R E P O R T
SVE SYSTEM CONSTRUCTION COMPLETION REPORT ADDENDUM
WRB REFINING LP
WOOD RIVER REFINERY
ROXANA, ILLINOIS
Prepared for Shell Oil Products US 17 Junction Drive PMB#39 Glen Carbon, IL 62034 February 2013
URS Corporation 1001 Highland Plaza Drive West, Suite 300 St. Louis, MO 63110 (314) 429-0100 Project # 21562850.12000
ILLINOIS EPA RCRA CORRECTIVE ACTION CERTIFICATION This certification must accompany any document submitted to Illinois EPA in accordance with the corrective action requirements set forth in a facility’s RCRA permit. The original and two copies of all documents submitted must be provided. 1.0 FACILITY IDENTIFICATION Name: WRB Refining LP - Wood River Refinery County: Madison Street Address: 900 South Central Ave. Site No. (IEPA): 1191150002 City: Roxana, IL 62084 Site No. (USEPA): ILD 080 012 305 2.0 OWNER INFORMATION 3.0 OPERATOR INFORMATION Name: Not Applicable Equilon Enterprises LLC d/b/a Shell Oil Products US Mailing Address: 17 Junction Drive, PMB #399 Glen Carbon, IL 62034 Contact Name: Kevin Dyer Contact Title: Principal Program Manager Phone No.: 618-288-7237 4.0 TYPE OF SUBMISSION (check applicable item and provide requested information, as applicable) RFI Phase I Workplan/Report IEPA Permit Log No. B-43R RFI Phase II Workplan/Report Date of Last IEPA Letter CMP Report; Phase on Project September 13, 2012 Other (describe): Log No. of Last IEPA SVE System Construction Completion Report Addendum Letter on Project B-43R-CA-12 and 14 Date of Submittal Does this submittal include groundwater information: Yes No 5.0 DESCRIPTION OF SUBMITTAL: (briefly describe what is being submitted and its purpose)
Construction Completion Report Addendum for a Soil Vapor Extraction System constructed
within the Village of Roxana, IL Public Works Yard. 6.0 DOCUMENTS SUBMITTED (identify all documents in submittal, including cover letter; give dates of all documents)
Cover letter, RCRA Corrective Action Certification and SVE System Construction Completion Report Addendum.
7.0 CERTIFICATION STATEMENT - (This statement is part of the overall certification being provided by the owner/operator,
professional and laboratory in Items 7.1, 7.2 and 7.3 below). The activities described in the subject submittals have been carried out in accordance with procedures approved by Illinois EPA. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
TABLE
1.0 IN
1 1
2.0 T
3.0 D
4.0 D
5.0 D
6.0 Q
7.0 C
8.0 R
List of Fig
Figure 1 Figure 2 Figure 2A
List of Ap
AppendixAppendixAppendix
OF CONT
NTRODUCTIO
.1 Site B
.2 Soil V
ECHNICAL S
DEVIATIONS
DESCRIPTION
DETAILED AS
QUALITY ASS
CONCLUSION
REFERENCES
gures
A
ppendices
x A x B x C
TENTS
ON ................
Background Vapor Extrac
SPECIFICATI
FROM CONC
N OF CONST
S-BUILT DRA
SURANCE/QU
NS .................
S ...................
Site LocatSoil VaporSoil Vapor
Korte & LContractorConstructi
.....................
.........ction .........
ONS……. .....
CEPTUAL DE
RUCTION AC
AWING...........
UALITY CON
.....................
.....................
tion Map r Extractionr Extraction
Luitjohan Asr QA/QC Doion Photogra
......................
....................
....................
......................
ESIGN… ........
CTIVITIES .....
......................
TROL ...........
......................
......................
System OveSystem
-Built Drawocumentationaphs
.....................
....................
....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
erall Plan
wing n / Test Resu
.....................
....................
....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
ults
......................
....................
....................
......................
......................
......................
......................
......................
......................
......................
ii
.... 1-1
.... 1-1
.... 1-2
.... 2-1
.... 3-1
.... 4-1
.... 5-1
.... 6-1
.... 7-1
.... 8-1
SVE SysteWRR Roxana, Il
SECTIO
At the r
construct
the west
Village o
Fenceline
presented
Village p
of the PW
subseque
(CCR) A
for the PW
in the SV
1.1 SIT
The WRR
and most
Central A
ownershi
formed J
LLC. O
named W
Holdings
business
included
Phillips
Products
and prog
Subsurfa
Route 11
Avenue t
These ar
“Site” fo
North Pr
em Constructi
linois
ONONErequest of S
ted a Soil Va
boundary (W
of Roxana, Il
e portion o
d in the May
property, inc
W portion o
ently execute
Addendum is
W Yard port
VE System Co
E BACKGRO
R is compos
t of the curr
Avenue, W
ip changed
January 1, 2
On Decembe
WRB Refin
s. ConocoPh
from their
an ownersh
66 (P66) is
US (SOPU
rams.
ace investiga
11 to the we
to the south
e the two ar
r the purpos
roperty, alon
on Completio
E Shell Oil Pr
apor Extract
West Fencel
llinois (Villa
f the Syste
y 2012 SVE S
cluding the P
of the System
ed on Octobe
s to provide
tion of the S
onstruction C
OUND
sed of five a
ent and past
WRR was op
to ConocoP
2007, was a
r 31, 2010,
ning LP (W
hillips Comp
Exploration
hip change a
now the o
S)) is worki
ations have
est, the Wes
and within th
reas to be ad
es of this do
ng the West
on Report Add
roducts US
tion (SVE) s
line) of the W
age) and wit
m was inst
System Cons
PW Yard, ha
m. An acce
er 5, 2012.
information
System. The
Completion
areas, includi
t waste mana
perated by
Phillips (CO
50/50 joint
WRB Refin
WRB) with l
pany announ
n & Produc
as well as a
perator of W
ing with the
been condu
st Fenceline
he WRR alo
ddressed by
ocument. Th
t Fenceline,
dendum
(SOPUS), U
system (Syst
Wood River
thin the Villa
talled betwe
struction Co
ad not yet be
ess agreemen
The purpose
n regarding S
ese construct
Report.
ing the Nort
agement are
Shell Oil C
OP) effective
venture bet
ning LLC w
limited part
nced the sep
ction busine
a name chan
WRR. Eq
assistance o
ucted within
e to the east
ong the West
y the System
he primary S
between Se
URS Corpo
tem). The S
r Refinery (W
age Public W
een March 2
ompletion Re
een provided
nt between
e of this Con
System layou
tion activitie
th Property,
eas. Located
Company an
e June 1, 2
tween COP
was converte
tners COP
paration of t
ess on July
nge that bec
quilon Enterp
of P66 on se
the area ge
t, East 1st St
t Fenceline (
m, and togeth
System const
econd and E
oration (UR
System was c
WRR) North
Works (PW)
2011 and J
eport. At th
d to SOPUS
SOPUS and
nstruction Co
ut and const
es were refer
which conta
d in the Vill
nd subseque
2000. WRB
and EnCan
ed into a lim
and Cenov
their Refinin
14, 2011.
came effectiv
prises LLC
everal enviro
enerally bou
treet to the
(Figure 1).
her will be r
truction area
Eighth Stree
Introduc
RS) designed
constructed a
h Property, i
Yard. The
January 201
hat time, acce
S for constru
d the Village
ompletion R
truction activ
rred to as Ph
ains storage
lage at 900 S
ent owners
B Refining
na US Refin
mited partne
vus US Ref
ng and Mark
The separ
ve May 1, 2
(d/b/a Shel
onmental pro
unded by Ill
north, and
referred to a
a is located o
ets in the Vi
ction
1-1
d and
along
in the
West
2, as
ess to
uction
e was
Report
vities
hase 6
tanks
South
until
LLC,
neries,
ership
finery
keting
ration
2012.
ll Oil
ojects
linois
Rand
as the
on the
illage
SVE SysteWRR Roxana, Il
SECTIO
(Figure
Figure 2
1.2 SOI
The curr
efforts b
conducte
and soil v
To addre
Investiga
2010, in
submitted
required
2011); ho
of forma
including
Fenceline
test work
Conceptu
remedial
System
correspon
construct
Completi
As stated
installatio
em Constructi
linois
ONONE2). The co
2A.
IL VAPOR EX
rent underst
beginning w
ed in 2006.
vapor sampl
ess potentia
ation Work P
which inst
d a Pilot Te
for System
owever, base
al approval
g advancem
e and SVE-2
k plan, also
ual/Final De
objectives
design.
ndence, IEP
tion and op
ion Report fo
d above, th
on of the PW
on Completio
E onstruction a
XTRACTION
anding of e
with the W
The investig
es.
al vapor int
Plan to the I
allation of a
est Work Pla
design. IEP
ed on conver
and were c
ment of soil
2 at the PW
o required s
esign Report
(and concep
Subsequent
PA issued a
eration of t
for the West
his CCR Ad
W Yard porti
on Report Add
area for the
existing site
West Fenceli
gative effort
trusion in t
Illinois Envi
an SVE sys
an to IEPA
PA formally
rsations with
conducted b
l borings co
Yard). The
ubmittal of
t was submit
ptual approa
to the C
Joint Const
the System.
Fenceline po
ddendum de
ion of the Sy
dendum
e PW Yard
conditions
ine P-93 D
ts included c
the Village,
ironmental P
stem was pr
in Decembe
y approved t
h the IEPA,
between Feb
ompleted as
e 2011 IEPA
a conceptu
tted to the IE
ach to meet
Conceptual/F
ruction and
SOPUS s
ortion of the
escribes the
ystem.
portion of
is the resu
Dissolved Ph
collection of
SOPUS su
Protection A
roposed (SO
er 2010 to g
the pilot test
pilot test act
bruary 28,
s SVE wel
A letter, in ad
ual/final des
EPA present
those objec
Final Desig
d Operating
submitted th
e System in M
constructio
the System
ult of extens
hase Benze
f soil, groun
ubmitted a
Agency (IEPA
OPUS, 2010
gather additi
t on March
tivities move
2011 and M
lls (SVE-1
ddition to ap
ign report.
ting backgro
ctives), and
gn Report
Permit on J
he SVE Syst
May 2012.
on activities
Introduc
m is presente
sive investig
ene Investig
ndwater, LN
Vapor Intr
A) in Septem
0). SOPUS
ional inform
16, 2011 (I
ed forward a
March 24, 2
along the
pproving the
The June
ound informa
provided a
and assoc
July 14, 201
tem Constru
associated
ction
1-2
ed on
gative
gation
APL,
rusion
mber,
then
mation
EPA,
ahead
2011,
West
e pilot
2011
ation,
final
ciated
11 for
uction
with
SVE SysteWRR Roxana, Il
SECTIO
Plans, te
were pro
included
The PW
(Figure 2
2012 SVE
The six S
PW prop
diameter
previousl
Property,
connecte
displacem
from the
traveling
A second
fresh air
em Constructi
linois
ONTWOechnical spec
ovided in th
in a subsequ
Yard portio
2). SVE we
E System Co
SVE wells (
perty are par
High Den
ly installed
, adjacent to
d via the 4-i
ment blower
PW Yard S
g through the
d blower, loc
to dilute the
on Completio
O cifications,
he June 11,
uent submitt
on of the S
ell constructi
onstruction C
(SVE-21, SV
rt of the “te
sity Polyeth
4-inch steel
o the PW Y
inch steel pip
r housed wit
VE wells fe
e blower and
cated on the
vapor stream
on Report Add
and drawing
2011 Conc
tal to IEPA o
ystem consi
ion details a
Completion R
VE-22, SVE
eal line” (Fi
hylene (HD
l piping term
Yard property
ping to a vap
thin a custom
eeds into the
d a baffle co
RTO side o
m as necessa
dendum
gs used for
ceptual/Fina
on Septembe
ists of six S
and boring lo
Report.
E-23, SVE-2
igure 2 and
DPE) piping.
minated at t
y. Within t
por/liquid se
mized interm
conex, whe
nnected to a
of the baffle,
ary.
T
constructio
al Design R
er 23, 2011.
SVE wells l
ogs were pre
4, SVE-26,
d Figure 2A
. The HD
the West Fe
the WRR, t
eparator (VL
modal freigh
ere vapor mo
a Regenerati
pushes the v
Technical S
on/installatio
Report, alon
located with
eviously pro
and SVE-27
A), interconn
DPE piping
enceline of
the PW Yar
LS) and a rot
ht container
oves through
ive Thermal
vapor into th
Specificat
on of the Sy
ng with revi
hin the PW
vided in the
7) located o
nected by 4
connects to
the WRR N
d SVE well
tary lobe po
(conex). P
h the VLS, b
Oxidizer (R
he RTO and
tions
2-1
ystem
isions
Yard
e May
on the
4-inch
o the
North
ls are
sitive
Piping
before
RTO).
d adds
SVE SysteWRR Roxana, Il
SECTIO
Similar t
carbon st
“teal line
facilitate
all HDPE
There we
PW Yard
em Constructi
linois
ONTHRo the West F
teel. Howev
e” within the
future locat
E piping from
ere no other
d portion of t
on Completio
REE Fenceline po
ver, as the p
e PW Yard
tion of the su
m each well
deviations f
the System.
on Report Add
ortion of the
piping on PW
was constru
ubsurface, n
vault to a ca
from the Co
dendum
D
System, the
W property
ucted of HD
non-metallic
arbon steel c
onceptual/Fi
Deviations
e piping with
was to be c
DPE piping, r
piping, a tra
connection fl
inal Design R
From Conc
hin WRR w
constructed
rather than c
acer wire wa
lange.
Report for i
ceptual De
was construct
below grade
carbon steel
as installed a
installation o
esign
3-1
ted of
e, the
l. To
along
of the
SVE SysteWRR Roxana, Il
SECTIO
Construc
galvanize
wells loc
Korte an
PW Yard
vacuum
At the re
were ins
piping w
mechanic
After the
connectio
HDPE p
concrete
The HDP
approxim
vault and
CA-6 agg
K&L com
testing o
Hydrosta
carbon s
Construc
System o
em Constructi
linois
ONFOUction of the P
ed steel vaul
cated at the P
nd Luitjohan
d portion of
excavation o
equest of the
talled as a c
was sealed a
cally excava
e utilities w
on flange at
piping and t
floors.
PE piping c
mately three
d piping exc
gregate was
mpleted con
f the HDPE
atic test resu
steel portion
ction Compl
on December
on Completio
UR PW Yard por
lts with con
PW Yard pro
, Inc. (K&L
the System.
of soil in loc
Village Pub
casing for th
at the ends
ate utilities fo
ere uncover
t the West F
tracer wire
connecting th
inches of sa
avations we
placed as th
nstruction ac
E piping that
lts can be fo
n of the “te
etion Repor
r 3, 2012, wi
on Report Add
rtion of the S
crete floors,
operty.
L), of Highla
. Constructi
cations of kn
blic Works D
he 4-inch v
to serve as
or repair or r
red, a pipe t
Fenceline to
were instal
he six SVE
and above a
re backfilled
he top layer o
ctivities on N
t extends fro
ound in App
eal line” w
rt. URS beg
ith all PW Y
dendum
Des
System cons
, and connec
and, Illinois,
ion activities
nown subsu
Department
apor lines a
a protectiv
replacement
trench was
each of the
lled, along w
wells to th
and below th
d with excav
of backfill in
November 1
om the PW
pendix B. Pr
were provide
gan commis
Yard SVE we
scription o
sisted of the
ction of the
, was respon
s commence
urface utilitie
(PWD), sec
at specific u
ve casing in
(Appendix
excavated f
e six SVE w
with galvan
he carbon st
he pipe. Th
vated materi
n roadway ar
19, 2012 wit
Yard SVE w
revious hydr
ed in Appen
ssioning of t
ells online b
of Construc
installation
six previous
nsible for co
ed on Octobe
es on the PW
tions of 8-in
utility crossin
n the event
A).
from the car
wells. Follow
nized steel
teel piping w
he remaining
ials. A 6- to
reas.
th the succe
wells to the
rostatic testi
ndix E of
the PW Yar
y December
ction Activ
of HDPE pi
sly installed
onstruction o
er 16, 2012,
W Yard prop
nch HDPE p
ngs. The 8
PWD neede
rbon steel p
wing excava
well vaults
was bedded
g portion of
o 12-inch lay
essful hydro
West Fence
ing results fo
the SVE Sy
rd portion o
r 6, 2012.
vities
4-1
iping,
SVE
of the
, with
perty.
piping
8-inch
ed to
piping
ation,
with
with
f well
yer of
ostatic
eline.
or the
ystem
of the
SVE SysteWRR Roxana, Il
SECTIO
Plan view
included
em Constructi
linois
ONFIVEws of the Sy
in Appendi
on Completio
E ystem are inc
ix A.
on Report Add
cluded in Fig
dendum
gures 2 and
D
d 2A. K&L’
Detailed As
s detailed as
s-Built Draw
s-built drawi
wing
5-1
ing is
SVE SysteWRR Roxana, Il
SECTIO
URS per
portion o
met the i
of instal
represent
K&L’s Q
Appendi
em Constructi
linois
ONSIX rsonnel prov
of the System
intent of the
lation, and
tatives moni
QA/QC doc
ix B.
on Completio
vided oversi
m to monitor
e design spec
general mo
tored compl
cumentation
on Report Add
ight during
r, document
cifications.
onitoring of
liance of the
n / SVE pi
dendum
the constru
t, and assure
Oversight a
f the constru
contractor w
iping hydro
Quality As
uction and i
e constructio
activities inc
uction. Ad
with their QA
ostatic testin
ssurance/Q
installation o
on activities
cluded layou
dditionally,
A/QC plans.
ng results a
Quality Con
of the PW
and perform
ut, document
the on-site
are presente
ntrol
6-1
Yard
mance
tation
URS
ed in
SVE SysteWRR Roxana, Il
SECTIO
Daily on
K&L’s o
QA/QC d
performe
conforma
Photogra
em Constructi
linois
ONSEVn-site constr
on-site QA/Q
documentati
ed by URS
ance with th
aphs of const
on Completio
EN uction moni
QC represent
ion and data
’ contractor
e design req
truction activ
on Report Add
itoring was
tatives. Cou
a, URS obse
rs for the P
quirements de
vities are inc
dendum
performed
upled with th
erved that th
PW Yard p
escribed in t
cluded in Ap
by URS fie
his monitori
he constructi
portion of th
the Conceptu
ppendix C.
eld represen
ing and revi
ion and insta
he System
ual/Final De
Conclus
ntatives and
ew of the pr
allation activ
were in ge
esign Report
sions
7-1
with
roject
vities
eneral
t.
SVE SysteWRR Roxana, Il
SECTIO
Illinois Eappro
Illinois EOper
Shell OilInves
Shell Oilby UR
Shell OilCorp
Shell OilURS
URS Cor
reque
em Constructi
linois
ONEIGHEnvironmentoval with con
Environmentrating Permi
l Products Ustigation. Pr
l Products URS Corporat
l Products Uoration.
l Products UCorporation
rporation. Se
est for additi
on Completio
HT al Protectionnditions.
al Protectiont
S. Septemberepared by U
S. Septembetion.
S. June 2011
S. May 2012n.
eptember 23
ional informa
on Report Add
n Agency (IE
n Agency (IE
er 2007. WesURS Corpora
er 20, 2010.
1. Conceptua
2. SVE Syste
, 2011 electr
ation.
dendum
EPA). Nove
EPA). July
st Fenceline ation.
Vapor Intru
al/Final Des
em Construc
ronic mail to
ember 15, 20
14, 2011. Jo
P-93 Dissol
usion Investig
sign Report.
ction Comple
o IEPA in re
010. Letter o
Joint Constru
lved Phase B
gation Work
Prepared by
etion Report.
esponse to Se
Referen
of work plan
uction and
Benzene
k Plan. Prepa
y URS
. Prepared b
eptember 1,
nces
8-1
n
ared
y
2011
SVE SysteWRR Roxana, Il
APPEN
em Constructi
linois
NDIXA
on Completioon Report Adddendum
Korte & Luuitjohan Ass-Built Drawwing
SVE SysteWRR Roxana, Il
APPEN
em Constructi
linois
NDIXB
on Completioon Report Add
Contra
dendum
actor QA/QQC Documeentation annd Test Ressults
SVE SysteWRR Roxana, Il
APPEN
em Constructi
linois
NDIXC
on Completioon Report Adddendum
Coonstruction Photograaphs
PHOTOGRAPHIC LOG
Client Name:
Shell
Site Location:
Shell SVE System- Public Works Property
Project No.
21562850.12000
Photo No.
1
Date 10/19/12
Description: Standing at WRR fence line looking southwest at the SVE pipe trench excavation.
Photo No.
2
Date 10/24/12
Description: Looking southwest at installation of the 4” diameter HDPE SVE pipe placed within a 8” diameter HDPE protective casing pipe in the location of underground utilities.
PHOTOGRAPHIC LOG
Client Name:
Shell
Site Location:
Shell SVE System- Public Works Property
Project No.
21562850.12000
Photo No.
3
Date 10/25/12
Description: Looking southwest at installation of the 4” diameter HDPE SVE pipe placed within a 8” diameter HDPE protective casing pipe in the location of underground utilities. Protective pipe casings were painted orange and tracer wire was installed the full length of the SVE piping.
Photo No.
4
Date 10/25/12
Description: At the WRR fence line looking northeast at the connection location of the 4” diameter HDPE SVE pipe from the Public Works Property to the 4” diameter carbon steel SVE pipe entering the WRR.
PHOTOGRAPHIC LOG
Client Name:
Shell
Site Location:
Shell SVE System- Public Works Property
Project No.
21562850.12000
Photo No.
5
Date 10/26/12
Description: Facing east, looking at the excavation and installation of the SVE piping to the east of the vault for SVE-27.
Photo No.
6
Date 10/26/12
Description: Facing northeast, looking at the excavation and installation of the SVE piping to the vault for SVE-27.
PHOTOGRAPHIC LOG
Client Name:
Shell
Site Location:
Shell SVE System- Public Works Property
Project No.
21562850.12000
Photo No.
7
Date 10/31/12
Description: Facing east, looking at the excavation and installation of the SVE piping to the south of the vault for SVE-27.
Photo No.
8
Date 10/31/12
Description: Facing northeast, looking at the excavation and installation of the SVE piping to the south of the vault for SVE-27.
PHOTOGRAPHIC LOG
Client Name:
Shell
Site Location:
Shell SVE System- Public Works Property
Project No.
21562850.12000
Photo No.
9
Date 10/31/12
Description: Installation of the concrete vault pad and galvanized vault. Facing southeast looking at the vault for SVE-27.
Photo No.
10
Date 11/1/12
Description: Facing east, looking at the excavation and installation of the SVE piping to the southwest of the vault for SVE- 27
PHOTOGRAPHIC LOG
Client Name:
Shell
Site Location:
Shell SVE System- Public Works Property
Project No.
21562850.12000
Photo No.
11
Date 11/1/12
Description: Looking inside the vault for SVE-27.
Photo No.
12
Date 11/5/12
Description: Facing west, looking at the excavation and installation of the SVE piping to SVE-26 and SVE-24.
PHOTOGRAPHIC LOG
Client Name:
Shell
Site Location:
Shell SVE System- Public Works Property
Project No.
21562850.12000
Photo No.
13
Date 11/9/12
Description: Looking north at the installation of the 4” diameter HDPE SVE pipe and an 8” diameter HDPE protective pipe casing placed below an electrical conduit servicing the Public Works equipment fuel tank.
Photo No.
14
Date 11/9/12
Description: Installation of the precast concrete pad for the vault for SVE 22. Facing north.
PHOTOGRAPHIC LOG
Client Name:
Shell
Site Location:
Shell SVE System- Public Works Property
Project No.
21562850.12000
Photo No.
15 Date
11/9/12
Description: Installation of vault for SVE-21. Facing north.
Photo No.
16 Date
11/6/12
Description: Installation of vault for SVE-26. Facing northeast.
PHOTOGRAPHIC LOG
Client Name:
Shell
Site Location:
Shell SVE System- Public Works Property
Project No.
21562850.12000
Photo No.
17 Date
11/9/12
Description: Excavation for the SVE piping from the vault for SVE-21. Facing south.
Photo No.
18 Date
11/9/12
Description: Trench backfill from vault at SVE-24 west to vault at SVE-26.
PHOTOGRAPHIC LOG
Client Name:
Shell
Site Location:
Shell SVE System- Public Works Property
Project No.
21562850.12000
Photo No.
19 Date
11/13/12
Description: Pipe trench excavation from vault at SVE-22 to vault at SVE-23. Facing east.
Photo No.
20 Date
11/14/12
Description: Grading and resurfacing the Public Works roadway from the southwest entrance gate eastward to the back gate. Facing east.
PHOTOGRAPHIC LOG
Client Name:
Shell
Site Location:
Shell SVE System- Public Works Property
Project No.
21562850.12000
Photo No.
21 Date
11/14/12
Description: Looking north at the 8” dia HDPE protective pipe casing installed just below a clay tile sewer pipe.
Photo No.
22 Date
11/14/12
Description: Pipe trench excavation from vault at SVE-22 to vault at SVE-23. Facing west.
PHOTOGRAPHIC LOG
Client Name:
Shell
Site Location:
Shell SVE System- Public Works Property
Project No.
21562850.12000
Photo No.
23 Date
11/14/12
Description: Preparation of 4” diameter HDPE pipe to be fusion welded.
Photo No.
24 Date
11/14/12
Description: Fabrication and installation of the 4” diameter HDPE SVE pipeline from vault at SVE-22 to vault at SVE-23. Facing southeast.
PHOTOGRAPHIC LOG
Client Name:
Shell
Site Location:
Shell SVE System- Public Works Property
Project No.
21562850.12000
Photo No.
25 Date
11/14/12
Description: Fabrication and installation of the 4” diameter HDPE SVE pipeline from vault at SVE-22 to vault at SVE-23. Facing west.
Photo No.
26 Date
11/16/12
Description: Grading and resurfacing the Public Works roadway from the northwest entrance gate eastward along the north side of the Public Works buildings. Facing west.
PHOTOGRAPHIC LOG
Client Name:
Shell
Site Location:
Shell SVE System- Public Works Property
Project No.
21562850.12000
Photo No.
27 Date
11/16/12
Description: Grading and resurfacing the Public Works roadway from SVE-22 south to SVE-26 along the east sides of the Public Works buildings. Facing south.
Photo No.
28 Date
11/16/12
Description: Installation of vault at SVE-23. Facing north.
PHOTOGRAPHIC LOG
Client Name:
Shell
Site Location:
Shell SVE System- Public Works Property
Project No.
21562850.12000
Photo No.
29 Date
11/19/12
Description: Finished grade with seed/straw along SVE pipe trench excavation running south from SVE-21. Facing south.
Photo No.
30 Date
11/19/12
Description: Finished grade with seed/straw slope near SVE-27. Facing northeast.