26.02.2008 R. Alemany LHCCWG
Summary of sector 45 operational tests Summary of sector 45 operational tests
QPS
PICEE
PCPM
On behalf of all the people Involved in the HWC
CYOVAC
SEQ
26.02.2008 R. Alemany LHCCWG
Cryo PerformanceCryo PerformancePIC
PC
QPS
EE
PM
VACCRY
SEQ
NOV07 DEC07 JAN08 FEB08
40
60
20
80
100
120
26.02.2008 R. Alemany LHCCWG
Powering Test SummaryPowering Test Summary
PCS: Splice Check (200 A)PLI3: Circuit Protection at I_INT
PCC: Power Converter ConfigurationPIC2: Interlocks TestPNO: Powering to Nominal
PIC
PC
QPS
EE
PM
VACCRY
SEQ
26.02.2008 R. Alemany LHCCWG
Powering Test SummaryPowering Test Summary
(*) Short circuit detected at warm - circuit condemned (to be repaired during warm-up).
MR4 I_PT (I_NOM) LL5 I_PT (I_NOM)
RQ6 3610 A (3610 A) 3610 A (4310 A)
RQ5 3610 A (3610 A) 3610 A (4310 A)
RQ4 X 3610 A (3610 A)
RD4 5520 A (5520 A) X
RD3 5520 A (5520 A) X
RD2 X 4400 A (4400 A)
RU 450 A (450 A) X
PIC
PC
QPS
EE
PM
VACCRY
SEQ
26.02.2008
Powering Test SummaryPowering Test SummaryPIC
PC
QPS
EE
PM
VACCRY
SEQ
26.02.2008
Powering Test SummaryPowering Test Summary
24.02.08 25.02.08 24.02.08 13H
24.02.08 14H
PIC
PC
QPS
EE
PM
VACCRY
SEQ
26.02.2008 R. Alemany LHCCWG
Powering Test SummaryPowering Test Summary
PGC Matching Section (13-14.02.08): PGC Matching Section (13-14.02.08):
IPQ
120 A
MR4 LL5
RQ4
RQ5 RQ5
RQ6 RQ6
RD4 RD2
PIC
PC
QPS
EE
PM
VACCRY
SEQ
26.02.2008 R. Alemany LHCCWG
Powering Test SummaryPowering Test Summary
LL5
PIC
PC
QPS
EE
PM
VACCRY
SEQ
26.02.2008 R. Alemany LHCCWG
Powering Test SummaryPowering Test Summary
PGC Arc (+ MR4&LL5) (19.02.08): PGC Arc (+ MR4&LL5) (19.02.08):
Test Plan:1. 2 kA FPA2. 4 kA FPA3. Heat Run
@ 9kA + squeeze
PIC
PC
QPS
EE
PM
VACCRY
SEQ
26.02.2008 R. Alemany LHCCWG
Powering Test SummaryPowering Test Summary
RB VS_FAULT
PIC
PC
QPS
EE
PM
VACCRY
SEQ
Heat Run with RB, QD, QF @9kA (19.02.08)
26.02.2008 R. Alemany LHCCWG
Powering Test SummaryPowering Test SummaryPIC
PC
QPS
EE
PM
VACCRY
SEQ
MR4 & LL5 Squeeze (19.02.08)
26.02.2008 R. Alemany LHCCWG
Powering Test SummaryPowering Test SummaryPIC
PC
QPS
EE
PM
VACCRY
SEQ
PGC Summary: RB settings generated from calibration
curves obtained from FIDEL model. The rest of the magnets: linear calibration
from layout database. Ramp to 5.3 TeV. Optics used: V6.500. PGC of sector 45 done with LSA and timing
system for synchronized ramps. Tests driven by:
LHC Sequencer: PGC of the Matching Sections (see slide 7).
Equip State: PGC of the Arc (see slide 9).
PGC Summary: RB settings generated from calibration
curves obtained from FIDEL model. The rest of the magnets: linear calibration
from layout database. Ramp to 5.3 TeV. Optics used: V6.500. PGC of sector 45 done with LSA and timing
system for synchronized ramps. Tests driven by:
LHC Sequencer: PGC of the Matching Sections (see slide 7).
Equip State: PGC of the Arc (see slide 9).
26.02.2008 R. Alemany LHCCWG
Powering Test SummaryPowering Test SummaryPIC
PC
QPS
EE
PM
VACCRY
SEQ
Special thanks to:HWC Teams.LHC OP Team. LSA Team.Database Management Team.Sequencer Team.
Please, forgive me if I forget somebody
Special thanks to:HWC Teams.LHC OP Team. LSA Team.Database Management Team.Sequencer Team.