SYSTEM RESTORATION

SYSTEM RESTORATION PROCEDURE

FOR NORTHERN REGIONAL GRID

March 2001

Page 2: SYSTEM RESTORATION

CHAMERA

DEHAR

HISSAR

MOGA

BHIWANI

PANIPAT

DADRI

RISHIKESH

MORADABAD

SULTANPUR

AZAM-GARH

GORAKHPUR

MAU

OBRA SARNATH

ANPARA

RIHAND

SINGRAULI

KANPUR

(PG)

AURAIYA

BALLABGARH

BAWANA

BAMNOLI

BASSI

JAIPUR

PANKI

211

Km

.

34 Km.

312

Km

.

262 Km.

46 Km.

53 K

m.

226 Km.

211 Km.

MURADNAGAR

37 K

m.

MANDAULA

24 Km.

VINDHYACHAL

MALERKOTLA

HYDRO

THERMAL

GAS

POWERGRID SUB-STATION

BBMB SUB-STATION

STATES SUB-STATION

400 kV UNSWITCHED

LINE REACTOR

33 kV SWITCHED

BUS REACTOR

400 kV SWITCHED

BUS/LINE REACTOR

STATIC VAR

COMPENSATOR

HVDC BACK TO BACK

LEGEND:-

NORTHERN BUS

WESTERN BUS

HVDC BIPOLE

(63)

A(50) (50)

A(50)

(50)

(50)

A(50)

(50)

(50)

(50)

B(50)

153

Km.

(50)

540 MW

3x250 MVA

2x315 MVA

1x500 MVA 3x315 MVA

TRF 400/220 kV4x315 MVA

TRF 400/220 kV

2x240 MVA

TRF 400/220 KV2x240 MVA

TRF 400/220 kV2x240 MVA

2x240 MVATRF 400/220 kV 2x240 MVA

TRF 400/220 kV

TRF 400/132 kV2x200 MVA

TRF 400/132 kV2x100 MVA

TRF400/132kV3x100 MVA

A

A(50)

A

A

A

TRF 400/220 kV3x250+1x315 MVA

B

B

B

B

B

277 km.

99 km.

KISHENPUR

132 km.

101 km.

400 kV GRID DIAGRAM OF NORTHERN REGION

400 kV TRANSMISSION LINES

765 kV TRANSMISSION LINES

URI

WAGOORAPAMPORE

11 km.

174

km.

4x120 MWTRF 400/220 kV

2x315 MVA

TRF 400/220 kV

TRF 400/132 kV

95 km.

NRLDC/POWERGRID

JANUARY, 2002

A

A

A

(50)

A

(50)

TRF 400/220 kV2x315 MVA

A(50)

A(50)

(50)

B

2x450 MVATRF 400/220 kV

A(50)

TRF 400/220 kV3x315 MVA

NATHPA JHAKRI

ABDULLAPUR

A(80)

A(80)

A(80)

A(80)

400/220 kV2x315 MVA

A(5

0)

TRF 400/220 kV2x315 MVA

2x240 MVATRF 400/220 kV

LUCKNOW2x240 MVA

TRF 400/220 kV

2x240 MVATRF 400/220 kV

2x200 MVA

1x315 MVA

BARREILLY

UNNAO

AA

(50)

A(50)

A(50)

A(50)

A(63)

HVDC 500 kV LINE

NALAGARH

A(80)

A(50)

+

TRF 220/132 kV2x150 MVA

290 km.

275 km.

TRF 400/220 kV

250

Km.

145 Km.

TRF 400/220 kV

TRF 400/220 kV

180 Km

.

1x315 MVA

AGRA AGRA(UPPCL)

RATANGARH

SURATGARH

144 km.

CHOMU

REENGUS

SIKAR

2x240 MVA

TRF 400/220 kV2x315 MVA

2x315 MVATRF 400/220 kV

TRF 400/220 kV2x315 MVA

B(63)

A(5

0)

A(50)

TRF 400/220 kV2x315 MVA

B(50)

Charged at220 kV

220 kVCharged at

2x315 MVA

TRF 400/220 kV

TRF

DULHASTHI

124 km.

Charged at400 kV

Charged at400 kV

A(5

0)

JALLANDHAR

SCALE : NOT TO SCALE

(63)A

82 km

.

2x315 MVATRF 400/220 kV

1x315 MVATRF 400/220 kV

2x315MVATRF400/220kV

220 kV TRANSMISSION LINES

ALLAHABAD

FROM BIHAR SHARIF

TRF 400/220 KV2x315 MVA

DRN. BY Ramjit

Page 3: SYSTEM RESTORATION

SUBSYSTEM

WESTERNU.P.

EXHIBIT-1A

T. G. 2300.95 MW

PUNJAB

J&K

HARYANA H.G. 1265.95 MW

TOTAL GEN. 7993 MWHYDRO GEN. 399 MW

SUBSYSTEMEASTERN U.P.TOTAL GEN. 2986 MW

HYDRO GEN. 434.32 MW

TOTAL GEN. 13397.96 MWHYDRO GEN. 6084.16 MW

SUBSYSTEMBBMB-DELHI

H.P.

DADRI

DELHI

B'GARH

AGRA

HISSAR

MURAD-NAGAR

KANPUR

PANKIBASSIHEERAPURA

RAJASTHANSUBSYSTEM

KOTA(T)

SUTATGARH

URI

CHAMERA

BHAKRA

RIHAND

SINGRAULI

VINDHYACHAL

Page 4: SYSTEM RESTORATION

RamjitDRN. BY

NORTHERN REGIONAL GRID : SUBSYSTEM SYNCHRONISATION

VINDHYACHAL TO AVAIL

EXHIBIT - 1B

START-UP POWER FROM

RIHAND (H) TO SELF-START

WESTERN REGION AND

FARIDABAD GAS,

AURAIYA (GT)

DADRI (GT)

BHAKRA (R)

DELHI (GT)

SELF START BY

ANTA TO SELF START

R.P. SAGAR TO SELF START

POWER FROM UJJAIN (W.R.)

KOTA (S)TO AVAIL START-UP

SELF START BY

YAMUNA COMPLEX

KHARA

RAMGANGA/TANAKPUR

KANPUR 400 kV BALLABGARH 400 kV BASSI 400 kV MURADNAGAR 400 kV

BALLABGARH 400 kV

SYNCHRONISE AT 400 kV

PANKI 400 kV

DADRI 400 kV

SYNCHRONISE AT 400 kV

PANKI/LUCKNOW/MORADABAD

DADRI/MURADNAGAR/AGRA

BALLABGARH

KANPUR/AGRA/BALLABGARH

SYNCHRONISE AT 400 kV

AGRA 400 kV

BASSI/HISSAR/AGRA/

EXTEND IT TO SINGRAULI

HISSAR 400 kV

LOWERJHELUM,RANJITSAGAR

CHAMERA,SALAL,URI,

AGRA 400 kV

CHILLA/MANERIBHALI

MORADABAD 400 kV

AGRA 400 kV

LUCKNOW 400 kV

DESYNCHRONISE WITH WESTERN

REGION AFTER SUBSYSTEM

POWER FROM KOTA(S)

RAPS(A),RAPS(B) TO AVAIL

STABILISATION

Page 5: SYSTEM RESTORATION

SYSTEM RESTORATION

LOAD GENERATION BALANCE

During system restoration for the security of operation of the restored subsystems as well as for ease of synchronization

---the load generation balance is to be maintained in

each sub-system and

---all efforts be carried out to maintain the system parameters near the nominal values

Page 6: SYSTEM RESTORATION

LOAD GENERATION BALANCE DURING SYSTEM RESTORATION

 

EASTERN U.P. SUBSYSTEM 

S No. Sources of Start-up Power QuantumMW

a WR - on 400 KV Vindhyachal AC By-Pass link 100

b Rihand (Hy) - Self start 250

c Obra (Hy)-Start-up from Rihand(Hy) 50

  Total 400

 

  Requirement of Start-up Power QuantumMW

a Start up power at Singrauli 70

b Start up power at Rihand 50

c Start up power at Anpara 70

d Start up power at Unchahar 40

e Start up power at Obra(Th) 40

f Start up power at Tanda 20

g Railway Traction 110

  Total 400

Page 7: SYSTEM RESTORATION

RamjitDRN. BY

EASTERN U.P. SUBSYSTEM : RESTORATION STAGES

POWER FROM WESTERN REGION ON VINDHYACHAL TO AVAIL START-UP

STAGE No.

3

2

1

EXHIBIT - 2A

400 kV AC BY-PASS LINK

RIHAND (H) TO SELF START

POWER TO

EXTEND START-UP

POWER TO ANPARA(Th)

EXTEND START-UP

RIHAND(Hy) TO SYNCHRONISE WITH

EXTEND SUPPLY TO 220kV

PANKI,FATHEPUR, NAUBASTA,

ALLAHABAD AND SAROJININAGARFOR RAILWAY TRACTION AND

NOTE:-

1. RIHAND (Hy) SHALL SYNCHRONISE WITH THE SINGRAULI SUPPLY

AT THE EARLIEST OPPORTUNITY.

SYNCHRONISM WITH WESTERN REGION TILL THE SUBSYSTEM GETS

2. EASTERN U.P. SUBSYSTEM SHALL CONTINUE TO OPERATE IN

ADEQUATELY STRENGTHENED.IN CASE OF NON AVAILABILITY FROM EASTERN REGION.

4. ROBERTSGANJ SHALL EXTEND SUPPLY TO SAHUPURI FOR RAILWAY TRACTION

EXTEND START-UP POWER

TO 400 kV SINGRAULI ON

EXTEND POWER TO 400 kV

KANPUR

400 kV VINDHYACHAL-

EXTEND START-UP

POWER TO OBRA(Hy)

RIHAND(Th) ON 400kV

POWER TO

EXTEND START-UP

UNCHAHAR(Th)

ON 400 kV

ROBERTSGANJ FOR

EXTEND POWER TO

RAILWAY TRACTION

SUPPLY FROM SINGRAULI

3. RAILWAY TRACTION SUPPLY AT SAHUPURI SHALL BE FED FROM

SINGRAULI LINE.

THROUGH 400 kV

EXTEND START-UP

POWER TO TANDA(Th)

EASTERN REGION.

AND OBRA (Th)

RIHAND(Hy) ON 132 kV

EXTEND POWER TO

EXTEND POWER TO 220 kV

KANPUR

4

POWER TO ANPARA(Th)

EXTEND START-UP

ON 132 kV.

OBRA & SULTANPURSTART-UP POWER TO PANKI(Th)

Page 8: SYSTEM RESTORATION

X

X

X

X

X

XHVDC

BLOCK-1

XHVDC

BLOCK-2

XSINGRAULI KANPUR

AWL5

AWL4-QAWL3-Q

1ANORTH BUS

NORTH BUS

AR2

D1

D2

AR2-Q

D21

D11

AWL6-TL

400 kV

B2Q11-QB1Q11-Q

B2Q21-QB1Q21-Q

1BWEST BUS

2BWEST BUS 400 kV

400 kV

D1D2 D1 D2 D2 D1

AR1-QAWL1-QAWL2-Q

VINDHYACHAL STPS-2

AR1

VINDHYACHAL STPS-1

400 kV

2A

EXHIBIT-7A

HVDCSTATIONCONTROL

CONTROLSTPSVINDHYACHAL

Page 9: SYSTEM RESTORATION

SYSTEM RESTORATION

OPERATION OF AC BYPASS LINK

Since the time taken for extending the start-up power from westeren region to northeren region is extremely vital for normalisation of the grid

---the operations for closing of AC bypass link should be done in quickest possible time.

Page 10: SYSTEM RESTORATION

RamjitDRN. BY

EASTERN U.P. SUBSYSTEM : START-UP SEQUENCE

1 2 3 4 5 6

SINGRAULI RIHAND(T)

SSTATION TO SELF-START

HYDRO STATIONS

THERMAL STATIONS

SUB-STATIONS

RAILWAY TRACTION

STEP No.

LEGEND:-

ANPARA

ROBERTSGANJ

STEP No.

RIHAND(H)

OBRA(H)

FATEHPUROBRA(T)

7

ALLAHABAD PANKI PANKI

R

TPS220 kV

AVAIL POWER

FROM WESTERN REGION

ON VINDHYACHAL AC

BY-PASS LINK

WITH SINGRAULI

SUPPLY AT

SYNCHRONISATION

R R

R

R

EXHIBIT - 2B

R

SAHUPURI

VINDHYACHAL

KANPUR400 kV 220 kV

KANPUR220 kVUNCHAHAR

TPSPANKI

OBRA SULTANPUR SULTANPUR TANDA220 kV400 kV 400 kV

S

RIHAND(H)

220 kVPANKI

220 kV

4

6

RIHAND(Hy)

R

S

S

Page 11: SYSTEM RESTORATION

SYSTEM RESTORATION

EASTERN UP SUBSYSTEM

For fast build-up of the sub-systems in UP area and to regulate the system parameters, the early start-up of the units at Rihand (Hydro) is extremely essential.

Furthermore in order to stablize the units at Rihand(Hydro) these must be synchronized with a stable source like western grid at the earliest opportunity.

Page 12: SYSTEM RESTORATION

S No. Sources of Start-up Power

a Bhakra(Right) 300b Bhakra(Left) 200c Auraiya(Gas) 110d Dadri(Gas) 130e I.P.Extn 50f Pong 120g Faridabad(Gas) 140h Salal HEP 105i Uri HEP 40j Lower Jhelum 30  Total 1225 

  Requirement of Start-up Power

a Panipat(Th) 40b Ropar 50c Bhatinda 30d Lehra Mohabbat 50e BTPS 40f Dadri(Th) 50g IP+Rajghat 40h Faridabad(Th) 20i Railway Traction 220j Other Essential Loads 685  Total 1225

LOAD GENERATION BALANCEBBMB-DELHI SUBSYSTEM

 

Quantum MW

Quantum MW

Page 13: SYSTEM RESTORATION

BBMB-DELHI SUBSYSTEM : RESTORATION STAGES

AURIYA TO SELF START BHAKRA(R) TO SELF STARTAND EXTEND POWER TO JAMALPUR AND GANGUWAL.

URI/LOWER JHELUM TO SELF START AND

SYNCHRONISE AT POWER TO I.P, RAJGHAT AND

DELHI(GT) TO SELF-START AND EXTEND START-UP

EMERGENCY LOAD IN DELHI.

SANGRUR,EXTEND POWER TO

POWER TO BHAKRA(L),EXTEND START-UP

220kV PANIPAT(BBMB)EXTEND POWER TO

RAILWAY TRACTIONEXTEND SUPPLY TO

FROM AGRA, MATHURA

POWER TO DADRI (T).EXTEND START-UP

RAILWAY TRACTIONEXTEND POWER TO

DADRI (G) TO

FROM RAJPURA, SAHNEWAL AND

SYNCHRONISE WITH

400 kV DADRI/PNPT.BBMB SYSTEM AT

STAGE No.

1

2

3

EXTEND POWER TO B.T.P.S. FOR

GOBINDGARH-II THROUGH DHULKOTE.DEHAR,GANGUWAL AND

EXTEND POWERTO KISHENPUR

DEERABASSI.BHATINDA, LEHRA-.B. SIUL, ROPAR,POWER TO PONG.EXTEND START-UP

THROUGH 132 kV POWER TO ROPAR(T)EXTEND START-UP

RAILWAY TRACTIONEXTEND SUPPLY TO

FROM PANIPAT ANDNARELA.

PANIPAT (Th).POWER TO EXTEND START-UP

DADRI (NTPC).EXTEND SUPPLY TOSYNCHRONISE/PANIPAT 400kV ANDEXTEND SUPPLY TOSYNCHRONISE WITH

AT 400kV AURAIYA/BBMB SYSTEM

EXHIBIT - 3A

MOHABAT AND

SALAL/CHAMERATO SELF START.AND SYNCHRONISE WITH

WESTERN REGION SUPPLYAT MALANPUR. PAMPORE/URI.

FARIDABAD GAS TOSELF START.

AND MOHALI.KOTLA HEP.

SYNCHRONISATIONWITH FARIDABAD/

BBMB SUPPLY.AND PHAPHUND.

ROPAR AND TOAGRA.

EXTEND START-UP POWER TO BTPS.

SURATGARH.

EXTEND START-UP

FARIDABAD (Th) ANDRAILWAY TRACTION

POWER TO

LOAD AT B'GARH.

AND SYNCHRONISE

SELF START.RANJITSAGARTO SELF START.

SYNCHRONISE

EXTEND POWERTO SARNA AND

WITH BBMB

ANANDPUR SAHIB.

DRN. BY Ramjit

SUPPLY.

JALLANDHAR,DIFFERENT SUPPLIES.

Page 14: SYSTEM RESTORATION

RamjitDRN. BY

B.B.M.B. - DELHI SUBSYSTEM (PART-1): START-UP SEQUENCE1 2 3 4 5 6 7 8 9 10 11

NARELA

DADRI (T)

DADRI G.T.PANIPAT(T)BHAKRA (L)

BHAKRA (R) DHULKOT PANIPAT220 kV 400 kV

PANIPAT400 kVDADRI BALLABHGARH

400 kVAGRA

400 kV 400 kVAURAIYA AURAIYA(GT)

DEHAR

MOHALI

KHETRIHISSARSANGRUR

MOHABATBARNALA(BBMB)

JAMALPUR

ROPAR

JALLANDHAR PONG B. SIUL CHAMERA

PAMPORE WAGOORA URIKISHENPUR

SALAL

SARNADASUYA

KISHENPURPAMPOREVALLEY HY. UNITS

S

2

3

S

SSTATION TO SELF-START

HYDRO STATIONS

THERMAL STATIONS

SUB-STATIONS

RAILWAY TRACTION

STEP No.

LEGEND:-

STEP No.

R

R

R

HY. UNITSVALLEY

8

1

LEHRA-BHATINDA

GOVINDGARH-I

EXHIBIT - 3B(1of2)

BAWANA NAJAFGARH BAMNAULI MEHRAULI BTPS

9

GANGUWAL

GANGUWAL KOTLAR

ROPARTPS

SAHNEWALROPAR132 kV

R

RAJPURA

DERABASSI

ROPAR TPS SAHNEWAL

S

RANJITSAGAR

SALAL

S

CHAMERA KISHENPUR

SALAL

220 kV132 kV

220 kVGANGUWAL

LEHRA MOHABATBARNALAPSEB220 kV

MALERKOTLA BHATINDA

RATANGARH SURATGARH SURATGARH TPS

R

R

220 kVBALLABHGARH

10BTPS 4 8

2

GOVINDGARH-II SAHNEWALR

TPS

2

RANJITSAGAR 1 1

1

1

2

6

S

WAGOORAURI

SARNA

S

4 81

1

1

FBD(G)

3

6 5

9

7

7

6

Page 15: SYSTEM RESTORATION

RamjitDRN. BY

B.B.M.B.-DELHI SUBSYSTEM (PART-2) : START-UP SEQUENCE1 2 3 4 5 6 7 8

PARKSTREET

DELHI GTs I.P. RAJGHAT

DADRI DADRI (T)DADRI GTs400 kV

MATHURAAURAIYA SIKANDARA

9

S

S

S

SSTATION TO SELF-START

HYDRO STATIONS

THERMAL STATIONS

SUB-STATIONS

RAILWAY TRACTION

STEP No.

LEGEND:-

STEP No.

R

R

EXHIBIT - 3B(2of2)

BALLABGARH

R

SAMAYPURFARIDABAD GT

S

BTPS

BALLABGARH 66kVFARIDABAD (T)

5

PANIPAT

PHAPHUND

AURAIYA400kV

R

R

5

9

7

10

6 7

10 9 8

I.P.Extn.(Delhi GT's)

1

10 94

BTPS

Page 16: SYSTEM RESTORATION

SYSTEM RESTORATION

BBMB-DELHI SUBSYSTEM

A strict load generation balance shall have to be maintained while developing the sub-system.

The voltages at different sections/buses are to be maintained within normal range by use of bus/line reactors and operating the units in synchronous condenser mode wherever possible.

Page 17: SYSTEM RESTORATION

S No. Sources of Start-up Power QuantumMW

a RPS-Self Start 150

b JS HEP 100

c Anta(Gas) 80

  Total 330

 

  Requirement of Start-up Power QuantumMW

a Start-Up at Kota 30

b RAPS(A) & RAPS(B) 50

c Railway Traction 70

d Emergency Loads 180

  Total 330

LOAD GENERATION BALANCE

RAJASTHAN SUBSYSTEM 

Page 18: SYSTEM RESTORATION

RamjitDRN. BY

RAJASTHAN SUBSYSTEM : RESTORATION STAGES

KOTA(S) TO AVAIL POWER FROMUJJAIN(M.P.) AND SYNCHRONISE

R.P. SAGAR TO SELF-START

1 KOTA SHOULD AVAIL START-UP SUPPLY FROM UJJAIN AND IN THE EVENT OF ANY DIFFICULTY IN GETTING

3 ANTA SHALL GET SYNCHRONISED WITH KOTA(S) IN CASE OF SURVIVAL ON HOUSE LOAD/SELF START.

NOTE:-

KOTA(S) IN CASE OF SURVIVAL ANTA TO EXTEND POWER TO

ON HOUSE LOAD/SELF START

RAPS (A)*, RAPS (B)*, ANTA* EXTEND POWER TO KOTA(Th),

EXTEND POWER TO RAILWAYTRACTION FROM KOTA, JAIPUR,DAUSA AND BHARTPUR.

SUPPLY FROM UJJAIN, IT SHALL TAKE START-UP POWER FROM R.P. SAGAR.

STAGE No.

1

2

3

4

OR AVAIL START-UP POWER

THEN SUPPLY SHALL BE TAKEN FROM KOTA(S).2 IF R.P. SAGAR IS NOT ABLE TO SELF START OR IS UNABLE TO AVAIL START-UP POWER FROM GANDHI SAGAR

FROM GANDHI SAGAR AND

EXHIBIT - 4A

RATANGARH, SURATGARH.THROUGH JAIPUR, KHETRI,EXTEND POWER TO SURATGARH

AND JAIPUR.

SYNCHRONISED AT KOTA(S)DIFFERENT SUPPLIES TO BE

WITH R.P.SAGAR.EXTEND POWER TO JAWAHAR-

RAPS (A) AND RAPS (B) TO EXTEND POWER TO KOTA (S)IN CASE OF SURVIVAL OF

ISLANDS.SAGAR AND KOTA(S)

* THE SUPPLY FROM KOTA(S) SHALL BE EXTENDED IN THE EVENT OF TRIPPING OF ABOVE STATIONS.

Page 19: SYSTEM RESTORATION

RamjitDRN. BY

RAJASTHAN SUBSYSTEM : START-UP SEQUENCE

1 2 3 4 5 6

KOTA(S)

KOTA(S)ANTA

1

SSTATION TO SELF-START

HYDRO STATIONS

THERMAL STATIONS

SUB-STATIONS

RAILWAY TRACTION

STEP No.

LEGEND:-

400 kVJAIPURKOTA(T)

KHETRIRAPS(A)

S

JAIPUR220 kV

DAUSA

STEP No.

R

J.SAGARR.P.SAGAR

FROM G.SAGAR (M.P.)START-UP POWER KOTA(S)R.P.SAGAR

S

J.SAGAR1

FROM UJJAIN (M.P.)START-UP POWER

S2

1

R

R

R

220 kVANTA

BHARATPUR

R

1

2

2

EXHIBIT - 4B

220 kVBASSI

R

RATANGARH SURATGARH

BASSI400 kV

NUCLEAR STATIONS

RAPS(B)

Page 20: SYSTEM RESTORATION

SYSTEM RESTORATION

RAJASTHAN SUBSYSTEM

In case of survival of RAPS(A)/RAPS(B) islands, these must be synchronized with the supply of R.P.Sagar / Kota (S) at the earliest opportunity.

  In case, Kota(S) has availed start-up power from Ujjain and RP Sagar has

been started up separately, then the two supplies are to be synchronized at Kota (S) / RP Sagar for stability and then the supply be extended further to other stations.

  The start-up of Anta is to be closely monitored. In case of its self-start, the

supply from Anta must be synchronized with supply at Kota (S) at the earliest opportunity.

Page 21: SYSTEM RESTORATION

S No.

Sources of Start-up Power Quantum(MW) 

a Chibro-Self start 150

b Ramganga Self start 100

c Remaining hydro stations 150

  Total 400

 

  Requirement of Start-up Power Quantum(MW) 

a Start-Up to NAPS 40

b Railway Traction 30

c Other Essential Loads 70

  Total 400

 

LOAD GENERATION BALANCE WESTERN U.P. SUBSYSTEM

Page 22: SYSTEM RESTORATION

RamjitDRN. BY

WESTERN U.P. SUBSYSTEM : RESTORATION STAGES

YAMUNA COMPLEX POWER

AVAILABLE AT SAHARANPUR.

KHARA TO SELF-START/ AVAILSTART-UP POWER TO OTHER STATIONS

IN YAMUNA COMPLEX VIZ , DHAKRANI,

CHIBRO/KHODRI TO SELF START AND

TO SELF START.CHILLA AND MANERI BHALI

AND TANAKPUR.SELF START RAMGANGA

MURADNAGAR 220 kV

TO CHIBRO/SYNCHRONISE

AT SAHARANPUR.

THROUGH SAHARANPUR

EXTEND START-UP POWER

EXTEND POWER UPTO

SUPPLIES i.e. FROMSYNCHRONISE THE TWO

DHALIPUR AND KULHAL TO BE EXTENDED.

AND SHAMLI.

TANAKPUR AND RAMGANGA

VIZ KHODRI, DHAKRANI, DHALIPUR AND/OR KULHAL HAS TO START AND EXTEND POWER UPTO MURADNAGAR.

1 IF FOR ANY REASON CHIBRO CAN NOT START THEN ANY OTHER POWER STATION IN SUCESSION

SAHARANPUR SHALL BE SENT BACKWARDS TO YAMUNA COMPLEX.

2 IN THE EVENT OF NON START-UP OF ANY POWER HOUSE OF YAMUNA COMPLEX, KHARA SUPPLY AVAILABLE AT

3 IN CASE OF COLLAPSE OF NAPP ISLAND RAMGANGA IS TO SELF START AND EXTEND POWER TO NAPP. IF THERE IS

NOTE:-

(H.P.) AND GIRI (H.P.).EXTEND POWER TO MAJRI-

EXTEND POWER TO

STAGE No.

1

2

3EXTEND SUPPLY TO NAPSFOR START-UP/SYNCHRONISATION.

EXHIBIT - 5A

INORDINATE DELAY IN GETTING THE SUPPLY FROM WESTERN U.P. AND AVAILABILITY OF BBMB-DELHI ISLAND SUPPLY

AT HARDUAGANJ 220 kV, THEN SUPPLY CAN BE AVAILED BY NAPP FROM HARDUAGANJ IN CO-ORDINATION WITH

CLDS LUCKNOW AND NRLDC.

AT MORADABAD.

MURADNAGAR 220 kVEXTEND POWER UPTO

THROUGH MUZAFFARNAGAR

AND MEERUT.

AT RISHIKESH.

YAMUNA COMPLEX SUPPLYSYNCHRONISE WITH EXTEND SUPPLY TO

AND RISHIKESH.

220 kV SAHARANPUR

NOIDA FOR EMERGENCY

SYNCHRONISATION

NAPS FOR START-UP/EXTEND SUPPLY TO

4

MANERIBHALI AND

CHILLA.

EXTEND POWER UPTO

EXTEND POWER TO MURADNAGAR 400 kV

LOAD.AND FURTHER TO

MORADABAD 400 kV.

Page 23: SYSTEM RESTORATION

RamjitDRN. BY

WESTERN U.P. SUBSYSTEM : STRT-UP SEQUENCE1 2 3 4 5 6

CHIBRO KHODRI KULHAL

3

SSTATION TO SELF-START

HYDRO STATIONS

THERMAL STATIONS

SUB-STATIONS

RAILWAY TRACTION

STEP No.

LEGEND:-

SHAMLISAHARANPUR

KHODRI

S

DHAKRANIDHALIPUR

STEP No.

GIRI(H.P.)

RISHIKESH

MURADNAGAR SAHIBABAD NOIDA

SAHARANPURKHARA

CHIBRO

CHILLARISHIKESH

KHODRI4

MORADABADNEHTAURRAMGANGA220 kV

400 kV

S

S

4

7

R

EXHIBIT - 5B

132 kV

MAJRI(H.P.)220 kV

MANERIBHALI

CHILLA

KHARAKHURJA NAPS

NUCLEAR STATION

CHIBRO

14 2

MANERI BHALI220 kV 132 kV

32 1 4

NAGAR MEERUT MURADNAGARMUZAFFAR

400 kV

S

S

NAPS

BAREILYTANAKPUR

1

1

RAMGANGA

44

5

3 4

5

400 kVMORADABAD

220 kVMORADABAD TANAKPUR

1

1

4

Page 24: SYSTEM RESTORATION

Ist Option :The units at Ramganga shall be self-started and the supply extended upto NAPS through --132 kV Ramganga --132 kV Nehtaur --220 kV Nehtaur --220 kV Moradabad --220 kV NAPS  IInd Option :The hydro units at Yamuna Complex (Chibro, Khodri, Dhakrani, Dhalipur and Kulhal) shall be self started and the supply shall be extended upto Muradnagar 220kV. From Muradnagar the supply shall be extended upto NAPS through Muradnagar-Khurja-NAPS link.  IIIrd Option :In case there is in-ordinate delay in the above two operations and by that time the Delhi-BBMB sub-system has been stablised and supply is available at Agra/Sikandara then the supply to NAPS is to be extended through Agra-Agra(new)-Harduganj-NAPS link.  

START UP POWER TO NAPS (Narora)

Page 25: SYSTEM RESTORATION

SYSTEM RESTORATION

WESTERN UP SUBSYSTEM

In the event of survival of NAPS island, UPPCL has to take necessary steps to extend the stabilized supply from the built up Western UP subsystem to NAPS at the earliest.

After synchronizing the Western UP subsystem with NAPS, all care is to taken by UPPCL to avoid any sudden variation in the load in the Western UP subsystem which may otherwise result in collapse of the subsystem and poisoning out of the nuclear units.

 

Page 26: SYSTEM RESTORATION

RamjitDRN. BY

LEGEND:-

GRID SUB-STATION (GSS)

TRACTION SUB-STATION (TSS)

SWITCHING STATION

25 kV

66 kV

132 kV

220 kV

SEB FEEDER RLY FEEDER

x x x

DA

NK

AU

R

KH

UR

JA

ME

HR

AW

AL

HA

TH

RA

S

MIT

WA

LI

SH

I KO

HA

BA

D

BH

AD

AN

ET

AW

AH

BH

AR

TH

NA

PH

AP

HU

ND

RU

RA

SA

HIB

AB

AD

PA

NK

I

SA

RS

AU

L

MA

L WA

N

RA

SU

LAB

AD

SIR

AT

HU

MA

NA

UR

I

NA

I NI

BH

EE

RP

UR

JIG

NA

MIR

ZA

PU

R

CH

UN

AR

JEO

NA

TH

PU

R

KR

I SH

AN

AN

AG

AR

NA

I NI C

OM

PLE

X

JIG

NA

PA

TH

RA

IYA

CH

UN

AR

NA

RA

INP

UR

SA

NE

HW

AL

RA

J PU

RA

SHAHBAD

TARAORI

DIWANA

SONEPAT

GHARAUNDA

KURUKSHETRA

AZADPURNARELA

NARELA

LALTOKALAN RAJPURA

CH

AN

AK

YA

x x

x x

x x

x x

PANIPAT

DELHISARAI-ROHILLA

NIZAMUDDINHAZRAT

PU

RI

DH

AU

LA K

UA

N

TO WESTERAN RAILWAYAND CENTRAL RAILWAY

MA

NA

UR

I

SIR

AT

HU

MA

L WA

N

PA

NK

I

SWSSWS

SIA

RS

AU

L ( A

LIG

AR

H)

MEHRAULIPARK-

I.P.EXTN.BTPS

STREET

RAMGANGA

NAPP

HARDUAGANJ PANKI NAUBASTA FATEHPUR ALLAHABAD OBTA(T) SAHUPURI(REWA ROAD)

FROM E.R.

OBRA(H)

RIH

AN

D(H

)

AH

RU

RA

RO

AD

BIR

OH

I

UN

CH

AD

I H

KA

RC

HN

A

BA

MR

AU

L I

BH

AR

WA

RI

KA

NW

AR

FA

I ZU

LLA

PU

R

BIN

DA

KI R

OA

D

CH

AK

ER

I

MA

I TH

A

JHIN

JAK

AC

HA

LDA

EK

DIL

JAS

WA

NT

NA

GA

R

KA

UR

AR

A

FE

RO

ZA

BA

D

TU

ND

LA

CH

AM

BO

L A

DA

UD

KH

AN

SO

HN

A

CH

OLA

DA

DR

I

MU

GH

AL

SA

RA

I

PA

HA

RA

ALL

AH

AB

AD

KA

NP

UR

CE

NT

RA

L

AMBALAMANDI G/GARHLUDHIANA

SWS

SIN

GR

AU

LI

VIN

DH

YA

CH

ALSIKANDRA

AURAIYA

BBMB-DELHIISLAND SUPPLY

EXHIBIT - 6A

RIDGE VALLEY

AURAIYA

PHAPHUND

GHAGGARDERA BASSI

KALKA

JAGADHRI

SAHARANPUR

ABDULLAPUR

AMOUSI

LUCKNOW

UNNAO

SAROJININAGAR

NAGARMURAD-

COMPLEXYAMUNA

FROMKANPUR

Page 27: SYSTEM RESTORATION

RamjitDRN. BY

POWER SUPPLY ARRANGEMENT TO CENTRAL & WESTERN RAILWAY

LEGEND:-

x x x x

LALITPUR(U.P.)

BASAI (M.P.)

JHANSI (U.P.)

HETAMPUR (M.P.)

GWALIOR (M.P.)

BHANDAI

PATHAULI

MATHURA

HODAL

BALLABHGARH

BINA (M.P.)

SAMAYPURBALLABHGARH

AGRA

AURAIYA

MATHURA

BALLABHGARH66 kV

DELHI

RUPBAG PATHAULI YAMUNABRIDGE

MURESHIRAMPUR

BHARATPUR

SALABAD

BAYANA

FATEH-

HINDAUN

SINGHPURA

PILODA

GANGAPUR

MALARANA

SWAIMADHOPUR

AMLI

LAKHERI

KAPREN

GURLA

RAVTHA

RAMGANJMANDI

KURLASI

ROAD

JHALAWAR

GURLA

LAKHERI

S/MADHOPUR

GANGAPUR

BAYANA

BHARATPUR

DAUSA

HINDAUN

JAIPUR

KOTA(S)

ANTA

RPS, JSFROM

MORAK

FROM UJJAIN

TO BOMBAY TO MADRAS

WE

ST

ER

N R

AIL

WA

Y

CE

NT

RA

L R

AI L

WA

Y

GRID SUB-STATION (GSS)

TRACTION SUB-STATION (TSS)

TRANSFORMER

25 kV

66 kV

132 kV

220 kV

SEB FEEDER RLY FEEDER

x x x

220 kV

FARIDABADGAS

x x

x

x

x

FARIDABAD

ASOTI

AJHAL

KITHAM

MANIA

JAKHAURA

EXHIBIT - 6B

220 kV

BA

SS

I

G

AGRABAYANA

Page 28: SYSTEM RESTORATION

SYSTEM RESTORATION

POWER SUPPLY TO RAILWAY TRACTION

 In the event of black start, initially the different subsystems shall be of small size and the running generating units shall have a limitation in regard to the ramp up rates.

Therefore, as soon as the power is made available for the purpose of traction, it would be ensured by Railways that

--- the load shall be kept restricted to bare minimum and

---the movements of trains in different sections would be co- ordinated for avoiding sudden jerks / ramp ups on the system.

Page 29: SYSTEM RESTORATION

SYSTEM RESTORATION

In the event of a total blackout, the initial moments are extremely precious and a desired action taken at first instance can help in speedy restoration of the system while a small delay or lapse in taking the initial action may prove to be extremely costly.

It is therefore extremely essential that:

---all essential loads and start-up sources alongwith the cocerned circuits be clearly identified and