Strictly Confidential All Rights ... · rectifier tube power indicator neon lamp rectifier inside...

12

Transcript of Strictly Confidential All Rights ... · rectifier tube power indicator neon lamp rectifier inside...

Page 1: Strictly Confidential All Rights ... · rectifier tube power indicator neon lamp rectifier inside meter *) See revisions. Revision 1) With instruments having a serial number with
Frank
Strictly Confidential All Rights Reserved
Frank
Purpose
Frank
Capacitance Measurement
Frank
Resistance Measurement
Frank
List of Figures
Frank
FP-2018-05-21
f p
Circuit Description
Page 2: Strictly Confidential All Rights ... · rectifier tube power indicator neon lamp rectifier inside meter *) See revisions. Revision 1) With instruments having a serial number with
Frank
Current and Voltage Measurement
Frank
Tube Tester Part
Frank
Short Circuit Testing
Frank
Isolation Testing
Frank
Replacement of Parts
Frank
Assembling
Frank
Voltages and Resistances of Transformer Windings
Page 3: Strictly Confidential All Rights ... · rectifier tube power indicator neon lamp rectifier inside meter *) See revisions. Revision 1) With instruments having a serial number with
Frank
Electrical Parts
Frank
Power Transformer Heater Transformer Measurement transformer
Frank
inside meter
Frank
rectifier tube power indicator neon lamp rectifier inside meter
Frank
*) See revisions
Frank
Revision 1) With instruments having a serial number with C suffix, a capacitor has been added C3 = 2350 pF consisting of two capacitirs with code number 48 752 10/4K7. This change was made to compensate for paracitic wire capacitance. This modification can be added to earlier instruments if desired.
Frank
Revision 2) To prevent overloading R4 when measuring indirectly heated tubes with shorted heater, the circuit of the contact bridge has been modified in instruments with C-suffix. The revision is done in the following way: a) Remove the connection between points A and B. Instead connect B and C. b) Remove the connection between pins 20 and D and connect points 20 and E. Fig. 24-1 shows the moving part of the contact bridge. Fig. 24-2 shows the fixed part of the contact bridge. Fig. 23 shows the modified situation.
Page 4: Strictly Confidential All Rights ... · rectifier tube power indicator neon lamp rectifier inside meter *) See revisions. Revision 1) With instruments having a serial number with
Frank
Mechanical Parts
Frank
Revisions
Frank
Revision 3) In older instruments, resistors R14, R15 and R24 (of the resistor units) and R41, R42 and R43 have to be replaced by special carbon resistors. Replacing R14, R15 and R24 is done by removing the resistive wire from the resistor units and mounting the new resistors on the existing contacts. (See fig. 25). R41, R42 and R43 can just be replaced.
Page 5: Strictly Confidential All Rights ... · rectifier tube power indicator neon lamp rectifier inside meter *) See revisions. Revision 1) With instruments having a serial number with
Frank
Simplified circuits for Capacitance measurements
Frank
Simplified circuits for Resistance measurements
Frank
DC Voltage measurement
Frank
DC Current measurement
Frank
AC Voltage measurement
Frank
AC Current measurement
Page 6: Strictly Confidential All Rights ... · rectifier tube power indicator neon lamp rectifier inside meter *) See revisions. Revision 1) With instruments having a serial number with
Frank
Capacitance measurement, with all contacts included.
Frank
Current and Voltage measurement, with all contacts included.
Frank
Tube testing, Cold
Frank
Reststance measurement, with all contacts included.
Page 7: Strictly Confidential All Rights ... · rectifier tube power indicator neon lamp rectifier inside meter *) See revisions. Revision 1) With instruments having a serial number with
Frank
Meter and Supply circuit
Frank
Measuring the ECH21 Heptode section
Frank
Measuring the ECH21 Triode section
Frank
Tube testing, Hot
Page 8: Strictly Confidential All Rights ... · rectifier tube power indicator neon lamp rectifier inside meter *) See revisions. Revision 1) With instruments having a serial number with
Frank
Modification of contact bridge circuit
Frank
Detail of Switch construction
Page 9: Strictly Confidential All Rights ... · rectifier tube power indicator neon lamp rectifier inside meter *) See revisions. Revision 1) With instruments having a serial number with
f p
Complete Circuit
Page 10: Strictly Confidential All Rights ... · rectifier tube power indicator neon lamp rectifier inside meter *) See revisions. Revision 1) With instruments having a serial number with
Frank
Positions of Electrical parts with Connection points
Page 11: Strictly Confidential All Rights ... · rectifier tube power indicator neon lamp rectifier inside meter *) See revisions. Revision 1) With instruments having a serial number with
Frank
Positions of Mechanical parts
Page 12: Strictly Confidential All Rights ... · rectifier tube power indicator neon lamp rectifier inside meter *) See revisions. Revision 1) With instruments having a serial number with

Instrument from: Type GM7630 Serial 654C

1

2 3

4

4x OA70

910Ω 123.6Ω 1000Ω

16.8Ω

109.6Ω 400µA

-

+ ~

~

Terminals seen from front side.