Nadi Integrated Flood Management Project Susan Vocea SOPAC

Transcript of Susan Vocea SOPAC. Background Project Components Deliverables Challenges and Opportunities ...

Page 1: Susan Vocea SOPAC.  Background  Project Components  Deliverables  Challenges and Opportunities  Progress to Date.

Nadi Integrated Flood Management Project

Susan VoceaSOPAC

Page 2: Susan Vocea SOPAC.  Background  Project Components  Deliverables  Challenges and Opportunities  Progress to Date.

Background Project Components Deliverables Challenges and Opportunities Progress to Date

Outline

Page 3: Susan Vocea SOPAC.  Background  Project Components  Deliverables  Challenges and Opportunities  Progress to Date.

The most common disasters impacting Pacific island developing countries are cyclones

Fiji is highly susceptible to flooding with severe floods and cyclones the key natural disaster facing the country.

SOPAC in collaboration with the World Bank, GEF – IWRM and the Government of Fiji is collaborating to develop Integrated Flood Management for the Pacific, using Nadi, Fiji as a case study.

Background

Page 4: Susan Vocea SOPAC.  Background  Project Components  Deliverables  Challenges and Opportunities  Progress to Date.
Page 5: Susan Vocea SOPAC.  Background  Project Components  Deliverables  Challenges and Opportunities  Progress to Date.

Institutional Strengthening of Flood Forecasting and Warning Systems

Flood Risk Assessment Institutional Strengthening for Integrated

Flood Management

Project Components

Page 6: Susan Vocea SOPAC.  Background  Project Components  Deliverables  Challenges and Opportunities  Progress to Date.

Project Deliverables

High resolution digital elevation model for Nadi Flood risk assessment

◦ 2D flood inundation model◦ Flood hazard maps for greater Nadi area◦ Flood mitigation (cost benefit analysis)

Standard operating procedure for flood monitoring and warning

Report summarising flood risk for Nadi National IFM policy document

These deliverables will also inform other activities in Nadi

Page 7: Susan Vocea SOPAC.  Background  Project Components  Deliverables  Challenges and Opportunities  Progress to Date.

LiDAR Survey Extent Area

Page 8: Susan Vocea SOPAC.  Background  Project Components  Deliverables  Challenges and Opportunities  Progress to Date.

Challenges and Opportunities 1

Delay in flight of LiDAR survey due to floods in February and April

Page 9: Susan Vocea SOPAC.  Background  Project Components  Deliverables  Challenges and Opportunities  Progress to Date.

Challenges and Opportunities 2

Need for verification Volume of data Large datasets Nadi is high on the Fiji Government and

donors’ agendas. Understanding and working within the

donor procurement processes

Page 10: Susan Vocea SOPAC.  Background  Project Components  Deliverables  Challenges and Opportunities  Progress to Date.

LiDAR Survey completed and data being verified

Project Updates 1

Page 11: Susan Vocea SOPAC.  Background  Project Components  Deliverables  Challenges and Opportunities  Progress to Date.

LiDAR Image of Denarau

Page 12: Susan Vocea SOPAC.  Background  Project Components  Deliverables  Challenges and Opportunities  Progress to Date.

Preliminary topographic data derived from LiDAR of the lower Nadi catchment

Nadi AirportDenarau

Page 13: Susan Vocea SOPAC.  Background  Project Components  Deliverables  Challenges and Opportunities  Progress to Date.

Flood Modelling; Consultants shortlisted

and RFP to be sent out shortly

Stakeholder Consultations

Project Updates 2

Page 14: Susan Vocea SOPAC.  Background  Project Components  Deliverables  Challenges and Opportunities  Progress to Date.

Questions