ABLE TO DEFINE WHAT IS TAB BOND PROCESS CONCEPT.

BE ABLE TO IDENTIFY THE 2 BASIC OPERATIONSIN A TAB BOND PROCESS.

TO DETERMINE HOW THE TAB BOND EQUIPMENT WORKS.

TO IDENTIFY TAB BOND WORKING ELEMENTS.

What is Tab Bonding?

It is a process of interconnecting inner-bonding pads of semiconductor dice to lead sites of tab circuit that are part of continuous tape.

Lead to die bonds are made using a single point thermosonic energy toform an intermetalic bond between the lead and a bond location on die.

To promote bond formation, the die is heated prior bonding.

The bond tool is repositioned and the bonding process repeated as many times as is needed to bond all leads at a lead site to the die.

All motions are controlled by the electronic control system in the bonder.

Chip Attach (Pick & Place Principle)

Describes the picking-up of the die by the Pick-Up Tool from the wafer and places it on the Pedestal for bonding.

Pre-Peel Vacuum

Push Up Force

Pick Up Force

Pick Up Time

Blow-off Pressure

Pick

Place

Working Elements Required

Die Pick Holding Vacuum

DPVS

Die Pick Vision System

It recognizes the taught condition to perform the Die Pick & Place operation.

Vision Area

Clarity (Illumination) of the die surface as seen in the vision area -this figure describes the best taught condition

Poor illumination - manual pick is needed due to its condition

Dies

Die Eject Assy

Blue TapeWafer Ring

Table Stop

Pick-Up Tool

Mechanical Set-Up

X & Y Axis (XY Table) Y-axis

X-axis

The Die Eject Assy is stationary

Table moving in the X-axis

Table moving in the X-axis

Table moving in the X-axis

Table moving in the X-axis

Table moving in the X-axis

Table moving in the X-axis

Table moving in the X-axis

Table moving in the X-axis

Table moving in the X-axis

B-Axis (Pick-Up Tool), D-Axis (Die Eject Assy)

B-axis

D-axis

Die Eject Assy moving in the D-axis

Pick-Up Tool moving in the B-axis

Die Eject Assy moving in the D-axis

Pick-Up Tool moving in the B-axis

Die Eject Assy moving in the D-axis

Pick-Up Tool moving in the B-axis

Die Eject Assy moving in the D-axis

Pick-Up Tool moving in the B-axis

Die Eject Assy moving in the D-axis

Pick-Up Tool moving in the B-axis

Z-Axis (Die Ejector)

Z-axis

Die Ejector

Die Ejector moving in the Z-axis

Die Ejector moving in the Z-axis

Die Ejector moving in the Z-axis

Die Ejector moving in the Z-axis

The “PICK”

It proceeds to the Pick Operation once the DPVSrequirement is satisfied.

The “PICK”

Suction Cup

Pick-Up Tool dropped near to the die surface

The “PICK”

Pre-Peel Vacuumactivates

The die is sucked towards the suction cup due to the introduction of the Pre-Peel Vacuum

The “PICK”

Pre-Peel Vacuumactivates

The die is sucked towards the suction cup due to the introduction of the Pre-Peel Vacuum

The “PICK”

Pre-Peel Vacuumactivates

The die is sucked towards the suction cup due to the introduction of the Pre-Peel Vacuum

The “PICK”

Pre-Peel Vacuumactivates

The die is sucked towards the suction cup due to the introduction of the Pre-Peel Vacuum

The “PICK”

Suction Cup

The Die Ejector moves up (Push Up Force) pushing the die back peeling off some blue tape holding it.

Some blue tape are peeled off. This is necessary to enhance the die pick.

Die Pick Holding Vacuum activates to hold back the die. NOTE: This is simultaneous to the moving up of the Die Ejector.

The “PICK”

Suction Cup

The Die Ejector moves up (Push Up Force) pushing the die back peeling off some blue tape holding it.

Some blue tape are peeled off. This is necessary to enhance the die pick.

Die Pick Holding Vacuum activates to hold back the die. NOTE: This is simultaneous to the moving up of the Die Ejector.

The “PICK”

Suction Cup

The Die Ejector moves up (Push Up Force) pushing the die back peeling off some blue tape holding it.

Some blue tape are peeled off. This is necessary to enhance the die pick.

Die Pick Holding Vacuum activates to hold back the die. NOTE: This is simultaneous to the moving up of the Die Ejector.

The “PICK”

Suction Cup

The Die Ejector moves up (Push Up Force) pushing the die back peeling off some blue tape holding it.

Some blue tape are peeled off. This is necessary to enhance the die pick.

Die Pick Holding Vacuum activates to hold back the die. NOTE: This is simultaneous to the moving up of the Die Ejector.

The “PICK”

The Die Ejector moves down back to position.

The Pick-Up Tool moves up (Pick Up Force) to its axis holding the die on a certain time (Pick Up Time).

Pre-Peel Vacuumdeactivates

The “PICK” & “PLACE” Transition

The Pick-Up Tool is positioned to move & place the die on the Pedestal

The “PICK” & “PLACE” Transition

To Pedestal

The “PICK” & “PLACE” Transition

To Pedestal

The Pedestal

Precisors

The Pick-Up Tool places the die on its Pedestal

The “PLACE”

The “PLACE”

The Blow-Off Pressure lays the die on the Pedestal

The “PLACE”

The Blow-Off Pressure lays the die on the Pedestal

The “PLACE”

The Blow-Off Pressure lays the die on the Pedestal

The “PLACE”

The Blow-Off Pressure lays the die on the Pedestal

The “PLACE”

The Pick-Up Tool moves back to continue another cycle

A certain valve activates a vacuum that holds the die towards the Pedestal once a high vacuum is detected on the Pedestal surface.

Die on the Pedestal

The “PLACE”

The Pick-Up Tool moves back to continue another cycle

A certain valve activates a vacuum that holds the die towards the Pedestal once a high vacuum is detected on the Pedestal surface.

Die on the Pedestal

The “PLACE”

The Pick-Up Tool moves back to continue another cycle

A certain valve activates a vacuum that holds the die towards the Pedestal once a high vacuum is detected on the Pedestal surface.

Die on the Pedestal

The “PLACE”

The Pick-Up Tool moves back to continue another cycle

A certain valve activates a vacuum that holds the die towards the Pedestal once a high vacuum is detected on the Pedestal surface.

Die on the Pedestal

The “PLACE”

The Precisors vibrate to move & correct die position on the Pedestal

Die on the Pedestal

The “PLACE”

The Precisors vibrate to move & correct die position on the Pedestal

Die on the Pedestal

The “PLACE”

The Precisors vibrate to move & correct die position on the Pedestal

Die on the Pedestal

The “PLACE”

The Precisors vibrate to move & correct die position on the Pedestal

Die on the Pedestal

The “PLACE”

The Precisors vibrate to move & correct die position on the Pedestal

Die on the Pedestal

The “PLACE”

The Precisors vibrate to move & correct die position on the Pedestal

Die on the Pedestal

The “PLACE”

The Precisors vibrate to move & correct die position on the Pedestal

Die on the Pedestal

Pedestal from Die Load to Unload Position

Once the Precisors are done, it is now ready to move to Die Unload Position at the Work Holder Assy. This time it releases (vacuum is deactivated) the die once bonded.

Load Unload

BOND FORCE

HEAT

WORKING ELEMENTS:

ULTRASONIC POWER

BOND TIME

3. BOND TIME

4. HEAT

WORKING ELEMENTS:

2. ULTRASONICPOWER

1. BOND FORCE

TO SUMMARIZE:

THERE ARE 2 MAJOR OPERATIONS IN TAB BOND PROCESS:- WAFER DIE PICK AND PLACE- SINGLE POINT TAB BONDING

WAFER DIE PICK AND PLACE OPERATION HAS THE FOLLOWING WORKING ELEMENTS:- PRE-PEEL & HOLDING VACUUM- PUSH UP & PICK UP FORCE- PICK & PLACE BOND TIME- BLOW OFF

TAB BOND OPERATION HAS THE FOLLOWING WORKING ELEMENTS:-ULTRASONIC POWER-BOND FORCE-BOND TIME-HEAT

THE TAB BONDING PROCESS IS NOT SUCCESSFUL WITH THE ABSENCE OF ANY OF THE WORKING ELEMENTS.

Tab bonding is a process of interconnecting inner-bonding pads of a dice to lead sites of tab circuit by means of single point thermosonic energy (combination of heat energy, ultrasonic energy and force) that forms an intermetallic (adhesion) bond between the die bonding pad and circuit leads.