Submittal Exchange: Transportation and Civil Construction

1
Submittal Exchange for Horizontal Construction ©2016 Textura Corporation ® Textura ® www.submittalexchange.com Horizontal Construction: Horizontal Construction refers to infrastructure (or structures) at or near ground level. Examples include roads, sidewalks, sewers, water mains, and pipelines. How Submittal Exchange Can Help: Setup – SE will create a list of expected submittals for the duration of the project based off of the project's spec manual, completely editable for additions and subtractions that may come up throughout the project. Even with few submittals, SE can streamline the document management process with documents that need no formal review like meeting minutes, test reports and budgets. Process Flow – Submittal Exchange’s flow is highly configurable to meet the needs of the project team even with a non-standard review process. Each project is assigned a dedicated Client Relationship Consultant (CRC) to answer any questions and make changes to the project. Every CRC has the capability and expertise to handle the setup and support of horizontal construction projects. Support – Unlimited training and support is included for all projects. Submittal Exchange’s Experience: Submittal Exchange has worked extensively with clients on horizontal projects nationwide. Several of these clients use SE exclusively or have us written into the specs on every project. Government Contract Vehicles (800) 714-0024 [email protected] DUNS: 19-591-6403 CAGE CODE: 6WXU1 SIN: 132-52 NAICS: 518210 GSA Contract #: GS-35F-507BA

Transcript of Submittal Exchange: Transportation and Civil Construction

Page 1: Submittal Exchange: Transportation and Civil Construction

Submittal Exchange for Horizontal Construction

©2016 Textura Corporation

®

Tex t u ra®

www.submittalexchange.com

Horizontal Construction:

Horizontal Construction refers to infrastructure (or structures) at or near ground level. Examples include roads, sidewalks, sewers, water mains, and pipelines.

How Submittal Exchange Can Help:

Setup – SE will create a list of expected submittals for the duration of the project based o� of the project's spec manual, completely editable for additions and subtractions that may come up throughout the project. Even with few submittals, SE can streamline the document management process with documents that need no formal review like meeting minutes, test reports and budgets.

Process Flow – Submittal Exchange’s �ow is highly con�gurable to meet the needs of the project team even with a non-standard review process. Each project is assigned a dedicated Client Relationship Consultant (CRC) to answer any questions and make changes to the project. Every CRC has the capability and expertise to handle the setup and support of horizontal construction projects.

Support – Unlimited training and support is included for all projects.

Submittal Exchange’s Experience:Submittal Exchange has worked extensively with clients on horizontal projects nationwide. Several of these clients use SE exclusively or have us written into the specs on every project.