Summary ProjectDescriptions
Project Description Project length, km Projectcapex,$k
Concessionperiod
Nairobi-Mombasa
O&M concession of followingstretches of highway:1 !""# !""
$i%ening of following stretches ofhighway un%er D'OM concession:( !"") !""
*olling
Nairobi-Na+uru
$i%ening of entire length ofhighway un%er D'OM concession,inclu%ing eleate% sections atNa+uru un%er D'OM concessionPossible inclusion of .itaru-/ironisectionPossible inclusion of (022 an%improements
*olling
13)4 5m 6wi%ening of /ironi-MauSummit inclu%ing eleate% sections7893# +m 6Strengthening, O&M of
(0227 8 1#) +m 6O&M of .itaru-/ironi7
3;,;;;
#4years
Nairobi- *hi+a
O&M concession of e"isting as builthighwayMo%est cape" a%%itions
*ollingSouthern O&M concession of e"isting as built
-
8/16/2019 Summary Project Descriptions
2/4
-
8/16/2019 Summary Project Descriptions
3/4
/esettlement
Project #stimated peoplea&ected
#stimatedstructures a&ected
#stimatedcost ofresettlement,hsm
Current status of resettlementplanning
Nairobi-Mombasa
Nairobi-Na+uru P>P sureyun%erprogress
)9) 11#9 />P un%er progress
Nairobi-*hi+a
Southern ypass
Nyali ri%ge
-
8/16/2019 Summary Project Descriptions