Modification No. 002 Task Order No. NRC-004 Under Contract ... · NRC-HQ-12-C-42-0106 Task Order...

3
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT SPA NO. 1 CONTRACTIOCOOE PAGE OF 2 AyN..NTwMOCF:CA flONNu 13 EFFECTIVE DATE 4 REOU,$ITIOVPLURCKASE REQ NO 5 PROJECT NO III'IC pl.f :::.2 jNRC-:3- 128 See blork :6C Da:ed: 5/8/13 5 ISS• OBy CODE '3100 ? AOMINTEREO oe l COOE 1110 S. 'vuc:oer ReVulatory Com, iss;on *;.S. Noclear Regulatory Co'.*,sslon , ,.'. of Cvr:-rac:s Div. of Contracts Aý.:.n: Aoc.is Perev-Orciz Mail Stop: TWB-01-B'0M s'Ui-'top: "Yl-.rm-0-sOx '.i~•ij:oz. nc 20555 washington, DC 20555 8 NAME-NDADRESS OFCONTRACTOR (NO.. Iniir cw.SwIeUM ZIPCOE* (XI) SA AMENDMENTOFSOCtCIIA TIONNO FNF.RGY RESEARCH, TNC. 9e. DATED (SFE ITEM 11) 6:89 .XcuClU2VE' .•ij 1Ok, MOODIFICATION OF CONTRACTIOROER NO :NRC-HO-.12-C-42-0106 NtRC-T004 QOCKVTL,.,E YVD 708523901 106. DATED (SEE ITEM 13) CUL 6712 : 1 2.r,9 ;ACILITY CODE X 102-27-2013 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, i is not extended. Offers must acknowledge receipt of this amendment pnor to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completbng Items 8 and 15. and returning ._ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC- KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you deasire to change an offer already submitted, such change may be made by telegram or teleer, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. '2 IkCC:I-JTING AND APPROPRIAT;ON DATA (l1,00090 B&R; 2013-25-17-4-1.18 JC:Q4251 BOC:252A A4Pt'1O:31X0200 ThIMIS:132131 NhlCS:541690 PSC:R425 DUJNS:52121-259 OL:'GArES: $8,000.00 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. X. A T.S CHANOF ORDEPR . ISSUED •URSUANT TO (SpeR/y ,.Aitdy) THE CHANGES SET FORTH IN ITEM U4ARE MADE IN THE CONTRACTORDER NO IN ITEM IA 0 r'iE AeOVE NUMBEREDCONTRACTTRDER IS MODIFIED TO RErIFECTTHE ADOINISTRATIVE CHANGES (NAl LA dPe$ in PRY' O.Ne. O 1eOIN'oQ, doel ete) SET FORTH IS ITEM 14 PVRSUANT TO THE AUTHORITY OF FAR 43.1io). C T"R5 SUPPLEMENTAL AGREEVENT IS ENTERED INTOPURSUANT TO AUTHORITY OF O OTHER (.pE.y iype ofnIuoitiSlJoM&NiImM) FAR 43.103 (a) Bilateral changes X m Mutual Agreement of the Pazties E. IMPORTANT: Contractor Z is not, r is required to sign this document and return 1 copies to the Issuing oftice. 14 DESCRIPTION Or AMENOMENTIMOOIFICATION IOr1.W, by LCF SeCOM KIIIa* ••AE.I•l "IINCWVWai S*d f1l1.1" Wie .ea I !`:e u-rip,)sis of this modlf..cation aret !I) correct numbering of section A.1 Consideration and Obligation Cost. Plus -xeU-Fe; 421 revise Scct-on A.1 Schedule - Supplies or Services; 03) provide incremental funding in the omount of 5850C0.00 thereby increosing the obligated amount from $8.000.00 to $16,000.00 se ,ý;q ro).- IIIj ; f'ýCa'.i on. deta ils. To- a' =*z~ed Am"on:; S.6,000.0 (Changed) .. :a. -t-rd e,.r q S79,196.75 [Uncltar~gcd) veC -., c'! Per!o't-rance; j40;O3- 1213:12014 lUnc~CTaged) 0 i f4fp $ proves, Nen TIN WITS ndsw C~ns 11 Of T WIICff MRA'RCIRIersid 4 INeM SAw W 10. n h*ieioOW*C. II)N4. INT1W5 U11W,~ AI~eSM US kVi TOme WW ~ ESA NAME AND T TLE OF SIGNER ITy Yoe 1P-no 16A. NAME ANOTITLEOF CONTRACTING OFFIZER I T yPs1 Er,')) '7) Adelis X. Rodriguez I'r( di,-ConitractinqOficer 'Es - EC. DATE SIGNED '58. UNIT AFMNA r, , ,1.7 MCA EIO l~~~lO.~ 1.5.O. TNAOFORM 3 & IREf 10-M) PREVIOUS EDITION NOT USADLE Pqml• ~ GSA - FAR 144S'CFRJ 53 24*3 ItMPLAT - A09001 ,'JNsi REVIEW COMPLETu ii GUMP3bi -lb dato 1 12?I i!7: a -u -

Transcript of Modification No. 002 Task Order No. NRC-004 Under Contract ... · NRC-HQ-12-C-42-0106 Task Order...

Page 1: Modification No. 002 Task Order No. NRC-004 Under Contract ... · NRC-HQ-12-C-42-0106 Task Order No. NRC-T004 Modification No. M002 Page 3 of 3 (e) This is an incrementally-funded

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT SPA NO. 1 CONTRACTIOCOOE PAGE OF

2 AyN..NTwMOCF:CA flONNu 13 EFFECTIVE DATE 4 REOU,$ITIOVPLURCKASE REQ NO 5 PROJECT NO III'IC pl.f:::.2 jNRC-:3- 128

See blork :6C Da:ed: 5/8/13

5 ISS• OBy CODE '3100 ? AOMINTEREO oe l COOE 1110

S. 'vuc:oer ReVulatory Com, iss;on *;.S. Noclear Regulatory Co'.*,sslon, ,.'. of Cvr:-rac:s Div. of Contracts

Aý.:.n: Aoc.is Perev-Orciz Mail Stop: TWB-01-B'0Ms'Ui-'top: "Yl-.rm-0-sOx

'.i~•ij:oz. nc 20555 washington, DC 20555

8 NAME-NDADRESS OFCONTRACTOR (NO.. Iniir cw.SwIeUM ZIPCOE* (XI) SA AMENDMENTOFSOCtCIIA TIONNO

FNF.RGY RESEARCH, TNC.9e. DATED (SFE ITEM 11)

6:89 .XcuClU2VE' .•ij 1Ok, MOODIFICATION OF CONTRACTIOROER NO:NRC-HO-.12-C-42-0106 NtRC-T004

QOCKVTL,.,E YVD 708523901106. DATED (SEE ITEM 13)

CUL 6712 : 1 2.r,9 ;ACILITY CODE X 102-27-2013

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, i is not extended.

Offers must acknowledge receipt of this amendment pnor to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completbng Items 8 and 15. and returning ._ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the

offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC-KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you deasire to change an offer already submitted, such change may be made

by telegram or teleer, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour

and date specified.

'2 IkCC:I-JTING AND APPROPRIAT;ON DATA (l1,00090 B&R; 2013-25-17-4-1.18 JC:Q4251 BOC:252A A4Pt'1O:31X0200ThIMIS:132131 NhlCS:541690 PSC:R425 DUJNS:52121-259OL:'GArES: $8,000.00

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

X. A T.S CHANOF ORDEPR . ISSUED •URSUANT TO (SpeR/y ,.Aitdy) THE CHANGES SET FORTH IN ITEM U4 ARE MADE IN THE CONTRACT ORDER NO IN ITEM IA

0 r'iE AeOVE NUMBERED CONTRACTTRDER IS MODIFIED TO RErIFECT THE ADOINISTRATIVE CHANGES (NAl LA dPe$ in PRY' O.Ne. O 1eOIN'oQ, doel ete)

SET FORTH IS ITEM 14 PVRSUANT TO THE AUTHORITY OF FAR 43.1io).

C T"R5 SUPPLEMENTAL AGREEVENT IS ENTERED INTO PURSUANT TO AUTHORITY OF

O OTHER (.pE.y iype ofnIuoitiSlJoM&NiImM) FAR 43.103 (a) Bilateral changes

X m Mutual Agreement of the Pazties

E. IMPORTANT: Contractor Z is not, r is required to sign this document and return 1 copies to the Issuing oftice.

14 DESCRIPTION Or AMENOMENTIMOOIFICATION IOr1.W, by LCF SeCOM KIIIa* ••AE.I•l "IINCWVWai S*d f1l1.1" Wie Wý .ea I

!`:e u-rip,)sis of this modlf..cation aret !I) correct numbering of section A.1 Consideration and Obligation Cost. Plus

-xeU-Fe; 421 revise Scct-on A.1 Schedule - Supplies or Services; 03) provide incremental funding in the omount of

5850C0.00 thereby increosing the obligated amount from $8.000.00 to $16,000.00

se ,ý;q ro).- IIIj ; f'ýCa'.i on. deta ils.

To- a' =*z~ed Am"on:; S.6,000.0 (Changed)

.. :a. -t-rd e,.r q S79,196.75 [Uncltar~gcd)

veC -., c'! Per!o't-rance; j40;O3- 1213:12014 lUnc~CTaged)

0

i

f4fp $ proves, Nen TIN WITS ndsw C~ns 11 Of T WIICff MRA'RCIRIersid 4 INeM SAw W 10. n h*ieioOW*C. II)N4. INT1W5 U11W,~ AI~eSM US kVi TOme WW ~

ESA NAME AND T TLE OF SIGNER ITy Yoe 1P-no 16A. NAME ANO TITLE OF CONTRACTING OFFIZER IT

yPs1 Er,'))

'7) Adelis X. Rodriguez

I'r( di,-ConitractinqOficer'Es - EC. DATE SIGNED '58. UNIT AFMNA r, , ,1.7 MCA EIO

l~~~lO.~ 1.5.O. TNAOFORM 3& IREf 10-M)PREVIOUS EDITION NOT USADLE Pqml• ~ GSA - FAR 144S'CFRJ 53 24*3

ItMPLAT - A09001,'JNsi REVIEW COMPLETu ii

GUMP3bi -lb dato1 12?I i!7: a -u -

Page 2: Modification No. 002 Task Order No. NRC-004 Under Contract ... · NRC-HQ-12-C-42-0106 Task Order No. NRC-T004 Modification No. M002 Page 3 of 3 (e) This is an incrementally-funded

NRC-HQ-12-C-42-0106Task Order No. NRC-T004Modification No. M002Page 2 of 3

The purposes of this task order modification are to:

(1) correct numbering of section A.1 CONSIDERATION AND OBLIGATION -COST-PLUS-FIXED-FEE (AUG 2011) ALTERNATIVE 1 (AUG 2011) stated in modification numberMOO1 from A.1 to A.2;

(2) revise Section A. 1 SCHEDULE - SUPPLIES OR SERVICES to maintain consistencyamong the cost-plus-fixed-fee contracts issued by the NRC to the contractor, EnergyResearch, Inc.; and

(3) provide incremental funding in the amount of $8,000.00 thereby increasing the obligatedamount from $8,000.00 to $16,000.00.

Accordingly, the following changes are hereby made:

(1) Section A.1 SCHEDULE- SUPPLIES OR SERVICES, is deleted in its entirety andreplaced with the following:

0001 Services described in the $75,425.48 $3,771.27 $79,196.75Statement of Work (SOW)entitled "Technical Support for

the Detroit EdisonCompany/Fermi 3 COLEnvironmental Review."

Total $79,196.75

(2) Section CONSIDERATION AND OBLIGATION -COST-PLUS-FIXED-FEE (AUG 2011)ALTERNATIVE 1 (AUG 2011) is deleted in its entirety and replaced with the following:

"A.2 CONSIDERATION AND OBLIGATION--COST-PLUS-FIXED-FEE (AUG 2011)ALTERNATE I (AUG 2011)

(a) The total estimated cost to the Government for full performance of thiscontract is $79,196.75, of which the sum of $75,425.48 represents the estimatedreimbursable costs, and of which $3,771.27 represents the fixed-fee.

(b) There shall be no adjustment in the amount of the Contractor's fixed fee.

(c) The amount currently obligated by the Government with respect to thiscontract is $16,000.00, of which the sum of $15,238.10 represents theestimated reimbursable costs, and of which $761.90 represents the fixed-fee.

(d) It is estimated that the amount currently obligated will cover performancethrough July 20, 2013.

Page 3: Modification No. 002 Task Order No. NRC-004 Under Contract ... · NRC-HQ-12-C-42-0106 Task Order No. NRC-T004 Modification No. M002 Page 3 of 3 (e) This is an incrementally-funded

NRC-HQ-12-C-42-0106Task Order No. NRC-T004Modification No. M002Page 3 of 3

(e) This is an incrementally-funded contract and FAR 52.232-22 - "Limitation ofFunds" applies.

(f) In accordance with FAR 52.216-8 - Fixed Fee, it is the policy of the NRC towithhold payment of fee after payment of 85 percent of the fee has been paid inorder to protect the Government's interest. The amount of fixed-fee withheldfrom the contractor will not exceed 15 percent of the total fee or $100,000.00,whichever is less. Accordingly, the maximum amount of fixed-fee that may beheld in reserve is $565.69."

A summary of obligations for this contract from award date through the date of this action isprovided below:

FY 2013 O bligated Am ount ............................................................... $16,000.00

Cum ulative Total NRC Obligations ....................................................... $16,000.00

All other terms and conditions under this task order remain unchanged.

END OF TEXT