ORDER FOR SUPPLIES OR SERVICES PAGE OF PAGES IMPORTANT: Mark all packages and papers with contract andlor order numbers. 1 2 0 1. DATE OF ORDER 2.CONTRACT NO. (If any) 6. SHIP TO: NRC-HQ-25-14-E-0005 a AEO OSGE 3. ORDER NO. 4. REQUISITIONIREFERENCE NO. NRC-HQ-20-15-T-0007 NRR-15-0188 XIAOSONG YIN PROJECT MANAGER RTR 5. ISSUING OFFICE (Address correspondence to) b. STREETADORESS US NRC - HQ 11555 ROCKVILLE PIKE ACQUISITION MANAGEMENT DIVISION MAIL STOP TWFN-5E03 WASHINGTON DC 20555-0001 _________________________ C. CITY d. STATE e. ZiP CODE ROCKVILLE MD 20852-2738 7. TO: I. SNIP VIA a. NAME OF CONTRACTOR ENERGY RESEARCH INC 8 YEO RE b.CMAYGAEIa. PURCHASE IKI b. DELIVERY c. STREET ADDRESS REFERENCE YOUR: 6189 EXE CUT IVE BLVD Except for billing instructions on the ________________________________________ reverse, this delivery order is subject to instructions contained on this side ________________________________________ only of this form and is issued Please furnish the following on the terms subject to the terms end conditions and conditions specified on both sides of of the above-numbered contract. d. CITY a . STATE Itf ZIP CODE this order and on the attached sheet, if any, ROCKV ILLE M D ]208523901I Iincluding delivery as indicated. 9. ACCOUNTING AND APPROPRIATION DATA 10. REOUISITIDNING OFFICE See Schedule OFF OF NUCLEAR REACTOR REGULATION 11. B&USINESS CLASSIFICATION (Check appmoprate box(es,))I 12. P.0.B. POINT []a. SMALL H] b. OTHER THAN SMALL H] c. DISADVANTAGED G•d. WOMEN-OWNED H] e. HUEZone H-" t. SERVICE-DISABLED w] g. WOMEN-OWNED SMALL BUSINESS (WOSB) [ VETERAN-OWNED ELIGIBLE UNDER THE WOSB PROGRAMHh.EWS 13. PLACE OF 14. GOVERNMENT B/L NO. 15.3/DELIVEFRE TO FOB POINte 15. DISCOUNT TERMS ON. OEVR BEFORE . (OINTe) a. INSPECTION b. ACCEPTANCE 0/421 Destination Destination 17. SCHEDULE (See reverse for Rejections) IQUANTITY UNIT QUANTITY ITEM NO. SUPPLIES OR SERVICES ORDERED UNIT PRICE AMOUNT ACCEPTED (a) (b) (c) (d) (a) (f) (B) Project Entitled 'Technical Assistance tor the MIST Test Reactor HEU LEU Conversion PEAR Review. " Contract Number: NRC-HQ-25-14-E-0005 Order Number: Task Order 9 (NRC-HQ-20-15-T-0007) Continued . .. 15. SHIPPING POINT 15. GROSS SNIPPING WEIGHT 201. INVOICE NO. 17(h) TOTAL (Cont. pages) 21. MAIL INVOICE TO: I00 SEEBILING NAMEUS NUCLEAR REGULATORY COMMISSION INs7RU~cTIONS'b. STREET ADDRESS ONE WHITE FLINT NORTH ONCE VERSE (or P.O. Bus) 11555 ROCEVILLE PIKE 17(i) GRAND MAILSTOP O3-El7A 'TOTAL c.CIYd. SAE . zPOE$'79, 64'7.55 4 ROCKVILLE MD 20852-2738 22, UNITED STATES OF 0 9 / 17 /2 0 15 23. NAME (Typed) AMERICA BY (Signature) hL DOMONIQUE MALONE r •' C •foon. TITLE: CONTRACTING/ORDERING OFFICER PREVlOUS EDITION NOT USABLE OPTIONAL FORM 34T (eov. 2120121 Prescribed by O SA/FA 4B cFR 53.21311) SUJNSI REVIEW coMPLETE OCT 1 32015

Transcript of Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract...

Page 1: Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005 Task 1: Development of Draft Evaluation Input Requirement Based on the requirements

ORDER FOR SUPPLIES OR SERVICES PAGE OF PAGES

IMPORTANT: Mark all packages and papers with contract andlor order numbers. 1 2 0

1. DATE OF ORDER 2.CONTRACT NO. (If any) 6. SHIP TO:NRC-HQ-25-14-E-0005 a AEO OSGE

3. ORDER NO. 4. REQUISITIONIREFERENCE NO.

NRC-HQ-20-15-T-0007 NRR-15-0188 XIAOSONG YIN PROJECT MANAGER RTR

5. ISSUING OFFICE (Address correspondence to) b. STREETADORESSUS NRC - HQ 11555 ROCKVILLE PIKEACQUISITION MANAGEMENT DIVISION

MAIL STOP TWFN-5E03

WASHINGTON DC 20555-0001 _________________________C. CITY d. STATE e. ZiP CODE

ROCKVILLE MD 20852-2738

7. TO: I. SNIP VIA

a. NAME OF CONTRACTORENERGY RESEARCH INC 8 YEO RE

b.CMAYGAEIa. PURCHASE IKI b. DELIVERY

c. STREET ADDRESS REFERENCE YOUR:6189 EXE CUT IVE BLVD Except for billing instructions on the

________________________________________ reverse, this delivery order is subjectto instructions contained on this side

________________________________________ only of this form and is issued

Please furnish the following on the terms subject to the terms end conditionsand conditions specified on both sides of of the above-numbered contract.

d. CITY a . STATE Itf ZIP CODE this order and on the attached sheet, if any,ROCKV ILLE M D ]208523901I Iincluding delivery as indicated.

9. ACCOUNTING AND APPROPRIATION DATA 10. REOUISITIDNING OFFICE

See Schedule OFF OF NUCLEAR REACTOR REGULATION11. B&USINESS CLASSIFICATION (Check appmoprate box(es,))I 12. P.0.B. POINT

[]a. SMALL H] b. OTHER THAN SMALL H] c. DISADVANTAGED G•d. WOMEN-OWNED H] e. HUEZone

H-" t. SERVICE-DISABLED w] g. WOMEN-OWNED SMALL BUSINESS (WOSB) [VETERAN-OWNED ELIGIBLE UNDER THE WOSB PROGRAMHh.EWS

13. PLACE OF 14. GOVERNMENT B/L NO. 15.3/DELIVEFRE TO FOB POINte 15. DISCOUNT TERMS

ON. OEVR BEFORE .(OINTe)

a. INSPECTION b. ACCEPTANCE 0/421Destination Destination

17. SCHEDULE (See reverse for Rejections)

IQUANTITY UNIT QUANTITYITEM NO. SUPPLIES OR SERVICES ORDERED UNIT PRICE AMOUNT ACCEPTED

(a) (b) (c) (d) (a) (f) (B)

Project Entitled 'Technical Assistance torthe MIST Test Reactor HEU LEU ConversionPEAR Review. "Contract Number: NRC-HQ-25-14-E-0005Order Number: Task Order 9(NRC-HQ-20-15-T-0007)Continued . ..

15. SHIPPING POINT 15. GROSS SNIPPING WEIGHT 201. INVOICE NO. 17(h)TOTAL(Cont.pages)

21. MAIL INVOICE TO: I00

SEEBILING NAMEUS NUCLEAR REGULATORY COMMISSION

INs7RU~cTIONS'b. STREET ADDRESS ONE WHITE FLINT NORTHONCE VERSE (or P.O. Bus) 11555 ROCEVILLE PIKE 17(i)

GRANDMAILSTOP O3-El7A 'TOTAL

c.CIYd. SAE . zPOE$'79, 64'7.55 4ROCKVILLE MD 20852-2738

22, UNITED STATES OF 0 9 / 17 /2 0 15 23. NAME (Typed)

AMERICA BY (Signature) hL DOMONIQUE MALONEr •' C •foon. TITLE: CONTRACTING/ORDERING OFFICER

PREVlOUS EDITION NOT USABLE OPTIONAL FORM 34T (eov. 2120121Prescribed by O SA/FA 4B cFR 53.21311)

SUJNSI REVIEW coMPLETEOCT 1 32015

Page 2: Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005 Task 1: Development of Draft Evaluation Input Requirement Based on the requirements

ORDER FOR SUPPLIES OR SERVICES PAGE NO

SCHEDULE - CONTINUATION 2IMPORTANT: Mark all packages and papers with contract and/or order numbers.DATE OF ORDER CONTRACT NO. ORDER NO.

09/17/2015 NRC-HQ-25-14-E-0005 NRC-HQ-20-15--T-0007

ITEM ND. SUPPLIESISERVICES QUANTITY UNIT UNIT 1 AMOUNT J QUANTITY

a)b)ORDERED PRICE ()ACCEPTED

Total Cost-Plus-Fixed-Fee: $79, 647.55Total Obligation:S79,647.55Period 0f Performance: September 17, 2015 -

March 14, 2017

Contracting Officers Representative: YinXiaosong, email: [email protected],

phone: 301-415-1404

Contractor POCs:Business: Tracey Mullinix, ContractAdministrator. Email: [email protected]: (301) 881-0866.Technical: Dr. Mohsen Khatib-Rahbar,President. Email: mkrl@eri-world. com.

Phone: (301) 881-0866.

ERI-Authorized Official DateAccounting Info:2015-X0200-FEEBASED-20-20D006-11-4-178-1061-25 2APeriod of Performance: 09/17/2015 to03/14/2017

TOTAL CARRIED FORWARD TO 1ST PAGE (ITEM 17(H)) 1> - $0.00____

PREVIOUS EDITION NOT USABLE Ui' I IUNAL I-UtR[ ;54l IRev. 4/2w0)Pre~ybod by GSA FAR 148 CFR1 53.213[f)

Page 3: Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005 Task 1: Development of Draft Evaluation Input Requirement Based on the requirements

TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005

SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS

Bi1 PRICE/COST SCHEDULE

CLIN DESCRIPTION OF ESTIMATED COST FIXED FEE TOTAL COST PLUSSUPPLIES/SERVICES FIXED FEE

Contractor to provide0001 Technical Assistance in - -

accordance with section C:DESCRIPTION!SPECIFICATIONS!

STATEMENT OF WORK

NRCB044 CONSIDERATION AND OBLIGATION--INDEFINITE-QUANTITY CONTRACT

(a) The contract type for this task order Cost-Plus-Fixed-Fee.

(b) The to•tal cost of the services under this task order is $79,647.55, of which thesum of •epresents the estimated reimbursable costs, and of whichinr

-represents fixed fee.

(c) The amount currently obligated by the Government with respect to this task order is$79,647.55, of which the sum ofJ represents the estimated reimbursable costs, and

of which represents fixed fe

(d) The Contractor shall comply with the provisions of FAR 52.232-20 - Limitation of Cost andFAR 52.232-22 - Limitation of Funds.

(End of Clause)

Labor Categories

The Contractor shall provide the following labor categories to perform the work under this task

order:

Program ManagerSubject Matter Expert/Senior Technical Reviewer

3

Page 4: Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005 Task 1: Development of Draft Evaluation Input Requirement Based on the requirements

TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK TASK ORDER STATEMENT OFWORK (SOW) - Development of an Evaluation for the Preliminary Highly-Enriched Uranium to LowEnriched Uranium Conversion Safety Analysis Report for the National Institute of Standards andTechnology Test Reactor

1. PROJECT DESCRIPTION

The purpose of this work is to secure contractor support for the review of the 'Preliminary HEU-LEU

Conversion Safety Analysis Report' (hereafter called "the Conversion PSAR") (ADAMS Accession No.ML15028A135) submitted by the National Institute of Standards and Technology (NIST - thelicensee) for the fuel conversion from highly-enriched uranium (HEU) to low enriched uranium (LEU)

of its test reactor and to provide an evaluation documenting the review. The contractor shall

perform the review in accordance with the guidance provided in Chapter 18 of NUREG-1537,

"Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors."~

The Statement of Work (SOW) for this Task Order falls within the unrestricted part of the NRC IDIQEnterprise-Wide Contract entitled Technical Assistance in Support of Agency Environmental and

Reactor Programs, paragraph 3.2, Licensing Support.

2. BACKGROUND

The NRC has responsibility to evaluate and process requests for licensing actions from research and

test reactor (RTR) licensees. RTR licensees authorized to possess and use HEU fuel are required by10 CFR 50.64, "Limitations on the Use of Highly Enriched Uranium (H EU) in Domestic Non-Power

Reactors," to convert to LEU fuel if Federal Government funding is available for the conversion and if

LEU fuel acceptable to the NRC has been developed for their reactors. If the facility cannot comply,

it needs to obtain an exemption as defined in 10 CFR 50.2.

NIST submitted a preliminary conversion SAR in preparation for the fuel conversion. The ConversionPSAR includes a description of the reactor, expected changes to the facility caused by the fuel

conversion, and a detailed safety and accident analysis of a proposed equilibrium core with LEU fuel.

Since the specific [EU fuel to be used for the conversion is still under development, this review and

evaluation constitute the first phase of the NIST test reactor fuel conversion review. The second

phase of the NIST reactor fuel conversion will be reviewed at a later time when NIST updates theConversion PSAR with approved LEU fuel and submits to the NRC for review and approval. This

evaluation input will be used as the starting point for the second phase review.

3. OBJECTIVE

The objective of this task order is to obtain the necessary technical expertise to assist NRC staff inthe review and evaluation of the Conversion PSAR. Specifically, the contract shall provide anevaluation input documenting its review and a list of LEU fuel open items as place holder to be

further review when the specific LEU fuel is approved.

4

Page 5: Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005 Task 1: Development of Draft Evaluation Input Requirement Based on the requirements

TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005

4. SCOPE OF WORK

The contractor shall review the information listed below (provided by the NRC staff):

* NIST Conversion PSAR;

* Chapter 18 of NUREG-1537, "Guidelines for Preparing and Reviewing Applications for the

Licensing of Non-Power Reactors;" and

* Other related information, as necessary.

The NRC Contracting Officer's Representative (COR) will conduct a kickoff meeting via a telephoneconference call to discuss the scope of the review. Following the kickoff meeting, the contractorshall develop a review plan detailing the schedules milestones for the review.

The contractor shall perform the review in accordance with the NRC approved review plan. Thecontract shall review and develop a draft evaluation input documenting its review and evaluationusing the guidance provided in Chapter 18 of NUREG-1537. The contractor shall performconfirmatory calculations of the licensee's approach in order to validate the accuracy of theinformation provided by NIST for the Conversion PSAR. The contractor shall provide a list of LEUfuel open items. This list shall be limited to specific LEU fuel information and shall serve as a placeholder to be reviewed when the LEU fuel is approved for the conversion.

If during the review, the contractor determines that additional information may be necessary, thecontractor shall communicate that information to the NRC COR who will obtain the necessary

information from the licensee.

Following an acceptance review by the NRC COR of the draft evaluation input, the contractor shallprovide the final evaluation input, incorporating the NRC COR comments.

Additionally, during the review, all communication to the licensee by the contractor shall be donethrough the NRC COR. Routine telephone conversations between the NRC COR and the contractor

will occur as necessary throughout the contract period.

5. SPECIFIC TASKS

The contractor shall perform the tasks as described below in accordance with the estimatedcompletion schedule specified.

5

Page 6: Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005 Task 1: Development of Draft Evaluation Input Requirement Based on the requirements

TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005

Task 1: Development of Draft Evaluation Input

Requirement

Based on the requirements of 10 CFR Parts 20, 30, 40, 50 and 70 as appropriate, and the guidancecontained in Chapter 18 of NUREG-1537, the contractor shall review the Conversion PSAR anddevelop a draft evaluation document consistent with the guidance. The draft evaluation shall statethe applicable regulations or standards, discuss the licensee's method for satisfying the regulationsor standards, and provide an analysis whether the licensee's method does indeed satisfy theregulations or standards.

Task la: Development of a Review Plan

The contractor shall develop and provide a draft review plan. The contractor shall provide a

proposed staffing plan contained with the draft review plan. The draft review plan shall also includedetailed milestones, which will be obtained by thoroughly reviewing the backgrounddocumentation, and expected dates of completion for each of the milestones.

The contractor shall provide the draft review plan, within two weeks after the kickoff meeting. Thecontractor shall submit the final review plan within 5 days of receiving comments from the NRC

COR.

Task ib: Independently Verify Statements and Provide Draft Evaluation Input and Requests forAdditional Information (RAI)

The contractor shall perform the review in accordance with the NRC approved review plan. Thecontractor shall review Conversion PSAR and prepare a draft evaluation input documenting itsreview using the guidance and outlines provided in Chapter 18 of NUREG-1537.

The contractor shall perform independent confirmatory calculations of the modeling values asprovided in the Conversion PSAR. The confirmatory calculations shall include the validation of the

Conversion PSAR's neutronic and/or thermal-hydraulic analyses, including departure from nucleateboiling ratio, critical heat flux, maximum cladding fuel temperature and peak fuel temperature,maximum hypothetical accident (MHA) dose for worker and member of the public, as applicable. Ifany confirmatory calculation is performed using computer codes, the contractor shall provide copies

of the code input and output. The codes and correlations chosen for the calculations shall beacceptable to the NRC (e.g., TRACE or RELAP). The code selection rationale shall be described. Tothe extent that other confirmatory calculations may become necessary, the contractor shall bringthis to the attention of the NRC COR for his/her approval prior to beginning performance of these

other calculations.

The draft evaluation input shall be forwarded to the NRC COR. The contractor shall identify theportions of the Conversion PSAR, if any, needing further clarification to complete the review,including any [EU fuel open items. Open items shall be limited to specific [EU fuel information. Thespecific questions, in the form of RAIs, which are derived from this review, shall be forwarded withthe draft evaluation input. Only one round of RAIs is planned given the appropriate contractorpersonnel qualification and conduct of review. The contractor shall meet with the NRC COR todiscuss the draft evaluation input and RAIs, if needed. The contractor shall revise the draft

6

Page 7: Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005 Task 1: Development of Draft Evaluation Input Requirement Based on the requirements

TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005

evaluation input and RAls based on NRC COR comments.

Task ic: Review RAI responses and provide revised Draft Evaluation Input incorporating licensee's

RAI responses

The contractor shall review the RAI responses to determine if the licensee's responses are

acceptable to support safety findings. The contractor shall discuss the adequacy of the RAI

responses with NRC COR. When RAI responses are satisfactory, the contractor shall revise the draft

evaluation input, incorporating RA! responses, and provide to the NRC COR within two weeks after

the discussion.

Standard

The draft and revised evaluation input shall be in accordance with the review guidance specified in

Chapter 18 of NUREG-1537, Part 2. The input shall be provided to the NRC COR as a Word file, and

shall follow the guidance in NUREG-1379, "•NRC Editorial Style Guide," Revision 2.

The draft evaluation input shall describe the contractor's evaluation of the Conversion PSAR

conformance to regulatory requirements and shall clearly identify the basis of acceptability for each

of the proposed methods and analyses.

If the contractor determines that there are areas where additional information is warranted, the

contractor shall communicate this information to the NRC COR as soon as possible. Any additional

information requested by the contractor shall include the related technical and/or regulatory bases

(e.g., 10 Code of Federal Regulations, NUREG-1537, ANSI/ANS, etc.).

The contractor shall provide the draft and revised evaluation input to the NRC COR on time, and be

technically acceptable with no spelling or grammatical errors and in the specified format.

Deliverables

Draft Review Plan- within two weeks after the kickoff meeting.

Review Plan - within 5 days of receiving comments from the NRC COR.Draft Evaluation Input - approximately six months after task order award.Revised Evaluation Input - within two weeks after discussion with NRC COR.

Task 2: Provide Final Evaluation Input and LEU Fuel Open Items

Requirement

The contract shall provide final evaluation input incorporating NRC COR's comments on the revised

draft evaluation input and [EU fuel open items.

Standard

The final evaluation input and [EU fuel open items shall be provided to the NRC COR as a Word file,and follow the guidance in NUREG-1379, "NRC Editorial Style Guide," Revision 2. The final

7

Page 8: Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005 Task 1: Development of Draft Evaluation Input Requirement Based on the requirements

TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005

evaluation input and the LEU open fuel items shall be on time, and be technically acceptable with nospelling or grammatical errors and in the specified format.

Deliverable

Final Evaluation Input and LEU fuel open items -within two weeks following receipt of the NRC COR

comments.

Task 3: Related Support

Requirement

If requested by the NRC COR, the contractor shall provide up to 80 hours of related technical

support to the NRC COR following delivery of the final evaluation input. This related support may,

for example, consist of tasks such as: responding to questions on the final deliverable; attending

meetings with NRC Management to discuss the results of the review and assisting NRC COR in

resolution of outstanding issues from these meetings.

The scope of the related support activity and amount of hours to be used shall be agreed upon

between the contractor and the NRC COR before starting the activity. The NRC COR will confirm the

request, due date, and estimated LOE for the specific activity by e-mail to the contractor with a

carbon copy to the NRC Contracting Officer (CO).

Standard

The contractor shall participate in related meeting support, if requested. The contractor shall

ensure that all information/support it provides for these meetings be technically correct.

Deliverable

The contractor shall provide support for the preparation of these meetings, including support

services for any presentation preparation. All deliverable due dates shall be specified by the NRC

CO R

6. APPLICABLE DOCUMENTS AND STANDARDS

The NRC COR will provide the specific documents related the review at the commencement of the

task order. Other documents needed are publicly available on the NRC Website. ANSI/ANS

standards include the ANSI/ANS-i5 series applicable to research and test reactors, which the

contractor will have to procure on its own. The NRC COR cannot provide those, due to copyright

restrictions.

The NRC COR will provide the information in an electronic format, or if the contractor requests, it

can be provided in paper form.

8

Page 9: Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005 Task 1: Development of Draft Evaluation Input Requirement Based on the requirements

TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005

7. DELIVERABLES AND DELIVERY SCHEDULE/REPORTING REQUIREMENTS

All deliverables shall be submitted to the NRC COR electronically with a copy provided to the NRCCO. These deliverables shall be prepared in Microsoft Office Word format, and in Adobe Acrobat file(pdf). The transmittal letter, at a minimum, sha'll contain the job code number (JCN), contract

number, as~well as the task order project title. Below is an example of an estimated delivery

schedule for review of Conversion PSAR. The specific dates for these deliverables will be agreedupon between the NRC COR and the contractor after task order award.

Review Plan Draft and Final Draft review plan- within two weeks of task

Review Plan order initiation.

Review Plan -within 5 days of receiving

________________________________comments from the NRC COR.

Draft Evaluation Input Draft Evaluation Six months after commencement of the

Input and RAIs review.

If any confirmatory

work is performedusing codes, the

contractor shallprovide the NRC

COR with copies ofthe-code input and

output.

Four weeks after receive of final RAIRevised Draft responses.

___________________Evaluation InputFinal Evaluation Input Final Input and [EU Two weeks after receipt of the NRC COR

and [EU fuel open items open fuel items comments.

Related Support As requested As requested.

Status Report Monthly Status l5th of each month.

__________________ Report

Monthly Letter Status Report

The contractor shall provide an electronic version of the Monthly Letter Status Report (MLSR) to theNRC CO, NRC COR, NRR Funds Certifying Official, and Office of the Chief Financial Officer (OCFO) bythe 1_5th of each month, in a format s'imilar to the sample contained in Attachment 2. The MSLRshall provide the technical and financial status of the review effort.

The technical status section of the MLSR shall contain a summary of the work performed during thereporting period, and milestones reached, or if missed, an explanation why; any problems or delaysencountered or anticipated with recommendations for resolution; and plans for the next reporting

9

Page 10: Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005 Task 1: Development of Draft Evaluation Input Requirement Based on the requirements

TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005

period. The status shall include information on travel during the period to include trip start and enddates, destination, and traveler for each trip.

The financial status section of the MLSR shall include the following information: the total task orderceiling amount; funds obligated to-date; total costs incurred in the reporting period, broken downby direct and other direct costs; and total cumulative costs incurred-to date. The MLSR shall alsocontain the balance of obligated funding remaining at the end of the reporting period, and thebalance of funds required to complete the contract. Additionally, if applicable, the MLSR shalladdress the status of the Contractor Spending Plan (CSP), showing the percentage of projectcompletion and any significant changes in either projected expenditures or percentage ofcompletion. The MLSR should also identify the acquisition cost, description (model number,manufacturer) and acquisition date of any property/equipment acquired for the project during themonth with an acquisition cost more than $500.

In the event that the data in the MLSR indicates a need for additional funding beyond that alreadyobligated to the task order for that reporting period, this information may only be used as supportto the official request for funding required in accordance with the Limitation of Cost (LOC) Clause(FAR 52.232-20) or the Limitation of Funds (LOF) Clause FAR 52.232-22.

License Fee Recovery Cost Status Report

The work specified in this SOW is not license fee recoverable.

Performance Requirements

The deliverables required under this effort must conform to the standards contained or referencedin this SOW. The table on performance requirements summarizes the performance requirements,deliverables, standards and method of review for this effort.

10

Page 11: Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005 Task 1: Development of Draft Evaluation Input Requirement Based on the requirements

TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005

Review Plan Review Plan includes the NRC COR Items determined by the NRCand Draft contractor staffing plan with all will review COR to be missing or incorrectEvaluation important milestones. Draft the Review will be corrected by contractor.Input input is in accordance with the Plan and If not incorporated after initial

review guidance specified in Draft identification by the NRC COR,Chapter 18 of NUREG-1537, Evaluation contractor will add/correct at itsincludes all information Input, own expense.requested in the SOW withplace holders as necessary, and

incorporates all comments fromthe NRC COR.

No spelling or grammatical

errors.Final Final Evaluation Input is in NRC COR Items determined to be missingEvaluation accordance with the review will review or incorrect will be corrected byInput guidance specified in Chapter 18 the Final contractor. If not incorporated

of NUREG-1537, includes all Evaluation after initial identification by theinformation requested in the Input. NRC COR, contractor willSOW and incorporates all add/correct at its own expense.comments by the NRC COR.Technical conclusions areproperly supported.

No spelling or grammatical

errors.

8. REQUIRED LABOR CATEGORIES/ ESTIMATED LEVEL OF EFFORT

The LOE for the review of the Conversion PSAR is estimated to be 480 hours. The estimated LOE forthis task order takes into consideration the contractor's knowledge gained through previousexperience with research and test reactor (RTR) HEU to LEU conversion reviews; and familiarity withthe NRC's RTR license renewal review process. The following are the minimum qualifications of thelabor categories for this task order:

11

Page 12: Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005 Task 1: Development of Draft Evaluation Input Requirement Based on the requirements

TASK ORDER (EWC U N TO 9) under EWC Contract NRC-HQ-25.-14-E-0005

Labor categories

Labor Category Minimum Qualification Requirement

Program Manager 1) B.S. in Engineering, Physics or similartechnical field,

or

2) Minimum 10 years research and test

reactor operating experience.

Subject Matter Expert 1) B.S. in Engineering, Physics or similartechnical field,

and

2) Minimum 8 years Technical Expertise in

thermal hydraulics analyses and dose

calculation.

Senior Technical 1) B.S. in Engineering Physics or similar

Reviewertechnical field,and

2) Minimum 5 years Technical Expertise in

thermal hydraulics analyses and dose

calculation.

9. GOVERNMENT-FURNISHED PROPERTY

No government-furnished property is expected to perform this task Order.

10. PERIOD OF PERFORMANCE

The duration of this Task Order from September 17, 2015 - March 14, 2017.

11. PLACE OF PERFORMANCE

The work will be performed at the contractor's site.

12. SPECIAL CONSIDERATIONS

TRAVEL/MEETINGS

The NRC does not anticipate that a site visit will be necessary for the contractor to complete thiswork. If the contractor believes conferences calls or other communications with the licensee arenecessary, the contractor shall make the arrangement through the NRC COR.

12

Page 13: Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005 Task 1: Development of Draft Evaluation Input Requirement Based on the requirements

TASK ORDER (EWC UN TO 9) under EWC Contract NRC-I-Q-25-14-E-0005

It is anticipated that for performance of work, the contractor will be required to make one trip toNRC HQ to support any related questions, or meetings that may result from the Conversion PSARreview. This support is outlined in Task 3, Related Support.

* Trip purpose and associated task: The purpose of this travel would be to answer questions

posed by NRC management, or attend a meeting related to the review.

* Frequency: One trip.

* Destination: NRC HQ office complex.

* Number of Staff: Up to three (3) contractor's staff

* Number of Days: Up to three (3) days.All travel requires prior written approval from the NRC COR.

$9000 is estimated for this travel.

SECURITY

No classified information is needed in the performance of this contract. Some materials provided

may be sensitive and the contractor shall have the necessary provisions to secure the information

consistent with the NRC guidance for storage and use of Official Use Only, Proprietary, or Pre-

decisional information.

Documents containing proprietary information and must be safeguarded against unauthorized

disclosure. After completion of work, the documents shall either be destroyed or returned to NRC.If they are destroyed, please confirm this in an email to the NRC COR with a copy to the CO and

include the date and manner in which the documents were destroyed.

KEY PERSONNEL

The contractor shall provide key personnel who have knowledge and/or practical experience with

RTR technology and fuel conversion analyses. The contractor key personnel shall have knowledgeand experience in areas such as health physics, core physics, thermal-hydraulics and nuclearengineering that is sufficient to assess the applicability of the guidance in Chapter 18 of NUREG-

1537 when reviewing the Conversion PSAR and preparing the evaluation input. Also, key personnel

shall have technical expertise in the area of radiation dose calculations to perform confirmatory

calculations using the licensee's assumptions for the operational doses and the MHA dose

calculations as described in NUREG-1537.

The contractor shall provide a Program Manager to oversee the efforts of the contractor team andto ensure the timely submittal of quality deliverables such that all information is accurate and

complete.

13

Page 14: Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005 Task 1: Development of Draft Evaluation Input Requirement Based on the requirements

TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005

Monthly Letter Status Report

The contractor shall provide an electronic version of the Monthly Letter Status Report(MLSR1) to the NRC CO, NRC COR, NRR Funds Certifying Official and Office of the ChiefFinancial Officer (OCFO) by the 15th of each month, in a format similar to the samplecontained in Attachment 2. The report shall provide the technical and financial status of theeffort.

The technical status section of the MLSR shall contain a summary of the .work performedduring the reporting period, and milestones reached, or if missed, an explanation why; anyproblems or delays encountered or anticipated with recommendations for resolution; andplans for the next reporting period.

The financial status section of the MLSR shall include the following information: the totaltask order ceiling amount; funds obligated to-date; total costs incurred in the reportingperiod, broken down by direct and other direct costs; and total cumulative costs incurred-todate. The MLSR shall also contain the balance of obligated funding remaining at the end ofthe reporting period, and the balance of funds required to complete the task order.Additionally, if applicable, the MLSR shall address the status of the Contractor SpendingPlan (CSP), showing the percentage of project completion and any significant changes ineither projected expenditures or percentage of completion. The MLSR should also identifythe acquisition cost, description (model number, manufacturer) and acquisition date of anyproperty/equipment acquired for the project during the month with an acquisition cost

more than $500.

In the event that the data in the MLSR indicates a need for additional funding beyond thatalready obligated to the task order for that reporting period, this information may only beused as support to the official request for funding required in accordance with theLimitation of Cost (LOC) Clause (FAR 52.232-20) or the Limitation of Funds (LOF) Clause FAR

52.232-22.

License Fee Recovery Cost Status Report

The work specified in this SOW is not license fee recoverable.

13. GOVERNMENT-FURNISHED PROPERTY

No government-furnished property is expected to perform this task order.

14. PLACE OF PERFORMANCE

The work will be performed at the contractor's site.

14

Page 15: Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005 Task 1: Development of Draft Evaluation Input Requirement Based on the requirements

TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005

15. SPECIAL CONSIDERATIONS

TRAVEL/MEETINGS

The contractor may need to make one trip to the NRC H~to support any related questions

or meetings that may result from the review.

Trip purlpose and associated task: The purpose of this travel would be to answer questions

posed by NRC management, or attend a meeting.

Frequency: One trip.Destination: NRC HQ. Rockville, MD, Number of Staff: one (1) senior key staff member

Number of Days: Up to three (3) days.

Contractor will be authorized travel expenses consistent with the substantive provisions of

the Federal Travel Regulation (FTR) and the limitation of funds specified in this

contract/order. All travel requires written Government approval from the NRC COR,.

SECURITY

No classified information is needed in the performance of this contract. Some materials

provided may be sensitive and the contractor shall have the necessary provisions to secure

the information consistent with the NRC guidance for storage and use of Official Use Only,

Proprietary, or Pre-decisional information.

The contractor shall safeguard documents containing proprietary information against

unauthorized disclosure. After completion of work, the contractor shall either destroy the

documents or return them to the NRC COR,. If they are destroyed, please confirm this in an

e-mail to the NRC COR with a copy to the NRC CO and include the date and manner in which

the documents were destroyed.

16. GOVERNMENT-FURNISHED PROPERTY

No government-furnished property will be provided for this task order.

17. PLACE OF PERFORMANCE

The work shall be performed at the contractor's site.

18. OTHER APPLICABLE INFORMATION

The work under this task order is not license fee recoverable.

SECTION D - PACKING AND MARKING

15

Page 16: Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005 Task 1: Development of Draft Evaluation Input Requirement Based on the requirements

TASK ORDER (EWC UN TO 9) under EWC Contract NRC-H-Q-25-14-E-0005

See Base Contract

SECTION E - INPSECTION AND ACCEPTANCE

See Base Contract

SECTION F - DELIVERABLES AND PERFORMANCE

NRCFO3OA PERIOD OF PERFORMANCE ALTERNATE IThis order shall commence on September 17, 2015 - March 14, 2017.(See FAR 52.216-18 - Ordering).(End of Clause)

Deliverables and Schedule

The deliverables required under this effort must conform to the standards contained orreferenced in this SOW. The deliverables shall be submitted electronically to theContracting Officer Representative. The table on performance requirements summarizesthe deliverables schedule for this effort.

Review Plan Draft and Final Draft review plan- within two weeks ofReview Plan task order initiation.

Review Plan - within 5 days of receiving______________comments from the NRC COR.

Draft Evaluation Input Draft Evaluation Six months after commencement of theInput and RAIs review.

If any confirmatorywork is performedusing codes, thecontractor shallprovide the NRCCOR with copiesof the code inputand output.

Four weeks after receive of final RAIRevised Draft responses.Evaluation Input

Final Evaluation Input Final Input and Two weeks after receipt of the NRC CORand LEU fuel open LEU open fuel comments.items items.Related Support As requested As requested.

16

Page 17: Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005 Task 1: Development of Draft Evaluation Input Requirement Based on the requirements

TASK ORDER (EWC U N TO 9) under EWC Contract NRC-HQ-25-14-E-0005

Status Report Monthly Status 1 5 th of each month.Report

SECTION G - CONTRACT ADMINISTRATION DATA

See the base contract for Contract Administration Data.

SECTION H - SPECIAL CONTRACT REQUIREMENTS

2052.215-71 CONTRACTING OFFICER REPRESENTATIVES

(a) The contracting officer's authorized representative hereinafter referred to as the project

officer for this contract is:

Name:Address:

Telephone Number:

Emaih:

Xiaosong YinUS NRCN RR/RTR LICENSING BRANCHWashington DC 20555

[email protected]

The alternate contracting officer's representative is:Name: Patrick BoyleAddress: US NRC

NRR/RTR LICENSING BRANCH

Washington DC 20555Telephone Number: 301-415-3936

Email: Patrick.boyle(~nrc..qov

(b) Performance of the work under this contract is subject to the technical direction of the NRCproject officer. The term technical direction is defined to include the following:

(1) Technical direction to the contractor which shifts work emphasis between areas of work ortasks, authorizes travel which was unanticipated in the Schedule (i.e., travel not contemplatedin the Statement of Work or changes to specific travel identified in the Statement of Work), fillsin details, or otherwise serves to accomplish the contractual statement of work.

(2) Provide advice and guidance to the contractor in the preparation of drawings, specifications,

or technical portions of the work description.

17

Page 18: Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005 Task 1: Development of Draft Evaluation Input Requirement Based on the requirements

TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005

(3) Review and, where required by the contract, approve technical reports, drawings,specifications, and technical information to be delivered by the contractor to the Government

under the contract.

(c) Technical direction must be within the general statement of work stated in the contract. Theproject officer does not have the authority to and may not issue any technical direction which:

(1) Constitutes an assignment of work outside the general scope of the contract.

(2) Constitutes a change as defined in the "Changes" clause of this contract.

(3) In any way causes an increase or decrease in the total estimated contract cost, the fixed fee,

if any, or the time required for contract performance.

(4) Changes any of the expressed terms, conditions, or specifications of the contract.

(5) Terminates the contract, settles any claim or dispute arising under the contract, or issues

any unilateral directive whatever.

(d) All technical directions must be issued in writing by the project officer or must be confirmedby the project officer in writing within ten (10) working dlays after verbal issuance. A copy ofthe written direction must be furnished to the contracting officer. A copy of NRC Form 445,Request'for Approval of Official Foreign Travel, which has received final approval from the NRC

must be furnished to the contracting officer.

(e) The contractor shall proceed promptly with the performance of technical directions duly

issued by the project officer in the manner prescribed by this clause and within the projectofficer's authority under the provisions of this clause.

(f) If, in the opinion of the contractor, any instruction or direction issued by the project officer iswithin one of the categories defined in paragraph (c) of this section, the contractor may not

proceed but shall notify the contracting officer in writing within five (5) working days after thereceipt of any instruction or direction and shall request that contracting officer to modify thecontract accordingly. Upon receiving the notification from the contractor, the contractingofficer shall issue an appropriate contract modification or advise the contractor in writing that,in the contracting officer's opinion, the technical direction is within the scope of this article anddoes not constitute a change under the "Changes" clause.

(g) Any unauthorized commitment or direction issued by the project officer may result in anunnecessary delay in the contractor's performance and may even result in the contractorexpending funds for unallowable costs under the contract.

(h) A failure of the parties to agree upon the nature of the instruction or direction or upon the

18

Page 19: Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005 Task 1: Development of Draft Evaluation Input Requirement Based on the requirements

TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005

contract action to be taken with respect to the instruction or direction is subject to 52.233-1 -Disputes.

(i) In addition to providing technical direction as defined in paragraph (b) of the section, theproject officer shall:

(1) Monitor the contractor's technical progress, including surveillance and assessment of

performance, and recommend to the contracting officer changes in requirements.

(2) Assist the contractor in the resolution of technical problems encountered during

performance.

(3) Review all costs requested for reimbursement by the contractor and submit to the

contracting officer recommendations for approval, disapproval, or suspension of payment forsupplies and services required under this contract.

(End of Clause)

2052.215-70 KEY PERSONNEL. (JAN 1993)

(a) The following individual are considered to be essential to the successful performance of the

work hereunder:

NAME LABOR CATEGORY/POSITION

M. Khatib-Rahbar Project Manager/STR

*The contractor agrees that personnel may not be removed from the contract work or replaced

without compliance with paragraphs (b) and (c) of this section.

(b) If one or more of the key personnel, for whatever reason, becomes, or is expected tobecome, unavailable for work under this contract for a continuous period exceeding 30 workdays, or is expected to devote substantially less effort to the work than indicated in theproposal or initially anticipated, the contractor shall immediately notify the contracting officerand shall, subject to the concurrence of the contracting officer, promptly replace the personnelwith personnel of at least substantially equal ability and qualifications.

(c) Each request for approval of substitutions must be in writing and contain a detailedexplanation of the circumstances necessitating the proposed substitutions. The request mustalso contain a complete resume for the proposed substitute and other information requestedor needed by the contracting officer to evaluate the proposed substitution. The contractingofficer and the project officer shall evaluate the contractor's request and the contracting officershall promptly notify the contractor of his or her decision in writing.

(d) If the contracting officer determines that suitable and timely replacement of key personnel

19

Page 20: Task Order No. NRC-HQ-20-15-T-0007 Under …TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005 Task 1: Development of Draft Evaluation Input Requirement Based on the requirements

TASK ORDER (EWC UN TO 9) under EWC Contract NRC-HQ-25-14-E-0005

who have been reassigned, terminated, or have otherwise become unavailable for the contractwork is not reasonably forthcoming, or that the resultant reduction of productive effort wouldbe so substantial as to impair the successful completion of the contract or the service order, thecontract may be terminated by the contracting officer for default or for the convenience of theGovernment, as appropriate. If the contracting officer finds the contractor at fault for thecondition, the contract price or fixed fee may be equitably adjusted downward to compensatethe Government for any resultant delay, loss, or damage.

(End of Clause)

SECTION I - CONTRACT CLAUSESee the base contract for the clauses applicable to this task order.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

Attachments:1. Monthly Letter Status Report Template