Introduction
• Understanding what to do first.
• éThekwini Roads
• éThekwini Stormwater and Coastal Management
• Challenges
• GRAP 17
• Where to from here?
Objectives of Infrastructure Asset Management
To provide an agreed level of servicelevel of service in the most cost effective mannercost effective manner for present and futurepresent and future communities
Infrastructure Assets Approximate Replacement Values (eThekwini)
Asset Group Replacement New Value (Millions)
Roads R 58,500.00
Water R 23,400.00
Buildings R 23,400.00
Electricity R 20,700.00
Sanitation R 18,000.00
Coastal & Drainage R 17,100.00
Other (uShaka etc) R 12,600.00
Land R 1,440.00
Fleet R 1,350.00
Durban Solid Waste R 1,080.00
Computers R 1,080.00
Parks R 1,080.00
eThekwini Transport Authority R 720.00
Total R 180,450.00
Understanding What To Do First?
Operational
Operational
Plans & Cost
Plans & Cost
Rate studies.
Rate studies.
Servi
ce S
tandar
ds
Servi
ce S
tandar
ds
and
and
Deman
d Model
s
Deman
d Model
sPerformance Performance MeasuresMeasures
&&BenchmarkingBenchmarking
CAPEX
New
Works
Total Asset
Total Asset
Managem
ent
Managem
ent
PlanPlan
Risk AssessmentRisk Assessment&&
Management PlansManagement Plans
Str
ate
gic
Main
tenance
Str
ate
gic
Main
tenance
(FM
EC
A,R
CM
)
(FM
EC
A,R
CM
)
ConditionMonitoring &Assessment
CAPEX / ORDM
CAPEX / ORDM
Optimised Renewal
Optimise
d Renewal
Decision M
aking
Decision M
aking
Fitting the Jigsaw Together
Fitting the jigsaw together
•GAP- Ex Level 1
IMESA’s IAM Training Courses
AM Organisational
Structure
Council
City Manager
DCM Forum
Steering Committee
Architecture CSCM Solid Waste
Electricity Parks Sanitation WaterRoads Finance
Flow Chart (Infrastructure Asset Management)
Note 11. Position /location(where the asset is)2. Condition assessment3. Present value and construction cost.4. Types of asset5. Construction date6. Person responsible for asset7. Photograph of asset
Note 4a) 5 year maintenance planb) community consultations
Note 2Historical failure and Predictive modellinga) Assess risk of failureb) Risk policyc) Risk Strategy
Note 3(eg a busy arterial road will require a higher level of service than a local road)a) politicalb) Customers (who are my customers)c) Financial d) Environmentale) Legislative
Decide on computerised
asset management
software
Buy-inPromoted by senior
Management
Knowledge of AssetsOn goingSee note 1
Asset Management Organisational
Structure
Failure Mode AnalysisSee note 2
Define Levels of ServiceSee note 3
Asset Performance
Standards(KPI)
Predict DemandPopulation growthCustomer trends
Asset Financial
Cash flowsSee note 4
Prepare Asset Management
Plan2020 Vision
Asset RenewalReplacement
Disposal
Link with IDP,Maintenance(Operational
Contracts)and Capital Contracts
Select Maintenance /
Capital Options
Asset SelectionPolicy
Policy
•(Done)
•(Done)
•(Done)
•(High Level Strategic Infrastructure Assets June 2007 – June 2009•Remainder June 2009 – June 2012)
•(85% Complete)
•(85% Complete)
•(Completion Date February 2009)
•(Completion Date February 2009)
Proposed Computer System (2004)
AMS 2007This is now VSMART
Asset Groups: Architecture, CSCM, ETA ,Water,
Sanitation, Solid Waste, Bridges, IS
IAM Software (VSMART)
Risk Management - Asset Failure
Condition Residual Life % Consumed
PoF % Life
ConsumedCoF
Population Served
BRE Rankings
•Redundancy Allowance
éThekwini Roads
• Introduction• Road Classification• Network Length• Traffic Flow• Visual Condition Index• Asset Value (Roads)• Maintenance Budget• Backlog
Introduction
• The road network of eThekwini Municipality is an economic resource and a valuable asset to the metropolitan area, the Province and its road users.
• The road network requires careful management and the Municipality was mindful of the implications of good road asset management when the electronic system was implemented.
• This system provides valuable information for road network management and planning.
Total Length = 5829 km
Road Classification Road Category
RISFA Classification
Description
UA 2Trunk roads, primary distributors, freeways, major arterials and bypasses used for primary urban distribution and linking urban districts/sectors.
UB 3 / 4
District and local distributors, minor arterials and collectors, industrial and CBD roads, goods loading areas and bus routes used for district distribution and to link communities.
UC 4Urban access collectors used for local distribution and to link neighbourhoods.
UD 5Local access roads (residential): Loops, access ways, access courts, access strips and cul-de-sacs.
UE Car parks, bus bays and taxi ranks.
UF Walkways, arcades and footpaths.
Distribution of annual traffic amongst road categories: UA, UB,
UC and UD
0% 20% 40% 60% 80% 100%
Length (km)
Annual traffic(million veh-km)
Length (km) Annual traffic(million veh-km)
UA 84 1,532 UB 1,442 2,632 UC 1,072 196 UD 2,842 104
– Very Good = 86% to 100%
– Good = 71% to 85%
– Fair = 51% to 70%
– Poor = 31% to 50%
– Very Poor = 0% to 30%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100% Very Good
Good
Fair
Poor
Very Poor
Rehabilitation Backlog
Visual Condition Index
Very Poor Condition
Very Poor Condition
Poor Condition
Fair Condition
Very Good Condition
Very Good Condition
– Very Good = 86% to 100%
– Good = 71% to 85%
– Fair = 51% to 70%
– Poor = 31% to 50%
– Very Poor = 0% to 30%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100% Very Good
Good
Fair
Poor
Very Poor
Rehabilitation Backlog
12, 0% 124, 2%
1001, 17%
2374, 41%
2318, 40%
VCI Distribution - 2009/10Length (km) and Percentage (%)
Very Poor
Poor
Fair
Good
Very Good
Visual Condition Index 81% (4,692 km) of paved roads in either
a very good or good condition
• Severe to warning crocodile cracks have developed on 6% (318 km) of roads indicating an urgent need to inspect these roads for structural repair.
• Moderate crocodile cracks have developed on 12% (660 km) of the network, indicating an urgent need to investigate preventive or repair measures to delay further deterioration.
• A further 12% (690 km) of roads have isolated crocodile cracks indicating a possible need for preventive measures.
VCI distribution for paved roads, 2003 to 2009/10
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2003 2005 2007 2009/10
Le
ng
th (%
)
Very Poor Poor Fair Good Very Good
Current asset value versus maximum asset value for paved
roads, 2009/10
0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000
Asset value (CDRC)(R million)
Max asset value (CRC)(R million)
R million
Asset value (CDRC)(R million)
Max asset value (CRC)(R million)
30,500 34,600 Total Replacement Cost (Including fill,
drainage etc) is R58500m
Asset Unbundling/Componentization
Determine asset components:
• Use standardisation (civil, electrical & mechanical)• Identify “parts” of the asset that require different maintenance or have different expected lives (i.e. riding surface, layerworks, embankments/fill, drainage, …)• Understand maintenance frequencies and types of maintenance required• Identify critical asset components
Road Rehabilitation Budget Allocation
0
50
100
150
200
250
300
350
400
2004/ 05 2005/ 06 2006/ 07 2007/ 08 2008/ 09 2009/ 10 2010/ 11
Financial Year
Budg
et A
lloca
tion
(R M
illio
n)
Budget for maintenance and rehabilitation
YEAR UA ROADS UB, UC, UD ROADS
2010/11 R47 million R370 million
2011/12 R50 million R370 million
2012/13 R55 million R330 million
2013/14 R55 million R330 million
2014 onwards R55 million R330 million
All budgets and are given in 2010 Rand value.
Optimal annualized fund allocation of the
MTEF Budget, for paved roads
By 2012, the backlog of maintenance and rehabilitation of both UA and UB category roads should be been eradicated and the maintenance objective then shifts towards the UC and UD road categories.
Budget Constraints and Predicted Road Network Deterioration
Constant Annual R80 Million Budget (Cat. B, C & D): Condition Distribution
0%10%20%30%40%50%60%70%80%90%
100%
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
Year
Len
gth
(%)
Very Poor Poor Fair Good Very Good
Predicted Condition Distribution of Paved Roads under Current Funding Scenario
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
20
03
20
05
20
07
20
09
20
10
20
11
20
12
20
13
20
14
20
15
20
16
20
17
20
18
20
19
Le
ng
th o
f p
ave
d r
oa
ds
(%
)MTEF Budget
Very Poor Poor Fair Good Very Good
Historic Predicted
The analysis results prove that the current level of funding is sufficient to keep the poor to very poor roads at lower levels.
éThekwiniCoastal Stormwater and Catchment
Management• CSCM Asset Types
• Stormwater Network
• Pipe Lengths
• Cash Flow (from VSmart)
• Visual Inspection
• Coastal Management
CSCM Assets Types
• CSCM Assets covered in this AMP include both the High level Strategic Assets & Second tier assets (known and unrecorded catchment areas): – A) Coastal Structures: Piers, Outfall Structures,;– B) Culverts; – C) Canals; – D) Pipes;– E) Manholes, – F) Pumps and pump stations
CSCM Asset Statistics
Pipe Size (mm)
150 225 300 375 450 525 600 675 750 825 900 1050 1200 1350 1500
% 3.4 12.5 27.8 16.6 16.3 2.4 7.2 0.6 1.6 3.4 1.5 3.2 3.0 0.3 0.2
Percentage of pipe size to Total Length
Culverts :Total Length = 135.94 km
Canals :Total Length = 46.77 km
73.2%
Pipes :Total Length = 4892 km
Condition Assessment-CCTV
Infrastructure Assets
•Drainage – Stormwater Assets
Cash Flow Required
Regional sea-level rise
Mather et al. (submitted to the African Journal of Marine Science )
Region Port Regional sea-level
trends (mm yr -1)
Luderitz Western
Port Nolloth +1.87
Simons Town Granger Bay Mossel Bay
Southern
Knynsa
+1.48 (excluding Granger and
Mossel Bays)
Port Elizabeth Eastern
Durban +2.74
Sea-level rise scenarios for Durban
• 300 mm
• (90% chance of happening by 2100)
• 600 mm
• (10% chance of happening by 2100)
• 1000mm
• (1% chance of happening by 2100)
Central sewerage treatment works
•Def
end
•Retreat
March 2007 event (Durban)
GRAP 17 Project Overview
Grap 17 data required for these and many more
Grap 17Focus Areas IRO Grap 17 Requirements
1. Knowledge / identification of Assets1. On VSmart database – in GIS format
2. In the Fixed Asset Register (JDE)
3. Stand alone GIS systems in each Department
4. Corporate GIS database
2. Condition Assessment of Assets1. It’s required to assist in the review of the useful lives of assets and
impairment costs.
3. Useful Life of Assets(based on National Treasury Guidelines)
1. To be reviewed at least each reporting date
2. Estimation of UL is a matter of judgement based on experience.
4. Impairment1. Loss in future economic benefits
2. The carrying amount (cost – accumulated depreciation) of an asset exceeds its recoverable amount (amount asset can be sold for)
5. Unbundling / Componentisation1. Identify each component with a different useful life
2. Depreciate each component over its expected useful life
Identify Asset Location & Relevant Asset Information
• Ensure asset locations are captured (preferably in a GIS database)
• Use free GIS software (Accuglobe® or other)
• Aerial photographs (SPOT5 or CDSM) can be obtained for free by state owned organisations
Asset Valuation Methods• Infrastructure replacement costs can be calculated quickly
using a “rule-of-thumb” based on indicative rates for construction of new infrastructure
• Calculate Current Replacement Cost using existing asset information (such as asset dimensions)
• Use a simple and consistent asset valuation methodologyNo. Type List of Asset Sub-Types Cost Group Cost Group Definition Group code Design Life Unit Capital Rate
1 Buildings Administration - Private - Residential - Canteen - Lifegaurd Tower
High spec High specification buildings used for offices, work/accommodation
buhs 80 m2 R 8,000.00
2 Buildings Electrical substation - Pumpstation - Crematoria - -
Operational Electrical Substation buop 80 m2 R 6,000.00
3 Buildings Changeroom - Coldroom - Ablution - Garage - Store room - Parcel Counter - Paybooth - Sport Equipmentroom
Medium spec Medium specification buildings used for storage/garage maintenance etc.
bums 80 m2 R 5,000.00
4 Buildings Taxi Shelter - Bus shelter - Canopy - Shed - Minor Lifegaurd tower
Low spec Low specification buildings generally used as a shelter from elements
buls 80 m2 R 2,000.00
5 Minor structures Statue - Memorial - Monument - - Feature structure Structures with heritage or other purpose such as statues
msfs 10 No. R 25,000.00
6 Minor structures Low walls - Plant boxes - Surface run-off drain - Drain - Gutters - Pipes & Valves
External structure Low walls and other external structures (generally masonary)
mses 20 m2 R 1,000.00
7 Structures Retaining wall - - - - Retaining wall Walls used for embankments msrw 80 m2 R 3,000.00
8 Minor structures Stairs - - - - Access Staircases msac 9 Minor structures Cage metal/enclosed - Cage
metal/open - Cage wiremesh enclosed - Cage wiremesh/open - Cage wood/open
Miscelaneous Animal Enclosures and other structures not compatibile with another category
msmi 10 No. R 5,000.00
10 Gardens Feature garden - - - - Garden Feature gardens such as display gardens, herb gardens, rose gardens, rock gardens, cactus garden, zen garden
gaga 8 m2 R 1,500.00
Asset Unbundling/Componentization
Determine asset components:
• Use standardisation (civil, electrical & mechanical)• Identify “parts” of the asset that require different maintenance or have different expected lives (i.e. riding surface, layerworks, embankments/fill, drainage, …)• Understand maintenance frequencies and types of maintenance required• Identify critical asset components
Asset Condition
• Asset condition based on inspection information• Asset remedial actions based on asset component and
urgency of repair
Impairment
Audit Trail• Implement a Quality System (ISO9001 or
similar)– Data management– Document management– Procedures– Management systems
• Undertake database backups• Use systems with built-in audit trails• Take pictures
57
AchievementsIntegrated Infrastructure Asset
Management in éThekwini• First Draft IAMP for high level strategic
asset completed in December.• Eight Individual AMP – December 2009
Roads, ETA, CSCM, Architecture, Parks, Solid Waste, Electricity and Water (Sanitation).
•Technical Staff
•Close Quality Primary Gaps
•Condition Assessment of Underground cables/pipes.
•Understanding future demands.
Challenges
AM Benchmark - EM Water (RBA1) Nov 2008
0
10
20
30
40
50
60
70
80
90
100
P&P Info Sys D&K CommTact
Org People AMP Overall
0
10
20
30
40
50
60
70
80
90
100
Your Assessment Top 10% of Similar Agencies Globally
Average (50%) Best Appropriate Practice
AM Benchmark - EM Water (RBA1) Nov 2008
0
10
20
30
40
50
60
70
80
90
100
P&P Info Sys D&K CommTact
Org People AMP Overall
0
10
20
30
40
50
60
70
80
90
100
Your Assessment Top 10% of Similar Agencies Globally
Average (50%) Best Appropriate Practice
Get The Base
Foundations In
Place
Current Accounting Standards
“We should be looking forward understanding the future demands, and the most appropriate capital and maintenance programs to deliver the levels of service required & funded by our stakeholders”.Source: Dr John Sing, Qld / Roger Byrne Melb
Asset Management Plan:A plan developed for the management of one or more infrastructure assets that combines multi-disciplinary management techniques (including technical and financial) over the lifecycle of the asset in the most cost effective manner to provide a specified level of service. A significant component of the plan is a long-term cash flow projection for the activities.Asset Register:A record of asset information including some or all of inventory, historical, service, financial, condition, construction, technical and financial information about each asset.
AMP vs Register
The Asset RegisterDoes not
Tell us• The replacement strategy of an asset• The planned maintenance program• The economic life of the asset• The reliability and capacity of the asset
In other wordsIt does not tell usIt’s state of decay(when it will fail)
Copyright © RBA. 2009
•1993•1996
The Evolution of Asset Management
1999
•2000
•2002•2003
•2005
•2004
2005
•2005•2006•2008
2009
(CRC) Current Replacement Costs: example 1
(CRC) Current Replacement Costs: example 2
•It was acknowledged that there will be a need for a step up in funding to comply with AM to avoid just having book entries.
•CONSTRUCTION COST = R 91 141 584
•CRC = R 2 388 073 754
Understand Asset Risk
• Failure of 1 asset can cause catastrophic failure of other/supporting assets
• Combination of small failures (pumpstation and blocked drainage channel) coupled with a large storm event caused major damage worth significantly more than the value of the failed assets
•Total damage R20m•Total Asset Cost R4m•Maintenance Cost ±R20000
Challenge
Where to?
The Problem With Our Current Approach
• There appears to be over 25 different approaches being taken to AM.
• Only a few organisations have adopted a quality framework or maturity assessment approach to identifying a logical improvement program.
• Training programs are being developed and undertaken by different groups using different approaches across many industry groups.
• Every industry or asset type is being done differently by different groups.
• Asset valuations and depreciation activities have been undertaken without appropriate guidelines.
• Condition assessments are being undertaken using a variety of methodologies.
Proposed NAMS
• To develop a quality framework by which Infrastructure Assets are managed.
• To drive the National program• Proposed key roll players