OPS Workshop August 8, 2001
Equilon Pipeline Company, LLC.
Equilon Pipeline’sRisk Management Program
OPS Workshop August 8, 2001
Equilon Pipeline Company, LLC.
•Background
•Risk Screening Scorecard
•Data Gathering
•Risk Assessment Data Sheets
•Risk Assessment Meeting
•Documentation Software
OPS Workshop August 8, 2001
Equilon Pipeline Company, LLC.
BackgroundBackground
•Risk Management Demonstration Project
•Conducted Risk Assessments on two major systems
•Recognized the importance of aligning/integrating data
•Viewing & digesting data was very onerous
•There has to be a better way
PIPELINE RISK SCREENING - SCORECARDPIPELINE RISK SCREENING - SCORECARD
Equation:
Details:
3 of 10
SCORING PROCESS
Abbreviations: CAUSE INDEXES IMPACT INDEXES Outside Force Damage (OF) Population Density (POP) Corrosion (CR) Environment Sensitivity (ENV) Failed Linepipe/Weld (FP) Commodity Hazard (COM1/2) Operations (OP) Release Potential (DIA) Other (OT)
Probability
Consequence
Relative Risk
The statements within each Cause Index are weighted relative to each other by “units” in parenthesis. Cause Indexes are weighted relative to each other by “%” in the upper right-hand corner. A pipeline system’s score for each statement is the product of the entry made (see STEPS) and the “units” shown. Statement scores within a Cause Index are added together, then multiplied by the Index’s weighting to get the Cause Index score. The System Probability score (%) is the sum of the five indexes.
The statements within the Population Density and Environment Sensitivity Impact Indexes are weighted by “points” in parenthesis (POP-1 & ENV-1 - points/mile; ENV-2 - points/crossing). A pipeline system’s score for each statement is the product of the entry made (see STEPS) and the “points” shown. These statement scores are added together, then multiplied by factors relating to the Commodity Hazard and the Release Potential (diameter) of the pipeline, to obtain the System Consequence score (points). The System Relative Risk score (points) is the product of the System Probability score (%) and the System Consequence score (points).
{OF%+CR%+FP%+OP%+OT%} {[(POP)(COM1)+(ENV)(COM2)][DIA]}X = SCORE
Data SourcesData Sources
Internal Data
External Data
Public Data
OPS Workshop August 8, 2001
Equilon Pipeline Company, LLC.
Internal DataInternal Data
Alignment Sheets
Internal Data
CIS
Smart Pig Data
CPDM
External Data
Public Data
OPS Workshop August 8, 2001
Equilon Pipeline Company, LLC.
Hydraulic Studies
External DataExternal Data
Internal Data
Wetlands Data
Nationwide Imagery Data
Nationwide Population Density
Nationwide DEM DataExternal Data
Public Data
OPS Workshop August 8, 2001
Equilon Pipeline Company, LLC.
Public Data Public Data
Internal Data
External Data
HCA Data:
High Population Areas
Other Population Areas
Commercially Navigable Waterways (CNW)
Drinking Water Areas
Unusually Sensitive Ecological Areas (USAs)
Public Data
OPS Workshop August 8, 2001
Equilon Pipeline Company, LLC.
Work FlowWork Flow
DataProcessing
Data Acquisition
Risk Assessment Data Sheet
Risk dB
Risk Application
RiskAssessment
Meeting
OPS Workshop August 8, 2001
Equilon Pipeline Company, LLC.
Equilon Pipeline Company, LLC.
Legend - Population ConsequenceLegend - Population Consequence
PopulationConcerns(High-Occupancy Structures)
A - AirportB - Business / Office BuildingC - Church D - Daycare F - StadiumH - Hospital I - Interstate / HighwayM - Mall O - Other Public BuildingP - Park / Recreation AreaR - RestaurantS - SchoolT - Hotel / ApartmentY- Yard / Home
10
Data provided by Operations / Maintenance personnel either:
1. Prior to Risk Assessment meeting using “Preliminary” Risk Assessment Data Sheets (instructions provided separately).
2. At Risk Assessment Meeting
Data provided by Operations / Maintenance personnel either:
1. Prior to Risk Assessment meeting using “Preliminary” Risk Assessment Data Sheets (instructions provided separately).
2. At Risk Assessment Meeting
Equilon Pipeline Company, LLC.
Legend - Population ConsequenceLegend - Population Consequence
HPOP - High Population Area (Urbanized)OPOP - Other Population Area (Other Incorporated)CNW - Commercially Navigable Waterway
OPS - HCA(High Consequence Area)
HPOP
OPOP
CNW
Non- Intersecting Intersecting
Non- Intersecting Intersecting
Non- Intersecting Intersecting
PopulationDensity(Per Square Milefrom 1990 Census)
> 10000
2501 - 10000
501 - 2500
101- 500
0 - 100 11
Data maintained and provided by DOT/OPS and displayed by Geofields.
Data maintained and provided by DOT/OPS and displayed by Geofields.
Data maintained and provided by U.S. Census Bureau, displayed by Geofields.
Data maintained and provided by U.S. Census Bureau, displayed by Geofields.
Based on intersection with ¼ mile Impact Zone
Based on intersection with ¼ mile Impact Zone
Equilon Pipeline Company, LLC.
Legend - Potential Release ImpactLegend - Potential Release Impact
Drain Time (Minutes)
7501 - 10,000
5001 - 7500
2501 - 5000
0 - 2500
Drain Volume (Barrels)
> 10,000
12
Drain volume / time obtained from Operations/Engineering using Equilon’s Spill Model, displayed by Geofields.
Drain volume / time obtained from Operations/Engineering using Equilon’s Spill Model, displayed by Geofields.
Note: Scale varies by system
5 Hour Graduated Scale(1 Hour Increments)
Drain Distance(Feet)
Graduated Scale (1000 Foot Increments)
Drain distance obtained from Geofields Overland Spread Model using Spill Model output file, displayed by Geofields.
Drain distance obtained from Geofields Overland Spread Model using Spill Model output file, displayed by Geofields.
OPS Workshop August 8, 2001
Equilon Pipeline Company, LLC.
Why this Approach?Why this Approach?
•Effective
•Systematic
•Conceptually Simple
•Participative
•Dovetails with Integrity Rule
OPS Workshop August 8, 2001
Equilon Pipeline Company, LLC.
Integrity RuleIntegrity Rule
•Baseline Assessment Plan
•Data Integration/Information Analysis
•Supports Integrity Assessment Work
OPS Workshop August 8, 2001
Equilon Pipeline Company, LLC.
Questions?Questions?