R E P O R T

SVE SYSTEM CONSTRUCTION COMPLETION REPORT ADDENDUM

WRB REFINING LP

WOOD RIVER REFINERY

ROXANA, ILLINOIS

Prepared for Shell Oil Products US 17 Junction Drive PMB#39 Glen Carbon, IL 62034 February 2013

URS Corporation 1001 Highland Plaza Drive West, Suite 300 St. Louis, MO 63110 (314) 429-0100 Project # 21562850.12000

ILLINOIS EPA RCRA CORRECTIVE ACTION CERTIFICATION This certification must accompany any document submitted to Illinois EPA in accordance with the corrective action requirements set forth in a facility’s RCRA permit. The original and two copies of all documents submitted must be provided. 1.0 FACILITY IDENTIFICATION Name: WRB Refining LP - Wood River Refinery County: Madison Street Address: 900 South Central Ave. Site No. (IEPA): 1191150002 City: Roxana, IL 62084 Site No. (USEPA): ILD 080 012 305 2.0 OWNER INFORMATION 3.0 OPERATOR INFORMATION Name: Not Applicable Equilon Enterprises LLC d/b/a Shell Oil Products US Mailing Address: 17 Junction Drive, PMB #399 Glen Carbon, IL 62034 Contact Name: Kevin Dyer Contact Title: Principal Program Manager Phone No.: 618-288-7237 4.0 TYPE OF SUBMISSION (check applicable item and provide requested information, as applicable) RFI Phase I Workplan/Report IEPA Permit Log No. B-43R RFI Phase II Workplan/Report Date of Last IEPA Letter CMP Report; Phase on Project September 13, 2012 Other (describe): Log No. of Last IEPA SVE System Construction Completion Report Addendum Letter on Project B-43R-CA-12 and 14 Date of Submittal Does this submittal include groundwater information: Yes No 5.0 DESCRIPTION OF SUBMITTAL: (briefly describe what is being submitted and its purpose)

Construction Completion Report Addendum for a Soil Vapor Extraction System constructed

within the Village of Roxana, IL Public Works Yard. 6.0 DOCUMENTS SUBMITTED (identify all documents in submittal, including cover letter; give dates of all documents)

Cover letter, RCRA Corrective Action Certification and SVE System Construction Completion Report Addendum.

7.0 CERTIFICATION STATEMENT - (This statement is part of the overall certification being provided by the owner/operator,

professional and laboratory in Items 7.1, 7.2 and 7.3 below). The activities described in the subject submittals have been carried out in accordance with procedures approved by Illinois EPA. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

TABLE

1.0 IN

1 1

2.0 T

3.0 D

4.0 D

5.0 D

6.0 Q

7.0 C

8.0 R

List of Fig

Figure 1 Figure 2 Figure 2A

List of Ap

AppendixAppendixAppendix

OF CONT

NTRODUCTIO

.1 Site B

.2 Soil V

ECHNICAL S

DEVIATIONS

DESCRIPTION

DETAILED AS

QUALITY ASS

CONCLUSION

REFERENCES

gures

A

ppendices

x A x B x C

TENTS

ON ................

Background Vapor Extrac

SPECIFICATI

FROM CONC

N OF CONST

S-BUILT DRA

SURANCE/QU

NS .................

S ...................

Site LocatSoil VaporSoil Vapor

Korte & LContractorConstructi

.....................

.........ction .........

ONS……. .....

CEPTUAL DE

RUCTION AC

AWING...........

UALITY CON

.....................

.....................

tion Map r Extractionr Extraction

Luitjohan Asr QA/QC Doion Photogra

......................

....................

....................

......................

ESIGN… ........

CTIVITIES .....

......................

TROL ...........

......................

......................

System OveSystem

-Built Drawocumentationaphs

.....................

....................

....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

erall Plan

wing n / Test Resu

.....................

....................

....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

ults

......................

....................

....................

......................

......................

......................

......................

......................

......................

......................

ii

.... 1-1

.... 1-1

.... 1-2

.... 2-1

.... 3-1

.... 4-1

.... 5-1

.... 6-1

.... 7-1

.... 8-1

SVE SysteWRR Roxana, Il

SECTIO

At the r

construct

the west

Village o

Fenceline

presented

Village p

of the PW

subseque

(CCR) A

for the PW

in the SV

1.1 SIT

The WRR

and most

Central A

ownershi

formed J

LLC. O

named W

Holdings

business

included

Phillips

Products

and prog

Subsurfa

Route 11

Avenue t

These ar

“Site” fo

North Pr

em Constructi

linois

ONONErequest of S

ted a Soil Va

boundary (W

of Roxana, Il

e portion o

d in the May

property, inc

W portion o

ently execute

Addendum is

W Yard port

VE System Co

E BACKGRO

R is compos

t of the curr

Avenue, W

ip changed

January 1, 2

On Decembe

WRB Refin

s. ConocoPh

from their

an ownersh

66 (P66) is

US (SOPU

rams.

ace investiga

11 to the we

to the south

e the two ar

r the purpos

roperty, alon

on Completio

E Shell Oil Pr

apor Extract

West Fencel

llinois (Villa

f the Syste

y 2012 SVE S

cluding the P

of the System

ed on Octobe

s to provide

tion of the S

onstruction C

OUND

sed of five a

ent and past

WRR was op

to ConocoP

2007, was a

r 31, 2010,

ning LP (W

hillips Comp

Exploration

hip change a

now the o

S)) is worki

ations have

est, the Wes

and within th

reas to be ad

es of this do

ng the West

on Report Add

roducts US

tion (SVE) s

line) of the W

age) and wit

m was inst

System Cons

PW Yard, ha

m. An acce

er 5, 2012.

information

System. The

Completion

areas, includi

t waste mana

perated by

Phillips (CO

50/50 joint

WRB Refin

WRB) with l

pany announ

n & Produc

as well as a

perator of W

ing with the

been condu

st Fenceline

he WRR alo

ddressed by

ocument. Th

t Fenceline,

dendum

(SOPUS), U

system (Syst

Wood River

thin the Villa

talled betwe

struction Co

ad not yet be

ess agreemen

The purpose

n regarding S

ese construct

Report.

ing the Nort

agement are

Shell Oil C

OP) effective

venture bet

ning LLC w

limited part

nced the sep

ction busine

a name chan

WRR. Eq

assistance o

ucted within

e to the east

ong the West

y the System

he primary S

between Se

URS Corpo

tem). The S

r Refinery (W

age Public W

een March 2

ompletion Re

een provided

nt between

e of this Con

System layou

tion activitie

th Property,

eas. Located

Company an

e June 1, 2

tween COP

was converte

tners COP

paration of t

ess on July

nge that bec

quilon Enterp

of P66 on se

the area ge

t, East 1st St

t Fenceline (

m, and togeth

System const

econd and E

oration (UR

System was c

WRR) North

Works (PW)

2011 and J

eport. At th

d to SOPUS

SOPUS and

nstruction Co

ut and const

es were refer

which conta

d in the Vill

nd subseque

2000. WRB

and EnCan

ed into a lim

and Cenov

their Refinin

14, 2011.

came effectiv

prises LLC

everal enviro

enerally bou

treet to the

(Figure 1).

her will be r

truction area

Eighth Stree

Introduc

RS) designed

constructed a

h Property, i

Yard. The

January 201

hat time, acce

S for constru

d the Village

ompletion R

truction activ

rred to as Ph

ains storage

lage at 900 S

ent owners

B Refining

na US Refin

mited partne

vus US Ref

ng and Mark

The separ

ve May 1, 2

(d/b/a Shel

onmental pro

unded by Ill

north, and

referred to a

a is located o

ets in the Vi

ction

1-1

d and

along

in the

West

2, as

ess to

uction

e was

Report

vities

hase 6

tanks

South

until

LLC,

neries,

ership

finery

keting

ration

2012.

ll Oil

ojects

linois

Rand

as the

on the

illage

SVE SysteWRR Roxana, Il

SECTIO

(Figure

Figure 2

1.2 SOI

The curr

efforts b

conducte

and soil v

To addre

Investiga

2010, in

submitted

required

2011); ho

of forma

including

Fenceline

test work

Conceptu

remedial

System

correspon

construct

Completi

As stated

installatio

em Constructi

linois

ONONE2). The co

2A.

IL VAPOR EX

rent underst

beginning w

ed in 2006.

vapor sampl

ess potentia

ation Work P

which inst

d a Pilot Te

for System

owever, base

al approval

g advancem

e and SVE-2

k plan, also

ual/Final De

objectives

design.

ndence, IEP

tion and op

ion Report fo

d above, th

on of the PW

on Completio

E onstruction a

XTRACTION

anding of e

with the W

The investig

es.

al vapor int

Plan to the I

allation of a

est Work Pla

design. IEP

ed on conver

and were c

ment of soil

2 at the PW

o required s

esign Report

(and concep

Subsequent

PA issued a

eration of t

for the West

his CCR Ad

W Yard porti

on Report Add

area for the

existing site

West Fenceli

gative effort

trusion in t

Illinois Envi

an SVE sys

an to IEPA

PA formally

rsations with

conducted b

l borings co

Yard). The

ubmittal of

t was submit

ptual approa

to the C

Joint Const

the System.

Fenceline po

ddendum de

ion of the Sy

dendum

e PW Yard

conditions

ine P-93 D

ts included c

the Village,

ironmental P

stem was pr

in Decembe

y approved t

h the IEPA,

between Feb

ompleted as

e 2011 IEPA

a conceptu

tted to the IE

ach to meet

Conceptual/F

ruction and

SOPUS s

ortion of the

escribes the

ystem.

portion of

is the resu

Dissolved Ph

collection of

SOPUS su

Protection A

roposed (SO

er 2010 to g

the pilot test

pilot test act

bruary 28,

s SVE wel

A letter, in ad

ual/final des

EPA present

those objec

Final Desig

d Operating

submitted th

e System in M

constructio

the System

ult of extens

hase Benze

f soil, groun

ubmitted a

Agency (IEPA

OPUS, 2010

gather additi

t on March

tivities move

2011 and M

lls (SVE-1

ddition to ap

ign report.

ting backgro

ctives), and

gn Report

Permit on J

he SVE Syst

May 2012.

on activities

Introduc

m is presente

sive investig

ene Investig

ndwater, LN

Vapor Intr

A) in Septem

0). SOPUS

ional inform

16, 2011 (I

ed forward a

March 24, 2

along the

pproving the

The June

ound informa

provided a

and assoc

July 14, 201

tem Constru

associated

ction

1-2

ed on

gative

gation

APL,

rusion

mber,

then

mation

EPA,

ahead

2011,

West

e pilot

2011

ation,

final

ciated

11 for

uction

with

SVE SysteWRR Roxana, Il

SECTIO

Plans, te

were pro

included

The PW

(Figure 2

2012 SVE

The six S

PW prop

diameter

previousl

Property,

connecte

displacem

from the

traveling

A second

fresh air

em Constructi

linois

ONTWOechnical spec

ovided in th

in a subsequ

Yard portio

2). SVE we

E System Co

SVE wells (

perty are par

High Den

ly installed

, adjacent to

d via the 4-i

ment blower

PW Yard S

g through the

d blower, loc

to dilute the

on Completio

O cifications,

he June 11,

uent submitt

on of the S

ell constructi

onstruction C

(SVE-21, SV

rt of the “te

sity Polyeth

4-inch steel

o the PW Y

inch steel pip

r housed wit

VE wells fe

e blower and

cated on the

vapor stream

on Report Add

and drawing

2011 Conc

tal to IEPA o

ystem consi

ion details a

Completion R

VE-22, SVE

eal line” (Fi

hylene (HD

l piping term

Yard property

ping to a vap

thin a custom

eeds into the

d a baffle co

RTO side o

m as necessa

dendum

gs used for

ceptual/Fina

on Septembe

ists of six S

and boring lo

Report.

E-23, SVE-2

igure 2 and

DPE) piping.

minated at t

y. Within t

por/liquid se

mized interm

conex, whe

nnected to a

of the baffle,

ary.

T

constructio

al Design R

er 23, 2011.

SVE wells l

ogs were pre

4, SVE-26,

d Figure 2A

. The HD

the West Fe

the WRR, t

eparator (VL

modal freigh

ere vapor mo

a Regenerati

pushes the v

Technical S

on/installatio

Report, alon

located with

eviously pro

and SVE-27

A), interconn

DPE piping

enceline of

the PW Yar

LS) and a rot

ht container

oves through

ive Thermal

vapor into th

Specificat

on of the Sy

ng with revi

hin the PW

vided in the

7) located o

nected by 4

connects to

the WRR N

d SVE well

tary lobe po

(conex). P

h the VLS, b

Oxidizer (R

he RTO and

tions

2-1

ystem

isions

Yard

e May

on the

4-inch

o the

North

ls are

sitive

Piping

before

RTO).

d adds

SVE SysteWRR Roxana, Il

SECTIO

Similar t

carbon st

“teal line

facilitate

all HDPE

There we

PW Yard

em Constructi

linois

ONTHRo the West F

teel. Howev

e” within the

future locat

E piping from

ere no other

d portion of t

on Completio

REE Fenceline po

ver, as the p

e PW Yard

tion of the su

m each well

deviations f

the System.

on Report Add

ortion of the

piping on PW

was constru

ubsurface, n

vault to a ca

from the Co

dendum

D

System, the

W property

ucted of HD

non-metallic

arbon steel c

onceptual/Fi

Deviations

e piping with

was to be c

DPE piping, r

piping, a tra

connection fl

inal Design R

From Conc

hin WRR w

constructed

rather than c

acer wire wa

lange.

Report for i

ceptual De

was construct

below grade

carbon steel

as installed a

installation o

esign

3-1

ted of

e, the

l. To

along

of the

SVE SysteWRR Roxana, Il

SECTIO

Construc

galvanize

wells loc

Korte an

PW Yard

vacuum

At the re

were ins

piping w

mechanic

After the

connectio

HDPE p

concrete

The HDP

approxim

vault and

CA-6 agg

K&L com

testing o

Hydrosta

carbon s

Construc

System o

em Constructi

linois

ONFOUction of the P

ed steel vaul

cated at the P

nd Luitjohan

d portion of

excavation o

equest of the

talled as a c

was sealed a

cally excava

e utilities w

on flange at

piping and t

floors.

PE piping c

mately three

d piping exc

gregate was

mpleted con

f the HDPE

atic test resu

steel portion

ction Compl

on December

on Completio

UR PW Yard por

lts with con

PW Yard pro

, Inc. (K&L

the System.

of soil in loc

Village Pub

casing for th

at the ends

ate utilities fo

ere uncover

t the West F

tracer wire

connecting th

inches of sa

avations we

placed as th

nstruction ac

E piping that

lts can be fo

n of the “te

etion Repor

r 3, 2012, wi

on Report Add

rtion of the S

crete floors,

operty.

L), of Highla

. Constructi

cations of kn

blic Works D

he 4-inch v

to serve as

or repair or r

red, a pipe t

Fenceline to

were instal

he six SVE

and above a

re backfilled

he top layer o

ctivities on N

t extends fro

ound in App

eal line” w

rt. URS beg

ith all PW Y

dendum

Des

System cons

, and connec

and, Illinois,

ion activities

nown subsu

Department

apor lines a

a protectiv

replacement

trench was

each of the

lled, along w

wells to th

and below th

d with excav

of backfill in

November 1

om the PW

pendix B. Pr

were provide

gan commis

Yard SVE we

scription o

sisted of the

ction of the

, was respon

s commence

urface utilitie

(PWD), sec

at specific u

ve casing in

(Appendix

excavated f

e six SVE w

with galvan

he carbon st

he pipe. Th

vated materi

n roadway ar

19, 2012 wit

Yard SVE w

revious hydr

ed in Appen

ssioning of t

ells online b

of Construc

installation

six previous

nsible for co

ed on Octobe

es on the PW

tions of 8-in

utility crossin

n the event

A).

from the car

wells. Follow

nized steel

teel piping w

he remaining

ials. A 6- to

reas.

th the succe

wells to the

rostatic testi

ndix E of

the PW Yar

y December

ction Activ

of HDPE pi

sly installed

onstruction o

er 16, 2012,

W Yard prop

nch HDPE p

ngs. The 8

PWD neede

rbon steel p

wing excava

well vaults

was bedded

g portion of

o 12-inch lay

essful hydro

West Fence

ing results fo

the SVE Sy

rd portion o

r 6, 2012.

vities

4-1

iping,

SVE

of the

, with

perty.

piping

8-inch

ed to

piping

ation,

with

with

f well

yer of

ostatic

eline.

or the

ystem

of the

SVE SysteWRR Roxana, Il

SECTIO

Plan view

included

em Constructi

linois

ONFIVEws of the Sy

in Appendi

on Completio

E ystem are inc

ix A.

on Report Add

cluded in Fig

dendum

gures 2 and

D

d 2A. K&L’

Detailed As

s detailed as

s-Built Draw

s-built drawi

wing

5-1

ing is

SVE SysteWRR Roxana, Il

SECTIO

URS per

portion o

met the i

of instal

represent

K&L’s Q

Appendi

em Constructi

linois

ONSIX rsonnel prov

of the System

intent of the

lation, and

tatives moni

QA/QC doc

ix B.

on Completio

vided oversi

m to monitor

e design spec

general mo

tored compl

cumentation

on Report Add

ight during

r, document

cifications.

onitoring of

liance of the

n / SVE pi

dendum

the constru

t, and assure

Oversight a

f the constru

contractor w

iping hydro

Quality As

uction and i

e constructio

activities inc

uction. Ad

with their QA

ostatic testin

ssurance/Q

installation o

on activities

cluded layou

dditionally,

A/QC plans.

ng results a

Quality Con

of the PW

and perform

ut, document

the on-site

are presente

ntrol

6-1

Yard

mance

tation

URS

ed in

SVE SysteWRR Roxana, Il

SECTIO

Daily on

K&L’s o

QA/QC d

performe

conforma

Photogra

em Constructi

linois

ONSEVn-site constr

on-site QA/Q

documentati

ed by URS

ance with th

aphs of const

on Completio

EN uction moni

QC represent

ion and data

’ contractor

e design req

truction activ

on Report Add

itoring was

tatives. Cou

a, URS obse

rs for the P

quirements de

vities are inc

dendum

performed

upled with th

erved that th

PW Yard p

escribed in t

cluded in Ap

by URS fie

his monitori

he constructi

portion of th

the Conceptu

ppendix C.

eld represen

ing and revi

ion and insta

he System

ual/Final De

Conclus

ntatives and

ew of the pr

allation activ

were in ge

esign Report

sions

7-1

with

roject

vities

eneral

t.

SVE SysteWRR Roxana, Il

SECTIO

Illinois Eappro

Illinois EOper

Shell OilInves

Shell Oilby UR

Shell OilCorp

Shell OilURS

URS Cor

reque

em Constructi

linois

ONEIGHEnvironmentoval with con

Environmentrating Permi

l Products Ustigation. Pr

l Products URS Corporat

l Products Uoration.

l Products UCorporation

rporation. Se

est for additi

on Completio

HT al Protectionnditions.

al Protectiont

S. Septemberepared by U

S. Septembetion.

S. June 2011

S. May 2012n.

eptember 23

ional informa

on Report Add

n Agency (IE

n Agency (IE

er 2007. WesURS Corpora

er 20, 2010.

1. Conceptua

2. SVE Syste

, 2011 electr

ation.

dendum

EPA). Nove

EPA). July

st Fenceline ation.

Vapor Intru

al/Final Des

em Construc

ronic mail to

ember 15, 20

14, 2011. Jo

P-93 Dissol

usion Investig

sign Report.

ction Comple

o IEPA in re

010. Letter o

Joint Constru

lved Phase B

gation Work

Prepared by

etion Report.

esponse to Se

Referen

of work plan

uction and

Benzene

k Plan. Prepa

y URS

. Prepared b

eptember 1,

nces

8-1

n

ared

y

2011

SVE SysteWRR Roxana, Il

em Constructi

linois

on Completioon Report Adddendum

Figures

SVE SysteWRR Roxana, Il

APPEN

em Constructi

linois

NDIXA

on Completioon Report Adddendum

Korte & Luuitjohan Ass-Built Drawwing

SVE SysteWRR Roxana, Il

APPEN

em Constructi

linois

NDIXB

on Completioon Report Add

Contra

dendum

actor QA/QQC Documeentation annd Test Ressults

SVE SysteWRR Roxana, Il

APPEN

em Constructi

linois

NDIXC

on Completioon Report Adddendum

Coonstruction Photograaphs

PHOTOGRAPHIC LOG

Client Name:

Shell

Site Location:

Shell SVE System- Public Works Property

Project No.

21562850.12000

Photo No.

1

Date 10/19/12

Description: Standing at WRR fence line looking southwest at the SVE pipe trench excavation.

Photo No.

2

Date 10/24/12

Description: Looking southwest at installation of the 4” diameter HDPE SVE pipe placed within a 8” diameter HDPE protective casing pipe in the location of underground utilities.

PHOTOGRAPHIC LOG

Client Name:

Shell

Site Location:

Shell SVE System- Public Works Property

Project No.

21562850.12000

Photo No.

3

Date 10/25/12

Description: Looking southwest at installation of the 4” diameter HDPE SVE pipe placed within a 8” diameter HDPE protective casing pipe in the location of underground utilities. Protective pipe casings were painted orange and tracer wire was installed the full length of the SVE piping.

Photo No.

4

Date 10/25/12

Description: At the WRR fence line looking northeast at the connection location of the 4” diameter HDPE SVE pipe from the Public Works Property to the 4” diameter carbon steel SVE pipe entering the WRR.

PHOTOGRAPHIC LOG

Client Name:

Shell

Site Location:

Shell SVE System- Public Works Property

Project No.

21562850.12000

Photo No.

5

Date 10/26/12

Description: Facing east, looking at the excavation and installation of the SVE piping to the east of the vault for SVE-27.

Photo No.

6

Date 10/26/12

Description: Facing northeast, looking at the excavation and installation of the SVE piping to the vault for SVE-27.

PHOTOGRAPHIC LOG

Client Name:

Shell

Site Location:

Shell SVE System- Public Works Property

Project No.

21562850.12000

Photo No.

7

Date 10/31/12

Description: Facing east, looking at the excavation and installation of the SVE piping to the south of the vault for SVE-27.

Photo No.

8

Date 10/31/12

Description: Facing northeast, looking at the excavation and installation of the SVE piping to the south of the vault for SVE-27.

PHOTOGRAPHIC LOG

Client Name:

Shell

Site Location:

Shell SVE System- Public Works Property

Project No.

21562850.12000

Photo No.

9

Date 10/31/12

Description: Installation of the concrete vault pad and galvanized vault. Facing southeast looking at the vault for SVE-27.

Photo No.

10

Date 11/1/12

Description: Facing east, looking at the excavation and installation of the SVE piping to the southwest of the vault for SVE- 27

PHOTOGRAPHIC LOG

Client Name:

Shell

Site Location:

Shell SVE System- Public Works Property

Project No.

21562850.12000

Photo No.

11

Date 11/1/12

Description: Looking inside the vault for SVE-27.

Photo No.

12

Date 11/5/12

Description: Facing west, looking at the excavation and installation of the SVE piping to SVE-26 and SVE-24.

PHOTOGRAPHIC LOG

Client Name:

Shell

Site Location:

Shell SVE System- Public Works Property

Project No.

21562850.12000

Photo No.

13

Date 11/9/12

Description: Looking north at the installation of the 4” diameter HDPE SVE pipe and an 8” diameter HDPE protective pipe casing placed below an electrical conduit servicing the Public Works equipment fuel tank.

Photo No.

14

Date 11/9/12

Description: Installation of the precast concrete pad for the vault for SVE 22. Facing north.

PHOTOGRAPHIC LOG

Client Name:

Shell

Site Location:

Shell SVE System- Public Works Property

Project No.

21562850.12000

Photo No.

15 Date

11/9/12

Description: Installation of vault for SVE-21. Facing north.

Photo No.

16 Date

11/6/12

Description: Installation of vault for SVE-26. Facing northeast.

PHOTOGRAPHIC LOG

Client Name:

Shell

Site Location:

Shell SVE System- Public Works Property

Project No.

21562850.12000

Photo No.

17 Date

11/9/12

Description: Excavation for the SVE piping from the vault for SVE-21. Facing south.

Photo No.

18 Date

11/9/12

Description: Trench backfill from vault at SVE-24 west to vault at SVE-26.

PHOTOGRAPHIC LOG

Client Name:

Shell

Site Location:

Shell SVE System- Public Works Property

Project No.

21562850.12000

Photo No.

19 Date

11/13/12

Description: Pipe trench excavation from vault at SVE-22 to vault at SVE-23. Facing east.

Photo No.

20 Date

11/14/12

Description: Grading and resurfacing the Public Works roadway from the southwest entrance gate eastward to the back gate. Facing east.

PHOTOGRAPHIC LOG

Client Name:

Shell

Site Location:

Shell SVE System- Public Works Property

Project No.

21562850.12000

Photo No.

21 Date

11/14/12

Description: Looking north at the 8” dia HDPE protective pipe casing installed just below a clay tile sewer pipe.

Photo No.

22 Date

11/14/12

Description: Pipe trench excavation from vault at SVE-22 to vault at SVE-23. Facing west.

PHOTOGRAPHIC LOG

Client Name:

Shell

Site Location:

Shell SVE System- Public Works Property

Project No.

21562850.12000

Photo No.

23 Date

11/14/12

Description: Preparation of 4” diameter HDPE pipe to be fusion welded.

Photo No.

24 Date

11/14/12

Description: Fabrication and installation of the 4” diameter HDPE SVE pipeline from vault at SVE-22 to vault at SVE-23. Facing southeast.

PHOTOGRAPHIC LOG

Client Name:

Shell

Site Location:

Shell SVE System- Public Works Property

Project No.

21562850.12000

Photo No.

25 Date

11/14/12

Description: Fabrication and installation of the 4” diameter HDPE SVE pipeline from vault at SVE-22 to vault at SVE-23. Facing west.

Photo No.

26 Date

11/16/12

Description: Grading and resurfacing the Public Works roadway from the northwest entrance gate eastward along the north side of the Public Works buildings. Facing west.

PHOTOGRAPHIC LOG

Client Name:

Shell

Site Location:

Shell SVE System- Public Works Property

Project No.

21562850.12000

Photo No.

27 Date

11/16/12

Description: Grading and resurfacing the Public Works roadway from SVE-22 south to SVE-26 along the east sides of the Public Works buildings. Facing south.

Photo No.

28 Date

11/16/12

Description: Installation of vault at SVE-23. Facing north.

PHOTOGRAPHIC LOG

Client Name:

Shell

Site Location:

Shell SVE System- Public Works Property

Project No.

21562850.12000

Photo No.

29 Date

11/19/12

Description: Finished grade with seed/straw along SVE pipe trench excavation running south from SVE-21. Facing south.

Photo No.

30 Date

11/19/12

Description: Finished grade with seed/straw slope near SVE-27. Facing northeast.