Service Report Customer : Tennamaram POM Service Engineer : Johairi Hussin Location : Batang Berjuntai Job no : - Contact : Mr. Mohd Nasir Date : 1 Dec 2010 Equipment: PANX 934 S/n 5019073 R/H 01330/46 OBJECTIVE: - To do inspection of decanter condition. - To do inspection of pre-cleaner system (Westfalia, double stage system). FINDING: Decanter 1. Checked machine vibration and bearing housing temperature Sludge (after cleaning) 1. 14.2 mm/s Big - 66ºC 2. 15.8 mm/s 3. 14.5 mm/s Small - 59ºC Alfa Laval (Malaysia) Sdn Bhd Parts & Service, PPS Page 1 Inspection Report Parts & Service

Transcript of Tannamaram POM

Page 1: Tannamaram POM

Service Report

Customer : Tennamaram POM Service Engineer : Johairi HussinLocation : Batang Berjuntai Job no : -Contact : Mr. Mohd Nasir Date : 1 Dec 2010

Equipment:PANX 934 S/n 5019073 R/H 01330/46

OBJECTIVE:

- To do inspection of decanter condition.- To do inspection of pre-cleaner system (Westfalia, double stage system).

FINDING:

Decanter

1. Checked machine vibration and bearing housing temperature

Sludge (after cleaning)1. 14.2 mm/s Big - 66ºC2. 15.8 mm/s3. 14.5 mm/s Small - 59ºC4. 14.3 mm/s

Throughput 10 m³/h Main motor 55 A Damplate size 137/142

2. Decanter drum and conveyer1. Remove all damplates and do manual cleaning.2. Drum and scroll can turn smoothly.

Alfa Laval (Malaysia) Sdn BhdParts & Service, PPS Page 1

Inspection Report

Parts & Service Revision : 01/2010

Page 2: Tannamaram POM

Service Report

3. No abnormal condition at drum.4. All screws at hub, drum and housing still in good condition, no

replacement required.5. Grease nipple still in good condition.

3. Inlet zone1. Inlet tube in good condition.2. Discharge bushing in good condition.

4. Gear box and back drive1. Gear oil level and condition – OK.2. GS Clutch ball bearing – OK.3. Back drive ball bearing – OK.4. Need new gear box cover.5. No abnormal sound and vibration during operation.

5. Decanter frame1. Decanter frame condition, clean.2. Decanter cover need new gasket.3. Liquid outlet funnel need new gasket4. Vibration dampers still in good condition.5. All screws still in good condition.

6. Belting (v-belt and tooth belt)1. All belting tensioning – OK.2. All belting still in good condition.

7. Flow meter and safety device1. Flow meter still in good condition.2. All safety device functioning (emergency, cover and overload switch).3. Air supply 5 bar.4. Manual flushing system.

8. Decanter panel

1. Panel in good condition. Need new tagging for all indicator lamp.2. All indicator lamp and ammeter functioning.

Alfa Laval (Malaysia) Sdn BhdParts & Service, PPS Page 2

Inspection Report

Parts & Service Revision : 01/2010

Page 3: Tannamaram POM

Service Report

9. Oil loss result (from lab)

1. 26 Nov 2010 H/p 0.80 %Cake 3.43 %

2. 27 Nov 2010 H/p 0.86 %Cake 3.29 %

3. 29 Nov 2010 H/p 1.18 %Cake 3.75 %

10. Sludge temp 90ºC

11. Underflow oil content

1. 26 Nov 2010 6.33 %2. 29 Nov 2010 7.33 %3. 30 Nov 2010 6.00 %

12. Recommendation To change new cover gasket to avoid oil leak during operation. To change new gasket for liquid outlet funnel. To change new gear box cover. The existing cover already in bad

condition To install new tagging at decanter panel. To check due date for servicing (high vibration).

Alfa Laval (Malaysia) Sdn BhdParts & Service, PPS Page 3

Inspection Report

Parts & Service Revision : 01/2010

Page 4: Tannamaram POM

Service Report

Maintenance for decanter (Recommendation).

1. FlushingDuring start up when ampere reaches 50A, open hot water feed 5m³/h. EVERY 4 hours, we highly recommend mill to do MANUAL flushing, open hot water 10m³/h for 10 minutes.During STOPPING, close sludge valve and open hot water 5m³/h until machine slow down. Close water valve before motor stop to prevent water back pressure and pour onto the electrical motor.

2. GreasingGrease the main bearing every 150 hours. Qty 10 gram (10 strokes)Grease the conveyor bearing every 300 hours. Qty 100 gram (67 strokes)Type of grease SKF LGHF2

3. Check the motor V-belt (4 pcs) tension every 2000 hours (strongly recommended to check every week). Please keep one set stock.

4. Check the 2.5 kNm gearbox flat belt tensioning every 2000 hours (strongly recommended to check every week). Please keep one set stock.

5. Check the level of gear oil inside the 2.5 kNm gearbox every 3 month. We request the mill 1 container (4 ltr) of gear oil in the store to top up.

6. Every 2 months, remove the grease from grease outlet at bearing housing. If you do not remove this grease, your motor V-belt will snap and need replacement frequently.

7. Casing Open the 10 screws on drum cover and check inside the casing for solid deposits (every 300 hours). There is an opening at the big end side of casing that the liquid can flow out into the light phase compartment. If this opening is block by solid deposits, the drum touches the liquid level and motor requires more power. The amp will increase and motor might burn or V-belt snap.

Alfa Laval (Malaysia) Sdn BhdParts & Service, PPS Page 4

Inspection Report

Parts & Service Revision : 01/2010

Page 5: Tannamaram POM

Service Report

8. Feed tubeTake off the V-belt guard at motor side and dismantle the feed tube. Before pulling out the feed tube, please mark the position so that when you assemble the feed tube It is in the same position as before. If there are worn out marks, the same worn out marks place in the same position to avoid further damage to other rotation which may result feed tubes broken into two pieces.

9. Safety switchesDuring start up or decanter STOP due to safety switches being activated, DO NOT start decanter before the causes investigated.

Overload switchOnce the light lid up at overload switch at control panel, open the gear box cover. Try to rotate the drum by hand. If the drum is difficult to rotate, open decanter cover. Rotate drum by hand and at the same time open hot water to cleanup the sludge inside the drum (strongly recommended to pull out all dam plates). You have to get rid of the sludge inside the drum until the drum is able to be rotated with one hand.Then close the decanter cover (do not put the gearbox cover yet) and start up the decanter. Once decanter reaches maximum speed, open the hot water valve.

Thermistor Motor operating at high temperature thus motor need to cool down at least 1 hour before start up again. Else motor burn.

Thermal tripMotor operating over its allowable maximum current. Reset push button on overload relay below delta connector inside control panel (K2).

Cover openPush pin inside the slot.

Remote emergency switchRelease emergency stop by pulling out the knob.

10. Solid conveyorSome control panel incorporates this safety feature onto the control panel. If you do not have, please do your own interlocking system.

11. VibrationIf decanter vibration is too high or strange sound please inform mill in charge (max vibration 18 mm/s).

12. Decanter jammed

Alfa Laval (Malaysia) Sdn BhdParts & Service, PPS Page 5

Inspection Report

Parts & Service Revision : 01/2010

Page 6: Tannamaram POM

Service Report

Call Alfa Laval and inform which side of decanter Small end side (main motor side) Big end side (gear box side) Tel No : 03 5191 2300 Fax No : 03 5191 7051

Pre-cleaner system

1st and 2nd stage

Top and bottom actuator can activate. All actuator valve installed at the correct position. No leakage discovered at sludge pump, pipe and pre-cleaner unit. Installed with digital and conversional pressure gauge. Both pressure gauge chocked and not working.

Recommendation

To check all pressure gauge condition and make sure inlet pressure 3 bar and outlet 1 bar.

Alfa Laval (Malaysia) Sdn BhdParts & Service, PPS Page 6

Inspection Report

Parts & Service Revision : 01/2010

Page 7: Tannamaram POM

Service Report

Note: The pre-cleaner used for the removal of fine sand and particles from sludge. It is normally installed before decanter or separator to provide pre-treatment and protect the equipment against excessive wear. There will definitely be considerable savings in maintenance cost as a result of lower wear and tear on the equipment. The most important requirement for efficient sand removal in any desanding system is the pressure drop.

The recommended pressure for the pre-cleaner is: Inlet pressure: 3 bars Outlet pressure: 1 bars

The maximum inlet pressure should not exceed 4.5 bars. The separating efficiency does not increase proportionally with high inlet pressure.

The timers setting also one of the most important things to pre-cleaner system. Pre-cleaner must run with correct timers (discharge sequence) to make sure sand cannot go through to decanter feed tank when the dirt receiver full. Pre-cleaner cannot run with too short or too long discharge interval. The timers will be set according to sand built up inside the dirt receiver (see sight glass).

The others thing we need to take care is the pre-cleaner pump. A good pre-cleaner pump must meet the following criteria

Inlet pressure to the pre-cleaner of at least 3 bar corresponding to the capacity and pumping head

Impeller rotating at low speed to avoid excessive agitation to the process medium

Casing with hard material to withstand the wear and tear of the application.

Alfa Laval (Malaysia) Sdn BhdParts & Service, PPS Page 7

Inspection Report

Parts & Service Revision : 01/2010

Page 8: Tannamaram POM

Service Report

Existing Sludge Piping

Alfa Laval (Malaysia) Sdn BhdParts & Service, PPS Page 8

Inspection Report

Parts & Service Revision : 01/2010

To Decanter feed tank

1st stage Sludge tank

1st stage precleaner

2nd stage precleaner

VC tank Sludge Tank

Page 9: Tannamaram POM

Service Report

Appendix 1

Decanter panel, new tagging for indicator lamp and push button.

Flow meter ingood condition

Alfa Laval (Malaysia) Sdn BhdParts & Service, PPS Page 9

Inspection Report

Parts & Service Revision : 01/2010

Page 10: Tannamaram POM

Service Report

Need new cover gasket Defected cover gasket

Appendix 2

Alfa Laval (Malaysia) Sdn BhdParts & Service, PPS Page 10

Inspection Report

Parts & Service Revision : 01/2010

Page 11: Tannamaram POM

Service Report

Discharge bushing still in good condition Liquid outlet funnel

Gear box and back drive Bearing housing condition

Appendix 3

Liquid outlet funnel gasket-OK V-belt condition

Alfa Laval (Malaysia) Sdn BhdParts & Service, PPS Page 11

Inspection Report

Parts & Service Revision : 01/2010

Page 12: Tannamaram POM

Service Report

Digital and normal pressure gauge No pressure reading (inlet/outlet)

Alfa Laval (Malaysia) Sdn BhdParts & Service, PPS Page 12

Inspection Report

Parts & Service Revision : 01/2010