Audit company: SGS Turkey Report reference: IS16K0-0836 Date: 29.11.2016
1
Supplier name: VIZON TEKSTIL ITH. IHR. VE MUMESILLIK LTD. STI.
Site country: TURKEY / TURKIYE
Site name: VIZON TEKSTIL ITH. IHR. VE MUMESILLIK LTD. STI.
Parent Company name (of the site): YOKTUR/NONE
SMETA Audit Type: 2-Pillar 4-Pillar
Date of Audit 29.11.2016
Audit company: SGS Turkey Report reference: IS16K0-0836 Date: 29.11.2016
2
Audit Company Name: SGS TURKEY
Report Owner (payee):
VIZON TEKSTIL ITH. IHR. VE MUMESILLIK LTD. STI.
Sedex Company Reference: (only available on Sedex System)
S: Firma Sedex sistemine henüz üye değildir. / Facility has not been registered to Sedex system yet.
Sedex Site Reference: (only available on Sedex System)
P: Firma Sedex sistemine henüz üye değildir. / Facility has not been registered to Sedex system yet.
Audit Conducted By
Commercial Purchaser
NGO Retailer
Trade Union Brand Owner
Multi-stakeholder Combined Audit (select all that apply)
Auditor Reference Number: (If applicable)
N/A _ Auditor has no such reference number / Denetçiye ait bir referans numarası bulunmamaktadır.
Audit company: SGS Turkey Report reference: IS16K0-0836 Date: 29.11.2016
3
Audit Details
Audit Details
A: Report #: IS16K0-0836
B: Time in and time out (SMETA BPG recommends 9.00-17.00 hrs. if any different please state why in the SMETA declaration )
Day 1 Time in: 09:00 Day 1 Time out:10:00
Day 2 Time in: NA Day 2 Time out: NA
Day 3 Time in: NA Day 3 Time out:NA
C: Number of Auditor Days Used: (number of auditor x number of days)
1
D: Audit type:
Full Initial Periodic Full Follow-up Partial Follow-Up Partial Other – Define: desktop review
E: Was the audit announced?
Announced Semi – announced: Window detail: Unannounced
F: Was the Sedex SAQ available for review?
Yes No
If No, why not? (Examples would be, site has not completed
SAQ, site has not been asked to complete the SAQ.)
Firma Sedex sistemine henüz üye değildir. / Facility has not been registered to Sedex system yet.
G; Any conflicting information SAQ/Pre-Audit Info to Audit findings?
Yes No
NA If Yes, please capture detail in appropriate audit by clause
H: Auditor name(s) and role(s): ARI KOLANCIYAN– AUDITOR / DENETCI
I: Report written by: ARI KOLANCIYAN
J: Report reviewed by: SEDA BAYER
K: Report issue date: 29.11.2016
L: Supplier name: VIZON TEKSTIL ITH. IHR. VE MUMESILLIK LTD. STI.
M: Site name: VIZON TEKSTIL ITH. IHR. VE MUMESILLIK LTD. STI.
N: Site country: TURKEY / TURKIYE
O: Site contact and job title: ONUR GULER – MUHASEBE SORUMLUSU / ACCOUNTANT
P: Site address: HURRIYET MAH. TAS OCAGI CAD. NO.14 KAT 2-3 KAGITHANE-
Audit company: SGS Turkey Report reference: IS16K0-0836 Date: 29.11.2016
4
(Please include full address) ISTANBUL
Site phone: 0090 212 321 27 80
Site fax: 0090 212 294 65 38
Site e-mail: [email protected]
Q: Applicable business and other legally required licence numbers: for example, business license no, and liability insurance
İşyeri açma ve çalıştırma ruhsatı numarası ve tarihi / Workplace opening and operating permit number and date : 2015/G/7266-21, 12.02.2015
R: Products/Activities at site, for example, garment manufacture, electricals, toys, grower
BAY VE BAYAN DOKUMA DIS GIYIM / WOVEN OUTWEAR GARMENTS FOR BOTH GENDERS
S: Audit results reviewed with site management?
EVET /YES
T: Who signed and agreed CAPR (Name and job title)
ONUR GULER – MUHASEBE SORUMLUSU / ACCOUNTANT
U: Did the person who signed the CAPR have authority to implement changes?
EVET / YES
V: Present at closing meeting (Please state name and position, including any workers/union reps/worker reps):
ONUR GULER – MUHASEBE SORUMLUSU / ACCOUNTANT
W: What form of worker representation / union is there on site?
Union (name) Worker Committee Other (specify) (Open door policy, suggestion boxes / Açık kapı
politikası, şikayet kutuları) None
X: Are any workers covered by Collective Bargaining Agreement (CBA)
Yes No
Y: Previous audit date: NA /UYGULANABILIR DEGIL
Z: Previous audit type:
SMETA 2-pillar SMETA 4-pillar Other
Full Initial
Periodic
Full Follow-Up Audit
Partial Follow-Up
Audit company: SGS Turkey Report reference: IS16K0-0836 Date: 29.11.2016
5
Partial Other*
*If other, please define: NA
Guidance:
The Corrective Action Plan Report summarises the site audit findings and a corrective, and preventative action plan that both the auditor and the site manager believe is reasonable to ensure conformity with the ETI Base Code, Local Laws and additional audited requirements. After the initial audit, the form is used to re-record actions taken and to categorise the status of the non-compliances. N.B. observations and good practice examples should be pointed out at the closing meeting as well as discussing non-compliances and corrective actions. To ensure that good practice examples are highlighted to the supplier and to give a more ‘balanced’ audit a section to record these has been provided on the CAPR document (see following pages) which will remain with the supplier. They will be further confirmed on receipt of the audit report.
Root cause (see column 4)
Note: it is not mandatory to complete this column at this time.
Root cause refers to the specific procedure or lack of procedure which caused the issue to arise. Before a corrective action can sustainably rectify the situation it is important to find out the real cause of the non-compliance and whether a system change is necessary to ensure the issue will not arise again in the future.
See SMETA BPG Chapter 7 ‘Audit Execution’ for more explanation of “root cause’’.
Next Steps:
1. The site shall request, via Sedex, that the audit body upload the audit report, non-compliances, observations and good examples. If you have not already received instructions on how to do this then
please visit the web site www.sedexglobal.com.
2. Sites shall action its non-compliances and document its progress via Sedex.
3. Once the site has effectively progressed through its actions then it shall request via Sedex that the audit
body verify its actions. Please visit www.sedexglobal.com web site for information on how to do this.
4. The audit body shall verify corrective actions taken by the site by either a "Desk-Top” review process via Sedex or by Follow-up Audit (see point 5).
5. Some non-compliances that cannot be closed off by “Desk-Top” review may need to be closed off via a “1 Day Follow Up Audit” charged at normal fee rates. If this is the case then the site will be notified after its submission of documentary evidence relating to that non-compliance. Any follow-up audit must take place within twelve months of the initial audit and the information from the initial audit must be available for sign off of corrective action.
6. For changes to wages and hours to be correctly verified it will normally require a follow up site visit. Auditors will generally require to see a minimum of two months wages and hours records, showing new rates in order to confirm changes (note some clients may ask for a longer period, if in doubt please check with the client).
Audit company: SGS Turkey Report reference: IS16K0-0836 Date: 29.11.2016
6
Corrective Action Plan
Corrective Action Plan – non-compliances
Non-Compliance
Number The reference number of the
non-compliance
from the Audit Report,
for example, Discrimination
No.7
New or Carried Over
Is this a new non-compliance identified at the follow-up or one carried over (C)
that is still outstanding
Details of Non-Compliance
Details of Non-Compliance
Root cause (completed by the
site)
Preventative and Corrective Actions Details of actions to be
taken to clear non-compliance, and the system
change to prevent re- occurrence (agreed
between site and auditor)
Timescale (Immediate,
30, 60, 90,180,365)
Verification Method Desktop / Follow-Up
[D/F]
Agreed by Management and Name of Responsible
Person: Note if management
agree to the non-compliance, and
document name of responsible person
Verification Evidence and Comments
Details on corrective action evidence
Status Open/Closed or comment
Sağlık ve Güvenlik No.3 (1) / Safety and Hygienic Conditions Nb.3 (1) LL
Yeni / New Firmada bulunan 2 asansörden 1’ inin ve kompresörün fenni muayeneleri 03.10.2016 ve 30.04.2016 tarihlerinde yapılmıştır ancak fenni muayene raporlarında ekipman güvenliğine yönelik uygunsuzluklar not edilmiştir ve ayrıca 1 asansörün ve buhar kazanına ait fenni muayene raporu bulunmamaktadır. It was noted that periodical inspections of the 1 out of 2 lifts and compressor were done on 03.10.2016 and 30.04.2016 however some non-compliances were noted in report regarding equipment safety and also there was no periodical
- Lütfen ilgili ekipmanların uygunluğunu kanıtlayacak fenni muayene raporu temin ediniz. It is recommended that related inspection report should be available to prove that the equipments are safe.
60 gün / 60 days
Dokuman Inceleme / Desktop
Evet / Yes ONUR GULER
- -
Audit company: SGS Turkey Report reference: IS16K0-0836 Date: 29.11.2016
7
inspection reports of lift and steam generator.
Sağlık ve Güvenlik No.3 (2) / Safety and Hygienic Conditions Nb.3 (2) LL
Yeni / New Firmada elektrik topraklama ölçüm raporu bulunmamaktadir. It was noted that the electricity grounding test report was not available on the date of audit.
- Topraklama ölçümü yılda bir kez yapılmalı ve kayıtları tutulmalıdır. The electricity grounding test should be done once a year and records should be kept.
30 gün / 30 days
Dokuman Inceleme / Desktop
Evet / Yes ONUR GULER
- -
Sağlık ve Güvenlik No.3 (3) / Safety and Hygienic Conditions Nb.3 (3) LL
Yeni / New Firmada üretim bölümlerinin bulunduğu 3. Katta bulunan acil çıkış kapısı üretim ekipmanlarıyla kısmen blokedir. It was noted that emergency exit doors in 3
rd
floor which production area were located was partially blocked with production equipments.
- Lütfen acil çıkış kapılarını ulaşılabilir olmasını sağlayınız. It was noted that emergency exit doors should be accessible.
30 gün / 30 days
Dokuman Inceleme / Desktop
Evet / Yes ONUR GULER
29.11.2016: Ilgili ekipmanlar taşınmıştır ve firma yönetiminin gönderdiği fotograflara istinaden ilgili uygunsuzluk kapatılmıştır. Related equipments were moved and according to the photos which were sent by company management, related noncompliance was closed
KAPANDI CLOSED 29.11.2016
Sağlık ve Güvenlik No.3 (4) / Safety and Hygienic Conditions Nb.3 (4) LL
Yeni / New Firmada düğme makinesinde göz koruyucu ekipman bulunmamaktadır. It was noted that there was no eye guard on button placement machine.
- Lütfen iligili koruyucu ekipmanı sağlayınız. It is recommended that related protective equipments should be provided.
30 gün / 30 days
Dokuman Inceleme / Desktop
Evet / Yes ONUR GULER
29.11.2016: Ilgili koruyucu ekipmanlar sağlanmıştır ve firma yönetiminin gönderdiği fotograflara istinaden ilgili uygunsuzluk kapatılmıştır. Related protective equipments were provided and according to the photos which were sent by company management, related noncompliance was
KAPANDI CLOSED 29.11.2016
Audit company: SGS Turkey Report reference: IS16K0-0836 Date: 29.11.2016
8
closed
Corrective Action Plan – Observations
Observation Number
The reference number of the
observation from the Audit
Report, for example,
Discrimination No.7
New or Carried Over
Is this a new observation
identified at the follow-up or one carried over (C)
that is still outstanding
Details of Observation Details of Observation
Root cause (completed by the site)
Any improvement actions discussed
(Not uploaded on to SEDEX)
YOKTUR / NONE
YOKTUR / NONE
YOKTUR / NONE YOKTUR / NONE YOKTUR / NONE
Good examples
Good example Number
The reference number of the non-compliance from the
Audit Report, for example,
Discrimination No.7
Details of good example noted
Any relevant Evidence and Comments
Odemeler ve Haklar No.5 (1) / Wages and
Yemek işçilere ücretsiz olarak sağlanmaktadır. Meal is provided free of charge to employees.
Yönetim ve çalışan görüşmeleri, ödeme kayıtları / Management and worker interviews, payment records
Audit company: SGS Turkey Report reference: IS16K0-0836 Date: 29.11.2016
9
Benefits Nb.5 (1)
Odemeler ve Haklar No.5 (2) / Wages and Benefits Nb.5 (2)
İşletmede personellere ücretsiz servis sağlanmaktadır. It was noted that transportation is provided to workers free of charge.
Yönetim ve çalışan görüşmeleri, ödeme kayıtları / Management and worker interviews, payment records
Audit company: SGS Turkey Report reference: IS16K0-0836 Date: 29.11.2016
10
Confirmation
Please sign this document confirming that the above findings have been discussed with and understood by you: (site management) If actual signatures are not possible in electronic versions, please state the name of the signatory in applicable boxes, as indicating the signature.
A: Site Representative Signature:
ONUR GULER Title : MUHASEBE SORUMLUSU /ACCOUNTANT Date : 14.11.2016
B: Auditor Signature: ARI KOLANCIYAN
Title : DENETCI / AUDITOR Date : 14.11.2016
C: Please indicate below if you, the site management, dispute any of the findings. No need to complete D-E, if no disputes.
D: I dispute the following numbered non-compliances: YOKTUR/ NONE
E: Signed: (If any entry in box D, please complete a signature on this line)
ONUR GULER Title : MUHASEBE SORUMLUSU /ACCOUNTANT Date : 14.11.2016
F: Any other site Comments: YOKTUR/ NONE
Audit company: SGS Turkey Report reference: IS16K0-0836 Date: 29.11.2016
11
Guidance on Root Cause
Explanation of the Root Cause Column If a non-compliance is to be rectified by a corrective action which will also prevent the non-compliance re-occurring, it is necessary to consider whether a system change is required. Understanding the root cause of the non-compliance is essential if a site is to prevent the issue re-occurring. The root cause refers to the specific activity/ procedure or lack of activity /procedure which caused the non-compliance to arise. Before a corrective action can rectify the situation it is important to find out the real cause of the non-compliance and whether a system change is necessary to ensure the issue will not arise again in the future. Since this is a new addition, it is not a mandatory requirement to complete this column at this time. We hope to encourage auditors and sites to think about Root Causes and where they are able to agree, this column may be used to describe their discussion. Some examples of finding a “root cause“ Example 1 Where excessive hours have been noted the real reason for these needs to be understood, whether due to production planning, bottle necks in the operation, insufficient training of operators, delays in receiving trims, etc. Example 2 A non-compliance may be found where workers are not using PPE that has been provided to them. This could be the result of insufficient training for workers to understand the need for its use; a lack of follow-up by supervisors aligned to a proper set of factory rules or the fact that workers feel their productivity (and thus potential earnings) is affected by use of items such as metal gloves. Example 3 A site uses fines to control unacceptable behaviour of workers. International standards (and often local laws) may require that workers should not be fined for disciplinary reasons. It may be difficult to stop fines immediately as the site rules may have been in place for some time, but to prevent the non-compliance re- occurring it will be necessary to make a system change. The symptom is fines, but the root cause is a management system which may break the law. To prevent the problem re-occurring it will be necessary to make a system change for example the site could consider a system which rewards for good behaviour Only by understanding the underlying cause can effective corrective actions be taken to ensure continuous compliance. The site is encouraged to complete this section so as to indicate their understanding of the issues raised and the
actions to be taken.
Audit company: SGS Turkey Report reference: IS16K0-0836 Date: 29.11.2016
12
Your feedback on your experience of the SMETA audit you have observed is extremely valuable. It will help to make improvements to future versions.
You can leave feedback by following the appropriate link to our questionnaire:
Click here for A & AB members:
http://www.surveymonkey.com/s.aspx?sm=riPsbE0PQ52ehCo3lnq5Iw_3d_3d
Click here for B members: http://www.surveymonkey.com/s.aspx?sm=d3vYsCe48fre69DRgIY_2brg_3d_3d