreement has been reached on the options and advice from
Plenary has been requested.
Profile Interoperability• There is a proposal on the field which is trying to reach a compromise,
but it has not been finalized. The group agreed to work on this proposal.• The direct contribution presented in SCP #62 and sent to REQ has not
been accepted by REQ, but its content has been included in the compromise proposal.
• No agreement has been reached on the compromise proposal and advice from Plenary has been requested.
© ETSI 2012. All rights reserved3
Results achieved by the WG REQ during REQ#46bis and REQ#47
13 CRs to be presented for acceptance to SCP#6360 Documents discussed related to the 3 open work items• Main topic for discussion is still eUICC
11 CRs on the eUICC requirements has been accepted1 CR on the contactless topic has been accepted1 CR on the UICC Access Optimizations has been accepted1 new Work Item has been accepted
4
Status of SCP REQ WIs after SCP REQ#47
5
REL-12
Use cases and requirements related to Embedded UICCs
11 CRs accepted
Target: SCP#64
Use cases and requirements related to the addition of new contactless features
1 CR accepted
Target: SCP#63
UICC Access Optimizations
1 CR accepted
Target: SCP#63
Embedded UICC WI
Policy Control:• A new set of credential has been introduced in order to allowed the Policy Rules
management outside the Profile.• No agreement on the Policy Rules definition.• Where to store a Policy Rule (inside or outside a Profile) will be defined in REQ and not
in TEC, as the rule may have some implication in the rule definition.
Definitions:• A CR (SCPREQ(14)000042r1) has been accepted to align the naming between REQ and
TEC.
Management of credentials:• Action R45/01 has been discarded because Orange and Samsung was not able to
prepare a joint contribution. Companies interested can provide contributions as usual.
© ETSI 2012. All rights reserved6
Addition of contactless features WI
1 CR accepted in document SCPREQ(14)000066r1• This CR should address the main ETSI SCP requirements in the context
of the Multiple Secure Element Management.
7
UICC access optimisation WI
1 CR accepted in document SCPREQ(13)000103r5
8
Output Documents – TSs
None
9
Output Documents – TRs
None
10
Output Documents - CRs
11 CRs against TS 103 383• SCP(14)000125 > SCP(14)000135
2 CRs against TS 102 412• SCP(14)000123 and SCP(14)000124
2 CRs has been sent to REQ by SCP#62:• SCP(14)000069: it has been revised and accepted by REQ in
document SCPREQ(14)000066r1 and is presented to SCP #63 in document SCP(14)000124.
• SCP(14)000073: it has been discussed in REQ and 3 companies were against this CR.
11
Output Documents – WIDs
A new work item “Mechanism for monitoring the number of updates to some UICC files” has been accepted in document SCPREQ(14)000046r2/SCP(14)000136.
12
Output Documents – LS
SCPREQ(13)000064/SCP(14)000137 DRAFT Reply LS on Naming of off-card entities of the eUICC
13
Request for advice from Plenary
Management of profiles:• Two different proposals related to the Profile Interoperability have been
discussed:• SCPREQ(14)000058r2 SCP REQ• SCP(14)000073 Deutsche Telekom AG, Apple France, AT&T GNS Belgium SPRL, HUAWEI TECHNOLOGIES Co.
Ltd.,Ericsson, Illuminismo Limited, INFINEON TECHNOLOGIES, NOKIA UK Ltd, OBERTHUR TECHNOLOGIES, QUALCOMM UK Ltd, Samsung R&D In
• The first one was originally (SCPREQ(14)000058r1) proposed by Giesecke & Devrient, Gemalto, Morpho, Oberthur and Valid. The meeting worked on this proposal in order to try to reach consensus and produced SCPREQ(14)000058r2. There are still some concerns on the current wording of the requirements. Requirement proposed in SCP(14)000073 has been included in SCPREQ(14)000058r2. Apple and Deutsche Telekom are not in the position to accept the proposal as it is now.
• The second one (SCP(14)000073) is the companies contribution presented during last Plenary and sent to REQ. No agreement has been reached on this CR and Valid, Gemalto, Morpho declared to be against this CR.
14
Request for advice from Plenary
Management of credentials:• Several proposals to introduce the possibility to have more than one set of Profile
Management Credentials. • Several companies and also the Chairman asked to add use cases to the content of the
CR and not only in the Reason for Change.• The proposals have been categorized in a table and the Chairman asked a show of hands
to understand the support of each option.
15
Request for advice from Plenary
Management of credentials:
16
OPTION 1:
One PMC for all Profile Management operations (7 supporting companies)Gemalto, Telenor, Orange, Telecom Italia, AT&T, Bouygues Telecom, VALID
OPTION 2:SCPREQ(14)000047r1
One PMC for transport and one PMC for all other Profile Management operations.(i.e. functional split) (12 supporting companies)Qualcomm, LG, Sprint, Huawei, Ericsson, Deutsche Telekom, AT&T, Telia Sonera, Giesecke & Devrient, Apple, Bouygues Telecom, Samsung
OPTION 3:(SCPREQ(14)000047r1 with SCPREQ(14)000048r1)SCPREQ(14)000059
Multiple PMCs for transport and one PMC for all other Profile Management operations. (7 supporting companies)Ericsson, Deutsche Telekom, Apple, Giesecke & Devrient, Qualcomm, Huawei, Samsung
OPTION 4:
Multiple PMCs, each enabling overlapping subsets of Profile Management operations (5 supporting companies)Morpho Cards, Qualcomm, Samsung, Deutsche Telekom, Apple
OPTION 5:SCPREQ(14)000114r1
Multiple PMCs allow for all Profile Management operations but only one set is usable at a given point in time. (e.g. PMC associated to a Profile and only usable in relation to this Profile) (2 supporting companies)Qualcomm, Huawei,
Next Steps / Milestones
• To progress WI for Embedded UICC Use Cases and Requirements
• Should target in priority the points identified by editors notes• Should introduce the missing features
• To progress WI on UICC access optimization• Requirements have been defined
• To progress WI on addition of contactless features• Requirements have been defined• Continuous collaboration with NFC Forum and GlobalPlatform
17
Meeting Schedule TC SCP REQ
SCP REQ#48• 23 – 25 June 2014, Kansas City US
SCP REQ#49• 25 – 27 August 2014, Venice IT
SCP REQ#50• 01 – 03 December 2014, TBD