Sustainable Airport Master Plan CCMPO Master Plan Presentation November 24, 2015

Transcript of Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan...

Page 1: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

Sustainable Airport Master Plan

CCMPO

Master Plan Presentation

November 24, 2015

Page 2: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

Agenda

• Commercial Air Service

• Master Plan Overview & Summary

• Questions

Page 3: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

Economic Impact

UNV is a major economic driver for the region, with an estimated

annual economic impact of $203.8 million1. UNV is the state’s sixth

busiest commercial service airport (in terms of passenger

enplanements).

142,551 enplanements in 2014 (+8.2 % over 2013)

64 based aircraft

I-99 Innovation Corridor

UNV is the primary air transportation facility, serving both

commercial and general aviation, within the I-99 corridor

1Wilbur Smith Associates, The Economic Impact of Aviation in Pennsylvania Study

(October 2011)

Page 4: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

Non-stop Destinations from

UNV (SCE)

Existing Airline Services

Potential Future Cities/Markets

DTW

ATL

SCE

IAD

PHL ORD

EWR

MCO

CLT

Page 6: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

Projections of Aviation Demand

Summary

Page 7: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

Projections – Summary

Year Enplanements

Commercial

Air Carrier General Aviation Military Total

Total Inbound

Air Cargo

Based

Aircraft

Historical

2000 125,659 61

2001 116,113 57

2002 120,938 57

2003 123,871 57

2004 137,066 54

2005 143,800 54

2006 132,543 44

2007 144,160 49

2008 133,777 53

2009 130,527 53

2010 143,531 62

2011 144,054 1,514,771 66

2012 138,488 14,293 25,733 863 40,889 1,445,060 59

2013 131,753 13,551 26,509 525 40,585 1,357,911 64

2014 143,191 EST 12,790 27,614 663 41,067 1,391,211 64

Projected

2017 151,480 13,210 27,352 863 41,425 1,535,123 63

2022 164,266 12,698 29,071 863 42,632 1,575,865 67

2027 176,879 12,046 30,874 863 43,783 1,620,523 71

2032 189,948 12,276 32,776 863 45,914 1,662,695 75

CAGR (2012-2032) 1.59% -0.76% 1.22% 0.00% 0.58% 0.70% 1.22%

Operations

Page 8: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

Summary of Facility Needs

&

Recommended Alternatives

Page 9: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

Alt 2 - 1,500’ Extension – Rwy 24

(Recommended)

Page 10: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

Commercial Airline Terminal Needs

• Increase/configure apron to accommodate

– One (1) 50-seat regional jet

– Four (4) 70- to 90- seat regional jets

– One (1) narrow body jet (Boeing 737, Airbus A320, MD-80)

• Configure existing terminal building layout to increase

space for passenger holding area

• Carry forward ultimate terminal area plan for long-term

planning purposes

Page 11: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

Commercial Terminal Apron

Parking Reconfiguration

(Recommended)

Page 12: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

Commercial Airline Terminal

Parking (Recommended)

Page 13: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

Ultimate Commercial Airline

Terminal Area

Page 14: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

General Aviation Area Development

(Recommended)

Page 15: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

T-Hangar Development

(Recommended)

Page 16: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

Aeronautical Development

(Recommended)

Page 17: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

Air Cargo Development

(Recommended)

Page 18: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

Landside Access (Recommended)

Recommended

Recommended

Page 19: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

Conceptual Development Plan

Page 20: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

Capital Improvement Plan

• Capital Improvement Plans (CIPs) help identify:

– Timeline and cost estimates for planned improvements

– Level of fiscal, staffing, and scheduling resources needed

– Capital needs of an airport to federal, state, and local officials

– Potential funding sources such as:

• AIP (entitlements, discretionary)

• PennDOT ADP

• Passenger Facility Charges (PFC)

• Local funding

• Others

– Customer Facility Charges (CFC)

– Private

– FAA facilities

Page 21: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

Next Project Steps

• Finalize ALP

• Master plan report at FAA for final review

• Disseminate master plan report and executive summary

Page 22: Sustainable Airport Master Plan - crcog.net6AD7E2DC-ECE4-41CD... · Sustainable Airport Master Plan CCMPO ... 64 based aircraft ... •PennDOT ADP •Passenger Facility Charges (PFC)

Questions?