STRUCTURAL CALCULATION
ESSEN WELDING SHOW
-
8/13/2019 Structural Calculation.venus Wires
2/14
STAND: VENUS WIRES
-
8/13/2019 Structural Calculation.venus Wires
3/14
-
8/13/2019 Structural Calculation.venus Wires
4/14
VENUS WIRES Stand, Messe Essen
1. INTRODUCTION
The stands has to be designed for Fair Trade in Essen, Germany.Area is 9 x 4,6m, height is 2.8m 5m.Walls are made by plywood sheets and glass, strengten with maxima aluminum and timber profiles.
1.1 ARCHITECTURAL INPUTS
-
8/13/2019 Structural Calculation.venus Wires
5/14
VENUS WIRES Stand, Messe Essen
-
8/13/2019 Structural Calculation.venus Wires
6/14
VENUS WIRES Stand, Messe Essen
1.2 LOAD ANALYSIS
Stand construction safety1
Stands, including all equipment and exhibits and advertising matter are to be constructed with suchstability as to pose no danger to public safety and order, and in particular to life and health. Theexhibitor is responsible for structural safety and must provide proof of this.
Free-standing structural elements and special structures (e.g. free-standing walls, high exhibits, highdecorative elements) which can fall over must be rated at least for a horizontally acting equivalentdistributed load qh:
qh1 = 0.125 kN/m2 up to 4.00 m high from the upper edge of the floor
qh = 0.063 kN/m2 for all surfaces above 4.00 m high.
The respective elevation area is the reference area. The relevant verifications to be prepared are to besubmitted to MESSE ESSEN GmbH in a form that can be examined.
Approval of stand construction
On the assumption that the technical regulations have been observed in the design and construction ofthe stand, there is no requirement for submission of drawings for approval in respect of single-storeystand structures up to 2.50 m in the halls.
1.2.1 DEAD LOAD
MATERIALS
Assumptions/Conversions Loading
Pl d
Sheets: BxL=2500 x 1000 mm,
Thi k 9 5 L1 0 0474 KN/
2
-
8/13/2019 Structural Calculation.venus Wires
7/14
VENUS WIRES Stand, Messe Essen
1.3 STRUCTURAL MODEL
-
8/13/2019 Structural Calculation.venus Wires
8/14
VENUS WIRES Stand, Messe Essen
Dead load
-
8/13/2019 Structural Calculation.venus Wires
9/14
VENUS WIRES Stand, Messe Essen
Wind load
1.4 STRUCTURAL DESIGN
-
8/13/2019 Structural Calculation.venus Wires
10/14
VENUS WIRES Stand, Messe Essen
Panel stress
-
8/13/2019 Structural Calculation.venus Wires
11/14
VENUS WIRES Stand, Messe Essen
2. DRAWINGS
No DRAWING NAME SCALE
1 STAND D110 Drawing 1 1:50
2 STAND D110 - Drawing 2 1:50
3 STAND D110 - Drawing 3 NTS
-
8/13/2019 Structural Calculation.venus Wires
12/14
1 : 50
-
8/13/2019 Structural Calculation.venus Wires
13/14
Section A - ASection B - B
Section C - C
1 : 100
1 : 50
-
8/13/2019 Structural Calculation.venus Wires
14/14
1 : 100
PLYWOOD QUANTITY
WALL W1 (timber columns)
2500 x 1000 ........... 18 pcs
2500 x 500 .............. 4 pcs
WALL W2 (maxima profiles)
2600 x 1450 ........... 2 pcs
2600 x 1200 ........... 2 pcs
TIMBER QUANTITY
WALL W1
COLUMNS L=5m.... 20 pcsBEAM L=4.5m..........18 pcs
WALL W3 (maxima profiles)
2500 x 1250 ........... 2 pcs
BEAM L=0.5m..........30 pcs
FLOOR
BEAM L=2.5m..........7 pcs
BEAM L=1.7m..........3 pcs
MAXIMA QUANTITY
OFFICE
COLUMNS L=2.6m....10 pcsBEAM L=4.1m............3 pcs
BEAM L=2.5m............3 pcs